HomeMy WebLinkAbout2010, 02-09 Permit App: 10000335 Water Damage Basement Project Number: 0 Inv: 1 Application Date: 02/09/2010 Page 1 of 2
SCITY of PERMIT CENTER
pokane THIS IS NOT A PERMIT
e l}leyrbe assessed for commencing wWt l�ta taep , Suite B-3
Spokane Valley,WA 99206
Project Information:
Permit Use: WATER DMG-BASEMENT-INSULATION, Contact: MR SERVICE INC
SHEETROCK Address: 728 N COOK ST
C-S-Z: SPOKANE WA 99207
Setbacks:Front Left: Right: Rear: Phone: (509)535-8801
Group Name:
Site Information: Project Name:
Plat Key: CONV Name: CONVERTED CNTY DATA District: East
Parcel Number: 45134.1355 Block: Lot:
SiteAddress: 16415 E RIVERSIDE AVE Owner:Name: WORCESTER,CYNTHIA
Address: 16415 E RIVERSIDE AVE
Location::CSV SPOKANE VALLEY,WA 99037
Zoning: R-4 SF Res Urban District
Water District: 010 VERA Hold: ❑
Area: 14,385 Sq Ft Width: 0 Depth: 0 Right Of Way(ft): 0
Nbr of Bldgs: 0 Nbr of Dwellings: 0
Review Information: m a.. m:e ,�n. �
Review
Building Plan Review Released B
Originally Released: 02/09/2010 By: tmelbourn
Permits:
Building Permit
Contractor: MR.SERVICE INC. Firm: MR.SERVICE INC
Address: 728 N COOK ST Phone: (509)535-8801
SPOKANE,WA 99202
This Application: Total Project:
Description Grp Type Notes Sq Ft Valuation Su Ft Valuation
BASEMENT R R-3 VB BASEMENT 0 $8,500.00 0 $8,500.00
WTR DMG
Totals: 0 $8,500.00 0 $8,500.00
Item Description Units Unit Desc Fee Amount
RESIDENTIAL PERMIT FEE 1 SELECT $167.25
WSBCC SURCHARGE 1 SELECT $4.50
SF PLNS RVW<7999 SQ FT 1 SELECT $66.90
Permit Total Fees: $238.65
Operator: jmm Printed By: HM Print Date: 02/09/2010
NOTICE
The ownership of a Spokane Valley Development Permit will inure to the property owner.The permit applicant, by
definition, is the property owner or an authorized agent of the property owner. It is the responsibility of the
applicant/permittee that the use described on the front of this permit complies with applicable codes and that required
inspections are requested. Failure to request inspections as listed below and obtain the necessary approvals before
progressing beyond the point where inspections are required may necessitate removal of certain parts of the
construction at the applicant's/permittee's or property owner's expense.At a minimum, the following inspections ARE
REQUIRED by City Code:
FOOTING—when forms and reinforcement are in place and prior to placement of concrete-all structures,including manufactured homes.
NOTE:This inspection includes review of the structure's setback from property lines.Minimum setbacks are established by City of Spokane
Valley Ordinance.Curb lines and fence lines are not necessarily indicative of property lines.The responsibility to comply with applicable
setback provisions lies solely with the permittee-neither the City of Spokane Valley nor its authorized representatives assume any
responsibility for the verification or location of your property lines. Please verify their location prior to locating your structure. Failure to
properly locate the structure may require its relocation at the owner's/permittee's expense.
FOUNDATION—when forms and reinforcement are in place and prior to placement of concrete.
PLUMBING—after rough-in,before covering,and final.
MECHANICAL—rough-in of piping,before covering,metal chimneys before concealment,and final.
FRAMING—after all framing,bracing and blocking is in place, rough electrical,plumbing and mechanical systems are complete,and prior to
concealing.
FINAL—when complete and prior to occupancy and/or use.All permits require final inspection.
NOTE: In addition to inspection of the structure,this inspection includes review of site improvements(typically depicted on the approved site
plan)required by ordinance or as a condition of approval of this permit.Items such as the installation of fire hydrants,fire department access,
on-site drainage('208'swales),road improvements,parking and landscaping are common requirements of a permit/site plan which must be
completed prior to final approval of a building or issuance of a Certificate of Occupancy.
MANUFACTURED HOMES—Final inspection required when complete,stairs,handrails,skirting,etc.installed,and prior to occupancy;
completed inspection record card must be available on site.
PLUMBING REVERSALS FOR SEWER CONNECTIONS—prior to cover.
RIGHT-OF-WAY/APPROACH—prior to placement of concrete/asphalt or,if gravel approach,after completion.
In addition to the above,any plumbing or mechanical systems or material which would be concealed by framing,drywall,concrete,etc.must
be inspected prior to cover.Check with the Building department for"special inspections"in conjunction with commercial projects.
FOR INSPECTIONS
Please give one working day/24 hour notice. Different parts of your project may require permits and inspections from more than one agency.
Building,plumbing(includes interior reversals for sewer)and Road cuts for utilities or driveways,City of Spokane Valley
mechanical,City of Spokane Valley Building Division 688-0054 Public Works 688-0195 or State Dept of Transportation
324-6000
Permits and inspections for electrical wiring,State Department of Labor Permits and inspections for Sewer Connection,Spokane County Utilities Division
And Industnes 324-2640 477-3604
Permits and inspections for on-site septic systems, Spokane Regional Fire sprinkler and alarm systems and private access road inspections,Spokane Valley
Health District 324-1560 Fire Department 892-4122
State law RCW 19.122 requires that prior to any excavation the"CALL BEFORE YOU DIG-center must be notified.Call before you dig at least 2 working days in advance,456-8000.
PERMIT EXPIRATION AND REFUNDS
All permits shall expire by limitation and be declared void if a)work is not started within 180 days of obtaining a permit,or b)work is
abandoned for 180 days or more after beginning work,or c)after two years from the date of permit issuance,regardless of whether the work is
finished. If a permit is expired for time,a new permit may be obtained for half the permit fee based on the value of the remainder of the work to
finish the original permit.
All refund requests must be made in writing by the original permittee to the Building Official no later than 180 days after the date of fee
payment. 100%refunds will be granted for any fee erroneously paid or collected. Refunds of not more than 80%of a permit fee may be
authorized when no work has been done under the permit issued.Refunds of not more than 80%of a plan review fee paid may be authorized
when an application is withdrawn or cancelled prior to the plan review being completed.
Owner/Agent Date
Staff Approval Date
Project Number: Inv: 1 Application Date: 02/09/2010 Page 2 of 2
SCITY of PERMIT CENTER
pokane THIS IS NOT A PERMIT
40.0.Mittlerbe assessed for conunencing wOrto tI U apet Suite B-3
Spokane Valley,WA 99206
Payment Summary
Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing
Building Permit $238.65 $238.65 $66.90 $171.75
$238.65 $238.65 $66.90 $171.75
Disclaimer:
Submittal of this application certifies the owner(or person(s)authorized by the owner)has both examined and finds the information
contained within to be true and correct,and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for,or an approval of,any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: jmm Printed By: HM Print Date: 02/09/2010
NOTICE
The ownership of a Spokane Valley Development Permit will inure to the property owner.The permit applicant,by
definition, is the property owner or an authorized agent of the property owner. It is the responsibility of the
applicant/permittee that the use described on the front of this permit complies with applicable codes and that required
inspections are requested. Failure to request inspections as listed below and obtain the necessary approvals before
progressing beyond the point where inspections are required may necessitate removal of certain parts of the
construction at the applicant's/permittee's or property owner's expense.At a minimum,the following inspections ARE
REQUIRED by City Code:
FOOTING—when forms and reinforcement are in place and prior to placement of concrete-all structures,including manufactured homes.
NOTE:This inspection includes review of the structure's setback from property lines.Minimum setbacks are established by City of Spokane
Valley Ordinance.Curb lines and fence lines are not necessarily indicative of property lines.The responsibility to comply with applicable
setback provisions lies solely with the permittee-neither the City of Spokane Valley nor its authorized representatives assume any
responsibility for the verification or location of your property lines.Please verify their location prior to locating your structure.Failure to
properly locate the structure may require its relocation at the owner's/permittee's expense.
FOUNDATION—when forms and reinforcement are in place and prior to placement of concrete.
PLUMBING—after rough-in,before covering,and final.
MECHANICAL—rough-in of piping,before covering,metal chimneys before concealment,and final.
FRAMING—after all framing,bracing and blocking is in place, rough electrical,plumbing and mechanical systems are complete,and prior to
concealing.
FINAL—when complete and prior to occupancy and/or use.All permits require final inspection.
NOTE:In addition to inspection of the structure,this inspection includes review of site improvements(typically depicted on the approved site
plan)required by ordinance or as a condition of approval of this permit.Items such as the installation of fire hydrants,fire department access,
on-site drainage('208'swales),road improvements,parking and landscaping are common requirements of a permit/site plan which must be
completed prior to final approval of a building or issuance of a Certificate of Occupancy.
MANUFACTURED HOMES—Final inspection required when complete,stairs,handrails,skirting,etc.installed,and prior to occupancy;
completed inspection record card must be available on site.
PLUMBING REVERSALS FOR SEWER CONNECTIONS—prior to cover.
RIGHT-OF-WAY/APPROACH—prior to placement of concrete/asphalt or,if gravel approach,after completion.
In addition to the above,any plumbing or mechanical systems or material which would be concealed by framing,drywall,concrete,etc.must
be inspected prior to cover.Check with the Building department for"special inspections"in conjunction with commercial projects.
FOR INSPECTIONS
Please give one working day/24 hour notice. Different parts of your project may require permits and inspections from more than one agency.
Building,plumbing(includes interior reversals for sewer)and Road cuts for utilities or driveways,City of Spokane Valley
mechanical,City of Spokane Valley Building Division 688-0054 Public Works 688-0195 or State Dept of Transportation
324-6000
Permits and inspections for electrical wiring,State Department of Labor Permits and inspections for Sewer Connection.Spokane County Utilities Division
And Industries 324-2640 477-3604
Permits and inspections for on-site septic systems. Spokane Regional Fire sprinkler and alarm systems and private access road inspections.Spokane Valley
Health District 324-1560 Fire Department 892-4122
Slate law RCW 19.122 requires that prior to any excavation the"CALL BEFORE YOU DIG"center must be notified.Call before you dig at least 2 working days in advance.456-8000.
PERMIT EXPIRATION AND REFUNDS
All permits shall expire by limitation and be declared void if a)work is not started within 180 days of obtaining a permit,or b)work is
abandoned for 180 days or more after beginning work,or c)after two years from the date of permit issuance,regardless of whether the work is
finished. If a permit is expired for time,a new permit may be obtained for half the permit fee based on the value of the remainder of the work to
finish the original permit.
All refund requests must be made in writing by the original permittee to the Building Official no later than 180 days after the date of fee
payment. 100%refunds will be granted for any fee erroneously paid or collected. Refunds of not more than 80%of a permit fee may be
authorized when no work has been done under the permit issued.Refunds of not more than 80%of a plan review fee paid may be authorized
when an application is withdrawn or cancelled prior to the plan review being completed.
Owner/Agent Date
Staff Approval Date
"v. Permit Center
- " PERMIT NUMBER:
*Wane11703 E SprabeAve,Suite B-3 .� 3J>�S okane Valle WA 99206 PERMIT FEE:
P �'.�
j\ahey (539)688:0036 FAk: (509)6848-0037
www.spokonevall ?dr*
Community Development /
Residential, Constik i, i C333 n New Construction Accessory Bldg
Permit ApOlitat` o _ n Addition/Remodel Deck
L,, j Other: leu% ij ,(9(.;53 rt2 91or ii,
{
SITE ADDRESS: 1 l 12 1( —, � _ till 5- e-- e �� • (.14,. -C,4-.V./
ASSESSORS PARCEL NO: LEGAL DESCRIPTION:
Buildin Owner: Contractor: A c ,
Name: Name:
Address: l C' ` v e,, 53 a, iv Address: 7 pi Ai . c,,,,,,Gk
City: -"IA)
UGy aStater d/, `Zip:[ -7 City: 5 xe)C State:LLQ. Zipq Giz6L
Phone: �/ Fax: Phone: 35,q ( Fax: Z 2P _ `Z<3---e Zl
Contr actor Lic NoJ Exp Date: / 5—...1 l
Contact Person City Business Lic.No: &69.0 /
. /(6' (c QQ
Name: `f
Phone:
Describe t e supe of 'ork de ail: Cost of Project: $ 5Q0 IL
7 0 5.cam (q T c ry �� t ri'k y lDee_A-a �� (6k3/?0 ,: 56-()/
Proposed Use: f &/,2,L-(s,
**************The following MUST be complete: (write N/A if not applicable)**********************
HEIGHT TO PEAK: DIMENSIONS: #OF STORIES: / TOTAL HABITABLE SPACE:
/ 7/2 v-0
MAIN FLOOR TO SQ. 2"" FLOOR SQ. FTG: UNFIN BASEMENT SQ. FTG: IMPERVIOUS SURFACE
FTG: AREA:
•
FINISHED BASEMENT GARAGE SQ. FTG: DECK/COV. PATIO SQ. FTG: 30% SLOPES ON
SQ. FTG: lob PROPERTY:
#OF BEDROOMS: O TIpC ION TYPE: HEAT SOURCE:� SEWER OR SEPTIC?
l C /ZEt�2
The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling,the
dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The
signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done
in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of
Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal,state or
local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before
this application can be pr cessed. /
SIGNATUREf ,C c1f,z/t.,ai7 (JJ212/'6a ATE: — Q - (n
Method of Payment:
0 Cash 4 Check ❑ Mastercard 0 VISA
Bankcard#: Expires: VIN#:
Authorized Signature:
REVISED 2/15/07
•
RESIDENTIAL CHECK LIST DIRECTIONS:
Place a check mark in box next to each document required for complete submittal.
o SITE PLAN
o Property lines and dimensions o Setbacks to property lines
o Direction arrow pointing North and orientation to streets o Distance between buildings
o Proposed/existing buildings (footprint and dimensions) o Right of way/easement location &sizes
o Utilities, septic tank/drain field locations and distances ❑ Driveway approach size and location
BUILDING PLANS (3 SETS) (minimum 1/8 inch scale or completely dimensioned)
❑ Elevations (Front/Rear/Sides)with roof peak and wall height including basement:
❑ Foundation Plan (crawispace, basement or slab on grade):
o Footing sizes and locations o Supporting wood cripple walls or beams
o Perimeter concrete foundation wall sizes o Thickened concrete pads supporting
o Crawlspace ventilation beams or girder trusses
O Floor Plan of each level (finished or unfinished)with dimensions:
o Floor Joist direction, size and spacing ❑Window and door location and sizes
o Header, beam or concrete lintel sizes o Window well locations if applicable
o Brace wall panel locations o Room usage labels
o Water heater and furnace locations o Smoke detector locations
o Exhaust fan locations o Attic and crawl space access locations
o Deck or concrete patio sizes and locations o Fire Wall construction
❑ Roof Plan:
o Engineered truss direction and spacing ❑ Ridge, eave and valley lines
o Rafter and over frame direction, size and spacing o Beam and girder size and location
❑ Wall Section Detail including:
Roof
o Slope/roofing material/underlayment/ice dam protection o Truss or rafter size, spacing &connection
o Sheathing size and type o Attic insulation/air space baffle/ventilation
Ceiling
o Joist size and spacing o Size of ceiling gypsum wall board
Wall
o Height/top plate/stud size and spacing/sole plate ❑ Siding/exterior house wrap/anchor bolts
o Exterior sheathing size and type o Insulation, vapor barrier, gypsum wall board
Floor
o Joist size and spacing o Sheathing or concrete floor size/insulation
Foundation Wall
o Concrete or Masonry unit width o Footing bottom to finished ground level depth
o Earth to wood separation distance o Horizontal &vertical reinforcement if any
Footing
o Size o Reinforcement if any
Radon
o Passive system with 6mil vapor barrier o Active system with 6 mil vapor barrier
Miscellaneous Construction Details
❑ Deck:
o Floor plan/side view/dimensions o Footings/post/and beam size and locations
o Floor Joist/decking direction, size and spacing
O Stairway tread rise & run and nosing 0 Handrail/Guard height&spacing
' ' For City Use Only
CITY ` {.SpöIiane Project Address %�.C%`��j � " ;_ �' L(,='7
alley 11703 E Sprague Ave Suite B-3 • Spokane Valley WA 99206
509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org
As part of our on-going commitment to customer service during the review process of your project
application, we are providing you with a TARGET DATE for the initial technical application review. If for
any reason we cannot meet this date, we will contact you with a revised target date.
Your application review TARGET DATE is ''
The TARGET DATE is the date we estimate your project application will have had its initial technical
review. It is not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
)%. Submit complete, accurate plans and documents.
Extra time may be required for re-submittals as project application reviewers work on multiple applications and it
may be several days before they can look at your new or revised information.
➢ Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one individual with the
expertise for dealing with reviewer comments would be the best choice for the entire review process.
➢ Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date,please feel free to contact us if you haven't heard from us
by your target date. Staff may contact you before the target date if the initial review is complete. By following this
procedure,you will save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required
documents, as indicated on your Pre-Application Checklist have been submitted or have been approved for deferred
submittal. This does not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free
from substantive flaws that would prevent technical staff from completing the technical review once it is started. When
this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it
comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance
review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by
phone,fax, email,or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re-
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections
of the application are received, a Permit Specialist will process the application and contact the person specified on your
application for permit pick-up. Information regarding fees and pre-construction meetings (if required) will be provided by
the Permit Specialist at that time.
WHITE-APPLICANT PINK-BUILDING FILE REV 9/07
PERMIT CENTER
Project Transmittal I
40.0.Vaile3re 11703 E Sprague Ave. Suite B-3,Spokane Vail 4y,WA 99244AR 2 (1
Phone: 509.720.5240 Fax: 509.68$00p.—.-,ts F
Deferred Documents ❑ Provide one of the following(rte pec mice). ^
Response to Review Comments ❑ PLUS Project#:
Revisions to Application o Parcel Number:
Other (Describe Below): ❑ Site Address:
Route to(Please check all that apply):
II Division #of Sheets/Type of Document/#of Copies
❑ Budding ad
f / !eves ec p refs lig1cfoif
x i
P, a
❑ Development Engineering /
❑ Planning /
/ / •
I }rG A
❑ SV Fire Department / /
Project Contact Information:
Name: WmtCesfet1 6,,r0d-V
Phone: �� 7' C&e
Email:�►'�o�?/, tvor ces7`(�' @/els, ai rN y.H..: / Fax:
Relationship to Project:
❑ Architect 0 Engineer 0 Other Design Professional 0 Contractor Owner I Applicant
NOTE:
Bring ali documents to the City of Spokane Valley Permit Center at 11703 E Sprague Ave—Suite B-3.
We are sorry for any inconvenience, but documents brought elsewhere cannot be accepted.
Effective June 10,2009
Permit Center
of 11703 E Sprague Ave, Suite B-3 PERMIT NUMBER:
Spcmokane gSpokane Valley,WA 99206 PERMIT FEE:
Valley'' (509)688-0036 FAX: (509)688-0037
www.spokanevalley.org
Community Development
Residential Construction n New Construction n Accessory Bldg
Permit Application n Addition/Remodel Deck
Other: E l r e s.5 1,/,-.„10 c.,,•
SITE ADDRESS: 16 4-45- F. RI veestde. A tier
ASSESSORS PARCEL NO: LEGAL DESCRIPTION:
Building Owner: Contractor: ,,/
Name: C r�OrY War( e..5 T-1.-- Name: (ter.e,ty W rCc4r�
Address: 16�-i - . R, v .5,d,e A✓2. Address: 16 — r Pi yc'r i cte Ave.
City:S'2o�a�t V��1�r
State:v4 Zip: /ge37 City: -,ora n.e . V ey State: 1.4/It Zip: 91237
Phone:5-e1_ 76 8_ ,g6, l Fax: Phone:50(i_7 6 3' 6 g' Fax:
Contractor Lic No: K/A Exp Date: k/A
Contact Person City Business Lic.No: ki/,4
Name: 6r egory Verce,srer
Phone: S® 7 3_ 6 $o )
Describe the scope of work in detail: Cost of Project: $ ',j0 0. 0 0
ee.x &var1ei. oJ CAtTY-r Pil Bf CZ/'1 '/-es-) w/Alto I-- 6h NE corner- Bf L.Se
, easT--Faci 4/iuis
Acid Te p er/frr;r i Ie'000.33,5—
Proposed Use:
**************The following MUST be complete: (write N/A if not applicable)**********************
HEIGHT TO PEAK: A I/A DIMENSIONS: Kik #OF STORIES: TOTAL HABITABLE SPACE:
MAIN FLOOR TO SQ. 2Nu FLOOR SQ. FTG: UNFIN BASEMENT SQ. FTG: IMPERVIOUnS SURFACE
FTG: ei
71 Y IVA N// AREA: / % 44
FINISHED BASEMENT GARAGE SQ. FTG: �I t DECK/COV. PATIO Q. FTG: 30% SLOPES ON
SQ. FTG: `I1� IVA N/A PROPERTY: Nene
#OF BEDROOMS: CONSTRUCTION TYPE: HEAT SOURCE: SEWER OR SEPTIC?
f`./A- (lets. bk5�dotrQl/I (V a"5 -F[u'nue S eh 7`i L
5 ob,)
The permitee verifies,acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling,the
dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The
signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done
in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of
Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal,state or
local laws,codes or ordinances.6) Plans or additional information may be required to be submitted, and subsequently approved before
this application can be processed.
,7
SIGNATURE: DATE: 11 M A R X0/0
Method of Payment: l ,
❑ Cash 0 Check 0 Mastercard 0 VISA
Bankcard#: Expires: VIN#: `'' `_.
Authorized Signature: ^,• •r.,i ^
1 .
REVISED 2/15/07
I
•
RESIDENTIAL CHECK LIST DIRECTIONS:
Place a check mark in box next to each document required for complete submittal.
o SITE PLAN
o Property lines and dimensions o Setbacks to property lines
o Direction arrow pointing North and orientation to streets o Distance between buildings
o Proposed/existing buildings (footprint and dimensions) o Right of way/easement location &sizes
o Utilities, septic tank/drain field locations and distances ❑ Driveway approach size and location
BUILDING PLANS (3 SETS) (minimum 1/8 inch scale or completely dimensioned)
❑ Elevations (Front/Rear/Sides)with roof peak and wall height including basement:
❑ Foundation Plan (crawispace, basement or slab on grade):
o Footing sizes and locations o Supporting wood cripple walls or beams
o Perimeter concrete foundation wall sizes o Thickened concrete pads supporting
o Crawlspace ventilation beams or girder trusses
O Floor Plan of each level (finished or unfinished)with dimensions:
o Floor Joist direction, size and spacing ❑Window and door location and sizes
o Header, beam or concrete lintel sizes o Window well locations if applicable
o Brace wall panel locations o Room usage labels
o Water heater and furnace locations o Smoke detector locations
o Exhaust fan locations o Attic and crawl space access locations
o Deck or concrete patio sizes and locations o Fire Wall construction
❑ Roof Plan:
o Engineered truss direction and spacing ❑ Ridge, eave and valley lines
o Rafter and over frame direction, size and spacing o Beam and girder size and location
❑ Wall Section Detail including:
Roof
o Slope/roofing material/underlayment/ice dam protection o Truss or rafter size, spacing &connection
o Sheathing size and type o Attic insulation/air space baffle/ventilation
Ceiling
o Joist size and spacing o Size of ceiling gypsum wall board
Wall
o Height/top plate/stud size and spacing/sole plate ❑ Siding/exterior house wrap/anchor bolts
o Exterior sheathing size and type o Insulation, vapor barrier, gypsum wall board
Floor
o Joist size and spacing o Sheathing or concrete floor size/insulation
Foundation Wall
o Concrete or Masonry unit width o Footing bottom to finished ground level depth
o Earth to wood separation distance o Horizontal &vertical reinforcement if any
Footing
o Size o Reinforcement if any
Radon
o Passive system with 6mil vapor barrier o Active system with 6 mil vapor barrier
Miscellaneous Construction Details
❑ Deck:
o Floor plan/side view/dimensions o Footings/post/and beam size and locations
o Floor Joist/decking direction, size and spacing
O Stairway tread rise & run and nosing 0 Handrail/Guard height&spacing