Loading...
2013, 02-08 Permit: SW-13000064 SewerSPOKANE COUNTY BUILDING AND PLANNING PERMIT Application Number: SW -13000064 Permit Issued Date: 02/08/2013 Expiration Date: 02/09/2013 Project Description: SEWER CONNECTION Project Name: RIVERCREST Permit Type: SEWER Primary Contact: COYOTE ROCK LLC & NEIGHBORHOOD INC Applicant: COYOTE ROCK LLC & NEIGHBORHOOD INC Address: 608 NORTHWEST BLVD STE #103 COEUR D'ALENE, ID 83814 Phone: Email: SITE INFORMATION: Site Address: Parcel Number: Subdivision: Assessor's Description: Inspection Area: Zoning: 11729 E RIVERCREST DR 45044.1815 RIVERCREST AT COYOTE ROCK LT 15 BLK 2 (AFN# 5950721) Owner: Address: Phone: Email: COYOTE ROCK LLC & NEIGHBORHOOD INC 608 NORTHWEST BLVD STE #103 COEUR D'ALENE, ID 83814 Water District: Irvin Fire District: Spokane Valley Fire Water District #6 Land Area: 6037 Square Feet CONTRACTOR INFORMATION: General Contractor ARROWEI055DF ARROW EXCAVATION, INC 3705 RAILROAD POST FALLS, ID 83854 208-773-5837 DETAILS: Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION 1 $125.00 $125.00 FEE DETAIL: Processing - Utilities Utilities Permit Total Fee: $125.00 $26.32 $125.00 $151.32 CONDITIONS: Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire. Inside Public Transit Benefit Area Date Printed: 02/08/2013 11:35:29 Printed by: IIS APPPOOL\SmartGovProdApp SPOKANE COUNTY BUILDING AND PLANNING PERMIT Permit Issued Date: Application Number: SW -13000064 02/08/2013 Expiration Date: 02/09/2013 CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed: 02/08/2013 11:35:29 Printed by: IIS APPPOOL\SmartGovProdApp