2013, 11-19 Permit App: BLD-2013-2455 Pole Bldg Community Development Department (Staff Use Only)
Permit Center
anor """^.� 11703 East Sprague Avenue, Suite B 3 - PERMIT NUMBER:—_�____ _____
Spokane Valley, WA 99206
Tel: (509) 720-2540 PERMIT FEE:
.,j. 1�at-Lei Al
Fax (509)6$8-0037
BL
RESIDENTIAL CONSTRUCTION PERMIT APPLICATION
NEW CONSTRUCTION ❑ ADDITION/REMODEL /ACCESSORY BUILDING
❑ DECK ❑ OTHER
SITE ADDRESS: 1 f 9 5- Ui U l{Orci
ASSESSORS PARCEL NO.: 2_+3_,t, IA- LEGAL DESCRIPTION:_^� � __
BUILDING OWNER NAME:
NAME: Jl/l.l U 0a- b _
ADDRESS: ISI 9 ; . e.0fc0 )-CI (�
CITY: SpOKAAL7— STATE: ff ,,``e ZIP: C19Zj7_
PHONE: S()q - 98,52,- S¢7 I FAx CELL:
CONTACT NAME: vi(\C 0
PHONE: SOS - —1 b 7- -7 71_09 Fax CELL: —_
CONTRACTOR NAME: r S R.,.. v e;_..
MAILING ADDRESS: 1 n7 2,4- Iv Y i - l�y--)l.,L"(� `_— _----
CITY: �jp__LV \__Q STATE: 1,66_, ZIP:ZIP: ci9 2.-11
PHONE: _4_51:7 - -7- Lo 7 j,�W"PAX: p- T /_-7 2- 3 cELL: ---. —__
CONTRACTOR LICENSE No.: SO --pQSL b'( `EXPIRES:61—/r9 r)I , CITY BUSINESS LICENSE N0.'
DESCRIBE THE SCOPE OF WORK IN DETAIL AND INDICATE USE & PROPOSED USE:
a x o X t_0 ___p0 __bi..,u\_d,As_
****YOU MIST COMPLETE THE FOLLOWING****
MARK N/A IF NOT APPUCAEILE
Height to Peak: 1 4.1 Dimensions:
671-i-X
ims ions: aux 3L ; No.of Stories: , Total Habitable —
�. . Vie: ;
Main Floor SQ FT: Upper Floor SQ FT: Unfinished Basement SQ j Finished Basement SQ
FT: _ FT:
Garage SQ FT: Deck/Covered Patio SQ -j Impervious Surface 30%Slopes on
72
S Fe FT: Area: Property:
No. of Bedrooms: ___ Construction Construction Type: Heat Source: — x Sewer or :
TOTAL COST OF PROJECT: $ 7, 00 0 Project #- 8 LD-- .bI3--2`/S
nT ig li/ r: ; RECEIVED
The permitted verifies, acknowledges and agrees by their signature that: 1) if this pergnit is for construction or on a dwelling,the ling is! ill
be served by potable water. 2)Ownership of this City of Spokane Valley permit inure to the property •. it) ory.. .•--,rty
owner or has permission to represent the property o in this transaction. 4) All c¢nstru�ction is to •i II rice 7'-" + Ci of
Spokane Valley Development code. Referenced codes are available for review at tate City of Spokane Valley Permit Center. The Ci of
Spokane Valley permit Is not a permit or approval for any violation of federal, state+fir local to odes or ordinances. 6) Plans or additi,nal
Information may be required to . -_•- . -• andsubsequen _rr.�'oved i
f..a this pplicationn k:abDti RE-6041T CENTER
:. :r Signature / ...male -- ISUB # D_te:l R 1 K/ l ` -
OPP-
Updated 1-11-11 Page 1 of 1
http://www.spokan= . ley.org/filestorage/124/938/210/948/14x36/Building_Permit_-__Residentia1_11-11-11.doc
Project #
c. Zo 13 LaLisS
RECEIVED
Residential Driveway
72093 fSTi , , 3 �-- PAVING WAIVER
VallerT CENTER
Community Development—Planning Division
SUB # nREV # 11703 E Sprague Ave Suite B-3•Spokane Valley WA 99206
. _ 09.720.5026♦ Fax: 509.688.0037♦planning®spokanevalley.org
Spokane Valley Municipal Code(SVMC)Section 19.40.020.8;"All residential driveway and off-street parking areas shall be paved with
asphalt,Portland cement,grasscrete,paver blocks or other equivalent hard surface material". A paving waiver can only be granted If
the structure you are proposing Is not going to require a driveway for daily use.
PART I—OWNER INFORMATION
OWNER NAME: Li a IT e�� I o-N b\ PARCEL#: 45 2 4 • Cs(
ADDRESS: L'J L - Q nkV1 d
CITY: CW_ STATE: GOA Zip: (19 .037
PHONE: n'-5+71 FAX: CELL: EMAIL:
PART H—DETAILS OF PAVING WAIVER
1. Do you have an existing garage for parking daily use vehicles? J'YES 0 NO
2. Is the proposed detached structure used for storage only?,E1 YES 0 NO
3. Do you plan on using the detached structure to park vehicles? 0 YES ,j NO If yes, then
what type of vehicles?
4. Do you plan to conduct a business from proposed detached structure? 0 YES ONO If so,what
is thenature of your our business?
PART III—AUTHORIZATION
I,(PRINT NAME) ill v'l e.' i. 416,, owner, hereby confirm that the information provided on this
form is true and correct. I acknowledge that any change in the foregoing conditions, could require
the City to impose paving requirements. I further agree to report any change in these conditions to
• the Spokane Valley Co mu ' y Development Department, Planning Division,within 30 days.
�(/i, /% ),L /.�
e ner - gnature Dat
PART IV—DECISION
STAFF HAS REVIEWED THE PROPOSED PAVING WAIVER ON BEHALF OF THE COMMUNITY DEVELOPMENT
DIRECTOR AND FIND THE REQUEST IS GRANTED AT el LJe RC?V.1 I F ne
SAID ADDRESS FOR PERMIT#:
C�11�1tLi1Cl .�( 1��,� L< L 11
Planning Division Staff Signature Date
Created 6/27/11 Page 1 of 1
t 31'�3:_�A3f
In$
z
s
co
—t !'i'
1 1 r t' \,./V'
// r y" ,
q iG
x ;
4110
C3 1- k ! ---".CO
JPraject # &t ?bt3 ?Y55
e- l RECEIVED
4
x
I NOV 2 7 2013
i
y PERMIT CENTER
Y
M..
SUB # I
.. _ _._m.. _._.�. __
( REV. #
1 r, jit
Ni
I►- 4O
jaii it- 1 l
0
( t2 �'
a
u1 - 4-?;3, GCS -C
:.,
_
PLANNING DEPT. APPROVED
X `, d ° ' � r , �; 1i Vic`
E Y Oe-taCt '...X. !9 4`i„, }" `( c't 1 �'
�Y ,` til . � � ,i11 - Ci�--
I tU` (..---e Y )\.9 L es ^ 4"I (),(�, -74 ° `k_ • t tI