Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
2014, 11-03 Permit App: BLD-2014-2678 Roof Photovoltaics
Community Develapment Department (Staff Use Only) Permit Center 11703 East Sprague Avenue, Suite B-3 PERMIT NUMBER: SciTYOF Spokane Valley,WA 99206 poli1.111 Tel: (509) 688-0036 PERMIT FEE: Valley Fax: (509) 688-0037 permitcenter@sookanevallev.orq • RESIDENTIAL CONSTRUCTION PERMIT APPLICATION B NEW CONSTRUCTION E ADDITION/REMODEL d ACCESSORY BUILDING El DECK 111 OTHER 5i-P-) 0 �, �-, SITE ADDRESS: Project # 1'-t/- 4._ J y--- 0 ASSESSORS PARCEL NO.: LEGAL DESCRI•TION: RE C E I V F [) �7 BUILDING OWNER NAME: / NUV U 2014 .4411 1, NAME: & , , • • & #001 'S �.Se I ADDRESS: 5//G A' , / G- a, CSV PERMIT CENTER CITY: ifbK•4x,,g_ l/�'7 -fiv cy STATE: km SUB # ZIP: i . J PHONE: (J O S) g-^ ??76' FAX: CELL: CONTACT NAME: PHONE: S/1 A FAX: CELL: CONTRACTOR NAME: AV.#9, • MAILING ADDRESS: < CITY: STATE: ZIP: PHONE: FAX: CELL: CONTRACTOR LICENSE No.: EXPIRES: CITY BUSINESS LICENSE NO.:' • DESCRIBE THE SCOPE OF WORK IN DETAIL AND INDICATE USE & PROPOSED USE: ****YOU MUST COMPLETE THE FOLLOWING**** MARK N/A IF NOT APPLICABLE Height to Peak: Dimensions: No. of Stories: Total Habitable Space: Main Floor SQ FT: Upper Floor SQ FT: Unfinished Basement SQ Finished Basement SQ FT: FT: Garage SQ FT: Deck/Covered Patio SQ Impervious Surface 30%Slopes on FT: Area: Property: No. of Bedrooms: Constr ction Type: Heat Source: Sewer or Septic: TOTAL COST OF PROJECT: ijoa 70, 13 DISCLAIMER The permitted verifies,acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling,the dwelling is/will be served by potable water. 2)Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of Spokane Valley permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required o be submitted and subsequently approved before this application can be processed. Signatur /fd.,,. i'. Date: /Ji4 ( ? 2b 11 Updated 1-11-11 Page 1 of 1 http://www.spoka nevalley.org/filestorage/124/938/210/948/1496/Building_Permit_-_Residential_11-11-11.doc RESIDENTIAL CHECK LIST DIRECTIONS: Place a check mark in box next to each document required for complete submittal. ❑SITE PLAN o Property lines and dimensions o Setbacks to property lines o Direction arrow pointing North and orientation to streets o Distance between buildings o Proposed/existing buildings (footprint and dimensions) o Right of way/easement location &sizes o Utilities, septic tank/drain field locations and distances o Driveway approach size and location BUILDING PLANS(3 SETS) (minimum 1/8 inch scale or completely dimensioned) ❑ Elevations(Front/Rear/Sides)with roof peak and wall height including basement: O Foundation Plan (crawlspace, basement or slab on grade): o Footing sizes and locations o Supporting wood cripple walls or beams o Perimeter concrete foundation wall sizes o Thickened concrete pads supporting o Crawlspace ventilation beams or girder trusses ❑ Floor Plan of each level (finished or unfinished)with dimensions: o Floor Joist direction, size and spacing ❑Window and door location and sizes o Header, beam or concrete lintel sizes o Window well locations if applicable o Brace wall panel locations o Room usage labels o Water heater and furnace locations o Smoke detector locations o Exhaust fan locations o Attic and crawl space access locations o Deck or concrete patio sizes and locations o Fire Wall construction ❑ Roof Plan: o Engineered truss direction and spacing o Ridge, eave and valley lines o Rafter and over frame direction, size and spacing o Beam and girder size and location ❑ Wall Section Detail including: Roof o Slope/roofing material/underlayment/ice dam protection o Truss or rafter size, spacing&connection o Sheathing size and type ❑Attic insulation/air space baffle/ventilation Ceiling ❑ Joist size and spacing o Size of ceiling gypsum wall board Wall o Height/top plate/stud size and spacing/sole plate o Siding/exterior house wrap/anchor bolts o Exterior sheathing size and type o Insulation, vapor barrier, gypsum wall board Floor o Joist size and spacing o Sheathing or concrete floor size/insulation Foundation Wall o Concrete or Masonry unit width o Footing bottom to finished ground level depth o Earth to wood separation distance o Horizontal&vertical reinforcement if any Footing o Size ❑ Reinforcement if any Radon o Passive system with 6mil vapor barrier o Active system with 6 mil vapor barrier Miscellaneous Construction Details ❑ Deck: o Floor plan/side view/dimensions o Footings/post/and beam size and locations o Floor Joist/decking direction, size and spacing O Stairway tread rise & run and nosing 0 Handrail/Guard height&spacing I Z OVER-THE-COUNTER BUILDING PERMIT CHECKLIST FOR RESIDENTIAL SOLAR PHOTOVOLTAIC SYSTEMS: ROOFTOP MOUNTED Contractors can apply for an Over-The-Counter(OTC)permit where the PV sytern meets the r ir- ergs iste.' ��� in this Checklist.All project plans and supporting documentation must be pro idPd'o f for :�'f_-.efaV TO BE COMPLETED BY APPLICA T - RECEIVED Q Project Information NOV U3 2014 Property Owner Name: Igr2r4 koEFF L p r j toi �°3 YRM1T CENTER Project Address: 'f l b A). ��g /La Parce # City: Spe dY4 lig 14 State: 1,x//9 SUB # P: 9trysailki, Day Phone: ($ ' $$'. ! 17/(.0 Contractor Name ti Contractor License#: Contractor Day Phone: PV system description (include manufacturer I:+e K r=A/e'- � 3° p-3 4 /� e I $or 5)/344.,. and model#of PV kOof nve0v 4 • AP 5 )/C, 5 Q4 - /11 I L-) 1%4 I,4140,5 modules and /5 -- I-7 inverters): ©Determine if your project qualifies for expedited permitting: Yes No 1. PV system is designed and proposed for a detached one-or two-family dwelling or townhouse not more than three stories above grade or detached accessory structure that J, ❑ is code compliant to setbacks and height, or code allows expansion of nonconformity for solar modules. [IRC 101.2] 2. Modules on pitched roofs do not exceed the highest point of the roof unless approved by g ❑ the local jurisdiction. 3. Rooftop is made from lightweight material such as a single layer of composition shingles, / ❑ metal roofing, lightweight masonry, or cedar shingles. 4. The installation shall comply with the manufacturer's instructions. [IRC M2302.2] A ❑ 5. The installation shall meet the requirements of NFPA 70 National Electric Code, and all required electrical permit(s) must be obtained from the Authority Having Jurisdiction to ❑ administer the electrical code. [IRC M2302.2] 6. The installation shall meet the requirements of the International Fire Code as amended ❑ by WA State. [IRC M2302.2] 7. The PV system is designed for the wind speed of the local area,and will be installed per ,2/ ❑ the manufacturer's specifications. [IRC M2302.2.1(1)] J� 8. The ground snow load does not exceed 70 pounds per square foot. [IRC M2302.2.1(2)] ❑ 9. Total dead load of modules,supports, mountings, raceways and all other appurtenances weigh no more than four pounds per square foot. [IRC M2302.2.1(3)] ❑ Enter total dead load of system (lbs/ft2): 3 PS/44 10. To address uplift, modules are mounted no higher than 18" above the surface of the ;$c ❑ roofing to which they are affixed. [IRC M2302.2.1(4)] 1 11. Supports for solar modules are installed to spread the dead load across as many roof- framing members as needed to ensure that no point load exceeds fifty(50) pounds. X ❑ [IRC M2302.2.1(5)] 12. The photovoltaic modules and supporting structure shall be constructed of noncombustible materials or fire-retardant treated wood equivalent to that required for J ❑ the roof construction. [IRC M2302.2.1] 13. Roof and wall penetrations shall be flashed and sealed to prevent entry of water, k. ❑ rodents,and insects. [IRC M2302.2.2] 14. PV modules are listed and labeled with a fire classification in accordance with UL 1703. X ❑ [IRC M2302.2.3] Comments: Ily If you answered yes to all of the above questions,the project qualifies for the over-the- counter permitting process. 0 Submit this Checklist, Site Plan, and other required permit application forms to: [insert contact info for jurisdiction having authority] yAs the property owner or authorized representative of the above listed property, I attest that all information in this checklist is accurate to the best of my knowledge. Applicant Signature: �, Date:43r 26/ Applicant Name(Please Print): ,4146 ,p cps `e TO BE COMPLETED BY CITY STAFF Qualifies for OTC Building Permit? DYes 0N Permit Application#: Staff Initials Date: 2