Loading...
1969, 10-22 Permit: I149 Enclosing BreezewaySPOKANE COUNTY BUILDING CODE DEPARTMENT Court House, Spokane, Washington Land Use or Structure Permit NUMBER1 1 4 9 Property Addresuzial...130ADvaggintl4il Group I TYPe- V Zone Aeriotaturta--SUbEWben Permit for 4111010114114 -4Kalitiag breueeraw „tor maroon owner--Geseielltuh-Windaskow Addressa. aims Architect Address. Ph Contractor..$ Address Phone Location.Let. 5 Nook -2,- Oppertanity-Terreeer astatine Bldg. Zone Fire Zone. 3 Size of Lot Sewage Stories Material....fras. Dimensions. 401:(48.1 Total Sq. Ft 1$0...appreikaluation.$3,1=0,00. Rooms1 Basement Foundation. imist41 Fireplace Heating System Miscellaneous: Certificate of Occupancy Issued for..31140111ilit.bree1101118y-fOrt.lituiroca...writhon..aosplated. Remarks---Callad—icapitetions—required-and-Viat-sonforaLto,Spokena..Countylluilding.riod• reepisesents. THIS PERMIT is granted upon the express conditon that the building or land use for which the permit is issued shall conform in all respects to all the ordinances of the County of Spokane, regulating the construction, use and occupancy of buildings in Spokane County, and may be revoked at any time upon the violation of any of the provisions of said ordinances, or failure of plans, as approved, to comply with said ordinances. In consideration of the issuance of the permit for the erection of signs the grantee must place the said signs where directed by County Officials and shall remove the said sign at the expiration of the permit unless regularly renewed. This permit will be good only for commencement of work within six months, and the entire completion thereof withlnil year from this date; after which time this permit will be void. Authorized by Building Official BU LDING COPE DEPARTMENT Permit Expires October 22, 1970 Fee Paid $...3...00 .Xibe By Buildist4 8 Date10/22/