Loading...
2012, 04-30 Permit App: BLD-2012-0516 Residence• Stiokane� CITY OF SPOKANE VALLEY Community Development Department Permit Center 11703 East Sprague Avenue, Suite B-3 Spokane Valley, WA 99206 Tel: (509) 688-0036 Fax: (509) 688-0037 permitcenter@spokanevalley.org RESIDENTIAL CONSTRUCTION PERMIT APPLICATION ® NEW CONSTRUCTION ❑ ADDITION/REMODEL ❑ ACCESSORY BUILDING ❑ DECK ❑ OTHER PERMIT NUMBER: PERMIT FEE: (Staff Use Only) SITE ADDRESS:1328 N. ROBIE LANE, SPOKANE VALLEY, WA 99206 ASSESSORS PARCEL NO.:45161.2109 LEGAL DESCRIPTION:LOT 9, BLOCK 1, PINE VALLEY ESTATES, AS PER PLAT THEREOF RECORDED IN BOOK 35 OF PLATS, PAGES 42-43; SITUATE IN THE NORTHEAST QUARTER OF THE NORTHEAST QUARTER OF SECTION 16, TOWNSHIP 25 NORTH, RANGE 44 EAST, WILLAMETTE MERIDIAN, CITY OF SPOKANE VALLEY, COUNTY OF SPOKANE, STATE OF WASHINGTON. BUILDING OWNER NAME: LEWIS CONSTRUCTION & DEVELOPMENT, INC. NAME:LEWIS CONSTRUCTION & DEVELOPMENT, INC. ADDRESS:8225 N DIVISION - SUITE A CITY: SPOKAN E STATE:WA ZIP:99208 PHONE:509-998-2304 FAx:509-279-0967 CELL:509-951-6959 CONTACT NAME:TIM LEWIS PHONE:509-998-2304 Fax:509-279-0967 CELL:509-951-6959 CONTRACTOR NAME:SAME AS ABOVE MAILING ADDRESS: CITY: STATE: ZIP: PHONE: FAX: CELL: CONTRACTOR LICENSE NO.:LEWISCD917BN LICENSE NO.:602-728-595 EXPIRES:01 /15/2013 CITY BUSINESS DESCRIBE THE SCOPE OF WORK IN DETAIL AND INDICATE USE: NEW, SINGLE FAMILY RESIDENCE - 3 BED, 2 BATH, 2 CAR GARAGE, 1 STORY, 1207 SF, CRAWL SPACE, RANCHER ON LOT 9, BLOCK 1 OF PINE VALLEY ESTATES (SUB -05-07) Effective October 28, 2007 Page 1 of 3 C:\Users\Tim\Desktop\!LCD\!!!Projects Active\12-015 - 1328 N Robie Lane - Cheryl Brotherton\12-015 2012.04.27 Building Permit Application cover.doc ****YOU MUST COMPLETE THE FOLLOWING**** Height to Peak:15'-2" FROM FINISH GRADE Dimensions:50' x 39' No. of Stories:1 Total Habitable Space:1207 Main Floor SQ FT:1207 Upper Floor SQ FT:N/A Unfinished Basement SQ FT:N/A Finished Basement SQ FT:N/A Garage SQ FT:440 Deck/Covered Patio SQ FT:N/A Impervious Surface Area:440 30% Slopes on Property:NO No. of Bedrooms:3 Construction Type:STICK FRAME Heat Source:GAs, FORCED AIR Sewer or Septic:SEWER TOTAL COST OF PROJECT: $158,000 = LAND @ $38,000 & CONSTRUCTION @ $120,000 DISCLAIMER The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner In this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of Spokane Valley permit is not a permit or approval for any violatio of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submitt. - ..• - •'seque•-•=pproved before this application can be processed. Signature Method of pay ent: ❑ Cash 0 Check Date:04/27/12 0 Visa 0 Mastercard Effective October 28, 2007 Page 3 of 3 C:\Users\Tim\Desktop\!LCD\!!!Projects Active\12-015 - 1328 N Robie Lane - Cheryl Brotherton\12-015 2012.04.27 Building Permit Application cover.doc • s'�'44h1 jValley® Target Date sheet For City Use Only PLUS Project ; c Project Address � ; e r< Ir^4 11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206 509.720-5240 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. Your application review TARGET DATE is The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review D Submit complete, accurate plans and documents. Extra time may be required for re -submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. D Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. D Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure, you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re - submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at that time. CD -003 V-7/ 06-21-11 Page 1 of 1 \\ 74.2' Rear Property Line 12.10' Setback (5' Required) 114,90' North Property Line sao Bedroom #2 En Sewer Stub Nater Stub pl 35.90' Rear Setback (20'-0" Required) Master Suite 0 0 • SITE PLAN 1328 N Robie Lane Pine Valley Estates 40.00' Setback (20.00' Required) 22 12.01' Setback (5' Required) PLANNING DEPT. APPROVED BY: DATE: Y -30-2o12- 114.90' South Property Line N Old - Iz-sib 't- 517 Name i✓1t`e-k 7l1U tint dI O<Y Utay Ewen,. T, at Font YW Property,. sbntefor eN Q Earned 1)0 .t Apt NM 20.00' Private Drive 8,509 SF 74.2' Front Property Line 20.00' Private Drive