Loading...
2014, 05-13 Permit: SW-14000611 Sewer SPOKANE COUNTY UTILITIES PERMIT Application Number: SW-14000611 Permit Issued Date: 05/13/2014 Expiration Date: 05/13/2015 Project Description: SEWER CONNECTION Project Name: WEST FARMS Primary Contact: GOBER'S LLC Applicant: GOBER'S LLC Phone: 509-924-5372 Address: 11215 E TRENT AVE SPOKANE,WA 99206 Phone: 509-924-5372 Email: SITE INFORMATION: Site Address: 4818 N KELLER RD Owner: DUGGAN, MICHAEL S/SCHOFIELD, DONALD L Parcel Number: 46344.0830 Address: 4818 N KELLER RD SPOKANE VALLEY,WA 99216 Phone: Assessor's Description: WEST FARMS IRR PLAT#4 PTN OF W1/2 OF BLK Email: 117 DAF; BEG ON E LN OF KELLER RD&S LN OF N5AC TH S125FT TH E135FT TH N1 OF T TH E293.45FT TH N115FT TH W428.45FT TO POB Inspection Area: : (509)-477-3675 Water District:Trentwood Irrigation District Fire District: Spokane Valley Fire #3 Zoning: Land Area:43722 Square Feet CONTRACTOR INFORMATION: GOBERL*899L7, Exp.06/27/2015 GOBER'S LLC 11215 E TRENT AVE SPOKANE,WA 99206 509-924-5372 DETAILS: Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION 1 $125.00 $125.00 $125.00 FEE DETAIL: Processing-Utilities $26.64 Utilities Permit $125.00 Total Fee: $151.64 CONDITIONS: Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire. Inside Public Transit Benefit Area CALL 1-800-424-5555 BEFORE YOU DIG--AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR&INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. _ SEWER PERMITS ARE VALID FOR ONE(1)YEAR FROM THE DATE OF ISSUANCE. FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT(509)477-3604 FROM 8:30-5:00 MONDAY-FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30-MINUTE INSPECTION.ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. Date Printed:05/13/2014 12:43:57 Project Coordinator:Vickie Merriott SPOKANE COUNTY UTILITIES PERMIT Application Number: SW-14000611 Permit Issued Date: 05/13/2014 Expiration Date: 05/13/2015 INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED.SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. _ THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed:05/13/2014 12:43:57 Project Coordinator:Vickie Merriott