Loading...
2012, 12-01 Permit App: BLD-2012-2211 Residence• Community Development Department Permit Center 11703 East Sprague Avenue, Suite B-3 Spokane Valley, WA 99206 Tel: (509) 688-0036 Fax: (509) 688-0037 permitcenter@spokanevallev.orq .t # 3W-IZ_ ?-z)) RECEIVED PERMIT NUMBER: PER aSr VEe E R rvu T CENTER t � UD 4 REV. 4 - RESIDENTIAL CONSTRUCTION PERMIT APPLICATION 1 NEW CONSTRUCTION a ADDITION/REMODEL la ACCESSORY BUILDING DECK • OTHER [TE ADDRESS: 1305 N Robie Lane - Spokane Valley, WA 99206 SSESSORS PARCEL NO.: 45161.2205 LEGAL DESCRIPTION: JILDING OWNER NAME: Lewis Construction & Development, Inc. ,ME: Tim Lewis 1DRESS:8225 N Division - Suite A TV: Spokane STATE: wa ZIp: 99208 ZONE: 5099982304 FAX: 5092790967 CELL: 5099516959 >NTACT NAME: Lewis Construction & Development, Inc. IONE: 5099982304 FAX: 5092790967 CELL: 5099516959 )NTRACTOR NAME: Lewis Construction & Development, Inc. 1ILING ADDRESS: TV: Spokane STATE: wa ZIP: 99208 IONE: 5099982304 FAX: 5092790967 CELL: 5099516959 iNTRACTOR LICENSE No.: LewisCD917BN EXPIRES: 5/13 CITY BUSINESS LICENSE NO.: LewisCD% ESCRIRF TINE crfPE OF WORK IN DETAIL AND INDICATE USE & PROPOSED USE: ngle Family Residence - 2 Story with 2 car attached garage ****YOU MUST COMPLETE THE FOLLOWING**** ARK N/A IF NOTAPPLICABLE (eight to Peak:25.-1„ Dimensions:40 x 38 No. of Stories: 2 Total Habitable 1936 Space: lain Floor SQ FT: 656 Upper Floor SQ FT: 1280 Unfinished Basement SQ FT: n/a Finished Basement SQ FT: n/a ;arage SQ FT: 724 Deck/Covered Patio SQ FT: 120 Impervious Surface Area: 464 30% Slopes on Property: 0 lo. of Bedrooms:3 Construction Type: Heat Source:9as forced air Sewer or Septic: sewer JTAL COST OF PROJECT: $ 180,000 :SCLAIMER e permitted verifies, acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling, the dwelling is/will served by potable water, 2) Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property ner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of okane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of okane Valley permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional ormation may be o e submitted and subsequently apprved before •is application can be processed. -) C Fecti • , - 28, 2007 Page 1 of 2 P. o munity Development\02 Administration\03 Forms - Official Versions\Permit Center\Residential Construction Permit App 10.28.07.doc • SpaTbkaneValley®~ Target Date sheet For City Use Only PLUS Project '2 lI /ZZIZ Project Address 11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206 509.720-5240 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. Your application review TARGET DATE is The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review ➢ Submit complete, accurate plans and documents. Extra time may be required for re -submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. ➢ Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. ➢ Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure, you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re - submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at that time. CD -003 V-7/ 06-21-11 Page 1 of 1 • PLP. BY'. Katitram?4. DATE: /z /, /202, 10' o' Project # (2,0\ -jz--Z2) ) RECE VED DEC 0 CSV PERF' North PI co SJB # Setbacks: Front = 22'-0" Back = 28'-10" West = 10'-0" East = 6'-6" 20' o" \\ Stubby Sewer Stub 20=0' 2012 CENTER N Utility Easement 1305 N Roble Lane Spokane Valley, WA 99206 Parcel #45161.2205 vfo- QY c-sTr 5 LOT 5, 5LOtK 2- /500 /5®O 11 Drainage Easement SPOKANE COUNTY BUILDING AND PLANNING PERMIT Application Number: SW -12002603 Project Description: SEWER CONNECTION Project Name: PINE VALLEY ESTATES Permit Type: SEWER Permit Issued Date: 12/06/2012 Expiration Date Primary Contact: W C CONNER EXCAVATING INC Applicant: W C CONNER EXCAVATING INC Address: 1809 E HOUSTON AVE SPOKANE, WA 99217-7541 Phone: Email; T INFORMAT.M Site Address; Parcel Number: 1305 N ROSIE LN 45161.2205 Subdivision; Assessor's Description: (CITY OF SPOKANE VALLEY) PINE VALLEY ESTATES LT 5 I:iLK 2 (AUDITORS #5728519 BK 35 PG$ 41 8 42) Inspection Area: Owner: Address: Phone: Ernafi; RADEZKY PROPERTIES WE1 LLD 12402 N DIVISION ST #389 SPOKANE, WA 99218 Water District; Modern Fire District: Spokane Valley Fire Electric Water Company Zoning: Land Area: 7501) Square Feet ¢.NT 7IQ&tt EQRI! IATI014I General Contractor WCCONE277JR W C CONNOR EXCAVATING 1809 E. HOUSTON AVE , SPOKANE, WA 99217 509-466-6178 DI TAIM Class SEWER Type Quantity Unit Charge Value SEWER CONNECTION ',tLgtTA L Processing - Utilities Utilities Permit 1 $125,00 5125.00 Total Fee: 5125,00 525.94 $125,00 5150.94 SGQ.NDITIQN.p i -r Plan review fee is required for all site pian reviews conducted by Spokane Valley Fire. Inside Public Transit Benefit Area CALL 1-800-424.5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL,. REQUIREMENTS OE THE WA STATE DEPT OF LABOR 8, INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. Oate Printed; 12106/2012 13:56:44 TO Printed by; tis APPPOOL1SrnrartGavProdApp XVI .1.32U3SY'I dH lId00 :t70 ZT/90/ZT