2013, 07-02 Permit: SW-13001150 Sewer SPOKANE COUNTY UTILITIES
PERMIT
Application Number: SW-13001150 Permit Issued Date: 07/02/2013
Expiration Date: 07/02/2014
Primary Contact: WOOD, R W&K M Applicant: WOOD, R W&K M
Phone: Address: 5105 N KELLER RD
SPOKANE,WA 99216-1439
Phone:
Email:
SITE INFORMATION:
Site Address: 5105 N KELLER RD Owner: WOOD, RW&K M
Parcel Number: 46344.0417 Address: 5105 N KELLER RD
SPOKANE,WA 99216-1439
Phone:
Assessor's Description: WEST FARMS IRR TRS PL 4 BLK 108 EXC Email:
W353.2'&EXC S140'&EXC N260'&EXC E150'
OF N410'EXC N320'THEREOF& EXC RD
Inspection Area: : (509)-477-3675
Water District:Trentwood Irrigation District Fire District: Spokane Valley Fire
#3
Zoning: Land Area:2.67 Acre(s)
CONTRACTOR INFORMATION:
PROEX**876KT, Exp.05/30/2015
PRO-EXC
PO BOX 700 NINE MILE FALLS,WA 99026
509-413-9529
DETAILS:
Class Type Quantity Unit Charge Value
SEWER SEWER CONNECTION 1 $125.00 $125.00
$125.00
FEE DETAIL:
Processing-Utilities $26.32
Utilities Permit $125.00
Total Fee: $151.32
CONDITIONS:
Inside Public Transit Benefit Area
Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire.
CALL 1-800-424-5555 BEFORE YOU DIG—AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR& INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
SEWER PERMITS ARE VALID FOR ONE(1)YEAR FROM THE DATE OF ISSUANCE. FOR SEWER INSPECTIONS CALL THE UTILITIES
DEPT AT(509)477-3604 FROM 8:30-5:00 MONDAY-FRIDAY PRIOR TO COVER.ONE WORKING DAY NOTICE REQUIRED. PERMIT
ALLOWS FOR A 30-MINUTE INSPECTION.ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. _
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
Date Printed:07/02/2013 15:58:36 Project Coordinator:
SPOKANE COUNTY UTILITIES
PERMIT
Application Number: SW-13001150 Permit Issued Date: 07/02/2013
Expiration Date: 07/02/2014
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED.SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. _
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME.BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed:07/02/2013 15:58:36 Project Coordinator: