2008, 05-05 Permit App: 08001646 Garage Addition Project Number: 08001646 Inv: 1 Application Date: 5/5/2008 Page 1 of 2
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Project Information:
Permit Use: 20 X 26 GAR ADD Contact: NORTON,GARY
Address: 5423 N REES CT
C-S-Z: SPOKANE,WA 99216
Setbacks:Front Left: Right: Rear: Phone: (509)928-4361
Group Name:
Site Information Project Name: uu
Plat Key: 004125 Name: SWAN ACRES 03RD ADD District: Nort
Parcel Number: 46353.2802 Block: Lot:
SiteAddress: 5423 N REES CT Owner:Name: NORTON,GARY
Address: 5423 N REES CT
Location::CSV SPOKANE VALLEY,WA 99216
Zoning: R-3 SF Res District
Water District: 001 TRENTWOOD Hold: ❑
Area: .00 Acres Width: 105 Depth: 150 Right Of Way(ft): 50
Nbr of Bldgs: 2 Nbr of Dwellings: 10
Review Information:
Review
Building Plan Review Released By:
Originally Released: 5/5/2008 By: tmelbourn
Septic Sys Review Released By:
Originally Released: 5/2/2008 By: LHALSEY
Landuse/Zoning/HE Conditions Released By:
Originally Released: 5/2/2008 By: Ibarlow
Permits: _ .
Operator: JD Printed By: jmm Print Date: 5/5/2008
Project Number: 08001646 Inv: 1 Application Date: 5/5/2008 Page 2 of 2
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Building Permit
Contractor: OWNER Firm: OWNER
Phone: (000)000-0000
Building Characteristics
Building Height 20
This Application: Total Project:
Description Grp Type Notes Su Ft Valuation Su Ft Valuation
GARAGE U-1 VB 520 $9,880.00 520 $9,880.00
Totals: 520 $9,880.00 520 $9,880.00
Item Description Units Unit Desc Fee Amount
RESIDENTIAL PERMIT FEE 1 SELECT $181.25
ACCESSORY PLANS REVIEW 1 SELECT $45.31
WSBC SURCHARGE 1 SELECT $4.50
Permit Total Fees: $231.06
Notes . _ .
HEALTH DISTRICT HAS PLACED A HOLD ON THIS DEVELOPMENT 07/01/91
Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing
Building Permit $231.06 $231.06 $0.00 $231.06
$231.06 $231.06 $0.00 $231.06
Disclaimer:
Submittal of this application certifies the owner(or person(s)authorized by the owner)has both examined and finds the information
contained within to be true and correct,and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for,or an approval of,any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: JD Printed By: jmm Print Date: 5/5/2008
Permit Center PERMIT NUMBER: �� / 6Co
SclTY or °��° w 11703E Sprague Ave, Suite B 3
pokane Spokane Valley,WA 99206 ` PERMIT FEE:
40"ValleY/ (509)688-0036 FAX: (509)688-0037
ww\v.spokanevalley.org
Community Development
Residential Construction New Construction I 1 Accessory Bldg
Permit Application i'Remodel Deck
III Other:
SITE ADDRESS: b'1 22) f l . EZE '3 (" T. , (17O KI -l€- VA L.,.t_0(, it. A 414 2-1(4
n
ASSESSORS PARCEL NO: "T to it."-')."--) E't -2-- LEGAL DESCRIPTION: ,..J Gt.11 iU'fS v�Lt( • L+ -2.
kik •
Building Owner: yl
Contractor:
—
Name: Name:
Address`.&I23 n �PPieec C. Address:
City: State: is3A Zip: er(Z-(b City: State: Zip:
�b�V,GCJ'le ��I Ce,�
Phone: Fax: Phone: Fax:
Contractor Lic No: Exp Date:U2 L� 'Z 0 O
it Ft Rint,igeilati C_
Contact Person City Business Lic.No: (pb I -12. "Mi)
Name: P ERA r1rs --i- ) —
Phone:d Z4- 43(G( - CELL 6-510 lv('(c
Describe6-1-7)the scope of work in detail: Cost of Project: $ 6 ,
nit
Proposed Use: 4;iig1
**************The following MUST be complete: (write N/A if not applicable)**********************
HEIGHT TO PEAK: DIMENSIONS: #OF STORIES: TOTAL HABITABLE SPACE:
2-D `?81 x Zia, 1 00-
MAIN FLOOR TO SQ. . 2"" FLOOR SQ. FTG: UNFIN BASEMENT SQ. FTG: IMPERVIOUS SURFACE
FTG:
6Z1). liq r Ci- . t.i/-A- 1•)/a- AREA: ti,-E-1- .
FINISHED BAS MENT GARAGE SQ. FTG.:a DfI DECK/COV. PATIO SQ. FTG: 30% SLOPES ON ���
SQ. FTG: 0/A �(Pr Do rJ/m- PROPERTY:
#OF BEDROOMS: CONSTRUCTION TYPE: HEAT SOURCE: SEWER OR SEPTIC?
>J/A 2x ip t111r 1 :t c:A _ til A
The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling,the
dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The
signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done
in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of
Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or
local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before
this application can be processed.
SIGNATURE:Aditx1
`y ' ' t '2`DATE: 64� �'EY //Method of Payment: .
❑ Cash 0 Check ❑ Mastercard 0 VISA CITY t _ ' LEy
Bankcard#: Expires: VIN#:
APR n 2006
Authorized Signature: l�
REVISED 2/15/07 r E ti. i! t E_'-v-s a..ri
For City Use Only
PLUS Project Number OOT (C4(0
CITY OFProject Apokaneddress
LK5400001.V
y°
ae11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206
509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org
As part of our on-going commitment to customer service during the review process of your project
application, we are providing you with a TARGET DATE for the initial technical application review. If for
any reason we cannot meet this date, we will contact you with a revised target date.
Your application review TARGET DATE is (0 C
The TARGET DATE is the date we estimate your project application will have had its initial technical
review. It is not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
➢ Submit complete, accurate plans and documents.
Extra time may be required for re-submittals as project application reviewers work on multiple applications and it
may be several days before they can look at your new or revised information.
➢ Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one individual with the
expertise for dealing with reviewer comments would be the best choice for the entire review process.
➢ Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date,please feel free to contact us if you haven't heard from us
by your target date. Staff may contact you before the target date if the initial review is complete. By following this
procedure,you will save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required
documents, as indicated on your Pre-Application Checklist have been submitted or have been approved for deferred
submittal. This does not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free
from substantive flaws that would prevent technical staff from completing the technical review once it is started. When
this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it
comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance
review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by
phone, fax, email,or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re-
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections
of the application are received, a Permit Specialist will process the application and contact the person specified on your
application for permit pick-up. Information regarding fees and pre-construction meetings (if required) will be provided by
the Permit Specialist at that time.
WHITE—APPLICANT PINK—BUILDING FILE REV 9/07
.."
Le-4-1,---ro fl.
Lr 'L E: 1' . "2_
4 . .
t........
(
I
,,.
Ho' i 1
i
1 I !
if V
AL I i
, 1
1 I I
I i_ i
$
1 r.lt 1 o P
---,-. -1)OSt !NIT 1 t...1 1.;
-.
.c,
1 !
-c-ci i I
I I
1 .
I
f , i
1 i.- ------ -
I PPt---7- _
- !,
! ,
I - .46t24
--P-41 s 0
it
' 0
_
—A
.c....)
) 1
I
I l 1
q0 I
.
. fr
LI()1,. A cliz: tiz
i ,....i
I 14 i
-- i
--- !_i e...I
F. SPnKA NE VALLEY
...-
CITY 0
ni RECEIVED BY
-t,
z. APR 3 :_,-.' 20116
PERMIT NITER
pr 7)pel•-•bi kin() 1 ---—_-.-----
.HS P ,a
.X.,
-. .....4...
544'2,3 r). 'REES C:r.
11111111•11=111111111=Emmimmlimilllip
zs"4124?-4.4,14011- -- - -
,1))/I. f") IT:1.(-A, sc.. -,, u ,A.L1:- Li- 7. E,(....1-L 1...
•
I 0' 1 I
_
.
. _ ., .
•
A 1 .
.1
I i
<-------a----1-- i
1) --,1\171•LII,..T,) 1
, 1
i 1
I ,
v 1 .
, t
I 13.12.0764.6D_ N
, 15'
. 4
-40
Tion
iiai, 2kt , 0 -4..cul Si— 14171 0
- ' k
5- I
\, 4 __
:f, 25
, I
I '
1 1-4-6 1)eut
... ,..„.
c--i
1 I
r
•,!. I '
_....__. __
_._ _. ___..
CIO
• 'TYE-7-K_
i 1
0 I
-.4
Lt•1101(117... L,
. 1
Y,1
r r
1----; i
. 1
. 73
4.
-4„
r`l
APPIR°116 •
,-z.
1
z, 61240g
pr,pe.1-ht Li ne),
I 1
.
, .
, -.--1--i'-:.1 ''t'-', r
61-1-2.: n ., -REE-C Eir..
.___.
,
FOUNDATION PLAN
PLEASE COMPLETE THE FOLLOWING INFORMATION AND ADD ON THE DRAWING BELOW.
BUILDING DIMENSIONS: 20' x'lb
GARAGE OPENING AND HEADER SIZE: d Cb X Ito 14 IDE! ?M inl C9 2-)CI
INDICATE
-x(INDICATE THE LOCATION AND SIZE OF ALL WINDOWS AND DOORS ON THE PLAN.
WIDTH 2(e` I
RIDGE LINE - -
- -----. 1
f
{ 1 ---op,LK-1n
( 11 1 I OO R-
I 1
1
[
( A 1 1 A
I •
��1 ;. J
0 � 1 1
1 ( 1
E1 I
I I 1
I 1\11 ' 1
tI ' i
1 � I
L
J I
`'.
Please note that while every effort is made to assure the accuracy of the information contained in this brochure is
not warranted for accuracy.This document is not intended to address all aspects or regulatory requirements for a
project and should serve as a star5ng point for your investigation. For detailed information on a particular project,
permit, or code requirement refer directly to applicable file and/or code/regulatory documents or cont #hsEiVED BY
appropriate division.
CITY OF SPOKANE VALLEY
APR 3 2008
R602.10.4 Brace Wall Panel min.48 in.—96 M. PERM( ENTER
R602.10.5 Continuous Wood Structural Panel Sheathing BY
R602.10.6.1 Alternate Brace Wall Panel min.28in.-42in.
R602.10.6.2 Alternate Brace Wall Panel min.l6in.-24in.
IBC 2305 Engineered Shear Wall Bracing
L../t ty vt
,SPOKANE VALLEY BUILDING DEPARTMENT
11707 E. Sprague Avenue#105,Spokane Valley,Washington 99203-Tel 509-58B-0035-Fax 509-SS5-0037
Following is a typi aI cross-ser.5on for a residential prep..... It may not represent the proposed project If you are using this detail
as a portion of your plan submit-at please complete the requested information in the boxes provided on both sides of this sheet
This completed sheet,along with any ad35oral information needs to be submitted with your apIi Son and be on site of the time
of irtspec5on.
PROTECTION AND OPENINGS SET1h'EEN NOTE:
DWELLINGS AND PRIVATE GARAGES SHALL HAVE: Diaconal wall bracing required on
4 each comer and every 25 feet of wall.
1)MATERIALS APPROVED FOR ONE HOUR FIRE Walls within 3 feet of a property line or
FlESISTWVE CONSTRUCTION ON THE GARAGE SIDE: within 6 feet of a dwelling must be 1 hour .
•5/3"TYPE"X"GYP BOARD(HABITABLE SPACE ABOVE) rated. (5/8'type.X'gypsum sheathing
112'GYP BOARD(RESIDENCE/ATTIC,FLOOP✓CEIUNG) on both sides of wall). Openings are not
2)OPENINGS BETWEEN GARAGE AND RESIDENCE permitted in these walls. Garages over
SHALL BE EQUIPPED WITH SOUD WOOD DOOR,SOLID OR 3,000 sq.ft require protec5on when
HONEYCOMB CORE STEEL DOORS NOT LESS THAN 1 3/3', closer than 20 feet to the property line.
OR 20 MINUTE FIRE RATED DOORS. Parapets may be required.
ALTERNATE FOUNDATION FOR
ACCESSORY BUIL DINGS FROMERED TRUS 10
. F1- R
• 400 SQ. FT.TO 3000 SQ.FT. RAFTER SIZE AND SPACING`)
x @ 21 O.C.
SECTION A-A /
ROOFING MATERIAL
A 'PtiA ter ARCS!c- r
ROOFING PAPER' i-Ilrr(—
' 2! ROOF ;ok
•
' _ �V SHEATHING a:
t .r •- - ,-• . - . . .44AaR 1 c,. Tc et DOUBLE TOP PLATE
A111t�1I1 '
=I—•4. '. - +'•1111x3➢11ff WALL HEIGHT A°
IIII�ll� i * 'N'F-lI BETWEEN.TRUSSES y
', 1 dk 24"MIN.
r� M,') •
• (2) REBAR ...,01. I 1/.( WALL SHEATHING .••
1---12'--1 • 1
i 2x @ '2O.0.
E ' :Ns ;"' SIDING r
=% t � c� 1Q.RM `r:t t 1 PRESSURE TREATED
r. OITO3f10' 111OtI`"i3r' SOLE PLATE
I
7 •4.• f •'. • •,._- i.,.1---j 1 ;.�. r3-12'CONCRETE SLAB
r4 • ' !t; 1 6"MIN. S'MIN. . ' • t
ll ll .1.''',,y•..II!Ii�lifl it� .., .
=ili1E-1111f. : < • l ll!I �I r . ANCHOR BOLTS
-9 II IC "i . . 31 =II' 24"MIN. N.
_. , 24"MI 6'MIN. • . 12"x9'MIN.
17"
� - (7'INTO CONCRETE)k
s'O.C.OR APPROVED
_ ._ 1-1 p..._.! '2)=4 REBAR 5'X12' ANCHOR INSTALLED
FOOTING PER MANUFACTURER
PROVIDE DIAGRAMS AND
ENGINEERING LAYOUTS FOR
ROOF TRUSSES, BEAMS AND
FLOOR SYSTEMS PRIOR TO FRAMING
INSPECTIONS
CITY COPY'
THIS BUILDING SUBJECT
TO FIELD INSPECTION CORRECTIONS
REVIEWED FOR
REVIEWED; :'ODE COMPLIANCE
ALLE ":2UIL ING 'VISION