2015, 02-10 Permit: SW-15000082 Sewer A
-1:4
SPOKANE COUNTY UTILITI $project T o I -a4 /
PERMIT RECEIVED
Application Number: SW-15000082 j Permit ii cbie2ok10/2015
Expiration Date: 02/10/2016
CEV PERMIT
Project Description: SEWER CONNECTION SUB ( REV.
Project Name: COYOTE ROCK EST L__ ------------- --
Primary Contact: VICTORY HOMES Applicant: VICTORY HOMES
Phone: 208-777-7000 Address: 2120 NORTHWEST BLV STE B
COEUR D'ALENE, ID 83814
Phone: 208-777-7000
Email: info@victoryhomesonline.com
SITE INFORMATION:
Site Address: 11703 E RIVERCREST DR Owner: LIGHTHOUSE GROUP INC
Parcel Number: 45044.1809 Address: 2120 NORTHWEST BLVD,STE B
COEUR D'ALENE, ID 83814
Phone:
Assessor's Description: RIVERCREST AT COYOTE ROCK LT 9 BLK 2 Email:
(AFN#5950721)
Inspection Area: : (509)-477-3675
Water District: Irvin Water District#6 Fire District: Spokane Valley Fire
Zoning: Land Area:4843 Square Feet
CONTRACTOR INFORMATION:
ARROWEI055DF, Exp.07/20/2015
ARROW EXCAVATION, INC
11741 W ROMAN RD POST FALLS, ID 83854
208-929-1830
DETAILS:
Class Type Quantity Unit Charge Value
SEWER SEWER CONNECTION 1 $125.00 $125.00
$125.00
FEE DETAIL:
Processing-Utilities $27.12
Utilities Permit $125.00
Total Fee: $152.12
CONDITIONS:
Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire.
Inside Public Transit Benefit Area
CALL 1-800-424-5555 BEFORE YOU DIG--AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR& INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
SEWER PERMITS ARE VALID FOR ONE(1)YEAR FROM THE DATE OF ISSUANCE. FOR SEWER INSPECTIONS CALL THE UTILITIES
DEPT AT(509)477-3604 FROM 8:30-5:00 MONDAY-FRIDAY PRIOR TO COVER.ONE WORKING DAY NOTICE REQUIRED. PERMIT
ALLOWS FOR A 30-MINUTE INSPECTION.ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES.
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
Date Printed:02/10/2015 12:10:52 Project Coordinator:Kathy Cummings
SPOKANE COUNTY UTILITIES
PERMIT
Application Number: SW -15000082 Permit Issued Date: 02/10/2015
Expiration Date: 02/10/2016
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed: 02/10/2015 12:10:52 Project Coordinator: Kathy Cummings