Loading...
2012, 04-03 Permit: SW-12001057 SewerSPOKANE COUNTY BUILDING AND PLANNING PERMIT Application Number: SW -12-001057 Permit Issued Date: 04/03/2012 Expiration Date: Project Description: Permit Type: SEWER CONNECTION SEWER Primary Contact: SWAN'S GROUND WORK Applicant: SWAN'S GROUND WORK Address: Phone: Email: 14415 N FORKER RD SPOKANE, WA 99217 509-465-4751 SITE INFORMATION: Site Address: Parcel Number: Subdivision: Assessor's Description: Inspection Area: Zoning: 13213 E RICH AVE 45031.1501 TRENTWOOD ORCHARDS TRENTWD ORCH PT OF B45 EXC S300FT;N150FT Email: OF S300FT OF W 106FT OF E256FT Owner: Address: Phone: BURUNOV, ALEKSANDR 13213 E RICH AVE SPOKANE VALLEY, WA 99216 Water District: Trentwood Fire District: Fire District 1 Irrigation District #3 Land Area: 2.79 acres / 121418 sqft CONTRACTOR INFORMATION: General Contractor SWANSGW951 LT SWAN'S GROUND WORK 14415 N FORKER RD SPOKANE, WA 99217 509-465-4751 DETAILS: Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION FEE DETAIL: Processing - Utilities Utilities Permit 1 $125.00 $125.00 Total Fee: $125.00 $25.94 $125.00 $150.94 CONDITIONS: CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. Date Printed: 04/03/2012 10:14:30 Printed by: IIS APPPOOLASP.NET v4.0 SPOKANE COUNTY BUILDING AND PLANNING PERMIT • Permit Issued Date: Application Number: SW -12-001057 1 04/03/2012 Expiration Date: INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed: 04/03/2012 10:14:30 Printed by: IIS APPPOOL\ASP.NET v4.0