Loading...
2014, 10-05 Duct Leakage AffidavitDuct Leakage Affidavit (New Construction) Permit #: City: SWo�[.o•r t V eftAZip: House address or lot number: Cond. Floor Area (ft2): LL Source (circle one): ❑ Duct tightness testing is not required. The total leakage test is not required for ducts and air handlers located entirely within the building thermal envelope. Ducts located in crawl spaces do not qualify for this exception. Estimated Measured Air Handler in conditioned space? 0 yes Ano Circle Test Method: Leakage to Outside Air Handler present during test?Ayes 0 no Maximum duct leakage: Post Construction, total duct leakage: (floor area x .04) = CFM@25 Pa Post Construction, leakage to outdoors: (floor area x .04) = CFM@25 Pa Rough -In, total duct leakage with air handler installed: (floor area x .04) =-70.(A CFM@25 Pa Rough -In, total duct leakage with air handler not installed: (floor area x .03) = CFM@25 Pa Test Result: Czi CFM@25Pa Ring (circle one if applicable): Duct Tester Location: QsvV.scw. Open 1 2 Pressure Tap Location: I certify that these duct leakage rates are accurate and determined using standard duct testing protocol. Company Name: �%4Alvar".- CurvOteNkt ANTechnician: Q-aM.4 Technician Signature: Date: \r)-��--►�1 Phone Number: 2c - (WC-'SSi. BUILDING LEAKAGE TEST Outsource Management Inc. dba: Dynamic Energy Solutions 25759 N. Lynnhaven Rd. Athol, Id. 83801 Phone: 208-818-5323 Date of Test: _\L Technician: Brad Ward Customer: Building Address: �1zvti..astc��- c44 c•ua..c V d\`c W 8 Test Results: 1. Airflow at 50 Pascals: ovz5), CFM (50 Pa = 0.2 w.c) 2. Tested Leakage: 3. Target: 4. Test Settings: 5. Conditioned Volume: `3 , j`,s-ACH50 ACH50 Test Mode: Depressurization Equipment: Model 3 Minneapolis Blower Door Flow Ring: (la -1, It -kit -v. Cubic ft. 6. Conditioned Floor Area: V-164. Sq Ft.