2012, 04-03 Permit: SW-12001057 SewerSPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Application Number: SW -12-001057
Permit Issued Date:
04/03/2012
Expiration Date:
Project Description:
Permit Type:
SEWER CONNECTION
SEWER
Primary Contact: SWAN'S GROUND WORK
Applicant: SWAN'S GROUND WORK
Address:
Phone:
Email:
14415 N FORKER RD
SPOKANE, WA 99217
509-465-4751
SITE INFORMATION:
Site Address:
Parcel Number:
Subdivision:
Assessor's Description:
Inspection Area:
Zoning:
13213 E RICH AVE
45031.1501
TRENTWOOD
ORCHARDS
TRENTWD ORCH PT OF B45 EXC S300FT;N150FT Email:
OF S300FT OF W 106FT OF E256FT
Owner:
Address:
Phone:
BURUNOV, ALEKSANDR
13213 E RICH AVE
SPOKANE VALLEY, WA 99216
Water District: Trentwood Fire District: Fire District 1
Irrigation District #3
Land Area: 2.79 acres / 121418 sqft
CONTRACTOR INFORMATION:
General Contractor
SWANSGW951 LT
SWAN'S GROUND WORK
14415 N FORKER RD
SPOKANE, WA 99217
509-465-4751
DETAILS:
Class
Type
Quantity Unit Charge Value
SEWER SEWER CONNECTION
FEE DETAIL:
Processing - Utilities
Utilities Permit
1 $125.00 $125.00
Total Fee:
$125.00
$25.94
$125.00
$150.94
CONDITIONS:
CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER.
ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES
APPLY AFTER 30 MINUTES.
Date Printed: 04/03/2012 10:14:30
Printed by: IIS APPPOOLASP.NET v4.0
SPOKANE COUNTY BUILDING AND PLANNING
PERMIT
•
Permit Issued Date:
Application Number: SW -12-001057 1 04/03/2012
Expiration Date:
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed: 04/03/2012 10:14:30
Printed by: IIS APPPOOL\ASP.NET v4.0