Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
2010, 05-18 Permit App: 10001343 Approach
Spokane jValley Community Development Permit Center 11703 E Sprague Ave, Suite P Spokane Valley, WA 99206 (509)688-0036 FAX: (509)6 www. spokanevalley. ora Approach Permit Application PERMIT NUMBER: F " 8-0037 .': a4 v p... t• r i' _. RM1fPh11, : PROJECT ADDRESS 5 a q N i( Q START DATE �4 Building Owner:�(� ©� Name: me '1 Address: i r--/ 3 Z er Subs tta' ANTICIPATED COMPLETION DATE City: p6 State: ,* Zip: 99/ 2 tw Phone: 12 "1O9 c) Fax: Contact Person Name: Phone: sc99- iOgf PROJECT DESCRIPTION (Provide site sketch) Residential Driveway Existing Curb & Gutter Culvert Installation Other Conditions Contractor: 1 �►i rn - p r -.'Se 2 3)?4. Name: m Yo 12-44 Address: 2 0 ') H t,) M C Fo.(' 1.-,R V City: M `- ( L y_ State: L..j Zip: 1 I B L2 Phone: ` p n •v 5'G OQ 3 Fax: J ° 9 Z • % '1 / 1i i Contractor Lic No:L f l 1 'y r M Date: f .. j )/ " 15-sG City Business Lic. No: Commercial/Industrial Driveway Rural Road Section Sidewalk Repair/Construction Bond/Insurance certification must be on file with the city. DISCLAIMER The permittee verifies, acknowledges and agrees by their signatures that: 1) If this permit is for construction of or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before this application can be processed. Signature Method ofPaymenr ❑ Cash 2- heck Bankcard #: Authorized Signature: REVISED 3/9/06 Date I7,Iz> ❑ Mastercard 0 VISA Expires: VIN#: APPROACH PERMIT APPLICATION REQUIRED SKETCH INFORMATION (Revised 1/25/10) Provide required measurements (in sketch boxes), and include street name. Check all existing conditions that apply: ❑ Sidewalk ft wide ft from back of curb ❑ Streetside Swale ❑ Drainage Ditch ❑ Drywell (show location on sketch) ❑ Other (please describe below) wi z' DISTANCE FROM INEAREST PROPERTY UNE MBE LEFT OR RIGHT SIDE) FT (SEE TABLE) CONCRETE APPROACH CURB J w z w • ELIf of al EDGE OF ASPHALT -4'--THROATWIDTH OFT--�4' WING (SEE TABLE) WING STREET NAME STREET WITH CURB DISTANCE FROM NEAREST PROPERTY LINE MAY BE LEFT OR RIGHT SIDE) �5 FT (SEE TABLE) ASPHALT APPROACH CURB RETURN NIF CORNER LOT, DISTANCE FROM CURB RETURN El FT (SEE TABLE) I --THROAT WIDTH PTIFT -1 (SEE TABLE) STREET NAME SA / LJ )V l< f /e /a - STREET WITH ASPHALT EDGE RADIUS RETURN I \IF CORNER LOT, DISTANCE FROM RADIUS RETURN 0 FT (SEE TABLE) Approach Requirements: Maximum 2 approaches per property frontage; one on arterials. Total width of approaches not to exceed 50% of frontage width. Residential Approaches Commercial Approaches Distance from Curb/Radius Return 15' minimum 75' minimum Separation between Approaches (measured from centerline to centerline of each approach) None specified See Page 7-27 in City Street Standards Throat Width (flat portion) 16' min., 30' max. 30' min., 40' max. Wing Width (at curb line) 4 feet typical 4 feet typical Minimum Distance from Side Property Line (@ r/w) 5.0' 5.0' Minimum Distance from Crosswalk 5' 5' jai Development Engineering 11707 E Sprague Ave Suite 106 • Spokane Valley WA 99206 509.921.1000 • Fax: 509.921.1008 • cityhall@spokanevalley.org Approach Permit Application Review TO: Building Department Site Address: 5214 N. Keller Rd. Project No: 10-1343 Reviewed By: Orrle Date: . /g—/d Accepted Not Accepted Approach X Building Location Paved Access Notes: Saw cutting of existing curb is not allowed within the City's jurisdiction. Driveway is to be inspected by the City's ROW Inspector prior to concrete placement. Approach to be constructed per City's Standard Plan R-114 (Driveway Approach Asphalt). Reviewed By: Orrle Date: . /g—/d PROPERTY LINE 27529' LLl _l --, PLANA NG DEPT. APPROVED DATE sfiIIa PROPERLY LINE 215.29' u 1- 0 ffi Q O E • N 0 Q)) a 'Date 5/2010 REL, Qsv E,,,,a, CENTER lagE /16"= Drawn GPM Job Sheet 505 12 Sheets