24877 PE-1414J
- % ~ ~6ElOER,f~~
I
/NORTHWEST
~ SOILS, TESTING & INSPECTION
July 25, 2002
Project No. C-70-S020105
Spokane County Engineers Office
1026 W. Broadway
Spokane, WA 99260-0170
Attn: Mr. Randy Stronks
Re: Riverwalk 11th Addition Construction Certification Package
Dear Randy,
Please find the following information which is intended to be used by you in the certification and
acceptance process for Riverwalk 11 th Addition.
1. A three-ring bound set of inspection and testing reports for the work constructed.
Included within this binder are the following sections which document the scope and
nature of the inspection work provided.
A. Correspondence
B. Test Reports
C. Daily Reports
2. A set of original mylar drawings and two bond copies stamped "Record Drawing."
It should be understood that this submittal provides certification for the initially constructed items
associated with this project. This certification only implies that the items shown were
substantially built as designed, and only valid the day the as-built survey and visual certification
were performed by this engineer. This certification makes no guarantee that other construction
activities associated with overall plat build out such as home builders or new home owners have
not in fact dislodged, destroyed, filled in or in any manner affected any of the items certified. It
should be noted that this letter does not relieve the contractor or developer from the warranties
implied within their bonding documents.
Should you have any questions or comments related directly to the certification package
submitted please do not hesitate to call.
Sincerely, P~X, T. NEtSO
STI ort , Q ~~oF c 'L
`7 have reviewed the
construction and to my knowledge find if to be
Paul T. Ne son, .E. in substantial ~ .
Associate conformance with the
approved certified plans
Cc: Craig Condron, C&L Development, L.L.C. and Standard -7
Specifications except as
CLC fle
STI fle noted." up7/-,~
~R~~
2214 East Riverside Avenue * Spokane, WA 99202 • Phone (509) 534-9711 • Fax (509) 534-9755
A Division of CLC Associates Inc.
~r ~
~ NORTHWEST
2214 E Riverside Avenue
SPOKANE, WA 99202
PHONE (509) 534-9711
FAX (509) 534-9755 Transmittal
Date: August 2, 2002 Phone No. 477-3604
Proiect No.: C-70-S020105 & C-70-S000194 Fax No. 477-4715
To: Spokane County Engineers Office
1026 W. Broadway
. Spokane WA 99260
Atfn: Randy Stronks
Re: Asphalt testing results for Hanson Center and Riverwalk 11
Transmittal of the Followinq_
Asphalt testing results
Notes:
REC~~Vrt-"D
. AUG 0 6 2001
SPOKANE COUNTY tivj:id~~r%
CC: CLC file
STI file
Tltransmittal-v, 1- 11/99
Project No.: C-70-S020105
Project Name: Riverwalk 11th Addition
JWrff NORTHWEST Lab No. : 838
Sample Date: 06/04/02
Sample Location: Sta 39+30
CLASS `A' &`B' ACP LABORATORY TESTING RESULTS
Gradation: (ASTM C-136 & C-117)
Sieve Size % Passing Specification
3/4" 100 100
1 /2" 94 90-100
3/8" 79 75-90
1 /4" 61 55-75
No. 10 36 30-42
No. 40 14 11-24
No. 200 6 3.0-7.0
Meets Specifications: Yes ~ No ❑
Percent Asphalt by Weight of Mix: (IVCAT Method)
5.7
Rice Specific Gravity: (ASTM D-2041)
153.7
~Paul T. I n, P.E.
Laboratory Supervisor
r~ 1
~ , ~
~ i
r
. ~ C,OUNTY ENG/NE
oFF-7C so
LAL PUgUC DOCU
MENr ~
ORIGIN,qI
"AS`B`
c~R u►LTSd
P►Rp JE F1ED RECQAp pRA
CT WlNGS
A~~~,ED: o
ENG "As-Builts" A p►'~t
PE-1414J _$i . Tom Andrel
RIVERWALK
11TH ADD
08-25-45 T&RDate
Prelirn. Review Henring Date
55483.9073
E. HARMONY, N. MICHIELLt, S. MQNTGOVIERY, W. RIO GRANDE
Lg Lots No / 20 LOTS - 4.97 ACRES (ENGINEER'S DBPT) - Plat rile-
NORTHWEST % R
Sri
SOILS, TESTING & INSPECTION
Apri15, 2002
STI Project No.: C-70-S020105
Spokane County Engineer's Office
1026 W. Broadway
Spokane, Washington 99260-0170
Arin: Mr. Randy Stronks
Re: Riverwalk 11th Addition
March 31, 2002 - Apri16, 2002
Contractor: Ed Loshbaugh & Sons, Inc.
Developer: C&L Development, L.L.C.
Dear Randy,
This letter transmits the general construction activity that occurred on site during the time listed above. This
letter is not intended to replace the construction daily report produced by STI Northwest or its staff, but it does
transmit the general information concerning the construction. activity. Any item that may be listed below may
or may not be in compliance with the plans and specifications. This letter is not intended to be a submittal for
~ acceptance. It is for informational use only.
The stub from the existing sanitary sewer manhole on Shannon was ezposed.
Native material was screened through a grizzly for later use.
No testing or tnspection work was performed by STI.
No major deficiencies to report at this time.
If you have any questions or comments conceraing any of the items listed above, please feel free to give me a
call.
Sincerely, _
STI Northwest
Bob Grah
Civil Projects Manager ,
cc: Craig Condron, C&L Development, L.L.C.
CLC File
~
STI File
2214 East Riverside Avenue • Spokane, WA 99202 • Phone (509) 534-9711 • Fax (509) 534-9755
A Division of CLC Associaces Inc.
1
- 092 NORTHWEST
-
April 15, 2002 SO/LS, TESTING & INSPECTION
STI Project No.: C-70-S020105
Spokane County Engineer's Office
1026 W. Broadway
Spokane, Washington 99260-0170
Attn: Mr. Randy Stronks
Re: Riverwalk 11t' Addition Apri I 7, 2002 - Apri I 13, 2002
Contractor: Ed Loshbaugh & Sons, Inc.
Developer: C&L Development, L.L.C.
Dear Randy,
This letter transmits the general construction activity that occurred on site during the time listed
above. This letter is not intended to replace the construction daily report produced by STI Northwest
or its staff, but it does transmit the general information concerning the construction activity. Any item
~ that may be listed below may or may not be in compliance with the plans and specifications. This
letter is not intended to be a submittal for acceptance. It is for informational use only.
Sanitary sewer 10" main line and ten services were installed on Shannon Ln.
Imported material was used for bedding and native material was used for backfill.
Compaction testing using a hand probe due to rocky material was performed.
The existing cap on the 10" SS line on Riverwalk Ln. was exposed and new line laid to
MH 24. Imported material was used for bedding. Line was not backfilled.
No major deficiencies to report at this time.
If you have any questions or comments conceming any of the items listed above, please feel free to .
give me a call. Sincerely,
STI Northwest
(~V Bob Graham Civil Projects Manager
cc: Craig Condron, C&L Development, L.L.C.
STI file
CLC File
2214 East Riverside Avenue • Spokane, WA 99202 • Phone (509) 534-9711 • Fax (509) 534-9755
A Division ot CLC Associatcs Inc.
SPGnANE COUNTY UTILITIES DI v iSION
WASTEWATER OPERATIONS
INSPECTION REQUEST FORM
. . . • , INSPECTOR
DATE: ~o Z
FROM: ,S'TX: NoRTNWEST PROJECT NAME: Rjvff_PWALK j tTN
PROJECT
REQUEST FOR:
191 PRE-PAVING T.V. INSPECTION ~ CHECK HERE FOR RE-N INSPECTION
Optional inspecfion, unless otherwise requested will incJude the same as post paving inspection.
E] POST-PAVING T.V. INSPECTION 1:1 CHECK HERE FOR RE-N INSPECTION
Required inspection prior to acceptance, inciudes complete video inspection of all lines for:
'cleanliness 'stub locations 'identifying any faults
E] POST-PAVING MANHOLE INSPECTIONS
~ SPECIAL INSTRUCTIONS:
CONTRACTOR: Ep L 059 BAO &c{soNJ. S"N ~
BILLING ADDRESS: __7 Lo- C Q A(,,KG `
(If New) -S par.& &[E . va A. 9 47
FIELD INSPECTOR: RADIO NO.:
(include drawing of all lines and/or manholes requested)
AT THIS TIME ROUTE • UTILITIES D •ANNING AND DESIGN"
PROJECT NAME:
ACTIVITY JOB#: PLANNING #
ATTACHMENTS: ~ DRAWING OF REQUESTED ~ DRAWINGS AT
AREA INCLUDING MANHOLE #S WASTEWATER
AND 1/4 SECTION #S OPERATIONS FIELD OFFICE
DATE FORWARDED: BY: DATE RETURNED:
AND ROUTE • UTILITIES D • AS TEWA - OPERATIONS"
ISSUE DATE: FILE NO.:
JOB NO.: VHS TAPE NO.:
13 ASAP El WHEN POSSIBLE ~ OTHER:
~ADD'IT'iONAMRS. TR'~UZNTI4NS:
~ ~ -
DATE COMPLETED: OPERATOR(S)
White - Utilities Yellow copy - Construction Revised 3/10/00
rt ~
~ 191. 5 2 2. 4 N
~ 1922.4
189.5/22.2 N
NORTH ~ I ~
~
r ~
^ 1
~ Wp 189.7/22.2 N ~r EXIST.
,
MH 22 ,
~ 4 5 9 N 3
2
i
; y 1 L Q~ 190.8/22 N
0 ~ ~ ~ 1 J
A
r • ~
,y` M~H 231 EXIST
EXIS 4 ^ -'~fFi,1
6 i
♦i L«` ,
' 5 - EXIST.
4 f MH 10
VAY LANE E 1 5 2 3 N `
acr "a" MH' 1 190.8/21.6
- , o
EXI
~
5 O r ~1
, L E I ST. ~ 4 r 190. 5 21. 5 N
M H 24 =
` M 1 3
A 1
~
`r
~r
EXIS 2
E/~t" . M H 1 ~ 9
18
~ {r1SHANNO
A 189.621.2N ,~r190.421,5N
'1-.1 N
~ Y~~`7'/NORTH~VL~T Riverwalk 1 ''on Job No.: C-70-S020105
Field Report L114 *r v
2214 E. Riverside 509-534-9711 Date:
Spokane, WA 99202 509-534-9755 fax Page Of
STINORTHWEST
April 22, 2002 SO/LS, TEST/NG & INSPECT/ON
STI Project No.: C-70-S020105
Spokane County Engineer's Office
1026 W. Broadway
Spokane, Washington 99260-0170
Attn: Mr. Randy Stronks
Re: Riverwalk 11t' Addition
April 14, 2002 - April 20, 2002
Contractor: Ed Loshbaugh & Sons, Inc.
Developer: C&L Development, L.L.C.
Dear Randy, This letter transmits the general construction activity that occurred on site during the time listed
above. This fetter is not intended to replace the construction daily report produced by STI Northwest
or its staff, but it does transmit the general information concerning the construction activity. Any item
~ that may be listed below may or may not be in compliance with the plans and specifications. This
letter is not intended to be -a submittal for acceptance. It is for informational use only.
Sanitary sewer 10" main line and services were installed on Riverwalk Lane.
Imported material was used for bedding and native material was used for backfill.
Compaction testing using a hand probe due to rocky material was performed.
Air & Mandrel testing was performed on sewer lines on Shannon Lane and Riverwalk
Lane. No major deficiencies to report at this time. -
If you have any questions or comments concerning any of the items listed above, please feel free to .
give me a call.
Sincerely,
STI Northwest
Bob Graham
Civil Projects Manager
~)cc: Craig Condron, C&L Development, L.L.C.
- STI file
CLC File
2214 East Riverside Avenue • Spokane, WA 99202 • Phone (509) 534-9711 • Fax (509) 534-9755
L
A Division ot CLC Associates Inc.
<< . '
~ rA
NORTHINEST
- • ~1NfP~•
J `"I SOILS, TEST/NG & INSPECT/0N
April 23, 2002
STI Project No. C-70-S020105
Spokane County Utilities Department
1026 W. Broadway
Spokane, WA 99260-0170
Attn: Billy Urhausen
Re: Riverwalk 11th Addition: Sewer Bond Reduction Request. Dear Billy: .
All work associated'with the air and mandrel testing has been completed in substantial
conformance with the plan set and specifications. At the request of our client, C&L
Development, L.L.C., we request a reduction of all associated sewer construction bonds
for this project.
.G I have enclosed copies of the air and mandrel testing reports indicating the test results
and when the inspections occurred. If you have any questions concerning this issue or
need any additional information to reduce the bonds, please feel free to contact me.
Sincerely,
STI Northwest
63:z
Bob Graham
Civil Projects Manager 7,
cc: Craig Condron, C&L Development, L.L.C.
CLC file
STI file
2214 East Riverside Avenue • Spokane, WA 99202 • Phone (509) 534-9711 ~ Fax (509) 534-9755
A Aivision of CLC Assoclates Inc.
~
PAGE 2 of 3
„ PROJECT NAME: Riverwalk 11th Addition
" PROJECT NUMBER; C-70-S420105
NORTHWEST qIR qND MANDREL FIELD TEST RESULTS REPORT No. 5
2214 E RIVERSIDE, SPOKANE, WA 99202 DATE: 4-16-02
(509)534-9711 FAX (549)534-9755 ~ TECH: Tim Johnson
LOCATION MANDREL MAIN PIPE MAIN SERVICE SERVICE TIME- --`'PRESSURE PASS COMMENTS ~
Manhole to Manhole DIAMETER DIAMETER LENGTH DIAM.ETER 'CENGTH FAIL
(to 114 inch) (Inches) (feet) (inches) (feet) (Minutes) PSI
1813-18C M 9'1. ~ 10 ~ 320 ~ - ~ - ~ - I - ~ P ~ mandrel only
20 - 24 N 9% N 10 N 217 ~ 4" ~ 137 ~ 15 N 5 ~ P air & mandrel
M ~ N N N ~ N
~ N N ~ N N ~
N N M N N N ~
N N N N N N ~ ~ N
N N N N ~ N ~
N ~ N N N ~ N ~
~ N ~ N N N
N N N N N ~ {
M N M ~ ~ ~ ~
N N N N ~
N N N N ~ ~ N ~ ~
N N N ~ N M
M N N N N ~ N ~
N N N ~ ~ ~
N N N ~ ~ N ~ ~ ~
N N ~ N N ~ ~ N ~
0:1ST11FORMS v1.0 4101
r
r
PAGE 2 of 3
PROJECT NAME: Riverwalk 11th Addition
' PROJECT NUMBER: C-70-S020105
NORTHWEST AIR AND MANDREL FIELD TEST RESULTS REPORT No. 4
2214 E RIVERSIDE, SPOKANE, WA 99202 DATE: 4-15-02
(509)534-9711 FAX (509)534-9755 TECH: Bob Graham
LOCATION MANDREL MAIN PIPE MA1N SERVICE SERVICE TIME 'PRESSURE PASS COMMENTS
Manhole to Manhole DIAMETER DIAMETER LENGTH DIAN~ER rtENGTH FAIL
(to 114 inch) (Inches) (feet) (inches} (feet) (Minutes) PSl
186 -18C N N 10 ~ 320 ~ 4 ~-400 ~>60 ~ 4 ~ P~ air oniy
N N N N
N N N ~ ~ ~
N N N N N
~ M N N N ~ M
N N N ~ N N ~
N N ~ N ~ N ~
~
~ N ~ N N M ~
M ~ ~ N M ~ M ~ N
0:1STIlFORMS v1.0 4/01
G-7o-SoZo
~ . .
...._A Y :F U1. .
SpoCo Wastewater
12007 E Empire Way
/iO)AJ• Spokane, WA 99206
rer. 50.477.19e4, Fax: 509.477.8998
Inspection report
Date: Project Weather. Operator section number. Ssction Name:
0411812002 tp 48 clear dry chrts 1 190.4121.5N
Planning Tnidc: Flushing date: Preset Cleaned: Grade:
pe-1414j-81 u-307 0
,
Street e shannon In Map #1: MH: 190.4/21.5N Town: spvkane Map #2: MH: 189.6l21.2N
Situat3on: street-aight traffic Tape 1144 tvd fgfh: 313.7 FT
Reason for inspection: pre-pave tnspection Diameter: 10"
SecUon Type: wastewater Material: PVC Length:
Protectlon:
Grid: 08553 Fite 1426
Remark: .
1:1000 dist code abservation counter photo rate
r„F,
N 11.60 DE Debris, cleaning needed 00:00:37 3
- 26.30, T Tee, at 02 o'clock, diameter 4(n 00:01:19 0
30.20 T Tee, at 10 o"clodc, diamster 4 in 00:01:55 0
84.80 T Tee, at 02 o'c(ock. diameter 4 in 00:03:53 0
89.00 T Tee, at 10 o'clock, diameter 4 in 00:04:21 0
~
~ •
:a 149.70 T Tee, at 02 o'dodc, dlameter 4 in 00:0625 0 ,
153.80 T Tee. at 10 o'dock, dlameter 4 in 00:06:51 0
roi
214.90 T Tee. at OZ o'ciock, diameter 4 in 00:08:57 0
rT Tee, at 10 o'clock, diameter 4 in 00:09:28 0
275.10 T Tee, at 02 o'dodc, diameter 4 In 00:11:30 0
Ui
279.40 T Tee, at 10 o'clock, diameter 4 in 00:11:57 0
313.70 FH Finish survey Q mh 00:13:19 0
• YT~;1
~ LAI* •
CMMACTOZ o CWW ~ ~ SWOUS
3, .
A ~--zv . .
i wy .
4.3o.oz-
# StLt LLb 60S ! I I 3f1 A1unoo aueAotlS • WV£b = O t`. ZO-OE-b
• : i ~..:.::i. ' . : :
SpaCo Wastewater
~ Spoka e WA 99208
Tet 6o9.41". i M. Fax sos.an.ssss
- Inspection report
Date: ProJect Weather: Operator secEton number. Sectian Name:
04H 8/2002 tp 48 clear dry chris 2 188.7122N
Pianning Truck: Flushtng date: Preset: Cleaned: Grade:
pe-14141-81 u-307 0
Street e rtverwalk in Map #1: MH: 188.7/22N
Town: spokane Map #2: MH: 189.7/22.2N
Situation: street-light traffic Tape 1104 tv'd Igth: 210.3 FT
Reason for inspectivn: pre-pave inspection Diameler. 10"
Sectlon Type: wastewater Material: PVC Length:
Protection:
Grid: 08553 File 1426
Remark:
1:1000 dist code observation counter photo rate
4.00 T Tee, at 10 o'clodc, diameter 4 in 00:13:36 0
y.6.70 DE Debrls, cfeaning needed 00:14:02 3
23.30 T Tee, at 02 o'dock, diameter 4 in 00:14:57 0
.
37.10 DE Debrls, cleaiiing needed 00: i5:32 3
62.30 T Tee, at 10 o'clodc, dlameter 4 In 00:16:36 0
83.80 T Tee, at 02 o'dodc, diameter 4 in 00:17:34 0
~ 121.70 T Tee, at 10 o'dock, diameter 4[n 00:19:01 0
~
140.70. T Tee, at 02 o'dack, diameter 4 in 00:19:57 0
4
159.40 T Tee, at 10 o'ctodc, diameter4 in 00:20:49 0
~
~
290.30 DE Debris, cleaning needed--in mh 8 beYond 00:22:35 22a 3
10.30 FH FlNsh survsy @ mh 00:22:44 0
~ .
£ /Z # S ► Lti LLV 605 ! , ` • I 1 1r1 A;~unoz) aue>IOdS !Wv£4 = O ~ = ZO-OE-b
~
• . _ . . . ~1::....
- - 5PasCa lRIosiacicngar
92007 EEmpire U1/ay !i
~ ~ ~ ~ l•t-~ 9~tia~oe,'yVA 98ZaS
` . I :.cc:PCh:a,~.. - . ~ a-r__~_~~~~ t ~ _T_-- • r Yei u00.4?7.9934. Fzu: 5II9.477.3992
I
- ~ h
Town: Street: ~i Date: section number. Section Name: ~
1 spokane e riverwalk ln 04118/2002x,
I _ , ~ ~ - . R . • ' ~ L3C,5-'`ti~ yrt~ ~ ~
~ S ,'h~~ , - • J~~~`t~~ . : li},.,.4Z i~t~ ~~i;.'i j~'~!,,'~~r
a
~~;~,~~.5• - t ,~f
All~
t
q
' ! r 'I~~ f•
i • ,
a y
~
Photo: 22a, Tape 1104, 00:22:35
Debris, cleaning needed--in mh & beyond
~
,
~
E /L•: ~J6i,i ._G~ FrO~i`- I ~~f' F4 u1t03 s UE;>!f%C~ 1E:i=W'Jtil 'C~1 :~0 0 E-t,
~ NORTHWEST SOILS, TESTlNG & INSPECTION
May 1, 2002
STI Project No.: C-70-S020105
Spokane County Engineer's Office 1026 W. Broadway
Spokane, Washington 99260-0170
Attn: Mr. Randy Stronks
Re: Riverwalk 11t' Addition
Apri I 21, 2002 - Apri I 27, 2002
Contractor: Ed Loshbaugh & Sons, Inc.
Developer: C&L Development, L.L.C.
Dear Randy,
This letter transmits the general construction activity that occurred on site during the time listed
above. This letter is not intended to replace the construction daily report produced by STI Northwest
or its staff, but it does transmit the general information concerning the construction activity. Any item
~ that may be listed below may or may not be in compliance with the plans and specifications. This
letter is not intended to be a submittal for acceptance. It is for informational use only.
Drywells were installed on the project. Construction observation was performed.
No major deficiencies to report at this time. ,
If you have any questions or comments concerning any of the items listed above, please feel free to
give me a call.
Sincerely,
STI Northwest
63~1 .
Bob Graham
Civil Projects Manager
cc: Craig Condron, C&L Development, L.L.C.
STI file CLC File
f~.
j
2214 East Riverside Avenue • Spokane, WA 99202 • Phone (509) 534-9711 • Fax (509) 534-9755
A Division of CLC Associates [nc.
- ~OFIIElt~~
NORTHWEST ~ ~
- • ~ANER'~. •
~
SOlLS, TESTING & INSPECTION
May 6, 2002
STI Project No.: C-70-S020105
Spokane County Engineer's Office
1026 W. Broadway
Spokane, Washington 99260-0170
Attn: Mr. Randy Stronks
Re: Riverwalk 11th Addition
April 27, 2002 - May 4, 2002
Contractor: Ed Loshbaugh & Sons, Inc.
Developer: C&L Development, L.L.C.
Dear Randy,
This letter transmits the general construction activity that occurred on site during the time listed
above. This letter is not intended to replace the construction daily report produced by STI Northwest
or its staff, but it does transmit the general information concerning the construction activity. Any item
that may be listed below may or may not be in compliance with the plans and specifications. This
0 letter is not intended to be a submittal for acceptance. It is for informational use only.
No work requiring STI inspection was performed.
No major deficiencies to report at this time.
If you have any questions or comments concerning any of the items listed above, please feel free to
give me a call. •
Sincerely,
STI Northwest
Bob Graham Civil Projects Manager
cc: Craig Condron, C&L Development, L.L.C.
STI file
CLC File
~ 2214 East Riverside Avenue • Spokane, WA 99202 • Phone (509) 534-9711 • Fax (509) 534-9755
A Division of CLC Ascociates Inc.
NORTHWEST
~ ov
May 13, 2002 SOILS, TEST/NG & 1NSPECT/ON
STI Project No.: C-70-S020105
Spokane County Engineer's Office
1026 W. Broadway
Spokane, Washington 99260-0170
Attn: Mr. Randy Stronks
Re: Riverwalk 11t' Addition
May 5, 2002 - May 12, 2002
Contractor: Ed Loshbaugh & Sons, Inc.
Developer: C&L Development, L.L.C.
Dear Randy:
This letter transmits the general construction activity that occurred on site during the time listed
above. This letter is not intended to replace the construction daily report produced by STI Northwest
or its staff, but it does transmit the general information concerning the construction activity. Any item
~ that may be listed below may or may not be in compliance with the plans and specifications. This
letter is not intended to be a submittal for acceptance. It is for informational use only.
No work requiring STI inspection was performed.
No major deficiencies to report at this time.
If you have any questions or comments concerning any of the items listed above, please feel free to
give me a call.
Sincerely,
STI Northwest
a~
Bob Graham Civil Projects Manager -
cc: Craig Condron, C&L Development, L.L.C.
STI file
CLC File
~
2214 East Riverside Avenue • Spokane, WA 99202 • Phone (509) 534-9711 • Fax (509) 534-9755
A Divislon oP CLC Associates Inc.
STINORTHWEST
SOILS, TESTING & INSPECTlON
May 28, 2002
STI Project No.: C-70-S020105
Spokane County Engineer's Office
1026 W. Broadway
Spokane, Washington 99260-0170
Attn: Mr. Randy Stronks
Re: Riverwalk 11th Addition
May 19, 2002 - May 25, 2002
Contractor: Ed Loshbaugh & Sons, Inc.
Developer: C&L Development, L.L.C. .
Dear Randy:
This letter transmits the general construction activity that occurred on site during the time listed
above. This letter is not intended to replace the construction daily report produced by STI Northwest
or its staff, but it does transmit the general information concerning the construction activity. Any item
that may be listed below may or may not be in compliance with the plans and specifications. This
f
~ letter is not intended to be a submittal for acceptance. It is for informational use only.
Density testing of subgrade for curb & gutter was performed. CSTC under curb & gutter was placed,-compacted and tested for density.
No major deficiencies to report at this time.
If you have any questions or comments conceming any of the items listed above, please feel free to
give me a call.
Sincerely, STI Northwest
Bob Graham Civil Projects Manager
cc: Craig Condron, C&L Development, L.L.C.
STI file
CLC File
f
2214 East Riverside Avenue • Spokane, WA 99202 • Phone (509) 534-9711 • Fax (509) 534-9755
A Division of CLC Associates Inc.
.
~
~ NrJRTH1NE-~T
~ .
2214 East Riverside
Spokane, WA 99202
(509) 534-9711
(509) 534-9755 • Fax
_ FAX TRANSMITTAL
DATE: 5/29/02 PAGES: 2 INCLUDING COVER SHEET
TO: Gene Repp FAX; 477-4715
COMPANY: Spokane County Utilities pgpNE; 477-7488
F'xoM: Bob Graham JpB; C-70-S020105
PROJECT Riverwalk 11 th Addition
~ ~TES:
~
This is the problem I discussed with you on the phone. I think Option 1 can be made to work while still
providing the required 2" of adjustment by altering the road crown, but it may end up a little less.
There are two manholes affected. Please call me at your earliest convenience with questions or comments.
Cc: STI file
S c--*SA K( M ur:t h'N t"' c. c. L
-.1 GRl~II~ GONORoN~ ~~G. UEv~t.o~N~E.N7' L~. G.
G r-
Confrdentialifv Notice
This document(s) accompanying this fax transmission contain(s) information, which is confidential and privileged. This information is intended to be for
the individual or entity set forth above. If you are not the intended recipient, please be aware that any disclosure, copying, distribution or use of the
contents of this information is prohibited. Thank you.
J:lstifaxform -0.0-4/00
. '
~
~
CURRENTLY MH IS -028' TOD
HIGH VITH 1' ADJUSTMENT
FROM CONE 0NLY
F~RING SECTION
4' INTEGRAL RISER
~S' BARREL SECTIDN
/
DPTIDN 1 OPT1DN 2
CUT -3' OFF OF CONE CHANGE BARREL SECTION, ADD
RESULTING IN •1' OF •10' OF ADJUSTNENT RINGS 6
ADJUSTMENT MORTpR
RiNG SECTION ~ ~RING SECTION
Ap,1USTMENT RJNGS ~
I• INTEGRaL R1SER
4• INTEGRAL RISER
~S' BARREL SECTiON .
4' BARREL SECTIQN
- ~p6EHERk~
NORTHWES°T
~
~ -
SOILS, TESTING & INSPECTION
June 3, 2002 STI Project No.: C-70-S020105 Spokane County Engineer's Office 1026 W. Broadway
Spokane, Washington 99260-0170
Attn: Mr. Randy Stronks •
,
Re: Riverwalk 11th Addition
May 26, 2002 - June 1, 2002
Contractor: Ed Loshbaugh & Sons, Inc.
Developer: C&L Development, L.L.C.
Dear Randy:
This letter transmits the general construction activity that occurred on site during the time listed above. This letter is not intended to replace the construction daily report produced by STI Northwest
or its staff, but it does transmit the general information concerning the construction activity. Any item
hat may be listed below may or may not be in compliance with the plans and specifications. This
Otletter is not intended to be a submittal for acceptance. It is for informational use only.
Curbs & gutters were poured. Concrete testing and construction observation were
performed.
No major deficiencies to report at this time.
If you have any questions or comments concerning any of the items listed above, please feel free to
give me a call.
Sincerely,
STI Northwest 6~aZ
Bob Graham "
Civil Projects Manager
cc: Craig Condron, C&L Development, L.L.C.
STI file
CLC File
. _
2214 East Riverside Avenue • Spokane, WA 99202 • Phone (509) 534-9711 • Fax (509) 534-9755 A DlvLslon of CI.C Assoc[atcs Inc.
~ NORTHWEST ~ 1 4
~ --SOILS, TEST/NG & INSPECTION
June 10, 2002 .
STI Project No.: C-70-S020105
Spokane County Engineer's Office 1026 W. Broadway
Spokane, Washington 99260-0170
Attn: Mr. Randy Stronks
Re: Riverwalk 11t' Addition
June 2, 2002 - June 8, 2002
Contractor: Ed Loshbaugh & Sons, Inc.
Developer: C&L Development, L.L.C.
Dear Randy:
This letter transmits the general construction activity that occurred on site during the time listed
above. This letter is not intended to replace the construction daily report produced by STI Northwest
or its staff, but it does transmit the general information concerning the construction activity. Any item
0 that may be listed below may or may not be in compliance with the plans and specifications. This
letter is not intended to be a submittal for acceptance. It is for informational use only.
CSBC, CSTC and ACP was placed and compacted. Density tests and construction
observation services were provided. Samples were obtained for lab testing.
No major deficiencies to report at this time.
If you have any questions or comments concerning any of the items listed above, please feel free to
give me a call.
Sincerely,
STI Northwest
Bob Graham .
Civil Projects Manager cc: Craig Condron, C&L Development, L.L.C.
STI file
CLC File '
2214 East Riverside Avenue • Spokane, WA 99202 • Phone (509) 534-9711 o Fax (509) 534-9755 A Division of CLC Associates Inc.
NoRTHwEST
'~n
- ' °~nccN'
.
,
"SOILS, TESTING & I/VSPECTION
June 17, 2002 STI Project No.: C-70-S020105
Spokane County Engineer's Office
1026 W. Broadway
Spokane, Washington 99260-0170
Attn: Mr. Randy Stronks
Re: Riverwalk 11th Addition June 9, 2002 - June 15, 2002
Contractor: Ed Loshbaugh & Sons, Inc.
Developer: C&L Development, L.L.C.
Dear Randy:
This letter transmits the general construction activity that occurred on site during the time listed
above. This letter is not intended to replace the construction daily report produced by STI Northwest
or its staff, but it does transmit the general information concerning the construction activity. Any item
that may be listed below may or may not be in compliance with the plans and specifications. This
0 letter is not intended to be a submittal for acceptance. It is for informational use only.
No work requiring STI inspection was performed.
No major deficiencies to report at this time.
If you have any questions or comments concerning any of the items listed above, please feel free to
give me a call.
Sincerely,
STI Northwest
Bob Graham .
Civil Projects Manager
cc: Craig Condron, C&L Development, L.L.C.
STI file
CLC File
~
~
2214 East Riverside Avenue • Spokane, WA 99202 • Phone (509) 534-9711 • Fax (509) 534-9755 ~
A Divlsion of CI.C Associntes Inc.
Ito
NORTHWEST SO/LS, TEST/NG & INSPECTION
.
June 24, 2002 STI Project No.: C-70-S020105 .
Spokane County Engineer's Office
1026 W. Broadway Spokane, Washington 99260-0170
Attn: Mr. Randy Stronks
Re: Riverwalk 11t" Addition
June 16, 2002 - June 23, 2002
Contractor: Ed Loshbaugh & Sons, Inc..
Developer: C&L Development, L.L.C.
Dear Randy:
This letter transmits the general construction activity that occurred on site during the time listed
above. This letter is not intended to replace the construction daily report produced by STI Northwest
or its staff, but it does transmit the general information concerning the construction activity. Any item
that may be listed below may or may not be in compliance with the plans and specifications. This
letter is not intended to be a submittal for acceptance. It is for informational use only.
0
No work requiring STI inspection was performed.
No major deficiencies to report at this time.
If you have any questions or comments concerning any of the items listed above, please feel free to
give me a call.
Sincerely, STI Northwest Bob Graham
Civil Projects Manager
cc: Craig Condron, C&L Development, L.L.C. STI file
CLC File
r 1
~
2214 East Riverside Avenue • Spokane, WA 99202 • Phone (509) 534-9711 • Fax (509) 534-9755
A Division oi CLC Associates Inc.
- rA
~ NORTHWEST
~
SOILS, TESTING & INSPECTION
July 1, 2002
STI Project No.: C-70-S020105
Spokane County Engineer's Office 1026 W. Broadway
Spokane, Washington 99260-0170
Attn: Mr. Randy Stronks
Re: Riverwalk 11th Addition
June 24, 2002 - June 29, 2002
Contractor: Ed Loshbaugh & Sons, Inc.
Developer: C&L Development, L.L.C.
Dear Randy:
This letter transmits the general construction activity that occurred on site during the time listed
above. This letter is not intended to replace the construction daily report produced by STI Northwest or its staff, but it does transmit the general information concerning the construction activity. Any item
that may be listed below may or may not be in compliance with the plans and specifications. This
~ letter is not intended to be a submittal for acceptance. It is for informational use only.
No work requiring STI inspection was performed.
No major deficiencies to report at this time.
If you have any questions or comments conceming any of the items listed above, please feel free to
give me a call.
Sincerely,
STI Northwest
k~
.
.
Bob Graham Civil Projects Manager
~
cc: Craig Condron, C&L Development, L.L.C.
STI file
CLC File
2214 East Riverside Avenue • Spokane, WA 99202 • Phone (509) 534-9711 • Fax (509) 534-9755 ~
A Divfsion of CI.C Assceiates Inc.
;
:
NaRT'H1NEST
- .
SOILS, TESTlNG & INSPECTION
July 8, 2002
STI Project No.: C-70-S020105
Spokane County Engineer's Office 1026 W. Broadway
Spokane, Washington 99260-0170
Attn: Mr. Randy Stronks .
Re: Riverwalk 11t' Addition
June 30, 2002 - July 7, 2002
Contractor: Ed Loshbaugh & Sons, Inc.
Developer: C&L Development, L.L.C.
Dear Randy:
This letter transmits the general construction activity that occurred on site during the time listed
.above. This letter is not intended to replace the construction daily report produced by STI Northwest
or its staff, but it does transmit the general information concerning the. construction activity. Any item
that may be listed below may or may not be in compliance with the plans and specifications. This
~ letter is not intended to be a submittal for acceptance. It is for informational use only.
No work requiring STI inspection was performed.
No major deficiencies to report at this time.
If you have any questions or comments concerning any of the items listed above, please feel free to
give me a call. ~
Sincerely,
STI Northwest
(3e
Bob Graham
Civil Projects Manager
cc: Craig Condron, C&L Development, L.L.C.
STI file
CLC File
;
( l
2214 East Riverside Avenue • Spokane, WA 99202 • Phone (509) 534-9711 • Fax (509) 534-9755 -
A Division of CLC Associates Inc.
- m~i
NORTHWEST
- • ~AMER~ •
July 22, 2002 SOILS, TESTING & INSPECTIOIV
STI Project No.: C-70-S020105
Spokane County Engineer's Office , 1026 W. Broadway
Spokane, Washington 99260-0170
Attn: Mr. Randy Stronks
Re: Riverwalk 11th Addition
July 14, 2002 - July 20, 2002
Contractor: Ed Loshbaugh & Sons, Inc.
Developer: C&L Development, L.L.C.
Dear Randy:
This letter transmits the general construction activity that occurred on site during the time listed
above. This letter is not intended to replace the construction daily report produced by STI Northwest
or its staff, but it does transmit the general information concerning the construction activity. Any item
that may be listed below may or may not be in compliance with the plans and speafications. This
~ letter is not intended to be a submittal for acceptance. It is for informational use only.
Subgrade for sidewalks was compacted and density testing performed. Sidewalks
were poured and concrete testing performed. All work requiring STI inspection has
been completed.
No major deficiencies to report at this time.
If you have any questions or comments concerning any of the items listed above, please feel free to
give me a call.
Sincerely,
STI Northwest
~ Bob Graham
Civil Projects Manager,
cc: Craig Condron, C&L Development, L.L.C.
STI file
CLC File
2214 East Riverside Avenue • Spokane, WA 99202 • Phone (509) 534-9711 • Fax (509) 534-9755
A Division of CLC Assocfates Inc.
Test RQSU'lhs
U.S. SIEVE OPENING IN INCHES I U.S. SIEVE NUMBERS I HYDROMETER ~
6 4 3 2 1 1 314 123l8 3 q 6 810 1416 20 30 40 50 60 100 140200
100 -
95--
f l ~ • • •
1\ in
vv
75 - -
70 - -
65 -
F-
_
~
T ~
Wc^
~ -
~
~
W ~y ~ I~A
' ~ ~
Z w • ~ .
F- 45 - -
v - ' -
~ qp - -
a ~
35
~
3p • \
25 - ' . ~ \ -
20_- --T---- ~ _
~
15
10- : ~
" - - - ~
. ~ :
. ~
5 - ' -
0~ 1~=- 10 , - O`~0.01 0.001
GRAIN SIZE IN MILLIMETERS
COBBLES GRAVEL ~ SAND SILT OR CLAY
coarse ~ fine ~ coarse ~ medium I fire
~
Specimen Identification ~ Description of Material LL ~ PL ~ PI ~ Cc ~ Cu
• 1 835 1.0 ~ CSBC 14.32 117.71
mi L Limit CSBC 1.0 ~ WELL-GRADED GRAVEL with SAND(G1N) 12.53 121.43
Al U Limit CSBC 1.0 1 11.40 175.83
Speamen Identification ~ D100 ~ D60 ~ D30 ~ D10 ~ %Gravel ~ °kSand ~ °r6Sift I °kClay
• 1 835 1.0 31.5 ~ 15.09 ~ 7.454 ~ 0.852 ~ 79.6 ~ 15.1 ~ 5.3
s m ~ L Limit CSBC 1.0 ~ 31.5 ~ 18.321 ~ 6.3 ~ 0.855 ~ 72.8 ~ 27.2 0.0
aA ~ U Limit CSBC 1.0 31.5 ~ 8.595 ~ 1.168 ~ 0.113 ~ 53.4 39.1 ~ 7.5
" GRAIN SIZE DISTRIBUTION
" o
o Project: Riverwalk 11 th
~
Locafion: Intand Sullivan Pit
~ JFrJF NORTHWEST Number: c-70-so20105
~ ~
145
~
_
140
~ 135
Laboratory ID No. 8351.0 M
Description of Material
h
130
Test Method ASTM D1557 Method C
~
125
TEST RESULTS
Maximum Dry Density 134.5 PCF
120 Optimum Water Content 4•5 %
~
~
~ ATTERBERG LIMITS
W 115
0
LL PL PI
~
0
~ 110
~ -r Curves of 100% Saturation
for Specific Gravity Equal to:
2.80
105
2.70
2.60
100
95
90
s
~
~
''+I+ I+ a
~ 85
~ 0 5 10 15 20 25 30 35
" WATER CONTENT, 96
0
° MOISTURE-DENSITY RELATIQNSHIP
0
Project: Riverwalk 11th
a
0
o Location: Grizzly Stockpile
JWrff NORTHWEST Number: c-70-S020105 ,
U.S. SfEVE OPENING IN II S I U.S. S1EVE NUMBERS I HYDROMETER
6 4 3 2 1.5 1 1R318 3 4 6 810 1416 20 30 40 50 60 100140200
100 -
95 -
" 90 - - ~ ~ ~ ~ ~ ~ • ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
1\
85 - -
so - -
75 ; -~~r-=-
70 : -
65 -
~
~ 60
~
} 55 -
m . .
W 50- -
Z
m
~
W - - ' ~ ~ ~ ~ ~ : ' ~ ' ~ ~ ~ ' ~ ~ ~ ~ ~ . ' • ~ ~ ~ ~ ~ ' ' ~ ~ ~ ~ ~
~
w - -
a 35 -
: . \ .
30 ~ - ---t-
~
25
,
~
~
20 _ - _ ~ T ~ ~ ~ _ ~ ♦ . ~ ~ ~ ~ ~ ~ _ _ ~ \ _ _ ~ _ ~ ~ ~ _ _ ~ _ ~ ~ ~
15 - ~
10 - - - ~ ' ~
'
5- -
- -
0 ' -
100 10 1 0.1 0.01 0.001
GRAIN SIZE IN MILLIMETERS
COBBLES GRAVEL ( SAND SILT OR CLAY
ooarse I flne I coarse I medium I fine
Specimen Identification ~ Description of Material ~ LL ~ PL ~ PI ~ Cc I Cu
• 1 823 1.0 1 1 5.32 163.13
m~ I limit CSTC 1.0 ~ POORLY GRADED SAND with GRAVEL(SP) 1 10.66 114.94
A ~ U limit CSTC 1.0 1 11•59 138.01
Speamen Identification ~ D100 ~ D60 ~ D30 ~ D10 ~%Gravel I %Sand ~%Sift I %Clay
• 1 823 1.0 1 19 1 4.841 1 1.405 1 0.077 1 40.6 1 49.5 1 9.9
g m ~ I limit CSTC 1.0 ~ 19 ~ 7.122 ~ 1.501 ~ 0.477 ~ 49.9 ~ 50.1 ~ 0.0
U limit CSTC 1.0 ~ 19 ~ 2.851 ~ 0.584 ~ 0.075 ~ 30.3 ~ 59.7 ~ 10.0
~ I I I I 1 I I. I
~ I I I 1 I 1 I I
~
GRAIN SIZE DISTRIBUTION
, o
Project: Riverwalk 11th
~
~ Location: Grizzly Stockpile
~ JWTJ NORTHWEST Number: C-70-so20105
~ ,
:
145
~ 140
135
Laboratory ID No. 8231.0
Description of Material
130 ~
Test Method ASTM D1557 Method B
125
TEST RESULTS
Maximum Dry Density 138.2 PCF
120 Optimum Water Content 7,0 %
~ ATTERBERG LIMITS
W 115
0
~ LL PL PI
0
110 Curves of 100% Saturation
for Specific Gravity Equal to:
2.80
105
2.70
2.60
100
VFNA
95
90
s
cn
~
~ 85
0 5 10 15 20 25 30 35
t
~ WATER CONTENT, 96
MOISTURE-DENSITY RELATIONSHIP ~
0
Project: Riverwalk 11th
0
~ Location: Grizziy Stockpile
NORTHWEST Number: c-70-so20105
~
U.S. SIEVE OPENING IN It S I U.S. SIEVE NUMBERS I HYDROMETER
6 4 3 2 1.5 1 4 123/8 3 4 6 810 1416 20 30 40 50 60 100 140200
100 - ,
95
so ~ ' _ - ~
as ~ - ~ - ~
so
75 :
70
~ : .
m
iL . .
W 50-
Z : .
LL. '
Z ~ - -
W •
~ 40- - - ~ - -
w ~
a ~
35 ' - -
30 - ' -
. 25 - -
~
15 -
~ 10-- : - - .
5 - ' - : - - :
- -
100 10 1 0.1 Y 0.01 0.001
GRAIN SIZE IN MILLIMETERS
COBBLES GRAVEL SAND SILT OR CIAY
coarse I fine coarse I medium I firie
Speamen Identification I Description of Material ~ LL ~ PL ~ PI ~ Cc ~ Cu
• 1 838 1.0 1 . ACP
Speamen Identification ~ D100 ~ D60 ~ D30 ~ D10 ~°kGravel I °r6Sand ~%Sift I %Ciay
• l 838 1.0 1 19 1 4.553 1 0.893 1 1 39.0 1 47.0 1 14.0
~ I I I l 1 I I. I
~ I I I I I I I I
~
GRAIN SIZE DISTRIBUTION
0
Project: Rivervvalk 11 th
~ Location: Grizzty Stockpile
~ JFTff NORTHINEST Number: c-70-so20105 ~
~
145
140
`
,
135
Laboratory ID No. 805 833.0
Description of Material
130
Test Method ASTM D1557 Method B
125
TEST RESULTS
Maximum Dry Density 138.0 PCF
120 Optimum Water Content 7.0 %
~
~ ATTERBERG LIMITS
W 115
0
~ LL PL PI
0
~ 110
Curves of 100% Saturation
for Speafic Gravity Equal to:
2.80
105
2.70
2.60
100
95 90
a
~
$ 0 5 10 15 20 25 30 35
~ WATER CONTENT, %
MOISTURE-DENSITY RELATIONSHIP
Project: Rivetwalk 11th
a
0
o Location: Grizzly Stockpile -
~ JWrff NORTHWEST Number: c-70-so20105
E ,
T
U.S. SIEVE OPENWG IN IP S I U.S. SIEVE NUMBERS I HYDROMETER
6 4 3 2 1.5 1 4 1/23/8 3 4 6 810 1416 20 30 40 50 60 100140200
100 "
95
.
i ' g0 -
g5 ' - -
g0 :
75 '
. ` • :
70 ' - -
65-- ~ - ~ -
~
60--
! - "
m 55'
~ . .
W rjQ . -
Z :
LA- '
Z ~ . - -
W
~ 40 : - •
W •
a
35 • ' -
30 ' -
~ ~ .
. ~ -
25 - ' -
\
20--
~
, 5 . . "
'Ip - - -
5 ' - -
0 - - ' - - - - - - - -
100 10 1 0.1 0.01 0.001
GRAIN SIZE IN MILLIMETERS
COBBLES GRAVEL ~ SAND SILT OR CLAY
coarse I fine ~ coarse I medium I fine
Speamen Identification ~ Description of Material ~ LL ~ PL ~ PI ~ Cc ~ Cu
• ~ 805 833.0 2•08 153.07
Speamen Identification ~ D100 ~ D60 ~ D30 ~ D10 ~%Gravel ~%Sand ~°kSilt I %CIay
• ~ 805 833.0 ~ 19.1 ~ 4.054 ~ 0.803 ~ 0.076 ~ 37.1 ~ 53.0 9.9
~I I I I 1 1 I I
~
dl GRAIN SIZE DISTRIBUTI N
0
Project: Rivervvalk 11th
~
; Location: Grizzty Stockpile ~
NORTHWEST Number: c-70-so20105
~ .
Report of Compression Test Results
,JWr,ff NORTHWEST
Report # : 9
2214 East Riverside RepoR Date: 5/28/2002
Spokane WA 99202 Job Number: C-70-S020105
Office: (509) 534-9711 Job Name: Riverwalk 11th
Fax: (509) 534-9755
Project Manager: Bob Graham
Specimen Type: 6x12" Concrete cylinders ASTM-C39
Mix and Field Data
Gast Date: 5/2812002 Cornractor. Ed Loshbaugh & Sons, Inc.
Piacement: Curb and Gutter
Str+ength: 3000 psi @ 28 Days Inspector: Tim Johnson
Mix ID: 321112 Actuai
Supplier: Central Pre-Mix Slump (in.) ASTM C443: 1"
Load Air Content ASTM C-231: 5.096
Truck 35 Unit Weight (pcf) ASTM C-138: N/A
Ticket 124933 Concmte Temp. (°F): 67°
Plant # :
6atch Site: 10 Ambient Temp. (°F): 60°
Water: 0 Weather: Partly Cloudy
Admixtur+e: Daravair
Time .
Batch Time: 7:40 AM Remarks: 0
Sample Time: 8:05 AM
Finish Time: 8:20 AM
Test Resuits
Actuat
Bmak Nominal Area Load Strength Break 96 of
Lab # Date Rec'd Test Date Time Age (days) Size (in x in) (Ibs) (psi) Type Req'd
603
a 5/29/2002 6/4 1/0 7 6x12" 28.27 114085 4040 CN 135%
b 5l29f2002 6/25 1/0 28 6x12" 0.00 0 NA 0 NA
c 5/29/2002 6/25 110 28 6x12" 0.00 0 NA 0 NA
d 5/29f2002 Hold
Break Types -(CN) Cone, (CSP) Cone Split, (CSH) Cone Stear, (SH) Shear, (CO) Columrrar
Reviewed 8y:
"c-otribution
Client: File: Producer: Others:
Report of Compression Test Results
, .
NORTHWEST
~ Report # : 16
2214 East Riverside Report Date: 7/18/2002
Spokane WA 99202 Job Number: C-70-S020105
Off-ice: (509) 534-9711 Job Name: Riverwalk 11 th
Fax: (509) 534-9755
Project Manager: Bob Graham
Specimen Type: 6x12" Concrete cylinders ASTM-C39
Mix and Field Data
Cast Date: 7/18/2002 Contractor: Johnson Concrete
Placement: Sidewalk, sampte taken at 17+00It Shannon Lane
Strength: 3000 psi cLD 28 Days Inspector: Mike Cunningham
Mjx ID: 321132 Actual
Supplier: CPM Slump (in.) ASTM C-143: 6.0"
Load 2 of 4 Air Content ASTM C•231: 3.596
Truck 38 Unit Weight (pcf) ASTM C-138: N/A
Ticket 128472 Concrete Temp. (°F): 67°F
0 Plarrt # : 1
Batch Size: 9.0yd9 Ambient Temp. (°F): 66°F
Water: 0.0 gal. Weather: Clear
Admixture: Daravair
Time .
Batch Time: 7:19 AM Remarks: 0
Sampte Time: 8:10 AM
Finish Time: 8:25 AM
Test Results
Actual
Break Nominal Area Load Strength Br+eak % of
Lab # Date Rec'd Test Date Time Age (days) Si=e (In x in) (Ibs) (psi) Type Req'd
636
a 7/19/2002 7/25 9:30 7 6x12" 28.27 89415 3160 CN 105°rb
b 7/19/2002 8/15 1/0 28 6x12" 0.00 0 NA 0 NA
c 7/19/2002 8/15 1/0 28 6x12" 0.00 0 NA 0 NA
d 7/19/2002 07/25 9:30 7 6x1 Z" 28.27 90425 3200 CN 106g6
Break Types -(CN) Cone, (CSP) Cone Split, (CSH) Cone Shear, (SH) Shear, (CO) Columnar
Reviewed By:
. ,
?--~`~tribution ~
Client: File: Producer: Others:
Report of Compression Test Results
Tj NORTHWEST Report # : s
2214 East Riverside Report Date: 5/28/2002
Spokane WA 99202 Job Number: C-70-S020105
Office: (509) 534-9711 Job Name: RIVERWALK 11 TH
Fax: (509) 534-9755
Project Manager: BOB GRAHAM
Specimen Type: 6x12" Concrete cylinders ASTM-C39
Mix and Field Data
Cast Date: 5/28/2002 Contractor:
Placement: 39+00 RIVERWALK LN.
Strength: 3000 psi @ 28 Days Inspector: TIM JOHNSON
Mix ID: 321112 Actual
Supplier: CPM Slump (in.) ASTM C-143: 1"
Load 1 OF 1 Air Content ASTM C-231: 5.0°k
Truck 35 Unit Weight (pcf) ASTM C-138:
Ticket # : 124933 Concrete Temp. (°F): 67°
Plant # :
Batch Size: 10 CY Ambient Temp. (°F): 60°
Water: 0 Weather: P/C
Admixture: OARAVAIR
Time
Batch Time: 7:40 AM Remarks: 0
Sample Time: 8:05 AM
Finish Time: 8:20 AM
Test Results
Actual
Break Nom(nal Area Load Strength Break % of
Lab # Date Rec'd Test Date Time Age (days) Size (in x in) (Ibs) (psi) Type Req'd
603
a 5/29/2002 6/4 1/0 7 6x12" 28.27 114085 4040 C 135%
b 5/29/2002 6125 1/0 28 6x12" 28.27 130750 4630 D 154%
c 5/29/2002 6/25 1/0 28 6x12" 28.27 114230 4040 D 135%
d 5/29/2002 Hold
Break Types -(CN) Cone, (CSP) Cone Sptit, (CSH) Cone Shear, (SH) Shear, (CO) Columnar
Reviewed By:
G /
f^' -tribution Client: File: Producer: Others:
Field RePorts
-
- . .
~
/
. ~~~'ST
~
; s~1 NpR
.
L
.~cTioN ~G
.
. INSp
p~t0
.
a. ► ISD ' ~
1i
4 -bc
, ~lj
`2 ~ ' ~ s~ :•-~N
At-
~ • ; !
C
.
L ~oLE
a r
~ C,cpNCRE, S~~ER
,~ypE E 5"STORNj
1NSpE~ S~SEVIER .
S
. ~ ,
, l~~l s 1
sTiNo
~ .
_ LOG
IlSSYECTIpN
,
V
,
A.,,,~--
~~l . .
~C~`. 1/ . '
.
SP~.~~
, ~3 ~ ~ e ~
~ ~ 1~ ~ ~
i-
T
~
~ ~ ~ •
-
!
-
• ~,-lv'~'~
.
, IL L
I ' • ,CONS~~R C E S"g~ORI~
~gpE S5,SE~RP~P
° STf NORTHWEST DAi Y FIELD REPORT
1
2214 East Riverside
Spokane, WA 99202 .
+ ~ ~ . ~ ~
Proiect InfoRnation
Project Narrte: Date:
Riverwalk 11 th Addition 4/9/2002
Project No.: Report No.:
c-7as020105 1
Weathef Arrival Twne: Oeparhtre Time:
Overcast, 45°f 1:00 1:30
Client Local ReExesenfiative / phone nunbw
C&L Development, L.L.C. Craig Condron
Gerteral Conhctor: Site Representative / phone number
Ed Loshbaugh & Sons, Inc. Travis
Subcontractar STI Projed ManW /phone number
Bob Graham 5349711
Page No. of STI Representatives on site
1 1 Mike Cunningham
- Manpawier and Equipment llsed
No SS installation or backfill activities being conducted at time of site visft
Field Observations
Amived on site at project manager's request. No personnel present or activity being conducted. 10"
sanitary sewer line from existing manhole # 18B to location of Manhole 18C has been installed and
bedded.
~
0
,r
STI Field Repres tative Contractor's Representative
THIS DOCUMEP(T AND REFERENCED ADDENDA ARE TO BE CONSlOERED PRQIMINARY UIJTIL REVIEWED AND SIGNED BY THE
STI CONSTRUCTION ENGINEER AI+D/OR STT PROJECT MANAGER. '
,l
Reviewed by / Date STI Project fa~nag:er Date
Caresparrding Dehaency Report No: Field Report V/2.2 812$/0I
iNORTHWEST DA1_ FIELD REPORT
s r
2214 East Riverside
Spokane, WA 99202
Proiect InformaGon Project Name: Date:
Riverwalk 11 th Addition 4/11/2002
Project No.; Report No.:
C-70-S020105 2a
Weather ARival Time: Departure Time;
Cloudy, rainy, cold 9:30 11:00
Client: Local Representative / phone number
C&L Development, L.L.C. Craig Condron
General Contractor: Site Representative / phone number
Ed Loshbaugh & Sons, Inc. Travis
Subcontractor STI Project Manager / phone number
Bob Graham 534-9711 .
Page No. of STI Representatives on site
1 3 Tim Johnson
- Manpower and Equipment Used
1-Cat 950E loader, 1-Cat 330L track-hoe, 1-worktruck, 1-optical level w/phillie rod, crew of 3
Field Observations ,
I arrived on site at contractor's request to test densification of sewer backfill. At the time of arrival, no
~ compacrion had taken place. The compaction crew had yet to arrive on site.
I observed the placement of 10" PVC sewer pipe. Contractor was bedding and haunching the pipe with
screened native material. I observed the contractor placing MH 18C. The contractor used a level to verify
elevations.
n,
.
~
STI Field presentative Contractor's Representative
THfS DOCUMENT AND REFERENCED AQDENDA ARE TO 8E CONSIDERED PRELIMINARY UNTIL REVIEWEO AND SIGNED BY THE
STI CONSTRUCTION ENGINEER ANOJOR STI PROJECT MANAGER.
f' /
j J \'t ( ✓ ~ 'Yrf~1 66el
I
Reviewed by Date STI Proj e anager ~ Date
Corresponding Deficiency Report No: Ficia Report v12.z snWI
191.5 22. 4 N
/ 191. 5/ 22. 4
189.5/22.2 N
~
NORTH r L
~
1~1. 189.7/22.2 ~ E XI ST. "
~ MH 22 ~
9 N 4 5,.~ ~ L11
3
2
"
~ 1 1
~
190.8/22 N
E X I T. ti ~ J
n A
-7
MH 231 EXIST
4 VN ,1 ~
EXIS e ~ 3 , ,
Lo
I
2 6
5 EXIST.
MH 10
UAY LANE E 1 • ` 2 4 '
5 3
TRACT "a" MM 1 190.8/21.6
E X I
5
1,00
MH 24 r ~ E IST. ~ 4 190.5 21.5 N~
M 1 3
" 2
, EXIST. 1
~ 9
Ek . ~ M H 18
~ 18 -i-SHANNO `r
~
r190.421.5N
~ A ~ 189.621.2N r
)1.1 NY `t
4:j,~ jW T~NO~ Riverwalk 11th Addition Job No.: C-70-S020105
- -
Field Repqrt : 2 q
2214 E. Riverside 509-534-9711 Date; llo d2
Spokane, WA 99202 509-534-9755 fax Page 2 Of
STI NORTHWEST ~ DA, f FIELD REPORT
2214 East Riverside
Spokane, WA 99202
~ Proiect Infamation
Project Name: Date:
Riverwalk 11 th Addition 4/9/2002
Praject No.: Report No.:
c-70-so20105 2b
Weather Arriva) Time: Ueparture Time:
Overcast, 50°f 2:00 2:30
Ciient Local Reprmntative / phone ntmber
C&L Development, L.L.C. Craig Condron
General ContraGbor: Site Represemative / pttorre number
Ed Loshbaugh & Sons, Inc. Travis
SuboontracW STI Project Manager / phone number
Bob Graham 534-9711
Psge No. of STI Represeniatives on site
1 1 Mike Cunningham
- Manpnw and Equipment Used
Field Observations
Arrived at Shannon Lane site at contracttor's request. The contractor was in the process of installing 4"
side services at the time of my visit. The side service to Lot 6 of Block 3 origin,ates in the barrel of
Manhole 18C. The vibratory roller which was expected to be on site earlier today had srill not arrived,
therefore, no backfi11 compaction activities have yet begun.
,
c ~
~
S1I Field R entative Contractor's Representative
THIS DOCUMENT AND REFERENCED ADOENDA ARE TO BE CONSIDERED PRELIMINARY UKT&. REVIEWm AND SIGNED BY TNE
STI CONSTRUCTION ENGfNEER AND/OR STI PROJECT MANAGER.
R+eviewed bY Date STI ProJ'ec~Manager ~ Date
Corresporrding Deficiency ReW No: Fiela Report v2.2 8128101
~ STI NORTHWEST DAk. Y FIELD REPORT
~ 2214 East Riverside
Spokane, WA 99202
/ ~ ~ .
Proiect Information Prolect Name: Date:
Riverwalk 11 th Addition 4112/2002
Project No.: Report No.:
c-70-so20105 3
Weather Arrival Time: Departure Time:
Pt cldy, 55°F 12:00 Z:oo
Clienr Local RWesenhative / phone number
C&L Development, L.L.C. Craig Condron
Gemral Gontractor: Site Repmentative / phorre number
Ed Loshbaugh & Sons, Inc. Travis
Subc:antrador STI ProJed Marrager / phorte number
Bob Graham 534-9711
Page (Vo. of STI Representatives on site
1 1 Mike Cunningham
- Manpawer and Equoment Used '
Cat 950E Loader, IR SP-48DD smootfi drum vibratory roller, Cat 330L excavator, Crew of 4
Field Obseivations Arrived on site at contractor's request. Shannon Lane backfill of native material placed and compacted at
-4.5 ft. below existing pavement. Side services backfilled and compacted sloping from 4.5 ft. at 10" SS
0 trench to approximate grade at side service cap.
Riverwalk Lane 10" SS bedded in gravelly sand. 4" side services entering Manhole 24 from Northwest
and Southwest. A 4" side service enters the 10" SS from the north at 5.6 ft. east of MH 24 ctr. and a 4"
side service enters the 10" SS from the south at 24.6 ft.east of MH 24 ctr.
Lift at --4.5 ft. on Shannon Lane tested by soil probe from 19+30 to, and around, MH 18C was firm and
unyielding with minimal probe penetration. Lift at -2.0 ft. on Shannon Lane tested by soil probe from
existing manhole to, and around, MH 18C was firm and uayielding with minimal probe penetration.
10" SS main on Riverwalk Lane was installed and bedded when I arrived on site. Side services to Lot 1
Block 1, and Lot 2 Block 1 on Riverwalk Lane were installed to slope and bedded using hand level, grade
rod, and h-ansit.
~
~
` G
STI Field R entative Contractor's Representative
THIS DOCUMENT M!D REFERENCED ADDENDA ARE TO BE CONSIDERED PRELIMINARY UNTIL REVIEWED AND SIGNED BY THE
STI CONSTRUCfION ENGINEER AND/OR STI PROJECT MANAGER.
,
i Reviewed by Date STI Pro' r Date
,
Corresponding Deficienc.y Report No: ,~W Report .7,2 sr29101
NORTHWEST DA_ Y FIELD REPORT
ST/
~
2214 East Riverside
Spokane, WA 99202
%Proiect Inforrnation Protect Name: Date:
Riverwalk 11 th Addition 4/15/2002
Project No.: Repart No.:
c-70-so20105 4
Weather Arrival Time: Departure Time:
Overcast, cool 11:30 12:00
Clienfi Local Representative ! phone nunber
C&L Development, L.L.C. Craig Condron
General Contrractor: Site Representative / phorte numbef
Ed Loshbaugh & Sons, Inc. Travis
SubcontracV STI Project Managef / phoRe number
Bob Graham 5349711
Page No. of STI Representatives on site
1 3 Bob Graham
- Manpower and Equortent Used Cat 950E Loader, Crew of 4
Fietd Observatiors I arrived on site at contractor's request to observe air pressure testing of the 10" sewer line between MH's
18B & 18C on Shannon Lane. At the time of my arrival, the line bad held 4 psi for --one hour. I
observed the test for another 15 minutes and requested the pressure be released so I could verify the
gauge. The test appeared to meet the AWWA/Spokane Couniy specifications.
STI Field R resentative Contractor's Representative
THIS DOCUMIENT AND REFERENCED ADDENDA ARE TO BE OONSfDERED Pft0.1MINARY UIJT(L REVIEWW AND SIGNm BY TFiE
STI (?ONSTRUCTION ENGINEER AND/OR STI PROJECT MANAGER.
-J52 ~ ~~~o (3 +11'' LO
~
Reviewed by Date STI Proj ect anager Date
Corresponding Qeflcieruy Report No: FieW xepon v2.2 9/28r01
~
PAG E 2 of 3
PROJECT NAME: Riverwalk 11th Addition
NoRTHwEST PROJECT NUMBER: C-70-S020105
AIR AND MANDREL FIELD TEST RESULTS REPORT No. 4
2214 E RIVERSIDE, SPOKANE, WA 99202 DATE: 4-15-02
(509)534-9711 FAX (509)534-9755 TECH: Bob Graham
LOCATION MANDREL MAIN PIPE MAIN SERVICE SERVICE TIME PRESSURE PASS COMMENTS Manhole to Manhole DIAMETER DIAMETER LENGTH DIAMETER LENGTH 1 FAIL
(to 1/4 inch) (Inches) (feet) (inches) (feet) (Minutes) PSI
1813-18C 10 ~ 320 ~ 4 ~-400 ~>60 ~ 4 ( P ~ air only
I I I I I I 1 I I
I I I I I 1 I I I
I I I I I I I I I
I I I I I I 1 I I
1 I I 1 I I I I I
I I I I I I I I I
I I 1 1 I I I I I
I I I I I I I I I
I I I I I I I I I
I 1 I I I I I 1 I
I I I I 1 I 1 I I
I I 1 I I I I I I
I I I 1 I I I I I
I I I I I 1 I I I
I I I I I I l I I
I I I I I 1 I I I
I I I I I I I I I
O:ISTIIFORMS v1.0 4/01
191.5/22.4 N 191.5/22.4 ~
189.5/22.2 N
NORTH ~
L
~
~189.7/22.2 N r EXIST."
,
M H 22 -
~
9 N 4 5
3
~
~ ~ - ~
2
C19.8/22 N
~ - EXI T.
~
~w~~~ • ~ ~ ~r ~r
...p . MH ~~EXI T '
4
EXIS 3
6
2
v L ~
^ J 5 EXIST.
MH 10
, E I 5 2 ~r 3 -kl ~
UAY LANE
TRACT "A" MH' 1 190.8/21.6
EXI
r
~
T" -1" ~ MH 24 E IST. _ 4 190.5 21.5 N ~
M 1 , 5
A
„
EXIST. 2
EX~ . ~ M H 18 V~ 19
18 ~-SHAN 0 ~r
/ k r
A 189.6 21.2 1190.4 2 5 f~
1.1 NY
. ~
jF7"/NORnxwM Riverwalk 11th Addition Job No.: C-70-S020105
Field Report
2214 E. Riverside 509-534-97 ] 1 Date: 4//,i /o Z so `mm A t Ot TtJTEA)
Spokane, WA 99202 509-534-9755 faac Page Z Of 3
NORTHWEST DAk_ . y FIELD REPORT
2214 East Riverside
Spokane, WA 99202
-
Pro'tect Information
Project Name: Date:
Riverwalk 11 th Addition 4/16/2002
Project No.: Report No.:
C-70-S020105 5
Weather Arrival Time: Departure Time:
Cloudy, rainy, cold 8:30 10:30
Client: Local Representa6ve / phone number
C&L Development, L.L.C. Craig Condron
General Contractor: Site Representative / phone number
Ed Loshbaugh & Sons, Inc. Travis
Subcontractor STI Project Manager / phone number
Bob Graham 534-9711
Page No. of STI Representatives on site
1 3 Tim Johnson
- Manpower and Equipment Used
1-Cat 950E loader, 1-worktruck, crew of 3
Field Observations I arrived on site at contractor's request to observe air and mandrel testing of the 10" sewer line between
existing MH 23 and MH 24 on Riverwalk Ln. Both air and mandrel tests passed.
The 10" sewer line between MH 18B and MH 18C on Shannon Ln. was mandrel tested and appeared to
be free of obstructions. The tests appeared to meet the AWWA/Spokane County specifications.
.
~ ~
STI Field R resentative Contractor's Representative
THIS QOCUMENT AND REFERENCED ADDENDA ARE TO BE CONSIDERED PRELIMINARY UNTIL REVIEWED AND SIGNED BY THE
STI CONSTRUCTION ENGINEER ANDIOR STI PROJECT MANAGER.
Reviewed by v Date STI Project anager ~ Date
Corresponding Deficiency Report No: Fiela Rcpon v2.2 8n8101
!
. _ .
PAGE 2 of 3
PROJECT NAME: Riverwalk 11th Addition
NoRTHwEST PROJECT NUMBER: C-70-S020105
AIR AND MANDREL FIELD TEST RESULTS REPORT No. 5
2214 E RIVERSIDE, SPOKANE, WA 99202 DATE: 4-16-02
(509)534-9711 FAX (509)534-9755 TECH: Tim Johnson
LOCATION MANDREL MAIN PIPE MAIN SERVICE SERVICE TIME PRESSURE PASS COMMENTS
Manhole to Manhole DIAMETER DIAMETER LENGTH DIAMETER LENGTH / FAIL
(to 1/4 inch) (Inches) (feet) (inches) (feet) (Minutes) PSI
186 -18C ~ 9'/4 ~ 10 ~ 320 ~ - ~ - J - J - ~ P( mandrel only
20 - 24 ~ 9'/4 ~ 10 ~ 217 ~ 4" ~ 137 ~ 15 ~ 5 ~ P ~ air & mandrel
I I I 1 I I I I I
I I I I I 1 1 I I
I I I I I I 1 I I
I I I I I I I I I
~ I I 1 I I I 1 I
I I I I I I I I
I I I I I I I I I
I I I I I I I I I
I I l I I I I I I
I I 1 I I I I I I
I I I I I I I I I
I I I I I I I I I
I I I I 1 I I I I
I1 I I I I I I I
I I I I I I I I I
I I 1 I I I I I I
O:ISTIIFORMS v1.0 4/01
•
. Ql91.5/22.4 N 191.5/22.4
. ~
~ 189.5/22.2 N -
• , ~ ~
NORTH L
^ 1
189.7/22.2 N , EXIST.
: M H 22
i 4 5
9 N 3
2
190.8/22 N
~
EXI T. r - r
r /
ry~' y...MH 231 `/\IJT ~
-3 4 ~
EXIS ~ L r
6w o
, 2
%i nJ x \J U ~
1- GA,5 ~ / - E X I S T.
MH 10 ,
VAY LANE E 1 5` 2
TRACT „A" M~1 190.8/21.6
EXI
5 t
I
.•T„ ~ MH 24 E IST. 190.5 21.5 N
~M 1 •~'3
A
"
EXIS . 2 G ' 19
~ ~n ~
EXF . MH 8
. 18 ~
. HANNO k 189.621.2N ~-190.421.5N
11 r ~ ~
.1 N
;j W rl NOm.Hwm Riverwalk 11th Addition Job No.: C-10-S020105 _
Field Re rt ~
2214 E. Riverside 509-534-9711 Date: R-1b 62
Spokane, WA 99202 509-534-9755 fax Page I Of I
NORTHWEST DAi._ _ V FIELD REPORT
2214 East Riverside
Spokane, WA 99202
~ i
- Proiect information
Project Name: Date:
Riverwalk 11 m Addition 4/23/2002
Project No.: Report No.:
C-70-S020105 6
Weather Arrival Time: Departure Time:
Cloudy, rainy, cold 8:30 10:30
Client: Local Representative J phone number
C&L Development, L.L.C. Craig Condron
General Contractor: Site Representative / phone number
Ed Loshbaugh & Sons, Inc. Travis
Subc;ontractor STI Project Manager / phone number
Bob Graham 534-9711
Page No. of STI Representatives on site
1 2 Tim Johnson
- Manpower and Equipment Used
1-Cat 950E loader,1-Cat 330L excavator,1-worktruck, crew of 3
Field Observations
I arrived on site at contractor's request to observe placement of a Type 'B'drywell. The contractor had
wrapped the precast barrel sections in filter fabric. The contractor placed filter fabric in the excavation
and then placed the drywell inside. The dimensions of the excavation appeared to permit the use of 40 tons of 1-3" of washed gravel backfill
in accordance with Spokane County Standard Plans sheet B-1 a.
The contractor used an optical level to ensure the drywell was placed at the proper elevation.
~
~
. ~ .
.
STI Field Re esentative Contractor's Representative
THIS DOCUMENT AND REFERENCED ADDENDA ARE TO BE CONSIDERED PRELIMINARY UNTIL REVIEWED AND SIGNED BY THE
STI CONSTRUCTION ENGINEER AND/OR STI PROJECT MANAGER.
3"rl~
Reviewed by Date STI Proj effManager Date
Corresponding Deficiency Report No: Fiela Repon vz.z 8n9/01
, > >
` ' . 191.5/22.4 N Q.91.5/22.4 ~
~ 189.5/22.2 N . ~
. ~ 0
NORTH ~
EXIST.~ ' ~ .
~189.7/22.2 N fi '
5 MH 22
L
~ ~ .
9N 3
190.8/22 N
J ,
, F. E X I T.
µAJ_.'T•'^ M,H 231 r r EXISI. ~ .
. 4
EXIS . ^ ? r ~ ~ ' L ~
6 - ~
d 2
Q ' U .
5 rE XIST.
4 ,
MH 10
VAY LANE E 1 5` 2 3 r
7 "TRACT "A„ M ki' 1 190.8/21.6
EXI
i
-lVFR
S r
.-ri ✓ 190.521.5 f~
IST. 4
MH 24 ~ E M ~ 3
~ °I V
^ ~
r ~ 2 '
EXIST. Al 19
EX~ . MH 18
~ n r
18 v 7-SHANNO . ~
> rr190.421.5N
~ 4.,/ 189.621.2N
r
1.1 N
JVrffN0FZn4WW Riverwalk 11th Addition Job No.: C-70-S020105
Field Report ~
2214 E. Riverside 509-534-9711 Date: ~ 2c~c,~
Spokane, WA 99202 509-534-9755 fax PageLOf ~
DA.L. . Y FIELD REPORT
STI NORTHWEST ~
2214 East ~versiae
Spokane, WA 99202
J
Proiect Infamation
Project Name: Date:
Riverwalk 1111 Addition 5I23/2002
Project No.: Report No.:
c-70-so20105 7
Weather Arrival Time: Departure Time:
Pt Cldy, 47°F 9:30 10:55
Ciienk Local Repremtative / phone number
C&L Development, L.L.C. Craig Condron
Gerteral Contracbor: Site Repre9entative / phone numbff
Ed Loshbaugh & Sons, Inc. Travis
Subcontractor STI Projed Manager / phorte number
Bob Graham 534-9711
Page No. of STI ReExeserrtatives on site
1 4 Mike Cunningham
~ Manpower and Eguipment Used
1-Cat 950E loader,1-IR SP48DD Vibratory Roller, Crew of three in morning, two in afternoon
Field Observations
I arrived on site at contractor's request to test densification of roadbed subgrade and CSTC for curb and
~ gutter bedding on both Sha,nnon Ln. and Riverwalk Ln. Due to the extremely rocky naiure of the native
material used for roadbed, soil probe testing was conducted. The roadbed appeared to be in a firm and
unyielding condition on both Riverwalk and Shannon with the exception of the top 1" which was sloppy
due to action of the loader during placement and wheel rolli.ng of the CSTC for curb and gutter bedding
after yesterday's rain. I observed several puddles on Riverwallc, but the material at the bottom of the
puddles was firm and unyielding.
I retunaed to the srte after a roller had been delivered and the CSTC had been compacted. At this tune I
observed that -1/3 of the CSTC on Riverwalk exhibited pumping under foot pressure. Nuclear density
testing of this material yielded results of 88-93% of optimum density with one 95% reading. The CSTC
on Shannon appeared to be in much better condition, but density tests were sti11 in the 89-94% range with
one 95% reading. Two cycles of rerolling and retesting of the right side of Shannon Ln. were conducted
without any appreciable improvement in results. I reauned to the site after more rerolling of the right side
of Sh.annon Ln. and retested there and the right side of Riverwalk after it was allowed to dry for several
hours. No improvement was observed in either locaLion.
See "Report of Field Compaction Tests".
. ` ~
STI Field Rep tative Contractor's Representative
THlS DOCUMENT AND REFERFNCED ADDENDA ARE TO BE CONSIDERED PRELIMINARY UNTIL REVIEWED AND SIGlVED BY THE
STI CONSTRUCTION ENGINEER AND/OR STI Pi20JECT MANAGER.
~
Reviewed by Date ST'I Project Manager Date
Caresponcfing Defiaenc.y Report No:
2214 East Riverside
Spokane, WA 99202
509-534-9711
NORTHWEST Fag 509-534-9755
REPORT OF FIELD COMPACTION TESTS Nuclear Method ASTM D 2922•96
soils and aggregates
Date: 5/2312002 Project Narne: Rivervvalk l lth Additian
Client: C&L Development, L.L.C. Project C-70-S020105
Tec6nician: Mike Cuaningham Fie1d Report No.: 7
Density Std.: 47582 Page: 2 of 4
Moisture Std: 10424
Guage Id.: CPN MC-1 MD 10306064
VI/et Dry Compaction Maets
Test ~tion ~P~ Below ~Sl Moisiure Material R,d Percent Spec Retest of
DT No.
No. SG Elevation (~F) % Type Compaction )
#1 Riverwalk Ln. 37+15 rt top of CSTC 129.7 ~ 6.0 122.4 ~ 1 ~ 95 ~ 88 N ~
#2 ~ Riverwalk Ln. 37+70 rt 137.6 ~ 6.6 129.0 ~ 1 ~ 95 ~ 93 N ~
#3 Riveawalk Ln. 38+40 rt 138.2 ~ 6.8 129.4 1 ~ 95 93 N
#4 Riverwalk Ln. 39+00 rt " 135.1 5.8 127.6 1 ~ 95 92 N
#5 ~ Rivervvalk Ln. 39+50 rt " 134.1 5.4 127.1 ~ 1 ~ 95 ~ 92 ~ N ~
#6 ~ Riverwalk Ln. 38+901t 139.4 ~ 5.8 131.8 1 ~ 95 ~ 95 Y ~
#7 ~ Riverwalk Ln. 37+651t 131.3 6.8 122.9 1 ~ 95 88 N ~
#8 Shannon Ln 17+15 rt 136.6 5.7 129.2 ~ 1 ~ 95 93 ~ N ~
r`~~#9 Shannon Ln. 18+35 rt 130.9 6.2 123.5 ~ 1 ~ 95 ~ 89 N ~
\ F 10 Shannon Ln. 19+70 rt " 134.4 4.9 128.1 1 ~ 95 ~ 92 N
~ I 1 I
#11 ~ Shazinon Ln. 19+35 rt 140.5 ~ 6.2 132.3 1 ~ 95 ~ 95 ~ Y
# 12 ~ Shannon Ln. 18+40 lt " 134.1 6.5 125.9 1 ~ 95 ~ 91 N ~
#13 Shannon Ln. 17+15 lt 138.5 6.5 130.0 ~ 1 ~ 95 ~ 94 N ~
# 14 Shannon Ln. 17+15 rt 134.2 5.7 126.9 1 ~ 95 ~ 91 N ~#8
#15 ~ Shannon Ln. 18+35 rt 131.8 6.1 124.2 1 ~ 95 ~ 89 N ~#9
# 16 ~ Shannon Ln 18+35 rt " 133.5 6.1 125.8 1 ~ 95 ~ 91 N 15
# 17 ~ Shannon Ln. 17+15 rt " 134.6 5.4 127.7 1 ~ 95 ~ 92 N 14
X Modified Froctor ASTM D1557-98 ~ iStandard Proctor ASTM D698-98
Mawrial Description max opt corr. Max
No. density moisture density
1 CSTC, Lab#765 138.9 ~ 6.7 ~
~
,
~ ,
2214 East Riverside
Spokane, WA 99202
509-534-9711
NORTHWEST Fag 509-534-9755
REPORT OF FIELD COMPACTION TESTS Nuclear Method ASTM D 2922•96
soils and aggregates
Date: 5/23/2002 Project Name: Riverwalk l lth Addition
Client: C&L Development, L.L.C. Project C-70-S020105
Technician: Mike Cunningham F'ield Report No.: 7b
Density Std.: 47582 Page: 2 of 4
Moisture Std: 10424
Guage Id.: CPN MC-1 MD 10306064
Test Depth Below wet Moisture Dry Material ~mpaction Percent Meets Retest of
No. Locahon SG Elevation Dens1ty % Density ,I,ype Req'd Compaction Spec DT No.
(PCF) (PCF) (Y/N)
#18 ~ Shannon Ln. 16+75 rt top of CSTC 133.7 ~ 4.9 125.8 ~ 1 95 ~ 91 ~ N
# 19 Shannon Ln. 17+15 rt " 133.7 ~ 4.9 127.5 ~ 1 ~ 95 ~ 92 N # 17
#20 Riverwalk Ln. 38+40 rt 136.5 6.7 127.8 ~ 1 ~ 95 92 N
1 I I I I
I I I I i I
I I I I I I I I
I I I I I I I I
I I I I I
I I I
I I I
i ~ I i I M I
X iModified Proctor ASTM D 1557-98 ~ +Standard Proctor ASTM D698-98
Material max opt corr. Ma~c
No. ~~p~~n density moisture density
1 ~ CSTC, Lab 4765 138.9 ~ 6.7 ~
, ,
189.5/22.2 N 191.5~22.4 N 191 5/22.4 ~
~
NORTH ~
L
,
189.7/22.2 N , r EXI~T.
~ MH 22 4 5
9N 3 LO -
2
1 ~ ~ ~ )C
,
ui~ (90-8/22 N
0 1 ~ . ~
I c. E X I T.
MH 231
4 EXIST EXIS
~
2 6 w ~
3
5 EXI ST.
MH 10 ~
UAY LANE E I . ' 2
5 3 ....y .
TRACT "A" MH' 1 1 g~.8/21.6
- a ~ EXI
MH 24 E IST. 4 5 190.5 21.5 N
~ M 1 3 .
EXIS . ' "2 t % EX~ . M H 19 ,
18 HANNO v ~ j a~ ~ •r
6
~ A 189.621.2N 90.421.5N
11.1 NY
Ho~ Riverwalk 11th Addition '
►~T/ Job No.: C-70-S020105
~ Field Rep rt 7
2214 E. Riverside 509-534-9711 Date: -57 1310~ Spokane, WA 99202 509-534-9755. fax Page~Of y
NORTHWEST FIELD REPORT
STf2214 East Riverside
Spokane, WA 99202
~ --'Prolect Infamation Project Name: Date:
Riverwalk 11 tfi Addition 5/24/2002
Project No.: Repat No.:
c-70-so20105 8
INeather Arrival Time: Deparhne Time:
Pt Cldy, 47°F 9:30 10:55
Client Local Representative / phone nunber
C&L Development, L.L.C. Craig Cortdron
General ContractOr: Site Representative / phorte number
Ed Loshbaugh & Sons, Inc. Travis
Subcontrador STI Project Martager / phone number
Bob Graham 5349711
Page No. of STI Representative.s on site
1 4 Mike Cunningham
~ Maqpower and Equipment Used
IR SP48DD Vbratory Roller, Water trudc, Crew of two
Field Obsetvations
I arrived on site at c,onuactor's request to retest densification of CSTC for curb and gutter bedding on both
~ Shannon Ln. and Riverwalk Ln. The CSTC had been watered and recompacted on Sharmon Ln. before
my azrival, Riverwalk Ln. had no watering or recompaction . It appears that lack of adequate moisture
was the cause of yesterday's low test results. After Shannon Ln. passed curb aad gutter density tests,
Riverwalk Ln. was waxered and recompacted. With some additional compaction, Riverwalk Ln. also met
Spokane County standards for curb and gutter base densifica.tion.
See "Report of Field Compaction Tests".
c
,/"000?
~ STI Field resentative Contractor's Representative
2
THIS DOCUOuENT AND REFERENCED ADDENDA ARE TO BE CONSIOERED PRHIMINARY UNTIL REVIEWED AND SIGNED BY THE
STI OONSTRUCTION ENGINEER AND/OR STI PROJECT MANAGER.
y ~
_.AI Reviewed by , Date STI Proje t Man.ager f ~ Date
Caresponding Deficienc.y Repcxt No: 7 Field Repmt d2.2 8l28101
2214 East Riverside
. Spokane, WA 99202
509-534-9711
~7T# NORTHWEST Fag 509-534-9755
`
~
REPORT OF I+'IELD COMPACTION TESTS Nuclear Method ASTM D 2922•96
soils and aggregates
Date: 5/24/2002 Project Name: Rivemalk l lth Addition
Client: C&L Development, L.L.C. Prnject C-70-S020105
Technician: Mike Cunningham Field Report No.: S
Density Std.: 47582 Page: 2 of 4
Moisture Std: 10424
Guage Id.: CPN MC-1 NID 10306064
Wet Dry Compaction Meets
Test Depth Below Moisture Material Percent Retest of
I.ocation Density o Density Req'd Spec
DT No.
No. SG Elevation (~F) /o (~F) Type (oo) Compaction (Y~)
#1 ~ Sh.annon Ln 17+05 rt top of CSTC 142.8 ~ 6.8 ~ 133.8 ~ 1 ~ 95 ~ 96 Y ~
#2 ~ Shannon Ln. 18+00 rt 141.5 ~ 6.5 ~ 132.9 ~ 1 ~ 95 ~ 96 Y ~
#3 Shannon Ln. 18+70 rt 145.8 ~ 6.1 ~ 137.8 1 ~ 95 ~ 99 Y ~
#4 Shazmon Ln. 19+75 rt " 141.7 ~ 4.8 ~ 135.2 1 ~ 95 ~ 97 ~ Y ~
#5 ~ Sh.annon Ln. 19+601t " 140.6 ~ 6.4 132.5 1 ~ 95 95 ~ Y ~
#6 ~ Shannon Ln. 19+10 lt 143.2 ~ 6.7 134.2 ~ 1 ~ 95 97 ~ Y ~
#7 ~ Shannon Ln 18+201t 146.3 ~ 6.8 ~ 137.0 ~ 1 ~ 95 99 ~ Y ~
#8 ~ Shannon Ln. 17+10 lt 145.3 6.6 136.3 ~ 1 ~ 95 98 ~ Y ~
#9 ~ Riverwalk Ln. 37+40 rt 134.3 5.9 126.8 ~ 1 ~ 95 91 ~ N ~
~_j~#10 Riverwaik Ln. 38+41 rt 135.7 ~ 5.5 ~ 128.6 ~ 1 ~ 95 93 ~ N ~
#11 Riverwalk Ln. 39+30 rt 139.6 6.9 ~ 130.6 ~ 1 95 ~ 94 ~ N~
# 12 Riverwalk Ln. 39+3 0 rt " 140.1 6.3 ~ 131.8 1 95 ~ 95 ~ Y 11
# 13 ~ Riverwalk Ln. 38+45 rt " 135.4 ~ 6.3 ~ 127.4 1 ~ 95 92 ~ N 10
# 14 ~ Riverwalk Ln. 38+45 rt " 139.9 ~ 6.9 ~ 130.8 ~ 1 95 94 ~ N 13
#15 ~ Riverwalk Ln. 37+50 rt " 140.1 6.2 132.0 1 95 ~ 95 ~ Y ~#9
#16 Riverwalk Ln. 37+50 lt " 139.7 5.9 131.9 1 95 ~ 95 ~ Y
#17 Riverwalk Ln. 38+151t 139.0 ~ 6.0 131.1 ~ 1 ~ 95 ~ 94 ~ N
X ~ Modified Ftnctor ASTM D 15 57-98 Standard Proctor ASTM D698-98
,
Material Description max opt corr. Max
No. density moisture density
1 ~ CSTC, Lab#765 138.9 ~ 6.7 ~
;
,
2214 East Riverside
Spokane, WA 99202
509-534-9711
NORTHWEST Faz 549-534-9755
-
REPORT OF FIELD COMPAC'I'ION TESTS Nuclear Method ASTM D 2922-96
soils and aggregates
Date: 5l24/2002 Pro}ect Name: Rivervvalk 11 th Addition
Client: C&L Development, L.L.C. Project C-70-S020105
Technician: Mike Curvningham Field Report No.: 8
Density Std.: 47582 Page: 2 of 4
Moisture Std: 10424
Guage Id.: CPN MC-1 MD 10306064
Test Depth Below wet Moisture Dry Material COMpactiOn Percent Meets Retest of
No. L,ocation SG Elevation Density /o o Density Req'd C Spec DT No.
~F) Type (oo) ompaction (YIN)
#18 Riverwalk Ln. 39+151t ~top of CSTC 145.3 ~ 6.3 136.7 ~ 1 95 ~ 98 ~ Y ~
#19 ~ Riverwalk Ln. 38+45 rt " 139.2 ~ 5.8 131.6 ~ 1 ~ 95 ~ 95 ~ Y ~#14
#20 ~ Riverwalk Ln 38+151t 140.3 ~ 6.4 ~ 131.9 1 95 ~ 95 ~ Y 17
I I I I I I
i I I I I I I I
I I I I I I
I I~ I I I I
I I I I I I I
I I I
I I
I I I I I
I I I I I I I I I
X IModified Proctor ASTM D1557-98 ~ ~Standard Proctor ASTM D698-98
Material Description maac opt corr. Max
No. density moistuce density
1 CSTC, Lab#765 138.9 ~ 6.7 ~
r
191.5/ . 22.4 N 191.5/22.4
~ C189.-5/22.2 N
v ~ ~
NORTH ~
~ • ~ ~ /
2a' 189.7/22.2 N , •r EXIST.
: MH 22
4 5
9N 3 L Y~ I ~ ~ r I I >i
190.8/22 N
_-EXI T. ~
, ,
`M H 3^
" EX{ ~
. 4
EXIS . ~ 3 i~ „ ~ ~ "
0
6
q ~ s -
5 E,XIST. ~
T H 10
4 M
w
UAY LANE E 1 . 5 iq 2 3
~ M~I' 1 190.8/21.6
TRACT ~~A,~
^ EXr
~r ~ -VR
5
4 r
ST. L . 190.521.5 N
24 E M I~ 3
i v MH - ~
A " ^EXIST. ,2 19
P ^ n ~
MH 8
E~F
. 18 ~ . -,SHANNb ~r
189.621.2N ,rri 90.421.5N
r
1.1 NY
1
4 ;~`T/NO~ Riverwalk 11th Addition Job No.: C-10-S020105
Field Rep rt
2214 E. Riverside 509-534-9711 Date: 2y /0Z
Spokane, WA 99202 509-534-9755 fax Page 41 Of_y
V ~ 72NORTHWEST ,.y FIELD REPORT
r 4
214 East Riverside
Spokane, WA 99202
Proiect Information ,
Project Name: Date:
Riverwalk 11 th Addition 5/28/2002
Project No.: Report No.:
C-70-S020105 9 Weather Arrival Time: Departure Time:
Pt. Cldy, 66°F 7:30 9:30
Client: Local Representative I phone number
C&L Development, L.L.C. Craig Condron
General Contractor. Site Representa6ve / phone number
Ed Loshbaugh & Sons, Inc. Travis
Subcontractor STI Project Manager / phone number
Jim Johnson Concrete Bob Graham 534-9711
Page No. of STI Representatives on site
1 3 Tim Johnson
- Manpower and Equipment Used 1-curb machine, 1-Case 580k backhoe, 1-utility truck Field Observations
I arrived on site at the contractors request to test and inspect concrete for curb and gutter.
~ At the time of arrival Jim Johnson concrete was placing Type 'R' curb and gutter on the north side of
~ Riverwalk Ln.
The string line was checked for straightness and slope. It appeared to confrom to the plans.
A sample of concrete was obtained at approx. sta 39+00 Riverwalk Ln, and tested for air, slump, and
temperature.
Four 6X12 test cylinders were poured.
After finishing C&G on Riverwalk Ln. the contractor moved on to Shannon Ln. to place Type'R' curb
and gutter there.
~
rvt/'
J
STI Fiel epresentative Contractor's Representative
THIS DOCUMENT AND REFERENCED ADDENDA ARE TO BE CONSIDERED PRELIMINARY UNTIL REVIEWED AND SIGNED BY THE
STI CONSTRUCTION ENGINEER ANDIOR STI PROJECT MANAGER.
Reviewed by Date STI Proje Manager Date
Corresponding Deficiency Report No: Fitld Rcport v2.2 8/28101
~r ` ~L . ~1 191.5/22.4 N 191;5/22.4
189.5/22.2 N
NORTH - ~ ~
~ L
189.7/22.2 N EXIST." -M H 22 4 5
N ~ ~ 3 a ~ . ~
2
~
~ z
L 190.8/22 N
~
~ XI T. ^
~
X /
. • , H 23 ~ i
EI T /
. ~
EXIS
7 ^ 2
6 i
N
L
5 ~ EXIST. ~
4 `M H 10
UAY LANE E I 2
Ny
5
. ~ ` TRACT "A" MH' 1 190.8/21.6
EXI
5 r ~i(FI
MH 24 r L E IST. I90.52 I.5 N
M 1
A /
EXIS
EXP . M H 8 19
18 I \J
~SHANNO •r
, r 189.621,2N rr190.421.5N
1.1 NY
Tl NORTHwFsr Riverwalk 11th Addition . Job No,: C-70-S020105
~
Field Report cS
2214 E. Riverside 509-534-9711 Date: VZ9,
Spokane, WA 99202 509-534-9755 fax Page~Of~
DA, _ Y FIELD REPORT
S77NORTHWEST -
2214 East Riverside ~
Spokane, WA 99202
= J Proiect Information
Project Name: Date:
Riverwalk 11 th Addition 5/30/2002
Project No.: Report No.:
C-70-S020105 10
Weather Arrival Time: Departure Time:
Sunny, hot 4:00 5:00
Client: Local Representative 1 phone number
C&L Development, L.L.C. Craig Condron
General Contractor. Site Representative I phone number
Ed Loshbaugh & Sons, Inc. Travis
Subcontractor STI Project Manager / phone number
Bob Graham 534-9711
Page No. of STI Representatives on site
1 3 Tim Johnson
~ Manpower and Equipment Used N/A
Field Observations I arrived on site at the contractors request to test and inspect subgrade.
When I arrived the contractor had already quito for the day.
~ I took density tests, starting on Riverwalk Ln. I used a Proctor value of 137.5 Pcf, that was a combination
of CSTC and screened native material.
Density tests of 95% or better were achieved on Riverwalk and Shannon Lane.
/
r
STI Fiel epresentative Contractor's Representative
THIS DOCUMENT AND REFERENCED ADDENDA ARE TO 8E CONSIDERED PRELIMINARY UNTIL REVIEWED AND SIGNED BY THE
STl CONSTRUCTION ENGINEER AND/OR STI PROJECT MANAGER.
-0tv/ 6 / 7 AeP Z
Reviewed by Date STI Projert Manager, Date
Corresponding Deficiency Report No: Ftcla Report vz 2 8n8101
2214 East Riverside
Spokaoe, WA 99202
509-534-9711
NORTHWEST Fax 509-534-9755
REPORT OF FIELD COMPACTION TESTS Nuclear Method ASTM D 2922-96
soils and aggregates
Date: 5/30/2002 Project Name: Riverwalk l lth Addition
Client: C&L Development, L.L.C. Project C-70-S020105
Technician: Tim Johnson Field Report No.: 10
Density Std.: 47572 Page: 2 of 3
Moisture Std: 10420
Guage Id.: CPN MC-1 MD 10306064
Wet Dry Compaction Meets
Test Depth Below Moisture Material Percent Retest of
No. Location SG Elevation Densiry o /o Density Req'd Spec DT No
~C~ ~Cfl Type Compaction .
~ Riverwalk Lane I I I I I I I
1 ~ 37+25 ~ 0.0 ~ 143.7 ~ 4.0 ~ 138.2 ~ 3 ~ 95 ~ 100 ~ Y ~
2 ~ 38+25 ~ 0.0 ~ 143.6 ~ 6.1 ~ 135.3 ~ 3 ~ 95 ~ 95 ~ Y ~
3 ~ 39+25 ~ 0.0 ~ 137.3 ~ 3.9 132.0 ~ 3 95 ~ 96 ~ Y ~
~ Shannon Lane
4 ~ 19+50 ~ 0.0 ~ 141.4 ~ 4.6 ~ 135.1 ~ 3 ~ 95 ~ 98 ~ Y ~
5 ~ 18+25 ~ 0.0 ~ 139.1 ~ 4.9 ~ 132.6 ~ 3 ~ 95 I 96 ~ Y ~
6 ~ 17+00 ~ 0.0 ~ 145.4 ~ 5.7 ~ 137.5 ~ 3 ~ 95 ~ 100 ~ Y ~
I I I I I I I I I I
I I I I I I r I I I
I I ~I I I I I I~ I I
I I I I I I I I I
I I I I I I I I I
I ~ I I I I I I I I I
I I I I I I I I i I
I I I I I I ~ I I I
I I I I I I I I I I
X IModified Proctor ASTM D1557-98 ~ ~Standard Proctor ASTM D698-98
Material max opt corr. Max ~
No. Description density moisture density
1 ~ CSTC, Lab#765 ( 138.9 ~ 6.7 ~
2 ~ Screened native material ~ 136.0
3 ~ Mix of #1  ~ 137.5
J%,
191.5/22.4 N 191.~~'22.4 /
189.5/22.2 N
iNin,
NORTH
r \ ~Y ' @ ^ ~I , I
~ p• ' 189.7/22.2 N r EXIST.~
4 5 MH 22
9N 0 ^
3 . , IN
2
~I ~
19 0.8 2 2 N
z
~
/
- • EXI T. ^ ~
~ -r ~r
, .
MH 231,
4 -EXIST ' .
XIS 3
7 r J ,
w
6 - ~
.5 J 0,EXIST. 'UAY LANE E 1 • 4 MH 10
~
5 2 3 b .p x
TRACT "A" ~ MM 1 190.8/21.6
~ ~ I ~ .
EXI
'lOfF
5 r
MH 24 r ~ E IST. 4 M 1 3 190.5 21.5 N
EXIST. " 2
, o 1EX~ . M H 18 9
18 -,SHANNO J ~
~r
/ A y ,~,19 0. 4 21. 5 N
,1.1 N r 189.6 21.2 N
k4- ~ ~T~NO~ Riverwalk 11th Addition Job No.; C-70-S020105
Field Report A: 16
2214 E. Riverside 509-534-9711 Date: ~ 30 02
Spokane, WA 99202 509-534-9755.fax Page ~j
NOf2THWEST DA. . Y FIELD REPORT
STI
2214 East Riverside
Spokane, WA 99202
1~---~J Proiect Infamation
Project Name: Date:
Riverwalk 11 th Addition 613/2002
Project No.: Report No.:
C-70-S020105 11
Weather Arrival Time: DeRarture Time:
Sunny, warm 8:30 10:00
Ciient: Lor,ai Representative / phane nurrtber
C&L Development, L.L.C. Craig Condron
General Contractar: Site ReExesentative / phone number
Ed Loshbaugh & Sons, Inc. Travis
Subcontractar STI Projed Manager / phone number
Inland Asphalt Bob Graham 5349711
Page No. of STI Representatives on site
1 3 Bob Graham
- Manpower and Equiipment Ussd ,
Case 602B DD roller, Hypac 6766C DD roller, Cat 140G grader, Athey grader, water truck
fi men
~
Field Observatiom
I amived on site at contractor's request to observe the placement of CSBC and to check it for
densification. At the time of my arrival, the ag,gregate had already been placed and compacted on
0 Riverwalk Ln. My testing confirmed densification in excess of the County 95 percent requirement. Cwb
reveal indicated approximately four inches of base rock had been placed. Inland placed centerline hubs
which appeared to be in agreement wit}i the specified 2% crown.
Base cour.se was also placed on Shannon Ln. wluch again met specifications for depth, croNvn and
compaction.
I obta.ined a sample of CSTC for laboratory testing. .
STI Fiele~tepresent*~e Contractor's Representative
THIS DOGUMENT AND REFEREN(ED ADDENDA ARE TO BE OONSIDERED PRELIMINARY UNTIL REVIEWED AND SIGNED BY THE
STI OONSTRUCTION ENGINEER ANDIOR STI PROJECT NWNAGER.
, ~
Reviewed by Date STI Proje(A/Manager ~ Date
Caresponding Deficienc.y ReW No: Fula Reporc V7.2 8/28/01
2214 East Riverside
Spokane, WA 99202
509-534-9711
NORTHWEST Fax 509-534-9755
REPORT OF FIELD COMPACTION TESTS Nuclear Method ASTM D 2922-96
soils and aggregates
Date: 6/3/2002 Project Name: Riverwalk l lth Addition
Client: C&L Development, L.L.C. Project C-70-S020105
Techaician: Bob Graham Field Report No.: 11
Density Std.: 2128 Page: 2 of 3
Moisture Std: 685 ~
Guage Id.: Troxler 19739
Wet Dry Compaction Meets
Test Depth Below Moisture Material Percent Retest of
Locarion Density a Density Req'd Spec
No. SG Elevation ~C~ /o ~,CF) Type (oo) Compaction (Y~ DT No.
~ Riverwalk Lane I I ( I I I I
1 ~ 39+40 RT ~ -5" ~ 146.6 ~ 5.7 ~ 138.7 ~ 1 ~ 95 ~ 98 ~ Y ~
2 ~ 38+50 LT ~ -5" ~ 146.2 ~ 6.2 ~ 137.6 ~ 1 ~ 95 ~ 97 ~ Y ~
3 ~ 37+50 cntr ~ -5" ~ 147.7 ~ 5.4 ~ 140.1 ~ 1 ~ 95 ~ 99 ~ Y ~
~ Shannon Lane
4 ~ 18+75 LT -5" ~ 147.3 ~ 6.5 ~ 138.3 ~ 1 ~ 95 ~ 85 ~ N ~
5 ~ 1987 RT -5" ~ 147.8 ~ 5.5 ~ 140.1 ~ 1 ~ 95 ~ 98 ~ Y ~
6 ~ 18+50 cntr ~ -5" ~ 142.6 ~ 5.6 ~ 135.1 ~ 1 ~ 95 ~ 95 ~ Y ~ 4
19+95 RT ~ -5" ~ 145.1 ~ 6.4 ~ 136.4 ~ 1 ~ 95 ~ 96 ~ Y ~
16+95 LT ~ -5" ~ 146.7 ~ 5.7 ~ 138.6 ~ 1 ~ 95 ~ 98 ~ Y ~
X IModified Proctor ASTM D1557-98 ~ I Standard Proctor ASTM D698-98
Material max opt corr. Max
No. Description density moisture density
1 ~ CSBC provided by Inland ~ 142.3
-
,
~
~ 191.5/22.4 N 191.5/22.4
~ 189.5/22.2 N - f
NORTH - `
^
r so~ _ 7 201- 189.7/22.2 N EXIST.
1 4 5 MH 22
9N 3
R ~
2
~i
n~~ , ~ ~ ? z 190.8/22 N
EXI T.
M,H 23" EXI T. -
EXIS 3
~ ` 0 J L 7 v
6
2
T~ ~~n •
5 ~ 4XIST.
M H 10
5 2 ,v..
VAY LANE E 1
3
r°
~ ~TRACT "A" Mki' 1 _ 190.8/21.6
EXI
-R
1131. '5 t
MH 24 E IST. 4 . 21.5 N
` - M 1 '
EXIST. " '2
EXP . MH 18 19
~
18 HAN 0N v l -fi
A 189.621:2N ,r190.421.5N
' 1.1 N
Y~k4V7'/NORTHwE9r Rivenwaik 11th Addition Job No.: C-70-S020105 Field Report#: _.O,
2214 E. Riverside 509-534-9711 Date: 3/o
Spokane, Wl~ ~202 509-534-9755 fax PBge 3 Of ~ 0
STJF M~ ~`DA_ Y FIELD REPORT
NORTHWEST
2214 East Riversidc ~
Spokanc, WA 99202
Proiect Information Project Name: Date:
Riverwalk 11Ih Addition 6/3/2002
Project No.: Report No.:
c-70-so20105 12
Weather Arrival Tune: Depariure Time:
Sunny, warm 12:30 1:00
Client Local Representative / phone nunber
C&L Development, L.L.C. Craig Condron
General Contractor. Site Representative / phone numbu
Ed Loshbaugh & Sons, Inc. Travis
Subcontractor STI Projed Managw / phone number
Inland Asphalt Bob Graham 5349711
Page No. of STI ReEuesentative.s on site
~ 3 Bob Graham
- Manpower and Equipment Used
Case 602B DD roller, Hypac 6766C DD roller, Cat 140G grader, Athey grader, water bruck
6 men
Field obsenrabons
I arrived on site at contractor's request to observe the placement of CSTC and to check it for
densification. At the tune of my arrival, the aggregate had already been placed and compacted oo both of
~ the roads in the project. The contractor was doing final shaping. My testing confirmed densificaxion in
excess of the County 95 percent requirement. Curb reveal indicated approximately three inches of rock
had been placed resulting in a two inch reveal for asphalt. Inland placed centerline hubs which appea.red
to be in agreement with the specified 2% crown.
,
S1'I Field KVepresentative/ Contra.ctor's Representative
THIS DOCUtJiE1JT AND REFERENCED ADDENDA ARE TO BE OONSDERED PRaiMINARY UNTIL REVIEWED AND SI6NED BY TFiE
STI CONSTRUCTION ENGINEER AND/OR STI PROJECf MANAGER.
C3 c,~ C /7~av
1( Reviewed by Date STI Proj ect fAa.nager ~ Date
Corresponding Deficiency Report No: Fiela Report .2.2 W28101
2214 East Riverside
Spokane, WA 99202
509-534-9711
NORTHWEST Fax 509-534-9755
~
~ f.
~
REPORT OF FIELD COMPACTION TESTS Nuclear Method ASTM D 2922-96
soits and aggregates
. Date: 6/3/2002 Project Name: Riverwalk l lth Addition
Client: C&L Development, L.L.C. Project C-70-S020105
Technician: Bob Graham Field Report No.: 12
Density Std.: 2128 Page: 2 of 3
Moisture Std: 685
Guage Id.: Troxler 19739
Wet Dry Compaction Meets
Test Depth Below Moisture Material Percent Retest of
Location Density o Densiry Req'd Spec
DT No.
No. SG Elevation (pCF) ~O (PCF) ~e Compaction
~ Shannon Lane I I
1 ~ 17+00 cntr ~ -2" ~ 139.9 ~ 5.4 ~ 132.8 ~ 1 ~ 95 ~ 95 ~ Y ~
2 ( 18+00 RT ~ -2" ~ 140.0 ~ 6.2 ~ 132.3 ~ 1 ~ 95 ~ 95 ~ Y ~
3 ( 15+50 cntr ~ -2" ~ 142.0 ~ 6.4 ~ 133.5 ~ 1 ~ 95 ~ 95 ~ Y ~
~ Riverwalk Lane
4 ~ 39+00 LT ~ -2" ~ 144.3 ~ 5.7 ~ 136.5 ~ 1 ( 95 98 ~ Y ~
5 ~ 38+50 cntr ~ -2" ~ 143.4 ~ 5.5 ~ 135.9 ( 1 ~ 95 ~ 97 ( Y ~
6 ~ 37+50 LT ~ -2" ~ 139.8 ~ 5.7 ~ 132.3 ~ 1 ~ 95 ~ 95 ~ Y ~
~f I I I I I 1 I I I I
I I I I I I I I I I
. I I I I I I I I I I
I I I I I I I I I I
I ~ I I I I I I I I I
I I I~ I I I I I I I
( I ( I I I I I I I
I I I I I I I I I I
X ~Modified Proctor ASTM D1557-98 ~ ~Standard Proctor ASTM D698-98
Material Descr max opt corr. Max
No. iption density moisture density
1 ~ CSTC assumed value ~ 140.0
~
't
1 ` ~l 1 ,L''..~ : , r ~ ~ .•;J~l'`,~ i ~ ~ l~, i...
~
~
NO RTW
'
~ r
~ ~ \ i A ,.:a . ~ • ~ ! ; 1
\ 1 ~ / ,rx..., t M t . '
~ ,f • 3a c{ ' I ~ ~ ' t' t,` , , ~
-A{~
4c 1 `t
~ ' ~ ( t ✓
! 1
. ~ r /I~lh~ f '
. N ~r . , I...~
~ , . . -
r A
t ' ' / ~~1 'I i
TRACT A~~
.
. ~
~
; ' : ` O 4 , / ~ '
Ok0 I
i
~ l > ! ~ / /
1 YY ,1 1 ~ • ~ ,11` 1 ~ ~ ~ / ~ ' ~f, ' ~ •
'I,
~ ~ , %1 ~
1
01) ~
E~ NORnmm Riverwalk 11th Addition Job No.: C-70-S020105
Field Report#; j `?y
2214 E. Riverside 509-534-971 l Date: -!~/z fo z,
Spokane, WA 99202 509-534-9755 fax Page 3 Of 3
NORTHWEST ~
W
• ~A#IE~tR.~
DAILY FIELD REPORT
roject Name ~I~~~ /;1 L ''r[~( Date:
,roject No. n keport No.: I~
_ ~ -
Veacner Arnval ~ime ~~30 Dep~u 3~me
~ 76>Q
;lient ~ ~ ~ Locai Representative/ phone number
~G &7~^ Wr LL
senerai c;ontractor , Site Representauvei pnone number
)ubcontractor/AtAWQ 4g-11,A, r STI Proj ~anager/~p~ e r
~
'age No. ~ of g #ACr.--,NA-A1
Vlanpower 8 Equipment Used
1 •
,
V-RAAZUII
Camments:
(wa~ ~.:~eted Appatenty
~ y~
a~nd ~Probienls c!N ~/~~~v 6 /7 i /C IA6 ~
r
j
~tZ7
/j~p~a~, ,
72NJs OF C&kSs "X 0c~1~AX/rU~It/ C.~ ~
~v ,
k
.RM&10,4zz L-Av. p&T1cok1,46:v 7~1S117E
AF7-61--e eoAvT~4&r0)n eoA1194Cr~ . &-6U&-rS ,,64-~6646
0 6 kf7~,
EPRESENTATIVE CONTRACTOR'S REPRESENTATIVE
This document and referenced addenda are to be cansidered preliminary until reveiwed and signed by the STI
construction engineer andlor STI project manager.
STI PROJE ANAGER: E
REVIEWEO BY: DATE
~
O.Uortn slstill ieldrop.pm 5
Corresponding Deficiency Repon No:
-
NORTHWEST el
~1 I
ate Inspector's Daily Repoh No.:
13
fl Project Na ~ O r~age ~vo. o~
~ - ~Z~ ~lS' z `f
mc«nc~ ~e~lr R c' L l~ C~! ll~~t/S, A1Z-&C61) , ~ Aged*Z-7-S4W6~-
Nork er S pecxficatiau Pmblans „ 39~ 1 ~ 6
nd Iheir SolNions) _ J~ p c. T
vv
.
.
STI ield Rep STI CE STI PM Conlractor's Rep
2214 East Rivcrside
Spokane, WA 99202
509
~T~ NORTHWEST . -534-9711
Faz 509-534-9755
~ ~r
REPORT OF FIELD COMPACTION TESTS Nuclear Method ASTM D 2922-96
soils & aggregates ~y
Date: &-V-QZ ' Project Name: ~U~
.
Client: Project 6-70-S'420165`
.
Techn~c.~an: Field Report No.: 13
Density Std.: Page: ~
Moisture Std:
~ 0417 r'& A/s
- - - , Dry Test I?ate Loratian DePth Below Moisture lty
Materisl Peroent Pass or Rctast of
No. . SG Elevation %Type Compadion Fail DT No.
1376
~ ~ .
~ I .
,
' Modified Proctor ASTM D1557-98 IStandard Proctor ASTM D698-98
Lab PrOct°r Sample Descxiption max opt oorr. Max
No. density moisture density
No.
~'Lfv&
~
Paul T. Nelson, P.E.
Laboratory Supervisor
/ ✓ ' ~
1 1 ; ;z ~ ~ '~.r..'' r ,..--r'
~ ~ ~ ~ 1 • ~
i / ~ ~ 1''~ , .
~ , + ~ r 1~ 'L ' ~ ' .
lo, • ~ .r"'"
S ~r
1
~ ^ / ~ L~ "1 ..i ~ ~ ' ~ E1 ' ~ r •e'
/ t R t Y'1
f~ • ~S~'~'1~ L ~t ' 3 ,
'
~ ♦ ~"1` ~ /
•
, ~ ~ ' ~ / ool
lo,
I
~
1 i ' ~ ~
~ ~ i koo oll i
~•1 `i ~•,,'`~~,~'i,.
/I f
ool- /
ol-l ,
f~.' ..~0•Cp2~1p
i •
C i'
b o.,
3o N
y ,
1 b ' 1 . it/~i, ♦ '
.
Add~ti on
1 ` ~ - • ~ e
Field Repo,}1 ~
MOrm Date:.~ ~
~ e Of
~09-53~`"9711 Pa9..a- . ~
A,P RiVetside - cn4.534-9155 f~ _
STJF NORTHWEST ~ DAILY FIELD REPORT
,~4~~~~ide
Spokane, WA 99202
~ t
Proiect Infarmatian
Project Name: Date:
Riverwalk 11 th Addition 7116/2002
Project No.: Report No.:
C-70-S020105 14
Weather Arrival Time: Departure Time:
Ciear, 720F 8:20 10:45
Client Local Representative / phone number
C&L Development, L.L.C. Craig Condron
Ceneral Contractor. Sitie Representative / phone number
Ed Loshbaugh & Sons, Inc. Travis
Suboontractor STI Projed Managff / phone nunber
Bob Graham 534-9711
Page No. of STI Repxesenhatives on site
1 3 Mike Cunningham
- Manpower and Equipment Used
Cat 950E loader, Cat vibratory roller, crew of three
Field Observations
I arrived on site at the contractor's request to test densification of bedding for sidewalk consisting sand
and screened native material. Shannon Lane was completed at my amival, I returned 2 hours later to test
Riverwalk Laae. Testing was done bY nuclear densometer. All test results met or exceeded SPokane
County Standards for sidewalk bedding. I informed the crew foreman that there was up to four inches of
excess material in some a,reas. He considered that to be Johnson Concrete's problem.
ASTliFielLd resentative Contractor's Representative
THIS DOCUMEHT AND REFERENCED ADUENDA ARE TO BE CONSIDERED PRELIMINARY UNTIL REV[EWED AtdD SIGNED BY THE
STI CONSTRUCTION ENGINEER AND/OR STI PROJECT MANAGER.
Reviewed b Date STI Pro' ect Manager Date
Y .1
Corresponding Deficienc,y Report No: Fiem xel3ort v2.2 W28101
2214 East Riverside
'r
" Spokane, WA 99202
509-534-9711
NQRTHWEST Fag 509-534-9755
REPORT OF FIELD CO1ViPACTION TESTS Nuclear Method ASTM D 2922•96
soils and aggregates
Date: 7/16/2002 Prnject Name: Riverwalk l lth Addidon
Client: C&L Development L.L.C. Project C-70-S020105
Tcchnician: Miks Cunningham Field Repvrt No.: 14
Density Std.: 48250 Page: 2 of 3
Moisture Std: 10572
Guage Id.: CPN MC-1 MD 10306064
Wet Dry Compaction Meets
Test Depth Below Moisture Material Percent Retest of
No. Location SG Elevafion Density % Density Type Rqd Compaction Spec DT No.
(PCF) (PCF) ( /o) (Y/N)
#1 ~ Shannon Ln. 17+00 lt S/W bedding) 133.6 ~ 4.4 128.1 1 ~ 92 92 ~ Y ~
#2 ~ Shannon Ln. 18+00 lt S/W beddind 134.1 ~ 4.9 128.3 1 ~ 92 92 ~ Y ~
#3 ~ Shannon Ln. 18+701t S/W beddind 142.1 8.1 131.4 ~ 1 ~ 92 ~ 95 ~ Y ~
#4 ~ Shannon Ln 19+50 lt S/W beddind 135.8 4.1 130.7 ~ 1 ~ 92 ~ 94 ~ Y~
#5 Riverwalk Ln. 37+50 lt S/W beddind 139.9 1 5.8 132.3 1 1 1 92 1 95 1 Y 1
#6 Riverwalk Ln. 38+00 lt S/W beddind 141.4 1 9.5 129.2 1 1 1 92 1 93 1 Y 1
#7 ~ Riverwalk Ln 39+00 lt S/W beddind 142.6 1 9.8 129.9 1 ~ 92 ~ 94 ~ Y ~
X Modified Proctor ASTM D1557-98 ~ ~Standard Proctor ASTM D698-98
,
Material Description max opt cort. Max
No. density moisture density
1 ~ CSTC, Lab#765 138.9 ~ 6.7
~
~ ~ ~ ~ i ~
~ , ~ ~ ~Q~,, ~ i ~ r 'r' ~ ~ ` ' •
_ _ N► ,
.
~ ✓ ' ~ ~ ♦ .
I r~ i r ~
^ , s' y~ 'f'J ~ t ~ J~
1 1 1 '
J ~ , ~ • ~ , ~ Y1
\ ~ ` ~ ~ ^ • / } ~
%
G7
1r1~~ J'~` t
u 1 5~~: 1 t t / {
f
r y
~i / a
J* ~ ~ i
i r . •w, ~ / ~ / / ,'I
,
lool
~
loll/ /
~ ~ 1 ~,i ~ i
, t, 1 " ~ ~ r
/
S^. ~ ~ r } ~ •11 / ~ ~ / ~ '
/
.
'ri ` / \ ~ ~ ~J
4 ~ ~O
~ o
3ob
I \ ~ ~ i` ~ ~ f ~ ~
W,
-'o~
A ~ -
\ M./ }t,~ ,`1 E / ,S~•k~ /
a~,~~~on
- Vrfjr No~'~ F1e~d Re
~
509'5349"5 Page~ _
.
cn9-534-9't5 -
~~~NORTHWEST DAILY FIELD REPORT
~ ,~2214 East Riverside ~ ' ~
Spokane, WA 99202
~ Proiect Information
Project Name: Date:
Riverwalk 11th Addition 7/17/2002
Project No.: - Report No.:
C-70-S020105 15
Weather Arrival Time: Departure Time:
Clear, 72°F 8:30 9:30
Client: Local Representative / phone number
C&L Development, L.L.C. Craig Condron General Contractor: Site Representative / phone number
Ed Loshbaugh & Sons, Inc. Travis
Subcontractor STI Project Manager / phone number
Bob Graham 534-9711
Page No. of STI Representatives on site
1 ,2' r Tim Johnson
~ Manpower and Equipment Used Cat 950E loader, Cat vibratory roller, crew of two Field Observations I arrived on site at the contractor's request to test and inspect concrete for sidewalk. The concrete
contractor was not on site. No concrete was poured.
I measured the drainage swales to ensure they were in compliance with the plans.
Ponds A, E and D did not match plan specs and need additional work. . 1
/
~
STI Field epresentarive Contractor's Representative THIS DOCUMENT AND REFERENGED ADDENDA ARE TO BE CONSIDERED PRELIMINARY UNTIL REVIEWED AND SIGNED BY THE
STI CONSTRUCTION ENGlNEER AND/OR STI PRQIECT MANAGER.
, , ~
EZeviewed by Date STI Projec anager Date
Corresponding Deficiency Report No: Fiela Repon.2.x 8n8/01
NORTHWEST
~ ~AIMEi~a
l ~
DAILY FIELD REPORT _
P~1'ect Nam Date:
7(olo z
{K. Project No, keport No.:
t G-
1~vea er ~ Anival I ime,., ue a~ure l'ime
Gient local Representative/ phone numbet
C ~L Qi.v~e,( C--#" V`
t~eneraf 1;ontractor i e epre . tative/ ho3~~ ber
- (t
Subcontractor ~J ST Pr oject Manager/ phone number
J~ll- m-'1M L- 11I~G✓~V~ 1 uit/l_ ~CL~U^,+ ~J 3 ! `7 71/
Page No. I of
'
~an wer & Equipment Used • .
- 7 ` ik- -d ' .~t.~v'ui c dvt.~ ltc
3 o1~ wp
~
,
Comments:
(Wo* completea AppareMiy
per Specifrcations Rroblems IL
s e' 4jy
~ ~
~
CA-$ c~-~. ~ v'c tojoA C4
~ ~ , ,
_4 ' I a~& 0 411~ ,
^
`
~s~~~01- k VU,Ar~
. , ~ ,
4JA1CAQ-AAQQ
f ~ ~L4 42s-
.e
~7~ ~~c v~a r Lc ~ . ' ir • 4
Pf
4L
~ -
_ STI FIELD RE~ SENTATIVE CONTRACTOR'S REPFtESENTATIVE
This document and referenced addenda are to be oonsidered preliminary until reveiwed and signed by the STI
construc#ion engineer and/or STI project manager.
( ✓cr~ ?
REVIEWED BY: DATE STI PROJECT NAGER: ATE
0;Vortnslstlfle1drep.pm5
;orresponding DefiGency Report No: