2014, 10-05 Duct Leakage AffidavitDuct Leakage Affidavit (New Construction)
Permit #:
City: SWo�[.o•r t V eftAZip:
House address or lot number:
Cond. Floor Area (ft2): LL Source (circle one):
❑ Duct tightness testing is not required. The total leakage test is not required for ducts and air handlers located
entirely within the building thermal envelope. Ducts located in crawl spaces do not qualify for this exception.
Estimated Measured
Air Handler in conditioned space? 0 yes Ano
Circle Test Method: Leakage to Outside
Air Handler present during test?Ayes 0 no
Maximum duct leakage:
Post Construction, total duct leakage: (floor area x .04) = CFM@25 Pa
Post Construction, leakage to outdoors: (floor area x .04) = CFM@25 Pa
Rough -In, total duct leakage with air handler installed: (floor area x .04) =-70.(A CFM@25 Pa
Rough -In, total duct leakage with air handler not installed: (floor area x .03) = CFM@25 Pa
Test Result: Czi CFM@25Pa
Ring (circle one if applicable):
Duct Tester Location: QsvV.scw.
Open
1
2
Pressure Tap Location:
I certify that these duct leakage rates are accurate and determined using standard duct testing protocol.
Company Name: �%4Alvar".- CurvOteNkt ANTechnician: Q-aM.4
Technician Signature:
Date: \r)-��--►�1
Phone Number: 2c - (WC-'SSi.
BUILDING LEAKAGE TEST
Outsource Management Inc.
dba: Dynamic Energy Solutions
25759 N. Lynnhaven Rd.
Athol, Id. 83801
Phone: 208-818-5323
Date of Test: _\L Technician: Brad Ward
Customer:
Building Address:
�1zvti..astc��-
c44
c•ua..c V d\`c W 8
Test Results:
1. Airflow at 50 Pascals: ovz5), CFM
(50 Pa = 0.2 w.c)
2. Tested Leakage:
3. Target:
4. Test Settings:
5. Conditioned Volume:
`3 , j`,s-ACH50
ACH50
Test Mode: Depressurization
Equipment: Model 3 Minneapolis Blower Door
Flow Ring: (la -1,
It -kit -v. Cubic ft.
6. Conditioned Floor Area: V-164. Sq Ft.