Loading...
2012, 08-08 Permit: SW-12001937 Sewer SPOKANE COUNTY BUILDING AND PLANNING PERMIT Permit Issued Date: Application Number: SW-12001937 08/08/2012 Expiration Date: 08/09/2012 Project Description: SEWER CONNECTION Primary Contact: ACME EXCAVATING Project Name: ROCKWELL PH I Applicant: ACME EXCAVATING Permit Type: SEWER Address: 6808 S LINKE RD GREENACRES,WA 99016 Phone: 509-251-8058 Email: SITE INFORMATION: Site Address: 14404 E RICH AVE Owner: OWEN,JOHN H Parcel Number: 45022.2105 Address: 14404 E RICH AVE SPOKANE,WA 99216-1336 Subdivision: THROOP& Phone: FITZPATRICK SUBDIVISION Assessor's Description: TRENTWDORCH THROOP&FITZ L5 B1 Email: Inspection Area: Water District:Trentwood Fire District:Spokane Valley Fire Irrigation District#3 Zoning: Land Area:6500 Square Feet CONTRACTOR INFORMATION: General Contractor ACMEEES963LD ACME EXCVT&SEWER BORING CO 6808 S LINKE RD GREENACRES,WA 99016 509-228-0691 DETAILS: Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION 1 $125.00 $125.00 $125.00 FEE DETAIL: Processing-Utilities $25.94 Utilities Permit $125.00 Total Fee: $150.94 CONDITIONS: Inside Public Transit Benefit Area CALL 1-800-424-5555 BEFORE YOU DIG--AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR&INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. Date Printed:08/08/2012 11:21:52 rPrinteIS APPPOOL\ASP.NET v4.0 SPOKANE COUNTY BUILDING AND PLANNING PERMIT Permit Issued Date: Application Number: SW-12001937 08/08/2012 Expiration Date: 08/09/2012 FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT(509)477-3604 FROM 8:30-5:00 MONDAY-FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30-MINUTE INSPECTION.ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED.SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME.BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed:08/08/2012 11:21:52 Printed by:IIS APPPOOL\ASP.NET v4.0