Loading...
24667 BSP-55B-97 Parcel: 45132.9066 Owner: WESTERN UNITED LIFE ASSURANCE CoOwner: Owner Address • 916 W 1ST AVE SPOKANE WA 99201 SiteAddress 190 15521 E BROADWAY AVE SPO Legal Description 13-25-44 r l PARCEL 1 OF BSP97-55 AUDITORS #4107346 BK 1 PAGS 93 & 94 3 BEING A PTN OF SW1/4 OF NW114 a , lcn R , :zxvr ~ f x r y :R ~ ' rt K Y Y R' xY yJ ~ 1C. ) \ ~ i t ♦ R ~ '?v r dWay. , - - - , rn ~ . - i O ` (D ~ ~ Notice: This is not a legal document. Data depicted on this map is general & subject to constant revision. It is intended for reference use only. Legal documents should be obtained from the appropriate agency. ~ % v ~ y'/~ ~ ~ : ~ , IV~ II ~ ~ ~N t ` ~ I ~ 11 ~ / T • ~ : h':~ _ ~ ,:1• :•r'..~.~ : f,: ~ i . ~ ~ ~ i;~_;. _r.;,• ~ A~~ ~ I ,F}~~ a ( , : ! ~ ~ z ~ ~L./a ~ 4, /4 •:;;t'•: iL. . ~ •'ti •~s ~ . i ~O • ~ I ~ . r ~ - . i/L ~ ~ ~ q ~ . ~3 I , , n ~ • ~ + ~ v,~ } % t~• ~ ~ ~1 ~ _ . _q Z ~ • • I ,a If 3 . ~ ' ~ ( i~~a'q► . ' . , . . / f -~f • i--i~, t~ ~ ..A., . i M • . •i , ~ j;. 1~~1~ . . _ x~0• GO.• M~1 ,.C,, • zs : - , `Ia GQ.P - 4gS _ -"ai" ♦o;~'' . _s~--~ _ ~s.C2~_c~ ~ ~ " s~ 120ADwAN tIO fl a.~/ N_- i/ L~~1~1'~..R ~'C ~ti •D ~ . `I t QK . c, .F. ! 1~- j c~ ~~yy~~..,, ~ _ ~ ~'1 j j -4J 2 ~ ` ~ 1 ~ ~ i s 14 11 ~ 1t 'n . ` l~~ 17 ic L~ . . . ~ ~ I e r . i ~ •c • ti ' ~_s,-~~ ' -a~'-- - - ~ d ~f S 1L01'H ~ '`Z v}. o ' o'u~~ ~ " • o ~1= . Pro;cctsta«,s Active ENGINEER'S REVIEW SHEET As Built Plans Received Binding Site Plan File BSP-0055$ "97 Road Plans Appruved Companion Files: Ncw Road Standards 5-15-95 Mylar Related Files: Hearing: Building Dept: Technical Review: Preliminary Rcview: 08/02/1999 Type: Seheduled For Large Lot ❑ Bidg. Square Feet Date Received. 07/21/199 No. Lots: 4 No. Acres: Project Name SUMMIT PROPERTY DEVELOPMENT SECOND .AMDNDMENT Sire Address N. DROADWAY, S. I-90, W. MOORE, E. SULLIVAN, Range-Township-Section: 44 - 25 - 13 PARCEL(S): (first 18) ApplicAnt Conditions Mailed: 45132.9066 Damon Smith Flood Zone SUMM IT PROPERTY DEV Water Source 929 W. Sprague Sewcr Source SPOICANE, WA 99201 . School Dist Phone Fire Dist (509) 835-2100 Phone Dist Engineer Sara Marks WYATT ENGINEERTNG 1801 W. Broadway, I 10 SPOKANL, WA 99201 Phone (509) 328-5139 Building Ph: 456-3675 ! Planning Ph: 456-2205 Contact: Date Submitte Description Initials Eng Need Technically Completc Eng Need [Iarvard Rd Mitigation Eng Nced Drainage Plans Eng Need Traffic Analysis Eng Need Other Eng Aay Fees Rcccived Eng Final Plat Fees Completed Eng Priority Fees Received Copy to Aecounting / f Notice to Aublic / Notice to Public # 1 3 4 6 Completed - or Needs to be signed Design Devialion Dates (In-0ut) 13ona quAnuT drainage item calculated Hearing Date Decision App Den Cond Appld DCC Appealed to BCC Decision App Den Cond Appld Court Appealed to Court Decision App Den Cond Appid f / Stamped Mylars to Secretary (Sandy) ~ / / Stamped 208 Lot Plans to Secretary (Sandy) I i OFFICE OF THE SPOKANE COUNTY ENGINEER 1026 W Broadway Ave, Spokane, WA 99260-0170 (509)477-3600 Fax (509)477-2243 S~,.~c~ "ENGINEER'S CONDITIONS OF APPROVAL" BINDING SITE PLAN TO: Spokane County Planning Department ,ROM: Division of Engineermg & Roads bATE: August,6, 1999 P PR JECT: SUMMIT PROPERTY DEV 2ND AMENDMENT FI E BSPE-005513-97 / ~ Hearing: @ Review Date: 08/02/1999 Sponsor/Applicant: DAMMON SMITH Section Township Range: 13-25-44 Planner: JOHN TODD Technical/Review Date: @ ) i, The Spokane County Engineering Department has reviewed the above referenced application. The, following "Conditions of Approval" are submitted to the Spokane County Planning Department for inclusion in the "Findings of Fact, Conclusions and Order/Decision" should the request be approved. 1. Spokane County Engineering has no new comments on this proposal. All previous County Engineering Conditions of Approval are still applicable. END CC: AppliCant DANIIMON SMITH Engineer/Surveyor SARA MARKS Planner JOHN TODD n OFFICE OF THE SPOR:ANE COUNTY ENGINEER 1026 W Broadway Ave, Spokane, WA 99260-0170 (509)456-3600 Fax 324-3478 "ENGINEER'S CONDITIONS OF APPROVAL" BINDING SITE PLAN TO: Spokane County Planning Department FROM: Division of Engineering & Roads DATE: August 5, 1999 PROJECT: SUMMIT PROP DEV 1ST ADMENTMENT FILE BSPE-0055A-97 / Review Date: 01/21/1999 Sponsor/Applicant: DAMON SMITH Section Township Range: 11-25-44 Plan.ner: JOHN TODD The Spokane County Engineering Department has reviewed the above referenced application. The following "Conditions of Approval" are submitted to the Spokane County Planning Department for inclusion in the "Findings of Fact, Conclusions and Order/Decision" should the request be approved. Prior to release of a building permit or use of property as proposed: 1. This application shall comply with all conditions of approval of ZN 34- 91 and related State Environmental Policy Act documentation. 2. Access to Sullivan Road and Broadway Avenue shall be specifically reviewed by the County Engineer. The original site plan of record for ZE 34-91 designated specific locations for ingress and egress. Since this proposal shall comply with those conditions of approval, Spokane County Engineering assumes that the access points remain valid. 3. All vested owners shall sign and record reciprocal access road and parking documents as prescribed by the Spokane County Engineer. These documents shall be reviewed and approved by the Spokane County Engineer prior to recording with the Spokane County Auditor. Recording numbers shall be referenced in the language of the Binding Site Plan. 4. This proposal was approved for 346,452 square feet of retail facilities per ZN-34-91. Prior to the release of a building permit the applicant - shall demonstrate to the satisfaction of the County Engineer that the requested permit does not exceed the 346,452 approved per the zone change. If the proposed permit does exceed the approved square footage, the applicant shall submit additional traffic information to the County Engineer for acceptance and perform the required mitigation prior to the permit release. CC: Applicant DAMON SMITH Engineer/Surveyor SARA MARKS . Planner JOHN TODD ~ Page ► 2 •'01/21/1999 ~ ' '0055A 5. A Professional Engineer, licensed in the State of Washington, shall submit final road and drainage plans, a drainage report and calculations that conform to all current standards and laws governing stormwater management in Spokane County. Final drainage plans and a drainage report shall receive the County Engineer's acceptance prior to release of a construction or building permit, or approval of the land action. 6. All construction within the existing or proposed Public Right of Way is to be completed prior to filing the final Binding Site Plan or a bond in the amount estimated by the County Engineer to cover the cost of construction of improvements. construction certification, "As Built" plans and monumenting the street centerlines shall be filed with the County Engineer. 7. The proposed Binding Site Plan shall be improved to the standards set forth in Spokane County Board of Commissioners Resolution No. 95-0498, as amended, which establishes regulations for roads, approaches, drainage and fees in new construction. 8. The applicant should be advised that there may exist utilities either underground or overhead affecting the applicants property, including property to be dedicated or set aside future acquisition. Spokane County will assume no financial obligation for adjustments or relocation regarding these utilities. The applicant should check with the applicable utilities and Spokane County Engineer to determine whether the applicant or utility is responsible for adjustment or relocation costs and to make arrangements for any necessary work. ; . , • . ~ S P O K A N E , C O U N T Y BUILDING AIVD PLANNWG . A DMStOtv OF THE PUBUC WOttxS DEPAxTmAECE C D James L. Manson, C.B.O., Director Gary Qberg, Director JUL 21 1999 • SPOKAIVE CO11NN ENG(NEER DATE: July 21, 1999 TO: Div' ' • ~ - - ' ~ ivision of Engineering and Roads - Development Services, Bill Hemmings Division of Utilities - Information Management, Jim Red Division of Utilities - Stormwater Utility, Brenda Sims Spokane Regional Health District, Steve Holderby Spokane County Fire District No. 1 Vera Water & Power Company Washington State Department of Transportation - Greg Figg FROM: J. Todd, Planner RE: Proposed Second Amendment to Binding Site Plan BSP 55-97 Attached is a copy of the above-referenced Bindir,g Site Flan map submitted by Suniini7 Froperty Development. The applicant has requested that the approved Fir.al Binding Site Plan for BSP-55-97 be amended to create Tracts D, E, F, G, and H. Please review this amendment and return your written comments and recommended conditions to me by August 2, 1999. If you have any questions regarding this matter, you may contact me at 477-3675. wc Enclosures copy w/o enclosures to: Summit Property Development, c/o Damon Smith Wyatt Engineering, c/o Sara Marks 1026 W. BROADWAY • SPOKANE, WASHINGTON 99260-0050 PHOtvE: (509) 477-3675 • FaY: (509) 477-4703 • TDD: (509) 324-3166