2010, 04-27 Permit App: 10001064 Roof Truss SystemProject Number: 10001064 Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Project Information:A : w _ Vaa a 4/. _ ...., a_ m.a 'S ..s.WW,., . W df.z W W
Permit Use: REPLACE ROOF TRUSS SYSTEM
Contact: JONATHAN WOODRUFF
Address: 13304 E RICH
C - S - Z: SPOKANE VALLEY WA 99216
509
Setbacks: Front Left: Right: Rear: Phone: (509) 924-4163
Group Name:
Project Name:
.,u V.V,% --1-4`,....3,r. :'WW1,..:,.i . ,, V V. V
District: Nort
Date: 4/27/2010 Page 1 of 2
Site Information: . a= . : __ ..: .
Plat Key: 000000 Name: Range
Parcel Number: 45031.2301 Block: Lot:
SiteAddress: 13304 E RICH AVE Owner: Name: JONATHAN WOODRUFF
Address: 13304 E RICH
SPOKANE VALLEY WA 99216
Location:: CSV
Zoning: R-3 SF Res District
Water District: 001 TRENTWOOD
Area: 27,190 Sq Ft Width: 0
Nbr of Bldgs: 0 Nbr of Dwellings: 1
Review Information •
Hold: ❑
Depth: 0 Right Of Way (ft): 0
Review
Building Plan Review
Originally Released: 4/27/2010 By: TMELBOU
Permits: . ,. . , _.. WW,.,e,.:4.. ,. .�,, _ W W..,.
Building Permit
Contractor: OWNER
Firm: OWNER
Phone: (000) 000-0000
This Application: Total Project:
Description Gra Type Notes So Ft Valuation Su Ft Valuation
1&2 FAMILY R-3 VB NEW 0 $6,650.00 0 $6,650.00
TRUSSES
Item Description
RESIDENTIAL PERMIT FEE
WSBCC SURCHARGE
SF PLNS RVW < 7999 SQ FT
Totals: 0 $6,650.00 0 $6,650.00
Units Unit Desc Fee Amount
1 SELECT $139.25
1 SELECT $4.50
1 SELECT $55.70
Permit Total Fees: $199.45
Operator: JD Printed By: jmm Print Date: 4/27/2010
Project Number: 10001064 Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 4/27/2010 Page 2 of 2
Payment Summary ,h .0sommoswastmonommoommgrmor..W„r;....,,. c., ..,..-
Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing
Building Permit $199.45 $199.45 $61.30 $138.15
$199.45 $199.45 $61.30 $138.15
Disclaimer:
Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information
contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: JD Printed By: jmm Print Date: 4/27/2010
Spokane
Valley
CITY OF SPOKANE VALLEY
Community Development Department
Permit Center
11703 East Sprague Avenue, Suite B-3
Spokane Valley, WA 99206
Tel: (509) 688-0036
Fax: (509) 688-0037
PERMIT NUMBER:_
PERMIT FEE:
(Staff Use
Only)
((PL -1
i
RESIDENTIAL CONSTRUCTION PERMIT APPLICATION
[A ADDITION/REMODEL ❑ ACCESSORY BUILDING
❑ OTHER
' I NEW CONSTRUCTION
❑ DECK
SITE ADDRESS: 5' !:' �, i► '' 7 `�.,;`e-t' " L'
ASSESSORS PARCEL NO.: k LEGAL DESCRIPTION: (ZEf'j/7 AzfrJt/
VA/ LI B%'
BUILDING OWNER NAME: .lU/ii
NAME: per/ 1 ► J
ADDRESS: l s.7 '22 r'! )G J Hifi
CITY: ye:4 'e, v 1 STATE:T
PHONE: s 7 1 ! ....T` FAX: A!!'�
CONTACT NAME:
PHONE: Ar/A
CONTRACTOR NAME:
ZIP: q
CELL: ,7f/ q — 7.
FAX: `A-
(.loT4/ . ^ L
MAILING ADDRESS: / j 1\ lam'
CITY: _)p,"1:4),,./e,
PHONE: - G! C 1 - "'
CONTRACTOR LICENSE No.:
t)/A
FAX:
CELL:
STATE:
AA
EXPIRES:
f
ZIP: %' 4
CELL:
Cl2,�_� _
A/A
CITY BUSINESS LICENSE
A/
DESCRIBE
f ���WORK IN DETAIL AND INDICATE USE:
P.totpDESCRIBE THE SCOPE OF1 Y`+01' 901/�:WY'' ',i�r rt' . i1 t� .12' r ye
shit � ref . twi
PROPOSED USE: e.} 1
ti�'r' "_J. k x l �,; . )ie . ¢" ;.• C l � J> -;:{;r;. �� 1,142-7 Art/
C Pat, 1'1 %Z f�'1b1 r„(� s 1pi!� .t.' >i 1:141 /IL hLe
Page 1 of 2
Effective October 28, 2007
Macintosh HD:Users:jonathanwoodruff:Library:Mail Downloads:Residential Construction Permit App.1.doc
****YOU MUST COMPLETE THE FOLLOWING****
Height to Peak:
Dimensions:
_ , A
No. of Stories:
/
Total Habitable ,
Space: 6 22 f
/.
Main Floor SQ
FT: 6 N-
Uppei= FI or SQ
FT: /WA-
Unfinished Basement
SQ FT: ;,,�`fA_
Finished Basement
SQ FT: Ai
Garage SQ FT:
RO
Deck/Covered Patio
SQ FT: .--7,1,,7_,
Impervious Surface
Area: 0
30% Slopes on/
Property: /,/ A.
No. of 2-
Bedrooms:
Construction jj
Type: ktio to r
Heat Source: i
Elt-�La:�, xx
Sewer or
Septic: fep*i
TOTAL COST OF PROJECT: $ 6, (4, 63/
DISCLAIMER
The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling, the dwelling is/will
be served by potable water. 2) Ownership of this Clty of Spokane Valley permit inure to the property owner. 3) The signatory Is the property
owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of
Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of
Spokane Valley permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional
information may be required to be spbmitted and subs quently approved before this application can be processed.
Signature )474`h:
Method of payment: 0 Cash
Bankcard #:
Check
Authorized Signature:
zikrall/
Date: 7 -iq .-)z)
0 Visa 0 Mastercard
EXP: VIN # :
Effective October 28, 2007 Page 2 of 2
Macintosh HD:Users:jonathanwoodruff:Library:Maii Downloads:Residential Construction Permit App.1.doc
Spokane
jUalley'
For City UsF Only
PLUS Project Number
Project Address
11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206
509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org
As part of our on-going commitment to customer service during the review process of your project
application, we are providing you with a TARGET DATE for the initial technical application review. If for
any reason we cannot meet this date, we will contact you with a revised target date.
Your application review TARGET DATE is
14
_.r
ti
The TARGET DATE is the date we estimate your project application will have had its initial technical
review. It is not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
➢ Submit complete, accurate plans and documents.
Extra time may be required for re -submittals as project application reviewers work on multiple applications and it
may be several days before they can look at your new or revised information.
➢ Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one individual with the
expertise for dealing with reviewer comments would be the best choice for the entire review process.
➢ Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us
by your target date. Staff may contact you before the target date if the initial review is complete. By following this
procedure, you will save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required
documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred
submittal. This does not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free
from substantive flaws that would prevent technical staff from completing the technical review once it is started. When
this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it
comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance
review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by
phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re -
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections
of the application are received, a Permit Specialist will process the application and contact the person specified on your
application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by
the Permit Specialist at that time.
WHITE -APPLICANT PINK - BUILDING FILE REV 9/07