2012, 06-14 Permit: SW-12001564 Sewer SPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Permit Issued Date:
Application Number: SW-12001564 06/14/2012
Expiration Date:
Project Description: SEWER CONNECTION Primary Contact: NAIL JR, LOWELL K
Project Name: ROCKWELL PHASE II Applicant: NAIL JR,LOWELL K
Permit Type: SEWER Address: 13924 E RICH AVE
SPOKANE,WA 99216-1320
Phone:
Email:
SITE INFORMATION:
Site Address: 13924 E RICH AVE Owner: NAIL JR, LOWELL K
Parcel Number: 45022.3014 Address: 13924 E RICH AVE
SPOKANE,WA 99216-1320
Subdivision: SMILEY SUBDIVISION Phone:
Assessor's Description: PART OF TWO ADDS TRENTWOOD ORCHARDS Email:
AND TRENTWOOD ORCHARD S MILEYS BLK 30
PT OF BLK 19; E7OFT OF W372FT OF 51.06AC
TRENT WOOD ORCH AND W7OFT OF N5.5FT OF
LT 4 BLK 1 SMILEYS SUB BLK 30 TRENTWOOD
ORCH
Inspection Area:
Water District:Trentwood Fire District:Spokane Valley Fire
Irrigation District#3
Zoning: Land Area:0.0892 acres/3885 sqft
CONTRACTOR INFORMATION:
General Contractor
SITENN"881 LA
SITE NORTHWEST
P.O.BOX 2228
POST FALLS, ID 83877
208-277-8998
DETAILS:
Class Type Quantity Unit Charge Value
SEWER SEWER CONNECTION 1 $125.00 $125.00
$125.00
FEE DETAIL:
Processing-Utilities $25.94
Utilities Permit $125.00
Total Fee: $150.94
CONDITIONS:
FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT(509)477-3604 FROM 8:30-5:00 MONDAY-FRIDAY PRIOR TO COVER.
ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30-MINUTE INSPECTION.ADDITIONAL INSPECTION FEES
APPLY AFTER 30 MINUTES.
Date Printed:06/14/2012 13:47:51 Printed by:IIS APPPOOL'ASP.NET v4.0
SPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Permit Issued Date:
Application Number: SW-12001564 06/14/2012
Expiration Date:
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION. _
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED.SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. _
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME.BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed:06/14/2012 13:47:51 Printed by:IIS APPPOOL'ASP.NET v4.0