Loading...
1991, 09-06 Permit App: 91005616 ResidenceSPOKANE COUNTY DEPARTMENT �OF BUILDINGS W. 1303 BROADWAY AVENUE + w^ SPOKANE, WASHINGTON 99260 (509) 456-3675I certify that I have examined this permit/application, state that the information contained in it and submitted by me or my agent to compile said permit/application is trueand correct, and authorize Spokane County to proceed with processing. In addition, I have read and understand the INSPECTION REQUIREMENTS/NOTICEprovisions included herein and agree to comply with same. All provisions of laws and ordinanceS governing this type of work will be complied with whether specifiedherein or not. I understand that the issuance of this permit/application and any subsequent inspection approvals or Certificates of Occupancy shall not be construed togive authority to violate or cancel the provisions of any state or local law regulating construction, or as a warranty of conformance with the provisions of any state or locallaws regulating construction.SIGNATURE OF APPLICATIONOWNER OR AGENT DATE PROJECT NUMBER= 9i0O56i6 ''`~~-- ****** THIS IS NOT A PERMIT ****** PENALTIES WILL BE ASSESSED FOR COMMENCING WORK WITHOUT A PERMIT APPLICATION DATE= 09/06/91 PAGE= 01 SITE STREET= 3909 % ROBIE %T ADDRESS= SPOKANE WA 99206 PERMIT USE= RESIDENCE — NATURAL GAS PLATO= BLOCK= AREA= 4 OF BLDG%= OWNER= STREET= ADDRESS= 005026 PLAT NAME= 2 LOT= F/A= 4 DWELLINGS= GREHY INC 122i2 E SIOUX CIR SPOKANE WA 99206 CONTACT NAME= FRANK COBB BUILDING SETBACKS: FRONT= 30 LEFT= 21 RIGHT= 20 REAR= 31 ****************************** REVIEW INFORMATION ************************** PARCELO= 33541-9044 MIDILOME 6TH ADD 2 ZONE= UR -3.5 DIJTO= F WIDTH= 85 DEPTH= 125 R/W= 50 i WATER DIST = MODEL PHONE= 509 924 9406 PHONE NUMBER= 509 924 9406 DEPARTMENT ---------- BUILDING BUILDING ENGINEER REVIEW COMMENTS PLAN REVIEW REQUIRED SETBACK REVIEW REQUIRED APPROACH/FLOOD PLAIN/DRAINAGE ******************************* BUILDING CONTRACTOR= STREET= ADDRESS= GR MY INC 12212 E SIOUX CIR SPOKANE WA 99206 NEW= K REMODEL= DWELL UNITS= i OCCUP. LD= BLDG W X D = %Q FT= REQ PARKING= OHANDICAP= APPROVAL COMMENT% ----------------------- -�^��c —421_------- ------------ PERMIT 3120 ******************************* MECHANICAL CONTRACTOR= R & R HEATING & AIR COND STREET= 1723 E FRANCIS AVE ADDRESS= SPOKANE WA 99207 **************************** PHONE= 509 924 9406 ADDITION= BLDG HGT= SPRINKLER= N CRITICAL MAT= N CHANGE OF USE= STORIES= PERMIT ************************** ***************************** PLUMBING PERMIT CONTRACTOR= PIPER PLUMBING & HEATING STREET= PO BOX 3992 ADDRESS= SPOKANE WA 99220 PROCESSED BY: WENDEL, GLORIA PRINTED BY: WENDEL, GLORIA ******************************** ' THANK YOU PHONE= 509 484 i405 ****************************** PHONE= 509 534 6986 ********************************* F NOTICE It is the responsibility of the permittee, not Spokane County, to see to it that the use described on the front of this permit complies with applicable codes and requirements and that required inspections are requested. Failure to request required inspections and obtain the necessary approvals prior to progressing beyond the point where inspections are required may necessitate removal of certain parts of the construction at the owner's/permittee's expense. At a minimum, the following inspections ARE REQUIRED by County Code: 1. FOOTING — when forms and reinforcement are in place and prior to placement of concrete. NOTE: This inspection includes review of the structure's setbacks from property lines. Minimum setbacks are established by County zoning regulations. Typically, side and rear yard setbacks are measured from property lines, while setbacks for yards abutting streets are measured from the property line or the center line of the roadway right-of-way, whichever provides the greater setback from the center line of the roadway right-of-way. Curb lines and fence lines are not necessarily indicative of property lines. In some residential areas, the County can own as much as 20 feet of right-of-way between your property and the actual improved street/curb. The responsibility to comply with applicable setback provisions lies solely with the permittee — neither Spokane County nor its authorized representatives assume any responsibility for the verification or location of your property lines. Please verify their location prior to locating your structure. Failure to properly locate the structure may require its relocation at the owner's/permittee's expense. 2. FOUNDATION — when forms and reinforcement are in place and prior to placement of concrete. (Blocking for a manufactured home is required to be inspected prior to the installation of skirting.) 3. FRAMING — after all framing, bracing and blocking is in place, and prior to concealing. 4. INSULATION — prior to the installation of drywall. 5. PLUMBING — after rough -in, before covering, and final. 6. MECHANICAL — rough -in of piping, before covering, metal chimneys before concealment, and final. 7. FINAL — when complete and prior to occupancy and/or use. Please provide 24 hours notice. NOTE: In addition to inspection of the structure, this inspection includes review of site improvements (typically depicted on the approved site plan) required by ordinance or as a condition of approval of this permit. Items such as the installation of fire hydrants, fire department access, on-site drainage ("208 swales"), road improvements, parking, and landscaping are common requirements of a permit/site plan which must be completed prior to final approval of a building or issurance of a Certificate of Occupancy. In addition to the above any plumbing or mechanical systems or materials which would be concealed by framing, drywall, concrete, etc., must be inspected prior to cover. Check with the department for "special inspections" in conjunction with commercial projects. CALL 456-3675 FOR INSPECTIONS. TO INSURE PROMPT SERVICE, PLEASE GIVE 24 HOUR NOTICE. YOUR INSPECTOR IS UNDER CERTAIN CIRCUMSTANCES, PARTS OF YOUR PROJECT MAY REQUIRE INSPECTIONS FROM OTHER AGENCIES: • road cuts for utilities or drives, State or County Engineer's Office 456-3600 • on-site waste disposal system, Environmental Health District 456-6040 • construction in a flood plain, County Engineer's Office 456-3600 • electrical wiring, State Department of Labor and Industries 456-2792 • sewer connection, County or City Utilities Department 456-3604 EXPIRATION Unless otherwise noted, this permit will be considered null and void by limitation of the work authorized by the permit is not commenced or is stopped for a period of 180 days, unless a written request for an extension of the permit is received and approved by the Building Official prior to expiration. At a minimum an inspection should be requested at least once every 180 days to assure the validity of the permit. A permit may be renewed within one year of the date of expiration for one-half the original fee, subject to certain limitations — please call us if you have any questions. MISTAKES? If you think we've made an error in processing this permit or in conducting inspections pertaining to it, or find erroneous information in the permit, please bring it to our attention immediately by filing a written request for correction within 10 working days of discovery. All such requests should be directed to the Department of Buildings at the address found on the face of this permit. • Spokane County DEPARTMENT OF BUILDING & SAFETY West 1303 Broadway Avenue Spokane, WA 99260 (509) 456-3675 PARCEL NUMBER: STREET ADDRESS: CITY/STATE/ZIP: INFORMATION WORKSHEET SUBDIVISION: BLOCK: LOT AREA: j # OF BUILDINGS: / , O Cic�/l 5 9zci� OA C._ - n n-1 /21 / 6 LOT: -2i ZONE: DISTRICT: F/A: WIDTH: DEPTH: 3 R/W: OWNER: 6g_ C_ ` , / # OF DWELLINGS: MAILING ADDRESS: CITY/STATE/ZIP: CONTACT: WATER DISTRICT: PHONE: - % Z1- S�o PHONE: SETBACKS: - FRONT: -,:jb LEFT:! RIGHT:j2C, REAR: 3 ,/ PERMIT USE: **************************************************************************** CONTRACTOR LICENSE NUMBER: CONTRACTOR: MAILING ADDRESS: E BUILDING INFORMATION /22/ Z ARCHITECT/ENGINEER: MAILING ADDRESS: NEW: REMODEL: DWELL UNITS: PHONE: - a y C,iz__ PHONE: ADDITION: CHANGE OF USE: OCCUPANT LOAD: BUILDING DIMENSIONS: REQUIRED PARKING: BUILDING HGT: STORIES: / X (WIDTH X DEPTH) SQ. FT.: //5;() # HANDICAP: SPRINKLERED:'�� CRITICAL MATERIAL: Please provide the following information for Energy Code compliance: Space heating type (check one) Forced air electric —7—Forced air gas Flat ceilings R Vaulted ceilings R Above grade walls R Below grade walls R Floor R Slab on grade R Electric baseboard or wall mount Propane Heat pump Other: Doors U Windows U Glazing area Total floor area of heated space 3120 h�r,, Furnace efficiency rating 6 -/U oda : Please indicate on your plans: The location of the radon vent, and the location of the vent fan area. Square footage Main floor: Second floor: Basement - Finished: Unfinished: tjo 0 Garage: `) Carport: -- " Decks: Additional Areas: Z Q1 if, c K FRo PERP1 Lw:\ CSAR !'a 1.,405 x1� 0 € etc, SS � 3� O S S, r<01 -T LoT ocK p ILO C9-1-14 COU-tRANL )",-- 1O�r X basem \ft 62.2 FT ••••"...". 00" 4•11111= 1 j RADON VENT 1 P. nt ••• •••••... mu.= gar age - - - base n t 1 • .5107 5 FLAN''.Lz ' &Wilier Cngineering E. 8620 44th Spokane, Wa. 99206 Phone 509 926 6217 Fax 509 928 868 Legend For Radon mitigation systen ----perForiated pipe beneath stab C) solid 4 ABS stack vent pipe RADON SYSTEM SPECIFICATIONS RADON MITIGATION SYSTEM This radon mitigation system is designed only For the specific Job site address designated. The syste is not guaranteed unless installed by Cavalier Corporation Job site address 3909 "KIRI E 7117teu?,2A., War r e ' ° s• .a,106 0( Environmental Protection Agency RCP ;lin 4 . S FT Environmental Protection Agency RCP *10 IMO 10 0 Q t0 ro lUiWGSDCI ssaJppu IMO OR. .-< N -• 0 3- 0-4. r N . P 0 (00N < i-► P 3 , P 0_ M p — L0 Q 0. Q C 7 0 0 P m 0 3 , , UIUJ C1 3 `< 3 LO 0 r -r a. r -r O , (0 (0 -0 -• D 19 m O XI LD 0 0--., p ▪ u:J r., P C J e-► -. ▪ '-+ 3 P r 0 r+ (D 3 O A (0 ..11 3 h a N V) I N 3 ?'-• (0 N (0 `*1 $ r-• -. P in n -. `< (1 O t, (0 e -w 0 O_ (0 tr NOIld]IIIW NOUV1 r- - D SNOI1V3IJI33d5 N31SAS NOQVU oII o m Ca- 0 7 -b. p r -t 3> (D Cz! Q_ 1/1 13 -. P • m 7C- crm < m m J p i"+ r -r 60S auoyd m w 0' ru O LO te-. ru S Oi 0' ru cn v 0 T P 3 X (0 O Z L 0 40 rV LO CO t0 o o c 01 01 Ca 3)57021 4,0,2 s QJItUIliEr engineering radon services E. 8620 44th * Spokane, WA 99206-9224 Phone (509) 926-6217 PAX (509) 928-8689 RADON SYSTEM SPECIFICATIONS, SPOKANE COUNTY: 1. Perforated pipe shall be installed within the native soil or fill (sand, gravel or soil) at a minimum depth of 1" below the intended slab. 2. The pipe shall be a minimum diameter of 4". meet AASHTO M252, have perforations no wider than 1/16" and have a minimum of 2.5 square inches of total perforations per linear foot of pipe. 3. There shall be a minimum of 10 linear feet of perforated pipe per hundred square feet of slab floor space. 4. The pipe shall be laid in a continuous loop, connected at both ends to the solid stack vent pipe. 5. Any slab area, which is larger than 10 square feet, which is isolated from other slab areas by footings or other barriers, shall have a perforated pipe installed to the above specifications. (The pipe can be a single length rather than a connected loop if the area is too small or narrow to accomodate a connected loop.) 6. A stack vent of ABS, schedule 40, minimum size 4", shall be connected to the sub -slab piping and proceed upwards to an exit location on the roof, and extending 14" above the roof. The pipe shall be labeled "radon vent" every 16" or less for its full length. The pipe's attic location shall allow a minimum of 4' of head room. When- ever possible this exit location shall be on the backside of the roof. 7. Any elbows in the stack vent piping shall have a centerline radius minimum of 1.5 by pipe width. 8. An inline centrifugal fan, minimum 114 cfm @ 3/8" W.C., UL listed, manufactured specifically for radon mitigation, maximum sone level 2.8, shall be installed in the exhaust line, in the attic. 9. Couplings to connect the vent piping to the fan shall be elastomeric PVC, Fernco series 1056 or equal. 10. The fan shall be hard -wired and the breaker labeled "radon fan". 11. All penetrations and joints in the concrete floor slab below grade shall be sealed with caulk or grout. 12. A notice shall be permanently attached to the electrical panel advising the owner or occupant about the radon system and that he/she shall test the home for radon annually. The notice shall include Cavalier's name and phone number. 13. All craftsmanship shall be of high quality.