Loading...
2012, 05-21 Permit: SW-12001381 SewerSPOKANE COUNTY BUILDING AND PLANNING PERMIT Application Number: SW -12001381 Permit Issued Date: 05/21/2012 Expiration Date: Project Description: Project Name: Permit Type: SEWER CONNECTION SHERWOOD FOREST/MICA PARK SEWER Primary Contact: ALL STAR EXCAVATING INC Applicant: ALL STAR EXCAVATING INC Address: Phone: Email: PO BOX 18869 SPOKANE, WA 99228 509-990-6694 SITE INFORMATION: Site Address: Parcel Number: Subdivision: Assessor's Description: Inspection Area: 1015 S ROBINHOOD ST 45203.1602 SHERWOOD FOREST SHERWOOD FOREST L2 B6 Owner: Address: Phone: Email: SIMON, RICHARD LANCE & LESLIE 1015 S ROBINHOOD ST SPOKANE, WA 99206 Water District: Spokane Fire District: Fire District 1 County Water District #3 Zoning: Land Area: 0.2296 acres / 10000 sgft CONTRACTOR INFORMATION: General Contractor ALLSTSE905DT ALL STAR EXCAVATING INC PO BOX 18869 SPOKANE, WA 99228 509-990-6694 DETAILS: Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION FEE DETAIL: Processing - Utilities Utilities Permit 1 $125.00 $125.00 $125.00 Total Fee: $25.94 $125.00 $150.94 CONDITIONS: CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. Date Printed: 05/21/2012 12:38:05 Printed by: IIS APPPOOL\ASP.NET v4.0 SPOKANE COUNTY BUILDING AND PLANNING PERMIT Permit Issued Date: Application Number: SW -12001381 05/21/2012 Expiration Date: INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed: 05/21/2012 12:38:05 Printed by: IIS APPPOOLWSP.NET v4.0