Loading...
2011, 09-14 Permit:11001969 PoolSpurbkane jValley° Permit Center 11703 E Sprague Ave Suite B3 Spokane Valley WA 99206 509.720-5240 ♦ Fax: 509.688.0037 • email: permitcenter@spokanevalley.org Site Information Project Information 1 Site Address: 18625 E RIVERWAY AVE Parcel Number: 55074.0175 Subdivision: Block: Lot: Zoning: R-2 SF Res Suburban District Owner: STROMBERGER, TIM & ARLENE Address: 18625 F. RIVERWAY RD GREENACRES, WA 99016 Building Inspector: EAST Water Dist: CONSOLIDATED IRRG #1 Project Number: 11001969 Inv: 1 Issue Date: 09/14/2011 Permit Use: 16 X 32 IN GROUND SWIMMING POOL Applicant: POOL WORLD INC. P 0 BOX 14927 SPOKANE, WA. 99214 Contact: POOL WORLD INC. P O BOX 14927 SPOKANE. WA. 99214 Phone: (509) 928-6585 Phone: (509) 928-6585 Setbacks - Front: Left: Right: Rear: Group Name: Project Name: Permits Swimming Pool Contractor: POOL WORLD INC License #: POOL.WI*241CP SWIM POOL> 5000 GAL $52.00 WSBCC SURCHARGE $4.50 Total Permit Fee: $56.50 A barrier is required around the pool area. The top of the barrier shall be at least 48 inches above grade measured opposite the pool side. The maximum vertical clearance between grade and the barrier is 2 inches. Spacing between vertical members is 1.75" in width. FOR POOL & FENCING INSPECTIONS CALL (509) 688-0054. Openings in the barrier shall not allow the passage of a 4" sphere. Where the barrier is composed of horizontal and vertical members and the distance between the tops of the horizontal members is 45" or more, the spacing of the vertical members shall not exceed 4". Gates shall comply with the above provisions and be equiped to accommodate a locking device. Pedestrian gates shall open outward away from the pool and shall have self-closing and self -latching devices. Other requirements may pertain to your specific installation. Where the harrier is composed of horizontal and vertical members and the distance between the tops of the horizontal members is less than 45" the horizontal members shall be located pool side. Where a wall of a dwelling unit serves as a part of the barrier, special requirements apply. Please see Chapter 31 Special Construction. Section 3109 for all requirements of the IBC. Payment Summary Total Fees AmountPaid AmountOwing $56.50 $56.50 $0.00 Tran Date Receipt # Payment Amt 09/14/2011 28334 $56.50 Processed By: DAVIS. JENNA Printed By: MORRIS. HEATHER Page 1 of 1 PERMIT NOTICE The ownership of a Spokane Valley Development Permit will inure to the property owner. The permit applicant, by definition, is the property owner or an authorized agent of the property owner. It is the responsibility of the applicant/permitee that the use described on the front of this permit complies with applicable codes and that required inspections are requested. Failure to request inspections as listed below and obtain the necessary approvals before progressing beyond the point where inspections are required and may necessitate removal of certain parts of the construction are at the applicant's/permittee's or property owner's expense. At a minimum, the following inspections ARE REQUIRED by the Spokane Valley Municipal Code (SVMC): FOOTING - when forms and reinforcements are in place and prior to placement of concrete -all structures, including manufactured homes. NOTE: This inspection includes review of the structures setback from property lines. Minimum setbacks are established by SVMC. Curb lines and fence lines are not necessarily indicative of property lines. The responsibility to comply with applicable setback provisions lies solely with the permitee-neither the City of Spokane Valley nor its authorized representatives assume any responsibility for the verification or location of your property lines. Please verify their location prior to locating your structure. Failure to properly locate the structure may require its relocation at the owner's/permittee's expense. FOUNDATION - when forms and reinforcement are in place and prior to placement of concrete. PLUMBING - after rough -in, before covering and final. MECHANICAL - rough -in of piping, before covering, metal chimneys before concealment and final. FRAMING - after all framing, bracing and blocking is in place, rough electrical, plumbing and mechanical systems are complete, and prior to concealing. FINAL - when complete and prior to occupancy and/or use; all permits require final inspection. NOTE: In addition to inspection of the structure, this inspection includes review of site improvements (typically depicted on the approved site plan) required by ordinance or as a condition of approval of this permit. Items such as installation of fire hydrants, fire department access, on-site drainage ('208' swales), road improvements, parking and landscaping are common requirements of a permit/site plan which must be completed prior to final approval of a building or issuance of a Certificate of Occupancy. MANUFACTURED HOMES - final inspection required when complete, stairs, handrails, skirting, etc. installed and prior to occupancy; completed inspection record card must be available on site. PLUMBING REVERSALS FOR SEWER CONNECTIONS - prior to cover RIGHT-OF-WAY/APPROACH - prior to placement of concrete / asphalt or, if gravel approach, after completion. In addition to the above, any plumbing or mechanical systems or material which would be concealed by framing, drywall, concrete, etc., must be inspected prior to cover. Check with the Building department for special inspections in conjunction with commercial projects. State law RCW 19.122 requires that prior to any excavation the 'CALL BEFORE YOU DIG' center must be notified. Call 411 at least 3 working days in advance. PERMIT EXPIRATION AND REFUNDS Expirations: Building or other permits (regulated under SVMC Chapter 24) shall expire by limitation and be declared void if a) work is not started within 180 days of obtaining a permit, or b) work is abandoned for 180 days or more after beginning work, or c) after two years from the date of permit issuance, regardless of whether the work is finished. If a permit is expired for time, a new permit may be obtained for half the permit fee based on the value of the remainder of the work required to finish the original permit. Right-of-way permits (regulated under SVMC Chapter 22) issued between April 1, and September 30, are valid for 30 days after the date of issuance, with a one-time 30 -day extension available. Right-of-way permits issued between October 1, and March 31, shall be valid until the following April 30. Refunds: All refund requests must be made in writing by the original permitee to the Building Official no later than 180 days after the date of fee payment. Full refunds will be granted for any permit issued in error. Rate of refund shall be as set forth in the City of Spokane Valley Master Fee Schedule in effect at the time of permit application. A copy of this schedule is available at Permit Center and also available for reference on the city website at: http://www.spokanevalley.orq and search for "fees" Owner/Agent 21/(awr-rta_ racuXnoxi9, ltr0I W07/Crl Date: 9-114`II Staff Approval Date: