Loading...
2012, 11-08 Permit: SW-12002529 Sewer SPOKANE COUNTY BUILDING AND PLANNING PERMIT Permit Issued Date: Application Number: SW-12002529 11/08/2012 • Expiration Date: Project Description: SEWER CONNECTION Primary Contact: MUELLER JACKHAMMER INC. Project Name: SUMMERFIELD PH 2 Applicant: MUELLER JACKHAMMER INC. Permit Type: SEWER Address: 3628 E 32ND AVE SPOKANE,WA 99223 Phone: 509-534-7143 Email: SITE INFORMATION: Site Address: 14901 E RICH AVE Owner: HOOPER, BRIAN Parcel Number: 45021.2711 Address: 14901 E RICH AVE SPOKANE,WA 99216-1338 Subdivision: SNIDER'S SUBDIVISION Phone: Assessor's Description: TRENTWD ORCH SNIDERS L11 B1 Email: Inspection Area: Water District:Trentwood Fire District: Spokane Valley Fire Irrigation District#3 Zoning: Land Area:7440.22 Square Feet CONTRACTOR INFORMATION: General Contractor MUELLJI060N6 MUELLER JACKHAMMER INC. 3628 E 32ND AVE SPOKANE,WA 99223 509-534-7143 DETAILS: Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION 1 $125.00 $125.00 $125.00 FEE DETAIL: Processing-Utilities $25.94 Utilities Permit $125.00 Total Fee: $150.94 CONDITIONS: Inside Public Transit Benefit Area Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire. CALL 1-800-424-5555 BEFORE YOU DIG--AT LEAST 2 WORKING DAYS IN ADVANCE.SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR&INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. Date Printed: 11/08/2012 14:10:19 Printed by:IIS APPPOOL\SmartGovProdApp SPOKANE COUNTY BUILDING AND PLANNING PERMIT Permit Issued Date: Application Number: SW-12002529 11/08/2012 Expiration Date: FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT(509)477-3604 FROM 8:30-5:00 MONDAY-FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30-MINUTE INSPECTION.ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED.SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed: 11/08/2012 14:10:19 Printed by:IIS APPPOOL\SmartGovProdApp