2012, 12-01 Permit App: BLD-2012-2211 Residence•
Community Development Department
Permit Center
11703 East Sprague Avenue, Suite B-3
Spokane Valley, WA 99206
Tel: (509) 688-0036
Fax: (509) 688-0037
permitcenter@spokanevallev.orq
.t # 3W-IZ_ ?-z))
RECEIVED
PERMIT NUMBER:
PER aSr VEe E R rvu T CENTER
t �
UD 4
REV. 4 -
RESIDENTIAL CONSTRUCTION PERMIT APPLICATION
1 NEW CONSTRUCTION a ADDITION/REMODEL la ACCESSORY BUILDING
DECK • OTHER
[TE ADDRESS: 1305 N Robie Lane - Spokane Valley, WA 99206
SSESSORS PARCEL NO.: 45161.2205 LEGAL DESCRIPTION:
JILDING OWNER NAME: Lewis Construction & Development, Inc.
,ME: Tim Lewis
1DRESS:8225 N Division - Suite A
TV: Spokane
STATE: wa ZIp: 99208
ZONE: 5099982304
FAX: 5092790967
CELL: 5099516959
>NTACT NAME: Lewis Construction & Development, Inc.
IONE: 5099982304
FAX: 5092790967
CELL: 5099516959
)NTRACTOR NAME: Lewis Construction & Development, Inc.
1ILING ADDRESS:
TV: Spokane
STATE: wa
ZIP: 99208
IONE: 5099982304 FAX: 5092790967 CELL: 5099516959
iNTRACTOR LICENSE No.: LewisCD917BN
EXPIRES: 5/13
CITY BUSINESS LICENSE NO.: LewisCD%
ESCRIRF TINE crfPE OF WORK IN DETAIL AND INDICATE USE & PROPOSED USE:
ngle Family Residence - 2 Story with 2 car attached garage
****YOU MUST COMPLETE THE FOLLOWING****
ARK N/A IF NOTAPPLICABLE
(eight to Peak:25.-1„
Dimensions:40 x 38
No. of Stories: 2
Total Habitable 1936
Space:
lain Floor SQ FT:
656
Upper Floor SQ FT:
1280
Unfinished Basement SQ
FT: n/a
Finished Basement SQ
FT: n/a
;arage SQ FT:
724
Deck/Covered Patio SQ
FT:
120
Impervious Surface
Area: 464
30% Slopes on
Property: 0
lo. of Bedrooms:3
Construction Type:
Heat Source:9as forced air
Sewer or Septic: sewer
JTAL COST OF PROJECT: $ 180,000
:SCLAIMER
e permitted verifies, acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling, the dwelling is/will
served by potable water, 2) Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property
ner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of
okane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of
okane Valley permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional
ormation may be o e submitted and subsequently apprved before •is application can be processed.
-) C
Fecti • , - 28, 2007 Page 1 of 2
P. o munity Development\02 Administration\03 Forms - Official Versions\Permit Center\Residential Construction Permit
App 10.28.07.doc
•
SpaTbkaneValley®~
Target Date sheet
For City Use Only
PLUS Project '2 lI /ZZIZ
Project Address
11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206
509.720-5240 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org
As part of our on-going commitment to customer service during the review process of your project application, we are
providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet
this date, we will contact you with a revised target date.
Your application review TARGET DATE is
The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is
not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
➢ Submit complete, accurate plans and documents.
Extra time may be required for re -submittals as project application reviewers work on multiple applications and it may be
several days before they can look at your new or revised information.
➢ Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise
for dealing with reviewer comments would be the best choice for the entire review process.
➢ Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us by your
target date. Staff may contact you before the target date if the initial review is complete. By following this procedure, you will
save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as
indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does
not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from
substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is
complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review.
Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email,
or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re -
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the
application are received, a Permit Specialist will process the application and contact the person specified on your application for
permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at
that time.
CD -003 V-7/ 06-21-11 Page 1 of 1
•
PLP.
BY'. Katitram?4.
DATE: /z /, /202,
10' o'
Project # (2,0\ -jz--Z2)
)
RECE VED
DEC 0
CSV PERF'
North
PI co
SJB #
Setbacks:
Front = 22'-0"
Back = 28'-10"
West = 10'-0"
East = 6'-6"
20' o" \\
Stubby
Sewer
Stub
20=0'
2012
CENTER
N
Utility
Easement
1305 N Roble Lane
Spokane Valley, WA 99206
Parcel #45161.2205
vfo- QY c-sTr 5
LOT 5, 5LOtK 2-
/500
/5®O 11
Drainage
Easement
SPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Application Number: SW -12002603
Project Description: SEWER CONNECTION
Project Name: PINE VALLEY ESTATES
Permit Type: SEWER
Permit Issued Date:
12/06/2012
Expiration Date
Primary Contact: W C CONNER EXCAVATING INC
Applicant: W C CONNER EXCAVATING INC
Address: 1809 E HOUSTON AVE
SPOKANE, WA 99217-7541
Phone:
Email;
T INFORMAT.M
Site Address;
Parcel Number:
1305 N ROSIE LN
45161.2205
Subdivision;
Assessor's Description: (CITY OF SPOKANE VALLEY) PINE VALLEY
ESTATES LT 5 I:iLK 2 (AUDITORS #5728519 BK
35 PG$ 41 8 42)
Inspection Area:
Owner:
Address:
Phone:
Ernafi;
RADEZKY PROPERTIES WE1 LLD
12402 N DIVISION ST #389
SPOKANE, WA 99218
Water District; Modern Fire District: Spokane Valley Fire
Electric Water Company
Zoning: Land Area: 7501) Square Feet
¢.NT 7IQ&tt EQRI! IATI014I
General Contractor
WCCONE277JR
W C CONNOR EXCAVATING
1809 E. HOUSTON AVE ,
SPOKANE, WA 99217
509-466-6178
DI TAIM
Class
SEWER
Type
Quantity Unit Charge Value
SEWER CONNECTION
',tLgtTA L
Processing - Utilities
Utilities Permit
1 $125,00 5125.00
Total Fee:
5125,00
525.94
$125,00
5150.94
SGQ.NDITIQN.p i -r
Plan review fee is required for all site pian reviews conducted by Spokane Valley Fire.
Inside Public Transit Benefit Area
CALL 1-800-424.5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL,. REQUIREMENTS OE THE WA STATE DEPT OF LABOR 8, INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
Oate Printed; 12106/2012 13:56:44
TO
Printed by; tis APPPOOL1SrnrartGavProdApp
XVI .1.32U3SY'I dH
lId00 :t70 ZT/90/ZT