Loading...
HomeMy WebLinkAbout2010, 12-21 Permit App: 10004096 Remodel ' Project Number: 10004096 Inv: 1 Application Date: 12/21/2010 Page 1 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Project Information Permit Use: HOUSE REMODEL TO INCLUDE PARTION Contact: BAKER BUILDERS WALL RELOCATION Address: 1802 E TRENT AVE C-S-Z: SPOKANE,WA 99202 Setbacks:Front Left: Right: Rear: Phone: (509)534-4500 Group Name: Site Information: Project Name: Plat Key: Name: Range District: East Parcel Number: 55083.5701 Block: Lot: SiteAddress: 18909 E RIVERWALK LN Owner:Name: MCCORMICK,BRADLEY N&JO Address: 18909 E RIVERWALK LN Location::CSV GREENACRES,WA 99016 Zoning: R-4 SF Res Urban District Water District: 134 CONSOLIDATED ID#19 Hold: E Area: 13,082 Sq Ft Width: 0 Depth: 0 Right Of Way(ft): 0 Nbr of Bldgs: 0 Nbr of Dwellings: 0 Review Information: �u„a ;� � ; e Review Building Plan Review Released By: Originally Released: 12/21/2010 By: tmelbourn Permits: —_-- — Building Permit Contractor: BAKER BUILDERS Firm: BAKER BUILDERS Address: 1802 E TRENT AVE Phone: (509)534-4500 SPOKANE,WA 99202 This Application: Total Project: Description Grp Type Notes Su Ft Valuation Su Ft Valuation 1&2 FAMILY R-3 VB HOUSE 0 $3,500.00 0 $3,500.00 REMODEL Totals: 0 $3,500.00 0 $3,500.00 Item Description Units Unit Desc Fee Amount RESIDENTIAL PERMIT FEE 1 SELECT $97.25 WSBCC SURCHARGE 1 SELECT $4.50 SF PLNS RVW<7999 SQ FT 1 SELECT $38.90 Permit Total Fees: $140.65 Operator: JD Printed By: JD Print Date: 12/21/2010 ' Project Number: 10004096 Inv: 1 Application Date: 12/21/2010 Page 2 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Mechanical Permit Contractor: BAKER BUILDERS Firm: BAKER BUILDERS Address: 1802 E TRENT AVE Phone: (509)534-4500 SPOKANE,WA 99202 Item Description Units Unit Desc Fee Amount HOOD-TYPE I 1 NUMBER OF $52.00 Permit Total Fees: $52.00 Plumbing Permit Contractor: PACE PLUMBING Firm: PACE PLUMBING Address: PO BOX 2827 Phone: (509)489-0824 SPOKANE WA 99220 Item Description Units Unit Desc Fee Amount SINKS 1 NUMBER OF $6.00 DISH WASHERS 1 NUMBER OF $6.00 GARBAGE DISPOSAL 1 NUMBER OF $6.00 Permit Total Fees: $18.00 Notes: Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing Building Permit $140.65 $140.65 $38.90 $101.75 Mechanical Permit $52.00 $52.00 $0.00 $52.00 Plumbing Permit $18.00 $18.00 $0.00 $18.00 $210.65 $210.65 $38.90 $171.75 Disclaimer: Submittal of this application certifies the owner(or person(s)authorized by the owner)has both examined and finds the information contained within to be true and correct,and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for,or an approval of,any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: JD Printed By: JD Print Date: 12/21/2010 Community Development Department (Staff Use Only) Ce ter S11703 ast Spr East Sprague Avenue, Suite B-3 PERMIT NUMBER: Spokane Valley, WA 99206 ��� Tel: (509) 688-0036 PERMIT FEE: 4.,,,0 alley K Fax: (509) 688-0037 permitcenter@spokaneva I lev.orq RESIDENTIAL CONSTRUCTION PERMIT APPLICATION NEW CONSTRUCTION ADDITION/REMODEL 0 ACCESSORY BUILDING DECK 0 OTHER SITE ADDRESS: / ?O9 v •i,.K 1- •�i� 4 L V ASSESSORS PARCEL NO.: 5-5- '> 5570/ LEGAL DESCRIPTION: £4, 131 gy,e0..v uK . 47,P BUILDING OWNER NAME: //-& ' YIIbN NAME: f31244D L ookr, ADDRESS: 439 K. j'• (V .wm_K CITY: 14341 V (.(.�y STATE: y • ZIP: c © CD ��O PHONE: "/ ZT. 33 ,j',7 FAX: CELL: CONTACT NAME: 041).g othelza- irefit4Vc PHONE: J~3 _4E ce) yr- 30(p FAX: 554---454: CELL: C65-- 50 CONTRACTOR NAME: F3.4k a�, MAILING ADDRESS: AO0 Z.- CITY: pa 1-7 STATE: ((/1 ZIP: 997.0z"z94 PHONE: 554---4-SoO FAX: 634 54- -3 CELL: 91 3- CONTRACTOR LICENSE No.: iK CoA •EXPIRES: 4/4/49/ CITY BUSINESS LICENSE NO.: 7-$/ -40? DESCRIBE THE SCOPE OF WORK IN DETAIL AND INDICATE USE & PROPOSED USE: K psi=a�� �r1 �/, ; ` ' div aitilefi667ZY, ,cue' 7;117;c '-i e fir' a4 y s , �Ct J Af ****YOU MUST COMPLETE THE FOLLOWING**** MARK N/A IF NOT APPLICABLE Height to Peak: Dimensions: No.of Stories: Total Habitable Space: Main Floor SQ FT: Upper Floor SQ FT: Unfinished Basement SQ Finished Basement SQ FT: FT: Garage SQ FT: Deck/Covered Patio SQ Impervious Surface 30%Slopes on FT: Area: Property: No. of Bedrooms: Construction Type: Heat Source: Sewer or Septic: TOTAL COST OF PROJECT: $ & . 0OV 0 DISCLAIMER The permitted verifies,acknowledges and agrees by their signature that: 1)if this permit is for construction or on a dwelling,the dwelling is/will be served by potable water. 2)Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of Spokane Valley permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted and subsequently approved before this application can be processed. Effective October 28, 2007 Page 1 of 2 P:\Community Development\02 Administration\03 Forms-Official Versions\Permit Center\Residential Construction Permit App 10.28.07.doc SignatureCC IS Date: / /O_ED l 0 Method of payment: 0 Cash ❑ Check FYVisa El Mastercard Bankcard #: EXP: VIN#: Authorized Signature: Effective October 28, 2007 Page 2 of 2 P:\Community Development\02 Administration\03 Forms - Official Versions\Permit Center\Residential Construction Permit App 10.28.07.doc For City Use Only ��, PLUS Project Number - '. Spokane Project Address 40.00 Ta11e y® 11703 E Sprague Ave Suite B-3 • Spokane Valley WA 99206 509.688.0036 ♦ Fax: 509.688.0037♦ permitcenter@spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review.If for any reason we cannot meet this date, we will contact you with a revised target date. Your application review TARGET DATE is The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review ➢ Submit complete, accurate plans and documents. Extra time may be required for re-submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. ➢ Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. ➢ Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date,please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure,you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents,as indicated on your Pre-Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone,fax, email,or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re- submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre-construction meetings (if required)will be provided by the Permit Specialist at that time. WHITE-APPLICANT PINK-BUILDING FILE REV 9/07