2011, 06-30 Permit App: 11001947 Fire Damge RepairProject Number: 11001947 Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 6/30/2011 Page 1 of 2
Project Information:
Permit Use: REPAIR DAMAGE CAUSED BY FIRE
Setbacks: Front
Site Information:
Plat Key: 005835 Name: RIVERWALK 07TH ADD PUD
Left: Right: Rear:
Contact: A-1 GENERAL CONTRACTORS
Address: 6410 N MONROE
C - S - Z: SPOKANE WA 99208
Phone: (509) 328-3054
Group Name:
Project Name:
Parcel Number: 55083.2516 Block:
SiteAddress: 1620 N RIO GRANDE LN
Location:: CSV
Zoning: R-4
SF Res Urban District
Lot:
District: East
Owner: Name: DEMICK, MICHAEL JAY
Address: 1620 N RIO GRANDE LN
SPOKANE VALLEY, WA 99016
Water District: 134 CONSOLIDATED ID #19 Hold: [.
Area: 8,331 Sq Ft Width: 64 Depth: 123 Right Of Way (ft): 0
Nbr of Bldgs: 0 Nbr of Dwellings: 0
Review Information
Review
Building Plan Review
Released By:
Originally Released: 6/30/2011 By: TMELBOU
Building Permit
Contractor: A-1 GENERAL CONTRACTORS Firm: A-1 GENERAL CONTRACTORS IN
Address: 6410 N MONROE ST Phone: (509) 328-3054
SPOKANE, WA 99208
This Application: Total Project:
Description Gra Tvae Notes Sa Ft Valuation Sq Ft Valuation
1&2 FAMILY R-3 VB PLAN 0 $10,000.00 0 $10,000.00
REVIEW
FEE
Item Description
RESIDENTIAL PERMIT FEE
WSBCC SURCHARGE
SF PLNS RVW < 7999 SQ FT
Totals: 0 $10,000.00 0 $10,000.00
Units Unit Desc Fee Amount
1 SELECT $181.25
1 SELECT $4.50
1 SELECT $72.50
Permit Total Fees: $258.25
Operator: jmm Printed By: jmm Print Date: 6/30/2011
Project Number: 11001947 Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 6/30/2011 Page 2 of 2
Notes: R, w r_: M. M aMn E. rte;= i Nammommtwalwr
OK TO ISSUE SEWER PERMITS PER ROGER 12/16/97
Payment Summary:
Permit Type
Building Permit
Fee Amount Invoice Amount Amount Paid Amount Owing
$258.25 $258.25 $72.50 $185.75
$258.25 $258.25 $72.50 $185.75
,Hr
Disclaimer:
Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information
contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: jmm Printed By: jmm Print Date: 6/30/2011
(11 Community Development Department
Permit Center
11703 East Sprague Avenue, Suite B-3
Spokane Valley, WA 99206
Tei: (509) 688-0036
F-ak: (509) 688-0037
perm itcenterOsDoka neva I lev, orq
(Staff Use Only)
PERMIT NUMBER:
PERMIT FEE:
RESIDENTIAL CONSTRUCTION PERMIT APPLICATION
❑ NEW CONSTRUCTION ❑■ ADDITION/REMODEL ❑ ACCESSORY BUILDING
❑ DECK OTHER /
SITE ADDRESS: 1 & 11 (5 Ccr nl� Lh 6 Aae.'nc i.ov, L) 4 01 t
ASSESSORS PARCEL NO.: LEGAL DESCRIPTION:
BUILDING OWNER NAME: (Y) C1AC; E0, I�i ,i I CI
NAME: Of) 1U/\ , (DOiry lC�(
ADDRESS: I(DX) /1/4j Cr) &CiAnak Ln
CITY: V"" le�l i:priu i
PHONE: I p3
CONTACT NAME:
STATE: A
FAX:
ZIP: gcn
CELL:I`! BSC
I7
PHONE:
FAX: CELL:
CONTRACTOR NAME: A-1 (3OA Q Cr) -A 4.` e,-- rxS
MAILING ADDRESS: 604 /
CITY: <"-)`/CaMQ, STATE: („).A
PHONE: jS y
CONTRACTOR LICENSE NO.: It) 6CIOCi CC) ID1-EXPIRES: 3-3)- aZ CITY BUSINESS LICENSE NO.:60/ .R.6 y3.)
D CRIBE THE SCOPE OF WORK IN DETAIL AND INDICATE USE & PROPOSED U E
"`UI' G m)Cy c key �-ctip 'rte, ► nn� - V�sv �..�a� ,
****YOU MUST COMPLETE THE FOLLOWING****
MARK N/A IF NOT APPLICABLE
ZIP:
CELL:
Height to Peak:
Dimensions:
No. of Stories:
Total Habitable
Space:
Main Floor SQ FT:
Upper Floor SQ FT:
Unfinished Basement SQ
FT:
Finished Basement SQ
FT:
Garage SQ FT:
Deck/Covered Patio SQ
FT:
Impervious Surface
Area:
30% Slopes on
Property:
No. of Bedrooms:
Construction Type:
Heat Source:
Sewer or Septic:
TOTAL COST OF PROJECT: $ ) (), coo O
DISCLAIMER
The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling, the dwelling is/will
be served by potable water. 2) Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property
owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of
Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of
Spokane Valley permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional
information may be required for ubmitted and subsequ tly approved before this application can be processed.
/ 1 /
Effective October 28, 2007 fPage 1 of 2
P:\Community Development\02 Administration\03 Forms - Official Versions\Permit Center\Residential Construction Permit
App 10.28.07.doc
(,
Spokane
Valley°
For City Use 9nly / c,
PLUS Project Number /-- 711
Project Address j (r (? I
11703 E Sprague Ave Suite B-3 • Spokane Valley WA 99206
509.688.0036 • Fax: 509.688.0037 • permitcenter@spokanevalley.org
As part of our on-going commitment to customer service during the review process of your project
application, we are providing you with a TARGET DATE for the initial technical application review. If for
any reason we cannot meet this date, we will contact you with a revised target date.
`7/(
Your application review TARGET DATE is
The TARGET DATE is the date we estimate your project application will have had its initial technical
review. It is not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
➢ Submit complete, accurate plans and documents.
Extra time may be required for re -submittals as project application reviewers work on multiple applications and it
may be several days before they can look at your new or revised information.
➢ Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one individual with the
expertise for dealing with reviewer comments would be the best choice for the entire review process.
➢ Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date, please feel free to contact us if you haven 't heard from us
by your target date. Staff may contact you before the target date if the initial review is complete. By following this
procedure, you will save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required
documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred
submittal. This does not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free
from substantive flaws that would prevent technical staff from completing the technical review once it is started. When
this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it
comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance
review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by
phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re -
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections
of the application are received, a Permit Specialist will process the application and contact the person specified on your
application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by
the Permit Specialist at that time.
WHITE -APPLICANT PINK - BUILDING FILE REV 9/07