Loading...
24663BSP-55A-97 0 0 f'roject Status Active ENGINEER'S REVIEW SHEET As I3uilt t'lans Received Binding Site Plan File BSP-0055A -97 Road Plans Approved Compnnion Files: New Road Standards 5-15-95 Mylar Itelated Files: I3SP-0055 Hearing: 13uilding Dept: Technical Revitw: Preliminary Review: 01121/1999 Type: Large Lot ❑ Bldg. Square Feet Date Received: No. Lots: 2 No. Acres: 1.07 Project Name SUM:MI1' PROP UEV B-3 IST ADMENllMENT Site Address , Range -Town sh i p-S ecti on: 44 - 25 - 13 l'AItCEL(S): (first 18) Applicant Conditions Mailcd: 45132.9066 Damon Smith r'lood Zone Nd SUMMI"1' PROPERTY DEV Water Source Aublic 929 W. Spi-Jgue Sewer Source Public Spokane, WA 99201 School Disl 356 Phone Fire Dist l (509) 835-21 p0 Phone Dist US West Owner Surveyor Sara Marks METR01'OLCI'AN MORTGAGE WYATT ENGINEERING 929 W. Sprague 1801 W. Broadway, 110 Spokane, WA 99204 Spokane, WA 99201 Phone !'hone (509) 838-31 l 1 (509) 328-5139 13uilding Ph: 456-3675 / Nlannmg Ph: 456-2205 Contart: JOHN TODD Uate Subtnitted Description Initials Cng Need Technically Complete Eng Need Harvard Rd Mihgalion Eng Need Drainage Plans Eng Need Traffic Analysis Eng Veed Other Eng Pay Fees Received Eng Final Piat Fees Cornpleted Copy to Accounting Eng Pnority Fees Received Notice to 1'ublic / Natice to Public # 1 3 4 6 Completed - or Needs to be signed ~ Design Dcviation Dates (In-Out) 7~ona quanties to drainage item calculated Hearing Date Decision App Den Cond Appld BCC Appealed to BCC Decision App Den Cond Appld Court Appealed to Court Decision App Den Cond Appld f / Stamped Mylars to Secretary (Sandy) , Stamped 208 i ot Plans to Secretary (Sandy) ~ 1 • v y~ ~ OFFICE OF THE SPOK:ANE COUNTY ENGINEER 1026 W Broadway Ave, Spokane, WA 99260-0170 (509)456-3600 Faac 324-3478 "ENGINEER'S CONDITIONS OF APPROVAL" BINDING SITE PLAN TO: Spokane County Planrung Department FROM: Division of Engineering & Roads DATE: March 18, 1999 PROJECT: SUMMIT PROP DEV 1ST ADMENTMENT FILE BSPE-0055A-97 / Review Date: 01/21/1999 Sponsor/Applicant: DAMON SMITH Section Township Range: 11-25-44 Planner: JOHN TODD The Spokane County Engineering Department has reviewed the above referenced application. The following "Conditions of Approval" are submitted to the Spokane County Planning Department for inclusion in the "Findings of Fact, Conclusions and Order/Decision" should the request be approved. Prior to release of a building permit or use of property as proposed: l. This application shall comply with all conditions of approval of ZN 34- 91 and related State Environmental Policy Act documentation. 2. Access to Sullivan Road and Broadway Avenue shall be specifically reviewed by the County Engineer. The original site plan of record for ZE 34-91 designated specific locations for ingress and egress. Since this proposal shall comply with those conditions of approval, Spokane County Engineering assumes that the access points remain valid. 3. All vested owners shall sign and record reciprocal access road and parking documents as prescribed by the Spokane County Engineer. These documents shall be reviewed and approved by the Spokane County Engineer prior to recording with the Spokane County Auditor. Recording numbers shall be referenced in the language of the Binding Site Plan. 4. This proposal was approved for 346,452 square feet of retail facilities per ZN-34-91. Prior to the release of a building permit the applicant shall demonstrate to the satisfaction of the County Engineer that the requested permit does not exceed the 346,452 approved per the zone change. If the proposed permit does exceed the approved square footage, the applicant shall submit additional traffic information to the County Engineer for acceptance and perform the required mitigation prior to the permit release. CC: Applicant DAMON SMITH Engineer/Surveyor SARA MARKS Planner JOHIV TODD . ~ ~ , ~ , ` ~ ' , . L Page, ifi 1/21/1;,? 9 OOSSAt . 5. A Professional Engineer, licensed in the State of Washington, shall submit final road and drainage plans, a drainage report and calculations that conform to all current standards and laws governing stormwater management in Spokane County. Final drainage plans and a drainage report shall receive the County Engineer's acceptance prior to release of a construction or building permit, or approval of the land action. 6. All construction within the existing or proposed Public Right of Way is to be completed prior to filing the final Binding Site Plan or a bond in the amount estimated by the County Engineer to cover the cost of construction of improvements. construction certification, "As Built" plans and monumenting the street centerlines shall be filed with the County Engineer. 7. The proposed Binding Site Plan shall be improved to the standards set forth in Spokane County Board of Commissioners Resolution No. 95-0498, as amended, which establishes regulations for roads, approaches, drainage and fees in new construction. 8. The applicant should be advised that there may exist utilities either underground or overhead affecting the applicants property, including property to be dedicated or set aside future acquisition. Spokane County will assume no financial obligation for adjustments or relocation regarding these utilities. The applicant should check with the applicable utilities and Spokane County Engineer to determine whether the applicant or utility is responsible for adjustment or relocation costs and to make arrangements for any necessary work. ~ z Kimball, Sandy From: Hemmings, Bill Sent: Tuesday, January 19, 1999 9:56 AM To: Todd, John Cc: Engelhard, Scott; Pederson, John; Harper, Pat; Kimball, Sandy; Busko, Doug; Miller, Katherine; Sims, Brenda; Darrell, Virginia Subject: BSP-55-97 - First Amendment 1-19-99 I received the above referenced application on January 7, 1999. This project lies in an area of approved soils so a concept drainage plan is not required. I have no knowledge of any critical areas on this site. I consider this application to be technically complete. I recommend the following condition of approval: A Professional Engineer, licensed in the State of Washington, shall submit final road and drainage plans, a drainage report and calculations that coaform to all current standards and laws governing stormwater management in Spokane County. Final drainage plans and a drainage report shall receive the County Engineer's acceptance prior to release of a construction or building permit, or approval of the land action. Ft,&,W ' , Page 1 r ~ _ PECS/ViED i~► .JA1V 0 ~ 1999 s S P O K A N E C O t7 N EN GINEER BUiLDIiVG AND PLANI`'ING • A DIVISION OF THE PUBLIC WORKS DEPARTMENT JAMES L. MANSON, C.B.O., DtxEC'roR DsNrtts M. SCO'r-r, P.E., DIttECZ'ox DATE: January 7, 1999 TO: Divi~sion of Engineering and1RYO`'a''ds. - Transpo •ation-Eingineering; Pat, Harper; c/o Sandny J„K~i m•bal 11% Division of Engineering and Roads - Development Services, Bill Hemmings Division of Utilities - Information Management, Jim Red Division of Utilities - Stocmwater Utility, Brenda Sims Spokane Regional Health District, Steve Holderby Spokane County Fire District No. 1 Vera Water & Power Company Washington State Department of Transportation - Greg FIgg FROM: J. Todd, Planner U RE: Proposed First Amendment to Binding Site Plan BSP 55-97 Attached is a copy of the above-referenced Binding Site Plan map submitted by Summit Property Development. The applicant has requested that the approved Final Binding Site Plan for BSP-55-97 be amended to create parcels B and C. Please review this amendment and return your written comments and recommended conditions to me by January 21, 1999. If you have any questions regarding this matter, you may contact me at 477-3675. wc Enclosures copy w/o enclosures to: Summit Property Development, c/o Damon Smith Wyatt Engineering, c/o Sara Marks 1026 WEST BROADA'AY AVEIVUE • SPOKANE, WASNINGTON 99260 PHOtvE. (509) 456-3675 • Ft>X: (509) 4564703 TDD: (509) 324-3166 Parcel: 45132.9066 Owner: WESTERN UNITED LIFE ASSURANCE CoOwner: Owner Address 916 W 1ST AVE SPOKANE WA 99201 ~ Site Address 15521 E BROADWAY AVE SPO Legal Description 13-25-44 • 1.111901 PARCEL 10F BSP97-55 AUDITORS #4107346 BK 1 PAGS 93 & 94 BEING A PTN OF SW1/4 OF NW114 ~ 4s141,0141 i~s~si,vou ~ Muii.,~ lt 110 S IlSAlOi 1SIN,0111 If,SSI; ! 113.10'f I1I14A131 S17S"IVOi ASI ~ f1111P0 !101 4tISS0:1If11SA:15 ~ Ifll/.lllf ISISSOS31 IS~}3 pop i{'I~u'Q lll Notice: This is not a legal document. Data depicted on this map is general & subject to constant revision. It is intended for reference use only. Legal documents should be obtained from the appropriate agency. aa E W.t~. T.25N-, F. sEC ~ ~ ~ cALE: ~ . J ~ Q s ~ e 7 ` p ~w t? M~abrc+~+ i ..yq ~ ~ t ~J I V +1. • ~c.~ ~1 nI0.4906 r • ~ `•c ~ • 1 J f ~`'1 ` fyp N! rr~e) - ~ jJ I I , snoxAnre 1- ~ 35 'riON b/•t ~ ,sc~~.__'_ ~ I ' . ~ T, f. S ~!t I BtAP[lNGT(1N NOATMLAN ~ TTZ j ^ Fe1~1• : o.n~,,.,.,, ~ j ` ,J' s ~ ; + '•r[r f ~ RAtLAO<II k1 1 ~ LI!'i1T ~ ~ y0'L~ ~ ~ ;`•1 r.Y ' ' ~ ~ p`~ i t y 1- 00• 1 ~ ►P0.'[ ROff aQ • , ~t fy 6 4~' h'v ~e ~ -.l•~ ~i h ~ ~:I ' F ~ii qi a` 'df"r~,z+i ` ~ ~~-'i'f~'.'x"'~~`~'^`'+'a°~.~,,,,~~~ 'uk'~~ S'Y ae E. ' v~ S~' ~ K ~ 1ry ~1 j}.~ ~ *,i~r~~ • r, " " ` _"'4" . ~ 3 G v, Q " l J~ a 1 L~~`' •i~...~~~~ ~~;a.~ ~M~~ "h~' SC~!s l~r~. 4i st 41 1 , ,sn~ . •;R ; o ~r ; ~ - *=rs ~.~'i`,^t"t.y.~.. Y . ~ . 1. a L: ~'~'.:f~'5;~+~,'~',s r ~'~`„-~•`~"'~••~~~,•ri'~~,=;,~~;'~ i...,.•t.:,^'.:'4 . s~..~se,r.a+ r~ 1 ~ Y° ' -a•a.,:~ ~,i'~'s.~':..>.;*~' ^"b,*f<:as.,r-~;~Y'- `tt' '.5~~~ j } ' 1 - •^j G -S ~ is r ~ .s ~f ~ ~ ~ ~ r ! •a -q'7 C.j a~,'i 3 ~i ~ ~ ~ Q~,V ro,,J _ tt"~re` ; p ~ h' .d k/ i { ~ ~ , 1• e ~ - d~ •1 S~ 00. ~ a ~.e+ .r • : ~ar ~ '~f7G Cs;, ~5» ~ >bc0 ~P _ P _ 7 -~t'' ~ • . Q r' o y:,•. ~ ,9 , ~ ~ . _6 ro ~ ~ 7 1 •Z y , ~ • , ~ • 20 "~T ~ 0' C~ C' 1 co y ~ 'ur ~ ~ ~ S 1?" ' ~ Q ~ /C I A . ' . ~ A~ O' ~e ' •T , ~ v~ v ss ' 25 27 ' ,i ...--~-'~,'S. s , a 15 16 ~ r ~ d~$ ~ ~iT tl ~.~,2• ~ ;p3= '''y_ ~`~t.rer C/ ~ n a~~•s=, . ' I L ~P' +9 32- L t.' rs i ~ ~ Y, m • •`rTFI i.7 . 3~ g w` Od.J 2ID c t; R O GOVN7~ ~M 1 1: ± [X~.~ ~Oi n ~ arn+'=~ ~[-i~ c~P lytk'` ~^Q ~ . . 6ro ally ~ E S~~ r p roo N i ~ EAR00JOgO a~ ~~_r..►~'~~ 6. i5-`7Z r, ~