2013, 03-18 Permit: SW-13000236 SewerSPOKANE COUNTY UTILITIES
PERMIT
Application Number: SW -13000236
Permit Issued Date: 03/18/2013
Project Description:
Project Name:
Primary Contact:
Phone:
SEWER CONNECTION
PINE VALLEY ESTATES
WC CONNER EXC
Applicant: WC CONNER EXC
Address: 1809 E HOUSTON AVE
SPOKANE, WA 99217-7541
Phone:
Email:
SITE INFORMATION:
Site Address:
Parcel Number:
1301 N ROBIE LN
45161.2204
Owner: RADEZKY PROPERTIES WE1 LLC
Address: 12402 N DIVISION ST #369
SPOKANE, WA 99218
Phone:
Assessor's Description: (CITY OF SPOKANE VALLEY) PINE VALLEY Email:
ESTATES LT 4 BLK 2 (AUDITORS #5728519 BK
35 PGS 41 & 42)
Inspection Area: : (509)-477-3675
Water District: Modern Electric Water Fire District: Spokane Valley Fire
Company
Zoning: Land Area: 8466 Square Feet
CONTRACTOR INFORMATION:
WCCONE277JR, Exp. 06/07/2013
W C CONNOR EXCAVATING
1809 E. HOUSTON AVE.
SPOKANE, WA 99217
509-466-6178
DETAILS:
Class
Type
Quantity Unit Charge Value
SEWER
FEE DETAIL:
Processing - Utilities
Utilities Permit
SEWER CONNECTION
Total Fee:
$26.32
$125.00
$151.32
1 $125.00 $125.00
$125.00
CONDITIONS:
Inside Public Transit Benefit Area
Plan review fee is required for a site plan reviews conducted by Spokane Valley Fire.
CALL
VANCE. SPOKANE
COUNTY
E
A -KO -424-5555 BEFORE YOU DIG—AT LEAST 2
COMPLY WITH ALL REQUIREMENTS OF WORKING
WA STATE DEPT OF DREQUIRES THE
OF LABOR & NDUSTRIES INCLUDING THOSE
INSTALLER
RELATED TO TRENCH SAFETY. TO
FOR SEWER INSPECTIONS CALL THE DEPT AT (509)477-3604 OMONDAY-FRIDAY PRIOR
TE
ONE WORKING DAY NOTICE REQUIRED.
PERMITOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES
APPLY AFTER 30 MINUTES.
Date Printed: 0311812013 12:22:36
Project Coordinator: Dawn Dompier
SPOKANE COUNTY UTILITIES
PERMIT
Application Number: SW -13000236 Permit Issued Date: 03/18/2013
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed: 03/18/2013 12:22:36
Project Coordinator: Dawn Dompier
J