Loading...
2013, 02-07 Permit: SW-13000058 SewerSPOKANE COUNTY BUILDING AND PLANNING PERMIT Application Number: SW -13000058 Project Description Project Name: Permit Type: SEWER CONNECTION WEST FARMS SEWER Permit Issued Date: 02/07/2013 Expiration Date: 02/08/2013 Primary Contact: GOBER'S LLC Applicant: GOBER'S LLC Address: 11215 E TRENT AVE SPOKANE, WA 99206 Phone: 509-924-5372 Email: SITE INFORMATION: Site Address: 5323 N KELLER RD Owner: Parcel Number: 46344.0310 Address: Subdivision: SP -480-87 Phone: Assessor's Description: W FARM IRR TR PL 4 TR B OF SP87-480 AUD NO Email: 8705290273 BE ING A PTN OF TR 107 AND TR 108 Inspection Area: Zoning: CONTRACTOR INFORMATION: General Contractor GOBERL*899L7 GOBER'S LLC 11215 E TRENT AVE SPOKANE, WA 99206 509-924-5372 DETAILS: DUNHAM, MELVIN D & CHRISTINE L PO BOX 141145 SPOKANE VALLEY, WA 99214 Water District: Trentwood Fire District: Spokane Valley Fire Irrigation District #3 Land Area: 19000 Square Feet Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION 1 $125.00 $125.00 $125.00 FEE DETAIL: Processing - Utilities $26.32 Utilities Permit $125.00 Total Fee: $151.32 CONDITIONS: Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire. Inside Public Transit Benefit Area CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. Date Printed: 02/07/2013 07:33:27 Printed by: IIS APP POO L\SmartGovProdApp SPOKANE COUNTY BUILDING AND PLANNING PERMIT Permit Issued Date: Application Number: SW -13000058 02/07/2013 Expiration Date: 02/08/2013 FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed: 02/07/2013 07:33:27 Printed by: IIS APPPOOL\SmartGovProdApp