2012, 04-30 Permit App: BLD-2012-0516 Residence•
Stiokane�
CITY OF SPOKANE VALLEY
Community Development Department
Permit Center
11703 East Sprague Avenue, Suite B-3
Spokane Valley, WA 99206
Tel: (509) 688-0036
Fax: (509) 688-0037
permitcenter@spokanevalley.org
RESIDENTIAL CONSTRUCTION PERMIT APPLICATION
® NEW CONSTRUCTION ❑ ADDITION/REMODEL ❑ ACCESSORY BUILDING
❑ DECK ❑ OTHER
PERMIT NUMBER:
PERMIT FEE:
(Staff Use Only)
SITE ADDRESS:1328 N. ROBIE LANE, SPOKANE VALLEY, WA 99206
ASSESSORS PARCEL NO.:45161.2109 LEGAL DESCRIPTION:LOT 9, BLOCK 1,
PINE VALLEY ESTATES, AS PER PLAT THEREOF RECORDED IN BOOK 35 OF PLATS, PAGES 42-43;
SITUATE IN THE NORTHEAST QUARTER OF THE NORTHEAST QUARTER OF SECTION 16, TOWNSHIP 25
NORTH, RANGE 44 EAST, WILLAMETTE MERIDIAN, CITY OF SPOKANE VALLEY, COUNTY OF SPOKANE,
STATE OF WASHINGTON.
BUILDING OWNER NAME: LEWIS CONSTRUCTION & DEVELOPMENT, INC.
NAME:LEWIS CONSTRUCTION & DEVELOPMENT, INC.
ADDRESS:8225 N DIVISION - SUITE A
CITY: SPOKAN E
STATE:WA ZIP:99208
PHONE:509-998-2304
FAx:509-279-0967
CELL:509-951-6959
CONTACT NAME:TIM LEWIS
PHONE:509-998-2304
Fax:509-279-0967
CELL:509-951-6959
CONTRACTOR NAME:SAME AS ABOVE
MAILING ADDRESS:
CITY:
STATE: ZIP:
PHONE:
FAX: CELL:
CONTRACTOR LICENSE NO.:LEWISCD917BN
LICENSE NO.:602-728-595
EXPIRES:01 /15/2013
CITY BUSINESS
DESCRIBE THE SCOPE OF WORK IN DETAIL AND INDICATE USE:
NEW, SINGLE FAMILY RESIDENCE - 3 BED, 2 BATH, 2 CAR GARAGE, 1 STORY, 1207 SF, CRAWL SPACE, RANCHER
ON LOT 9, BLOCK 1 OF PINE VALLEY ESTATES (SUB -05-07)
Effective October 28, 2007 Page 1 of 3
C:\Users\Tim\Desktop\!LCD\!!!Projects Active\12-015 - 1328 N Robie Lane - Cheryl Brotherton\12-015 2012.04.27 Building
Permit Application cover.doc
****YOU MUST COMPLETE THE FOLLOWING****
Height to Peak:15'-2"
FROM FINISH GRADE
Dimensions:50' x 39'
No. of Stories:1
Total Habitable
Space:1207
Main Floor SQ
FT:1207
Upper Floor SQ FT:N/A
Unfinished Basement
SQ FT:N/A
Finished Basement
SQ FT:N/A
Garage SQ FT:440
Deck/Covered Patio
SQ FT:N/A
Impervious Surface
Area:440
30% Slopes on
Property:NO
No. of Bedrooms:3
Construction
Type:STICK FRAME
Heat Source:GAs,
FORCED AIR
Sewer or
Septic:SEWER
TOTAL COST OF PROJECT: $158,000 = LAND @ $38,000 & CONSTRUCTION @ $120,000
DISCLAIMER
The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling, the dwelling is/will
be served by potable water. 2) Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property
owner or has permission to represent the property owner In this transaction. 4) All construction is to be done in full compliance with the City of
Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of
Spokane Valley permit is not a permit or approval for any violatio of federal, state or local laws, codes or ordinances. 6) Plans or additional
information may be required to be submitt. - ..• - •'seque•-•=pproved before this application can be processed.
Signature
Method of pay ent: ❑ Cash 0 Check
Date:04/27/12
0 Visa 0 Mastercard
Effective October 28, 2007 Page 3 of 3
C:\Users\Tim\Desktop\!LCD\!!!Projects Active\12-015 - 1328 N Robie Lane - Cheryl Brotherton\12-015 2012.04.27 Building
Permit Application cover.doc
•
s'�'44h1
jValley®
Target Date sheet
For City Use Only
PLUS Project ; c
Project Address �
; e r< Ir^4
11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206
509.720-5240 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org
As part of our on-going commitment to customer service during the review process of your project application, we are
providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet
this date, we will contact you with a revised target date.
Your application review TARGET DATE is
The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is
not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
D Submit complete, accurate plans and documents.
Extra time may be required for re -submittals as project application reviewers work on multiple applications and it may be
several days before they can look at your new or revised information.
D Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise
for dealing with reviewer comments would be the best choice for the entire review process.
D Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us by your
target date. Staff may contact you before the target date if the initial review is complete. By following this procedure, you will
save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as
indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does
not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from
substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is
complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review.
Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email,
or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re -
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the
application are received, a Permit Specialist will process the application and contact the person specified on your application for
permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at
that time.
CD -003 V-7/ 06-21-11 Page 1 of 1
\\
74.2' Rear Property Line
12.10' Setback
(5' Required)
114,90'
North
Property Line
sao
Bedroom #2
En
Sewer
Stub
Nater
Stub
pl
35.90' Rear Setback
(20'-0" Required)
Master
Suite
0 0
•
SITE PLAN
1328 N Robie Lane
Pine Valley Estates
40.00' Setback
(20.00' Required)
22
12.01' Setback
(5' Required)
PLANNING DEPT. APPROVED
BY:
DATE: Y -30-2o12-
114.90'
South
Property Line
N
Old - Iz-sib 't- 517
Name i✓1t`e-k
7l1U tint dI
O<Y Utay Ewen,.
T, at Font YW
Property,. sbntefor eN Q Earned
1)0 .t Apt NM
20.00' Private Drive 8,509 SF
74.2' Front Property Line
20.00' Private Drive