Loading...
2012, 09-25 Permit: SW-12002265 SewerSPOKANE COUNTY BUILDING AND PLANNING PERMIT Application Number: SW -12002265 Permit Issued Date: 09/25/2012 Expiration Date: Project Description: Project Name: Permit Type: SEWER CONNECTION WHITE BIRCH SEWER Primary Contact: LARRY MILLER EXCAVATING Applicant: LARRY MILLER EXCAVATING Address: Phone: Email: 7117 E RUTTER AVE SPOKANE, WA 99212 509-218-3335 SITE INFORMATION; Site Address: Parcel Number: Subdivision: Assessor's Description: Inspection Area: Zoning: 16324 E RIVERSIDE AVE 45134.1436 VERADALE REPLAT OF BLOCK 13 VERA REPL B13 L4 B1 Water District: Vera Irrigation District #15 Owner: Address: Phone: Email: NIMRI, NEZAR K 16324 E RIVERSIDE AVE VERADALE, WA 99037 Fire District: Spokane Valley Fire Land Area: 14385 Square Feet CONTRACTOR INFORMATION: General Contractor LARRYME918DR LARRY MILLER EXCAVATING 7117 E RUTTER AVE SPOKANE, WA 99212 509-218-3335 DETAILS: Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION FEE DETAIL: Processing - Utilities Utilities Permit 1 $125.00 $125.00 Total Fee: $125.00 $25.94 $125.00 $150.94 CONDITIONS: Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire. Inside Public Transit Benefit Area CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. Date Printed: 09/25/2012 10:04:55 Printed by: IIS APPPOOL\ASP.NET v4.0 SPOKANE COUNTY BUILDING AND PLANNING PERMIT ,. Permit Issued Date: Application Number: SW -12002265 09/25/2012 Expiration Date: FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed: 09/25/2012 10:04:55 Printed by: IIS APPPOOL\ASP.NET v4.0