Loading...
2014, 07-17 Permit App: BLD-2014-1706 Accessory Bldg Community Development Department (Staff Use Only) Permit Center 0.1.1\14 11703 East Sprague Avenue, Suite B-3 PERMIT NUMBER: Spokane Spokane Valley, WA 99206 Tel: (509) 688-0036 PERMIT FEE: Valle Fax: 688-0037 Y • permitcenitcenter@spokanevalley.orq RESIDENTIAL CONSTRUCTION PERMIT APPLICATION ID NEW CONSTRUCTION El ADDITION/REMODEL 14 ACCESSORY BUILDING DECK MI OTHER SITE ADDRESS: I Li dO V L.. 2,,OIC_v\r _,I I Avct, ��/�/}} 'ASSESSORS PARCEL NO.: LEGAL DESCRIP` ib 0i � 'J '(/ I+ [70( BUILDING OWNERENAME: NAME: R��s ,\\ \ ,,_, JULi 7 ?M1 ADDRESS: C7©9 g. 1-e,tJC,\G��A\ 1V44:4_, C r v, P i_f (;yrs i 1�� r't=BITER � Sl?o c. ,� ` 9 c \ 6 _l CITY: k; ��• �r W.�, STATE: �!� ..ZIf?:.._ s u b ,. ; PHONE: S Q1 ' ,73.-%C c jl � FAX L�. 5 �4;v ,,. CONTACT NAME: .Q_A\ V uS PHONE: -_1,C) - pC:c7 C FAX: CELL: CONTRACTOR NAME: -Z vss-�' MAILING ADDRESS: CITY: STATE: ZIP: PHONE: FAX: CELL: CONTRACTOR LICENSE No.: EXPIRES: CITY BUSINESS LICENSE NO.: DESCRIBE RIE SCOPE OF W RK IN DETAIL AND INDICATE USE & PROPOSED USE: f �J ****YOU MUST COMPLETE THE FOLLOWING**** MARK N/A IF NOT APPLICABLE Height to Peak: Dimensions; y, No. of Stories: Total Habitable /\ O( Space: Main Floor SQ FT: Upper Floor SQ FT: Unfinished Basement SQ Finished Basement SQ FT: FT: Garage SQ FT: Deck/Covered Patio SQ Impervious Surface 30% Slopes on FT: Area: Property: No. of Bedrooms: Construction Type: Heat Source: Sewer or Septic: TOTAL COST OF PROJECT: $ U , 5OC DISCLAIMER The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling,the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of Spokane Valley permit is not a permit or approval violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required-to'be su mittey6 sequ y approved before this application can be processed. Signatur 7----- .r Date: —7/!7/l4 Updated 1-11-11 Page 1 of 1 http://www.spokanevalley.org/filestorage/124/938/210/948/1496/Building_Permit_-_Residential_11-11-11.doc RESIDENTIAL CHECK LIST DIRECTIONS: Place a check mark in box next to each document required for complete submittal. o SITE PLAN o Property lines and dimensions o Setbacks to property lines o Direction arrow pointing North and orientation to streets o Distance between buildings o Proposed/existing buildings (footprint and dimensions) o Right of way/easement location &sizes o Utilities, septic tank/drain field locations and distances o Driveway approach size and location BUILDING PLANS (3 SETS) (minimum 1/8 inch scale or completely dimensioned) ❑ Elevations (Front/Rear/Sides)with roof peak and wall height including basement: ❑ Foundation Plan (crawlspace, basement or slab on grade): o Footing sizes and locations o Supporting wood cripple walls or beams o Perimeter concrete foundation wall sizes o Thickened concrete pads supporting o Crawlspace ventilation beams or girder trusses ❑ Floor Plan of each level (finished or unfinished)with dimensions: o Floor Joist direction, size and spacing ❑Window and door location and sizes o Header, beam or concrete lintel sizes o Window well locations if applicable o Brace wall panel locations o Room usage labels o Water heater and furnace locations ❑ Smoke detector locations o Exhaust fan locations o Attic and crawl space access locations o Deck or concrete patio sizes and locations o Fire Wall construction ❑ Roof Plan: o Engineered truss direction and spacing o Ridge, eave and valley lines o Rafter and over frame direction, size and spacing ❑ Beam and girder size and location ❑ Wall Section Detail including: Roof o Slope/roofing material/underlayment/ice dam protection o Truss or rafter size, spacing & connection o Sheathing size and type o Attic insulation/air space baffle/ventilation Ceiling o Joist size and spacing o Size of ceiling gypsum wall board Wall o Height/top plate/stud size and spacing/sole plate o Siding/exterior house wrap/anchor bolts o Exterior sheathing size and type o Insulation, vapor barrier, gypsum wall board Floor o Joist size and spacing o Sheathing or concrete floor size/insulation Foundation Wall ❑ Concrete or Masonry unit width o Footing bottom to finished ground level depth o Earth to wood separation distance o Horizontal &vertical reinforcement if any Footing o Size o Reinforcement if any Radon o Passive system with 6mil vapor barrier o Active system with 6 mil vapor barrier Miscellaneous Construction Details ❑ Deck: o Floor plan/side view/dimensions o Footings/post/and beam size and locations o Floor Joist/decking direction, size and spacing ❑ Stairway tread rise &run and nosing 0 Handrail/Guard height&spacing Project # CL j --N-rad El i Residential Driveway Sfökane j PAVING WAIVER ral YGJUL € 7 2014 I pi 4CENCToEmmun. Development— Planning Division 03 E prague Ave Suite B-3 • Spokane Valley WA 99206 509.720.5026• ax: 509.688.0037 1 planning@sookanevallev.org SUF3 ( � Rv 1-41_ J Spokane Valley Municipal Code(SVMC)Section:1 .40.020.6; "All resp en ear affveway and off-street parking areas shall be paved with asphalt,Portland cement,grasscrete,paver blocks or other equivalent hard surface material". A paving waiver can only be granted if the structure you are proposing is not going to require a driveway for daily use. PART I — OWNER INFORMATION OWNER NAME: I �E QI -I \ - M7 PARCEL#:q5-0d,2‘, 5-c20'.3 ADDRESS: I CO E. 5 t ocy) oe4 ( I l-ve. CITY: \r'1i-j hC e_ \(() 4V( STATE: W A ZIP: qq a I (0 PHONE:SO?_aaU�( to FAX: CELL: EMAIL: x Q)dC lObfCL;l,cOf1 PART II —DETAILS OF PAVING WAIVER 1. Do you have an existing garage for parking daily use vehicles? ❑ YES NO 2. Is the proposed detached structure used for storage only? 0 YES ❑ NO 3. Do you plan on using the detached structure to park vehicles? ❑ YES 14 NO If yes, then what type of vehicles? 4. Do you plan to conduct a business from proposed detached structure? ❑ YES 121.NO If so, what is the nature of your business? PART III —AUTHORIZATION I,(PRINT NAME)RUSSO I 1-1&.S5 owner, hereby confirm that the information provided on this form is true and correct. I acknowledge that any change in the foregoing conditions, could require the City to im ose paving requirements. I further agree to report any change in these conditions to the Sp. Kane Val ey Co 'ty Development Department, Planning Division, within 30 days. c ,. '7-1 l5//4 Owner Signature Date PART IV — DECISION STAFF HAS REVIEWED THE PROPOSED PAVING WAIVER ON BEHALF OF THE COMMUNITY DEVELOPMENT DIRECTOR AND FIN THE REQUEST IS GRANTED AT Q SAID DDR SS FO PER IT#: j`)- �J \i 1 - 11DU 1 / PI nning I ivision Staff Signature Date Created 6/27/11 Page 1 of 1 iqcos . Pci<1.,D0/7 i by rt: 1 t Qi Project /7— I RECEIVED JUL, 1 7 2014 4 CSV pERviT CENTER 1 t.,, 1 r : 1 , 1 0 '_.------_„. t . ...,,,,N ,--- - ....,..., . .._, • •••m• PLANNING D '.:‘---',',:::'; ','•:,''' 'i \ 4-_, c" rm, BY. DATE: lAill4r t b w o ve.- ek ih iv r_----) paittl,)aodeitiorkif L5-) a614 bid_55 .4- J ct) *N. 8a. '