Loading...
2010, 06-21 Permit App: 10001822 Deck Roof Project Number: 10001822 Inv: 1 Application Date: 6/21/2010 Page 1 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Project Information: Permit Use: BUILD COVERED ROOF OVER EXISTING DECK Contact: SABORI CONSTRUCTION LLC Address: PO BOX 1477 C-S-Z: DEER PARK WA 99006 Setbacks:Front Left: Right: Rear: Phone: (509)276-7227 Group Name: Site Information: Project Name: Plat Key: 003395 Name: HENDRICKSON ADD District: East Parcel Number: 46353.1703 Block: Lot: SiteAddress: 5008 N REES RD Owner:Name: TALLEY,J H Address: 5008 N REES RD Location::CSV SPOKANE VALLEY,WA 99216-304 Zoning: R-3 SF Res District Water District: 001 TRENTWOOD Hold: ❑ Area: 10,880 Sq Ft Width: 0 Depth: 0 Right Of Way(ft): 0 Nbr of Bldgs: 0 Nbr of Dwellings: 1 Review Building Plan Review Released By: Originally Released: 6/21/2010 By: tmelbourn Landuse/Zoning/HE Conditions Released By: Originally Released: 6/21/2010 By: tschmidt Permits: ... . . z Operator: jmm Printed By: jmm Print Date: 6/21/2010 Project Number: 10001822 Inv: 1 Application Date: 6/21/2010 Page 2 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Building Permit Contractor: SABORI CONSTRUCTION LLC Firm: SABORI CONSTRUCTION LLC Address: PO BOX 1477 Phone: (509)499-7937 DEER PARK WA 99006 This Application: Total Project: Description Grp Type Notes Sa Ft Valuation Sa Ft Valuation COV DECK R-3 VB COVER 196 $2,940.00 196 $2,940.00 OVER DECK Totals: 196 $2,940.00 196 $2,940.00 Item Description Units Unit Desc Fee Amount RESIDENTIAL PERMIT FEE 1 SELECT $83.25 WSBCC SURCHARGE 1 SELECT $4.50 SF PLNS RVW<7999 SQ FT 1 SELECT $33.30 Permit Total Fees: $121.05 Notes: r m _.. Payment Summary: ..-_.._. .r _a_. �... ,.._. . A .- _.... Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing Building Permit $121.05 $121.05 $33.30 $87.75 $121.05 $121.05 $33.30 $87.75 Disclaimer: Submittal of this application certifies the owner(or person(s)authorized by the owner)has both examined and finds the information contained within to be true and correct,and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for,or an approval of,any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: jmm Printed By: jmm Print Date: 6/21/2010 (Staff Use Only) *dime _' PERMIT NUMBER: «�.leY PERMIT FEE: 'A„" l r.: .' CITY OF SPOKANE VALLEY it ,.. Community Development Department r "'E ,,kyr CENTERPermit Center i 11703 East Sprague Avenue, Suite B-3 JUN-,2 01 Spokane Valley, WA 99206 r Pr;i; _ ,k Tel: (509) 688-0036 ' Ane Fax: (509) 688-0037 s --__.___ b permitcenterOspokanevallev.org ISubm!ttai RESIDENTIAL CONSTRUCTION PERMIT APPL TION NEW CONSTRUCTION VADDITION/REMODEL 0 ACCESSORY BUILDING U DECK Q OTHER SITE ADDRESS: 5CC 3 N- /C E CS' SpoIca,ie Lint.fMet / WA- ASSESSORS PARCEL NO.: LEGAL DESCRIPTION: BUILDING OWNER NAME: NAME: -ret, (Ifrt?C ADDRESS: coo A/. /C;-GS CITY: 5/w ka 0.e. 6'/&.1 'P 1 / LA1i r STATE: 1/1/4/ .4 ZIP: PHONE: )0- 9 7 30 ,3 FAX: CELL: — CONTACT NAME: Jo 2 pv 040„.cj 7 (IevJ PHONE: 9 - 9 Z 5' 36)3C, FAX: 7 CELL: AV- CONTRACTOR NAME: 5A-t30i f feiv c r t-e c7—L(9 Al L.-GC MAILING ADDRESS: 2, F D A 14 11 /� CITY: 1)e c v Pak, L / `,J STATE: \ 4- ZIP: ,j 3 4/y �./to PHONE: G.)g - V(: _.72-2-1 FAX: CELL: ,ccs- 1,99- 73-3-7 CONTRACTOR LICENSE No.: SA atn p C L.9�i L EXPIRES: '�24/I 0 CITY BUSINESS LICENSE NO.: DESCRIBE THE SCOPE OF WORK IN DETAIL AND INDICATE USE: / su1id Ctwevec) recto-C 0vev' -e y(s4r�t y bee k - 117- t!� e e tC 6 rt✓.5f ex(Sf(fic/ S`-VVL,cc' kvP PROPOSED USE: � to CE Vr io 1 Q 0 C(TC/OCA it-- 5,Ota C- Effective October 28, 2007 Page 1 of 2 C:\Documents and Settings\HP_Owner\My Documents\Residentialbuildpermit.doc • ****YOU MUST COMPLETE THE FOLLOWING**** MARK N/A IF NO_ T APPLICABLE Height to Peak: Dimensions: No. of Stories: Total Habitable /5- 14 X 1 4 ( /0-1 Space: 0 Main Floor SQ Upper Floor SQ Unfinished Basement Finished Ba ement FT: N/.� FT: til ----, SQ;FT: Ai/ SQ FT: N/4 Garage SQ FT: Deck/ vered Patio Impervious Surface 30% Slopes ori/ /OM— SQ FT: L ! 9 4, rea: N144-- Property: N(A-- No. of Constru ' Heat Source: , Sewer or 52rBedrooms: , Type: 1,),,c, ;✓a.vite NA- Septic: Al/A' TOTAL COST OF PROJECT: $ A 13 SX) ( ' ©b oK- DISCLAIMER The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling,the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner In this transaction. 4) All construction Is to be done in full compliance with the City of Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of Spokane Valley permit is not a permit or approv for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted a subsequently approved before this application can be processed. Signature _ 5,--, Date: —?.O —to /Q zignl Method of payment: ❑ Cash ❑ Check p/iVisa ❑ Mastercard Bankcard #: EXP: VIN#: Authorized Signature: Effective October 28, 2007 Page 2 of 2 C:\Documents and Settings\HP_Owner\My Documents\Residentialbuildpermit.doc For City Use Only sarryoFmPLUS Project Number /0- J ea- peneProject Address SW FS YI �¢00 400000 alle y 11703 E Sprague Ave Suite B-3 • Spokane Valley WA 99206 509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. Your application review TARGET DATE is IJ/` 3/1 The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review ➢ Submit complete, accurate plans and documents. Extra time may be required for re-submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. ➢ Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. ➢ Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date,please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure,you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete: Your application has been accepted as counter complete. This means all of the required documents,as indicated on your Pre-Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application willbe routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone,fax,email,or mail by your TARGET DATE once the initial technical compliance review is complete. 4.Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re- submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre-construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE—APPLICANT PINK—BUILDING FILE REV 9/07 i\ , 5 y PLANNING DEPT. APPROVED • .5. BY: 4'�a, N <---------1---- 5' 1 DATE: 4/z'�, f 1 [ , , f 1 , r f - _. 1 3 ' ' • 5Do8 N• REC5"" 1 241 r I I ‘ ,;) la "i- ILI w oN AZ gcc5 0 i ICS_1Ct Ilia C > -' -- ____--_____- ---- ' %���cy I`PLOT 7L/n/