Loading...
2012, 05-11 Permit: SW-12001319 Sewer SPOKANE COUNTY BUILDING AND PLANNING PERMIT Permit Issued Date: Application Number: SW-12001319 05/11/2012 Expiration Date: Project Description: SEWER CONNECTION Primary Contact: KORNEYCHUK, IVAN I&ELENA G Project Name: WEST FARMS Applicant: KORNEYCHUK, IVAN I &ELENA G Permit Type: SEWER Address: 104 E FENDER RD COLBERT,WA 99005 Phone: Email: SITE INFORMATION: Site Address: ,,Q PF 604 AZ ki1ky' Owner: KORNEYCHUK, IVAN I &ELENA G Parcel Number: 46344.1503 Address: 104 E FENDER RD COLBERT,WA 99005 Subdivision: PLAT NO 4 OF WEST Phone: FARMS IRRIGATED TRACTS Assessor's Description: SPOKANE VALLEY SHP-04-07 LOT 3 BLK 1 Email: (AFN#5578104) BEING A PTN OF SE1/4 Inspection Area: Water District:Trentwood Fire District: Fire District 1 Irrigation District#3 Zoning: Land Area: 0.6067 acres/26428 sqft CONTRACTOR INFORMATION: General Contractor OWNER OWNER NOT KNOWN AT TIME OF ENTRY UNKNOWN, UK 00000 DETAILS: Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION 1 $125.00 $125.00 $125.00 FEE DETAIL: Processing-Utilities $25.94 Utilities Permit $125.00 Total Fee: $150.94 CONDITIONS: CALL 1-800-424-5555 BEFORE YOU DIG--AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR& INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. _ Date Printed:05/11/2012 09:52:23 Printed by:IIS APPPOOL\ASP.NET v4.0 SPOKANE COUNTY BUILDING AND PLANNING PERMIT Permit Issued Date: Application Number: SW-12001319 05/11/2012 Expiration Date: FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT(509)477-3604 FROM 8:30-5:00 MONDAY-FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30-MINUTE INSPECTION.ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. _ INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. _ SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED.SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. _ THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. _ Date Printed:05/11/2012 09:52:23 Printed by: IIS APPPOOL\ASP.NET v4.0