CITY OF SPOKANE VALLEY
Community Development Department
Permit Center
11703 East Sprague Avenue, Suite B-3
Spokane Valley, WA 99206
Tel: (509) 688-0036
Fax: (509) 688-0037
perm itcenterna spokanevalley.orc
PERMIT NUMBER:
PERMIT FEE:
(Staff Use Only)
Project /33q
RECEIVED
AUG 1 6 2012
CSV PERMIT CENTER
RESIDENTIAL CONSTRUCTION PERMIT
LICATION--
® NEW CONSTRUCTION
❑ DECK
❑ ADDITION/REMODEL
❑ OTHER
❑ ACCESSORY BUILDING
SITE ADDRESS:1309 N. ROBIE LANE, SPOKANE VALLEY, WA 99206
ASSESSORS PARCEL NO.:45161.2206 LEGAL DESCRIPTION:
BUILDING OWNER NAME:LEWIS CONSTRUCTION & DEVELOPMENT, INC.
NAME:LEWIS CONSTRUCTION & DEVELOPMENT, INC.
ADDRESS:8225 N. DIVISION - SUITE A
CITY: SPOKANE
PHONE:509-998-2304
STATE:WA ZIP:99208
Fax:509-279-0967
CELL:509-951-6959
CONTACT NAME:TIM LEWIS
PHONE:509-998-2304
Fax:509-279-0967
CELL:509-951-6959
CONTRACTOR NAME:SAME AS ABOVE
MAILING ADDRESS:
CITY:
STATE:
ZIP:
PHONE:
FAX: CELL:
CONTRACTOR LICENSE No.:LEWISCD917BN
LICENSE No.:602-728-595
EXPIRES:01 /15/2013
CITY BUSINESS
DESCRIBE THE SCOPE OF WORK IN DETAIL AND INDICATE USE:
NEW, SINGLE FAMILY RESIDENCE - 3 BED, 2 BATH, 2 CAR GARAGE, 1 STORY, 1234 SF, CRAWL SPACE, RANCHER
PROPOSED USE:
NEW SINGLE FAMILY HOME
Effective October 28, 2007 Page 1 of 2
C:\Users\Tim\Desktop\!LCD\!!!Projects Active\12-045 - 1309 N Robie Lane - Spec\Permit Docs\12-045 2012.08.14 Building
Permit Application cover.doc
****YOU MUST COMPLETE THE FOLLOWING****
Height to Peak:15'-10"
FROM FINISH GRADE
PI ARI% 1‘ f A Al •w
Dimensions:45' x 43'
• rte• • =,,ArW
No. of Stories:1
Total Habitable
Space:1234
Main Floor SQ
FT:1234
Upper Floor SQ FT:N/A
Unfinished Basement
SQ FT:N/A
Finished Basement
SQ FT:N/A
Garage SQ FT:400
Deck/Covered Patio
SQ FT:N/A
Impervious Surface
Area:440
30% Slopes on
Property:No
No. of Bedrooms:3
Construction
Type:sTICK FRAME
Heat Source:GAs,
FORCED AIR
Sewer or
Septic:SEWER
TOTAL COST OF PROJECT: $148,000 = LAND @ $48,000 & CONSTRUCTION @ $100,000
DISCLAIMER
The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling, the dwelling is/will
be served by potable water. 2) Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property
owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of
Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of
Spokane Valley permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional
information may be required to be submitted and subsequently approved before this application can be processed.
Signature
Date:08/14/12
Method of payment: D Cash ® Check
Bankcard #:
❑ Visa ❑ Mastercard
EXP: VIN#:
Authorized Signature:
Effective October 28, 2007 Page 2 of 2
C:\Users\Tim\Desktop\!LCD\!!!Projects Active\12-045 - 1309 N Robie Lane - Spec\Permit Docs\12-045 2012.08.14 Building
Permit Application cover.doc
Valley®
Target Date sheet
For City Use Only
PLUS Project 6, _ ,, ?.C/ . - /33
Project Address /sn { /4/. /,?Cvf-
11703 E Sprague Ave Suite 6-3 ♦ Spokane Valley WA 99206
509.720-5240 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org
As part of our on-going commitment to customer service during the review process of your project application, we are
providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet
this date, we will contact you with a revised target date.
Your application review TARGET DATE is
The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is
not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
> Submit complete, accurate plans and documents.
Extra time may be required for re -submittals as project application reviewers work on multiple applications and it may be
several days before they can look at your new or revised information.
> Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise
for dealing with reviewer comments would be the best choice for the entire review process.
> Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date, please feel free to contact us if you haven 't heard from us by your
target date. Staff may contact you before the target date if the initial review is complete. By following this procedure, you will
save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as
indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does
not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from
substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is
complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review.
Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email,
or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re -
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the
application are received, a Permit Specialist will process the application and contact the person specified on your application for
permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at
that time.
CD -003 V-7/ 06-21-11 Page 1 of 1
}
}
Rear
Set Back
CO
70' s"
Side
Set Back
5'0"
SITE PLAN
1309 N Robie Lane
Spokane Valley WA
@ Pine Valley Estates
7,951 SF
NORTH
} flaw
0" 1 -
Side
Set Back
Dry
Unity
Stubs
Z
45'-0
The Retreat
1234
11
Dry
Utility
Easement
10'0"
* *
Dry
Utility
Easement
18' 0"
Driveway
Sewer
Stub
Drainage
Swale
Easement
Water
Stub
Private Drive \1
20
0"
Drainage
Swale
Easement
40'0"
Side (Flanking)
Set Back
PERMIT
Application Number: SW -12001997
8Zti6'°N WdtiZ ZIOZ '9l'2nd
Permit Issued Dale:
08/16/2012
Expiration Data;
Project Description; SEWER CONNECTION Primary Contract: WC CONNER €XC
Project Name; PINE VALLEY ESTATES Applicant WC CONNER EXC
Permit Type: SEWER Address: 1809 E HOUSTON AVE
SPOKANE, WA 99217-7541
Phone:
ErneII:
LTZ_IIMEQl 4'IA'YIQN.i
Site Address: 1309 N ROME LN Owner: RADEZKY PROPERTIES WE1 LLC
Parcel Number: 45161.2206 Address: 12402 N DIVISION ST 4369
SPOKANE, WA 90218
Subdivision: Phone;
Assessor's DescrIplion: (CITY OF SPOKANE VALLEY) PINE VALLEY Email;
ESTATES LT 6 BLK 2 (AUDITORS #5728519 BK
35PGS 41&42)
Inspection Area:
Water District: Modem Fire District' Spoicane Valley Fire
Electric Water Company
Zoning: land Area: 7051 Square Feet
General Contractor
WCCONE277JR
W C CONNOR EXCAVATING
1809 E, HOUSTON AVE,
SPOKANE, WA 99217
509-466-6178
Claes
Type
Quantity Unit Charge Value
SEWER
SEWER CONNECTION 1 $125.00 $125,00
EF.ED.E_TA1k:
Processing - Ulliities
Utilities Permit
$125.00
525,94
$12600
Total Fee: S150,94
3zt9PLTIQN$.
CALL 1-800424.5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LAESOR 8 INDUSTRIES, INCLUDING THOSE
Rt LA'rED TO TRENCH SAFETY.
FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30.5;00 MONDAY -FRIDAY PRIOR TO COVER.
ONE WORKING DAY NOTICE REQUIRED. PERMITALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES
APPLY AFTER 30 MINUTES.