1992, 04-15 Permit App: 92002541 ResidenceSPOKANE COUNTY DFpARTMENT OF BUILDINGS
W. Jb34 OADWAY AVENUE
SPOKANE, WASPJNGTON 99260
(509) 456-367P
1 certify that I have examined this permit/application, state that the information contained ini'it and submitted by me or my agent to compile said perm it/application is true
and correct, and authorize Spokane County to proceed with processing. In addition, I have read and understand the INSPECTION REQUIREMENTS/NOTICE
provisions included herein and agree to comply with same. All provisions of laws and ordinances governing this type of work will be complied with whether specified
herein or not. I understand that the issuance of this permit/application and anysubsequent inspection approvals or Certificates of Occupancy shall not beconstrued to
give authority to violate or cancel the provisions of any state or local law regulating construction, or as a warranty of conformance with the provisions of any state or local
laws regulating construction.
SIGNATURE OF APPLICATION
OWNER OR AGENT DATE
F'l:�,C)..JF.f" �' i•IE.)r`iYtr::r.: '.,2;.100' 754 f �',i='F�'I...:i:C,AT' TC)N I)A i E=: ��,4/1 "x/``�:'. F'r",€;F:::: Cr S
tikai 3i +i ;e i"! -IT ,F T T Ni)T A PE'::RM:I''T iE�atii�x
I", I : N A I... "r :f. F:::i Ix} r I... L. i; #:: f`•t;i ' F: :�' I I7 F 1 R C": f? M i F" t�I►.� T N G WORK WITHOUT A F'
I :F:: T':::: ::i�� i "5 t I r) : T. F: l °,^,F:C"!^I... = 3354 i
a
NATlJFtit`t{... ! A"3
1='{...f.';'1G0!,,C;;'26 I:'1...r-•#'i M ID ciT A1),C,..
B L()C:K.
ARF:F f:,::: WJ:)r,TI.J : DEF'TFi:::: R/ (J::;: ",C.,
OF BL. '::: i Ci!! :I...i...:}:r1C::,4::: •i IAiA«1'F::F� 1)C "T MODF"1...
C)WNE'R:: GREM•Y :i: NQ PH0N1= := 5+; 9 924 94i?a.Ay
-i' _'J" F.:. S:Fr.)1.+,� C::.T.F
r�T>Z)I�f: ,�':::: ;.:F�'CJI<;ANI:` l,�f§ a�t�2t4
I...F::i�1.«R)ER Ni;ME Wt`s::>H:CN,GTC:)N TRUST BANK PH1::1Ni`: NUMBER= = ':e:;`;� ;:i'5 3 � ',�
«}
i FE E T• F' C:) T t 212-1
C`:ONT ACCT Nr-1ME::m, G'R'EMY TN(::: PH0NF. NLJMBEr,;::: 509 9.24 9406
F-R0NT:..- 2 L EFT':... •i i R,1. x{«IT- 442 CF::. -it:.. 2
x x ;r r a• i{ x � �: i< r * 3i :,r. x R F:* V I E in! .T. N F C:) 64 i•' A 'l C) N
+.: i:::F'FaF::'T'1~iE id'E` F�:F::'x{:i: i : (:'r:.)'i'ril ,i,! TS
l�'{-'I�:C:I'+ AL.. C..0M 1F:.I� T S
.11 ... I) J: N.i.� E ' L.. t NFi: I: i :i: is i�1 F F" Ca 1..i I i F: it _ ...... «.......� _ ....:^R....« ..._.......... _
.0C.):E:E..DJ:LaoC:V F::NF-FL:GY Pi...AN RF V TF.W F-;i:CItJTRC:.)+ ........
F:: s`'•1 C .r. N F:: k':� F�; as i :' F' E~; C7 r� f; I•E ;' F�' E«. C:'f C7 7Z F�` E._ F�i :i: �! :' � � E�: r'`, :r Pd �a CY F:: � . -... .. « . .... _. «..
BUILDING PF RMJ:T )r � �: ii �i 3i tt iz � ai H �{ •� � ai• y,• iY 1r � � � p � a ib i. # �+:
T :.: 1221" ' E : " :I: C:) CJ X. C:: J: F;
AJ:)C;=;"•�:. �:« `F'()KfirNF:: 1.�Ia°t i}`��'c:).a
N1:1'.W C RF::P'EC1[;F-:L..
D!A1I:- i...1... L.) N :E: :::: 't 0 C:: C, C.) F' I... 1):t. -
1
i ; F:: in ►=' r°� r� l` ;t: sus C:Y ::: N I -d (i N Y) :L C:` A F' ___:
1)1`SC;14;'r. F, I' J: CJi�i C:rF'tL)UF' T '(PE
r„Y w�F,'ACY F:. M_ _i VN
111' Mi 1C, E"S E";i:::: E=t :i: P T :L C) t ;±
«... .. .
VAI ...Ue,*i'T':E:(tN
;,i'.'1'ATE 1:1.) RC FIAR G r
C..t.)►..}N'T Y ,,E.iE�.t.�i•dr�r1`;!«YF�
I^'I«IlyiSYF=:: 1509 9244 ":164i36
A DD :F 'T 10 N (: i -E -M C:v F: C)1”'
i:;1...S)t:, FdGT::: 24 ;rTC)RT I":c',:--
T VAL..E.Er: T T ON
441:1 4840 . 00
16 7' 7xj r 015,158, 0 1 13 257 tt:;
CUANTJ: TY i~C"E Ai'1t:)iJNT
........ ... ... .... .... ....
Y 16 5 Cl
y 44 a ")0
'r I 2 8 : 9
:• ;u;• - : �r i�: �i ar: as 4k 4{ ii :>4 3i N ;( i> r. �i ?i 3c re : 1; k i'I E' : C:: I••I A N1. C A I... r-' F: F4 5,'''i J: T it 3R 9» � �: it ,�: k it 3i x N: ie h N: ac � 3t a �t• ri• ri �t � it ;t
S 1FCd{= 1 #'�
"1 F{ F:: F:: "T' .. i ,'': F" E:: I i r -r F i u
r`li)S)RI:::,: C:)tt:NF` CAiA , B •..
1:TEM DE,°;C:iRTPTT C)N C.?!_)AN'T:i:T'Y F"i":I:: AHC:)CJt}T
...... ... ............................................................... «...«. .. , «
I:f r•1 !�1 rel 1 ,::. {•'; 1'T 1-. F•t T F:.1'4 .1 .I � � : +r; S'/
r(.!t, F, i 12 410
.14 4
11 'l to')
� r
NOTICE
It is the responsibility of the permittee, not Spokane County, to see to it that the use described on the front of this permit
complies with applicable codes and requirements and that required inspections are requested. Failure to request required
inspections and obtain the necessary approvals prior to progressing beyond the point where inspections are required may
necessitate removal of certain parts of the construction at the owner's/permittee's expense. At a minimum, the following
inspections ARE REQUIRED by County Code:
1. FOOTING — when forms and reinforcement are in place and prior to placement of concrete.
NOTE: This inspection includes review of the structure's setbacks from property lines. Minimum setbacks are
established by County zoning regulations. Typically, side and rear yard setbacks are measured from property
lines, while setbacks for yards abutting streets are measured from the property line or the center line of the
roadway right-of-way, whichever provides the greatersetback from the center line of the roadway right-of-way.
Curb lines and fence lines are not necessarily indicative of property lines. In some residential areas, the County
can own as much as 20 feet of right-of-way between your property and the actual improved street/curb. The
responsibility to comply with applicable setback provisions lies solely with the permittee — neither Spokane
County nor its authorized representatives assume any responsibility for the verification or location of your
property lines. Please verify their location prior to locating your structure. Failure to properly locate the structure
may require its relocation at the owner's/permittee's expense.
2. FOUNDATION — when forms and reinforcement are in place and priorto placement of concrete. (Blocking fora
manufactured home is required to be inspected prior to the installation of skirting.)
3. FRAMING — after all framing, bracing and blocking is in place, and prior to concealing.
4. INSULATION — prior to the installation of drywall.
5. PLUMBING — after rough -in, before covering, and final.
6. MECHANICAL — rough -in of piping, before covering, metal chimneys before concealment, and final.
7. FINAL — when complete and prior to occupancy and/or use. Please provide 24 hours notice.
NOTE: In addition to inspection of the structure, this inspection includes review of site improvements (typically
depicted on the approved site plan) required by ordinance oras a condition of approval of this permit. Items such
as the installation of fire hydrants, fire department access, on-site drainage ("208 swales"), road improvements,
parking, and landscaping are common requirements of a permit/site plan which must be completed prior to final
approval of a building or issurance of a Certificate of Occupancy.
In addition to the above any plumbing or mechanical systems or materials which would be concealed by framing, drywall,
concrete, etc., must be inspected prior to cover. Check with the department for "special inspections" in conjunction with
commercial projects.
CALL 456-3675 FOR INSPECTIONS.
TO INSURE PROMPT SERVICE, PLEASE GIVE 24 HOUR NOTICE.
YOUR INSPECTOR IS
UNDER CERTAIN CIRCUMSTANCES, PARTS OF YOUR PROJECT MAY REQUIRE INSPECTIONS FROM OTHER
AGENCIES:
• road cuts for utilities or drives, State or County Engineer's Office
456-3600
• on-site waste disposal system, Environmental Health District
456-6040
• construction in a flood plain, County Engineer's Office
456-3600
• electrical wiring, State Department of Labor and Industries
456-2792
• sewer connection, County or City Utilities Department
456-3604
EXPIRATION
Unless otherwise noted, this permit will be considered null and void by limitation of the work authorized by the permit is not
commenced or is stopped for a period of 180 days, unless a written request for an extension of the permit is received and
approved by the Building Official prior to expiration. At a minimum an inspection should be requested at least once every 180
days to assure the validity of the permit. A permit may be renewed within one year of the date of expiration for one-half the
original fee, subject to certain limitations — please call us if you have any questions.
MISTAKES?
If you think we've made an error in processing this permit or in conducting inspections pertaining to it, or find erroneous
information in the permit, please bring it to our attention immediately by filing a written request for correction within 10 working
days of discovery. All such requests should be directed to the Department of Buildings at the address found on the face of this
permit.
Spokane County
DEPARTMENT OF'BUILDING & SAFETY
West 1303 Broadway Avenue Spokane, WA 99260 (509) 456-3675
INFORMATION WORKSHEET
PARCEL
CITY/STATE/ZIP:
NUMBER:
-i /,I- c__ --
MAILING ADDRESS:
STREET
ADDRESS:—
DDRESS:
/dam
CITY/STATE/ZIP:
m
.�v
SUBDIVISION: / / ' �) i C-4 L 4O-2 G
BLOCK:_ LOT: / ZONE: DISTRICT:
LOT AREA: Z F/A: WIDTH: DEPTH: R/W:__
# OF BUILDINGS: / # OF DWELLINGS:_ WATER DISTRICT: _
OWNER: V>/�L •i �/y PHONE: -
MAILING ADDRESS:
CITY/STATE/ZIP:
CONTACT:
PHONE: -
SETBACKS: - FRONT: 3 y LEFT:// RIGHT REAR:
PERMIT USE:
�i
BUILDING INFORMATION
CONTRACTOR LICENSE NUMBER: z ::�14 / 6 dy
CONTRACTOR: (r2-
—
-i /,I- c__ --
MAILING ADDRESS:
�.
/ LZ/ 7--
/dam
ARCHITECT/ENGINEER:
MAILING ADDRESS:
PHONE: 5�-
?- .
PHONE:
NEW: REMODEL: ADDITION: CHANGE OF USE:
DWELL UNITS : OCCUPANT LOAD: BUILDING HGT: STORIES:c�i
BUILDING DIMENSIONS: X (WIDTH X DEPTH) SQ. FT.:
REQUIRED PARKING: # HANDICAP: SPRINKLERED: CRITICAL MATERIAL:
Please provide the following information for Energy Code compliance:
Space heating type (check one)
1
Forced air electric
Electric baseboard or wall mount
Propane
Forced air gas
Heat pump
Other:
Flat ceilings R
Doors U
Vaulted ceilings R
Above grade walls R
Windows U
Glazing area 3 0'�
%: / ko
Below grade walls R�
Floor R_
Slab on grade R
Total floor area _
of heated space
Furnace efficiency ratings
Please indicate on your plans: The location of the radon vent, and the location of the vent fan area.
Square footage
Main floor:
J� floor:
Basement - Finished:
Unfinished:
Garage: 1S
Carport:
Decks: /!
Additional Areas:
z
�2Erty (�� CoN T,z.��To.Z
Pi N
4
�, rZA � F
V 67-
n �✓ j
/2t�✓►
rL2
� "^
1(d _
i
V 67-
n �✓ j
/2t�✓►
rL2
� "^
1(d _
Please provide the following information for Energy Code compliance:
Space heating type (check one)
Forced air electric Electric baseboard or wall mount Propane
Forced air gas Heat pump Other:_
Flat ceilings R Doors U
Vaulted ceilings R Windows U
Above grade walls R Glazing area
Below grade walls R Total floor area
Floor R of heated space
Slab on grade R Furnace efficiency rating
Please indicate on your plans: The location of the radon vent, and the location of the vent fan area.
Square footage J� = !ti s
Main floor: �7 73
Second floor:
s
Basement - Finished:
�/v o i2 ./✓rpt �.v
Unfinished:
Garage:
Carport:
Decks:
Additional Areas:
LENDER/BOND HOLDER: A S H 10 G (DA-) G u +mato lC �,ot ✓; T
ADDRESS: ;�,c' F-)
-)A
CONTACT:
CONTACT: �1�� �`� - C 14 S PHONE:
0
�auilier
E. 8620 44th
�or�ur�irna
Spokane, Wa. 99206
Phone 509 926-6217 Fax 509 928-8689
Legend for Radon mitigation system
— —perforated pipe beneath slab
0 solid 4YABS stock vent pipe
RADON SYSTEM SPECIFICATIONS ATT.
RADON MITIGATION SYSTEM
This radon mitigation system is
designed only for the specific job -
site address designated. The system
is not guaranteed unless installed
by Cavalier Corporation
Sub Slab System YES
I SO FT
Criawlspace System
SO FT
Jurisdiction COUNTY
Project Number
in '0005��
acre
-ff-Fl~ ANIV q &I
R d d
Environrientol, Protection Agency RCP #1' S
9, 'mloss
Jobsite S. 3915 ROBIE
Builder GREMY
Address 12212 E. SIOUX CIRCLE
Phone 924-9406
E. 8620 44th a Spokane, WA 99206
Phone (509) 929-4217 FAX (509) 928-8689
RADON SYSTEM SPECIFICATISM, SPOKANE COUNTY:
1. Perforated pipe shall be installed within the native soil
or fill (sand, gravel or soil) at a minimum depth of 1"
below the intended slab.
2. The pipe shall be a minimum diameter of 4". meet AASHTO
M252, have perforations no wider than 1/16" and have a
minimum of 2.5 square inches of total perforations per
linear foot of pipe.
3. There shall be a minimum of 10 linear feet of perforated
pipe per hundred square feet of slab floor space.
4. The pipe shall be laid in a continuous loop. connected at
both ends to the solid stack vent pipe.
5. Any slab area, which is larger than 10 square feet, which
is isolated from other slab areas by footings or other
barriers, shall have a perforated pipe installed to the
above specifications. (The pipe can be a single length
rather than a connected loop if the Area is too small or
narrow to accomodate a connected loop.)
6. A stack vent of ABS, schedule 40, minimum size 4", shall
be connected to the sib, -slab piping and proceed upwards
to an exit location on the roof, and extending 14" above
the roof. The pipe shall be labeled "radon vent" every
16" or less for its fall length. The pipe's attic
location shall allow a minimum of 4' of head room. When-
ever possible this exit location shall be on the backside
of the roof.
7. Any elbows in the stack vent piping shall have a
centerline radius minimum of 1.5 by pipe width.
8. An inline centrifugal tan, minimum 114 cfm @ 3/8" W.C.,
LCL listed, manufactured specifically for radon mitigation,
maximum sone level 2.8, shall be installed in the exhaust
line, in the attic.
9. Couplings to connect the vent piping to the fan shall be
elastomeric PVC, Ferneo series 1056 or equal.
10. The fan shall be hard -aired and the breaker labeled "radon
fan".
11. All penetrations and Joints in the concrete floor slab
below grade shall be sealed with caulk or grout.
12. A notice shall be permanently attached to the electrical
panel advising the owner or occupant about the radon
system and that he/she shall test the home for radon
annually. The notice shall include Cavalier's name and,
phone number.
13. All craftsmanship shall be of high quality.
L