Loading...
2011, 09-07 Permit App: 11002738 Pole Bldg Project Number: 11002738 Inv: 1 Application Date: 9/7/2011 Page 1 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Project Information: a. . rein'; Permit Use: 26x30x10 POLE BLDG/STORAGE-GARAGE Contact: SPOKANE POST FRAME Address: 7001 E 2ND C-S-Z: SPOKANE,WA 99212 Setbacks:Front Left: Right: Rear: Phone: (509)926-0865 Group Name: Site Information: Project Name: Plat Key: Name: Range District: Nort Parcel Number: 35121.3103 Block: Lot: SiteAddress: 7021 E RUTTER AVE Owner:Name: HOWE,JEFFREY W Address: PO BOX 11332 Location::CSV SPOKANE VALLEY,WA 99211 Zoning: R-2 SF Res Suburban District Water District: 002 ORCHARD AVENUE Hold: ❑ Area: 14,000 Sq Ft Width: 0 Depth: 0 Right Of Way(ft): 0 Nbr of Bldgs: 0 Nbr of Dwellings: 0 Review Information: . - m� � .m_ =u� am �� rs n Review Building Plan Review Released By: Originally Released: 9/7/2011 By: tmelbourn Landuse/Zoning/HE Conditions Released By: Pursusant to SVMC 19.40.020 B.All residential driveways and off-street parking areas shall be paved with asphalt,Portland cement,grasscrete,paver blocks or other equivalent hard surface material. Originally Released: 9/7/2011 By: tschmidt Operator: MBB Printed By: JD Print Date: 9/7/2011 Project Number: 11002738 Inv: 1 Application Date: 9/7/2011 Page 2 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Building Permit Contractor: SPOKANE POST FRAME Firm: SPOKANE POST FRAME Address: 7001 E 2ND AVE Phone: (509)926-0865 SPOKANE,WA 99212 This Application: Total Project: Description LER Type Notes Sq Ft Valuation Su Ft Valuation POLE BDLG U-1 VB Pole bldg 780 $14,820.00 780 $14,820.00 Totals: 780 $14,820.00 780 $14,820.00 Item Description Units Unit Desc Fee Amount RESIDENTIAL PERMIT FEE 1 SELECT $251.25 WSBCC SURCHARGE 1 SELECT $4.50 SF PLNS RVW<7999 SQ FT 1 SELECT $100.50 Permit Total Fees: $356.25 Notes.._ ,v„ocrgu,NI ,x Ask116 ,—AKAWAAATITAtiAANATAAA I.. .'A_A,MA—AAA,A Pursusant to SVMC 19.40.020 B.All residential driveways and off-street parking areas shall be paved with asphalt,Portland cement,grasscrete,paver blocks or other equivalent hard surface material. 7222 E UTAH AVE--PROPERTY MUST BE DIVIDED TO ADD THE RESIDENCE IN THE SHOP. THE EXISTING SHOP CAN BE EXPANDED TO A MAXIMUM OF 1,029 SF. Payment Summary: a r, _ i _ Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing Building Permit $356.25 $356.25 $100.50 $255.75 $356.25 $356.25 $100.50 $255.75 Disclaimer: Submittal of this application certifies the owner(or person(s)authorized by the owner)has both examined and finds the information contained within to be true and correct,and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for,or an approval of,any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: MBB Printed By: JD Print Date: 9/7/2011 Permit Center S Spoit n 11707 E Sprague Awe,Suite 106 NUMBER:NER: !-�7 C Spokane Valley,WA 99206 PERMIT FEE: .� 38 evt (509)688-0036 FAX:(509)688-0037 www.spokanevalley.org Community Development Residential Construction ❑ New Construction 2/Accessory Bldg Permit Application ❑ Addition/Remodel ❑ Deck ❑ Other: SITE ADDRESS: 'c??A is li C 4-*41-' _ 4,, ,- S 'J k'YNre e 0/1' ,(o!"2 CZ- 1.- ASSESSORS PARCEL NO: 3 s`41:- -5/o 3 LEGAL DESCRIPTION: Building Owner: Contractor: Name: �L /tawi Name:3il���t-A'�-- �o�d i'1--" .i.` -IX c_ Address:V-3_0-3_02_\ c .; A-Lt,-'4 0__ 1,4..V . Address: ,.0 0 l i, at..st .44i., City: .$pi)vC,i-d„.._ vprk4 u State: Zip:Ee`Z t z City:SPo 1, .- 4 State: jen 2_1. _ Zip: Phone: J 3��i Fax: Phone: i--L6,... 'o - Fax: 9 t Li„5-141 ContractorroKPif 1-'11 FYN" Exp Date: Ji-2- L/.2 p`7 Contact Person City Business Lic.No: Name: 1 LoL(- ._ ( i k),_ Phone: 4 24 -- ©D' Describe the scope of work in detail: Cost of Project: ol Ea 0 _ ,____/ 2 4 'y. '3 ® f )( cO ° Po tc j)Le.v14 Vfz� ,�-t 2 .� Proposed Use: 6- ��--C,-`Z.- 5 )(L4cr£ Vic.-1,4 Li,:ict **************The following MUST be complete: (write NfA if not applicable)********************** HEIGHT TO PEA « IMENSIONS: #OF STORIES: TOTAL H (TABLE SPACE: MAIN FLOOR TO S . 2"I'FLOOR SQ. FTG: UNFIN BASEMENT SQ. FTG: IMPERVIOUS SURFACE FTG: ,,e.3— .-&-- AREA: FINISHED BASEMENT A -SG: FTK DECK/COV. PATIO.SQ. FTG: 30%SLOPES ON SQ. FTG: ''$ Ag- __PROPERTY: #OF BEDROOM ONST-RucT r ® C� TYPE: HEAT SOURCE: ( SEVERAR SEPTIC? The permitee verifies,acknowledges and agrees by their siqhature that: 1) If this permit is for construction of or on a dwelling,the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permitinure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal,state or local laws, codes or ordinances.6) Plans or additional information may be required to be submitted,and subsequently approved before this application can be processed. SIGNATURE: DATE: Method of Payment: i .... . FY 0 Cash heck 0 Mastercard 0 VISA CITY OF Bankcard#: Expires: VIN#: SEP 0 7 2.U11 Authorized Signature: N. tjtrtivIl I �. y• REVISED 2/15/07c----2 Target Date sheet For City Use Only SiOkane it Project Addss [~! 'it �� 'si ?t' (—Uta,, Valley® 11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206 509.720-5240 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application,we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date,we will contact you with a revised target date. Your application review TARGET DATE is The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review ➢ Submit complete,accurate plans and documents. Extra time may be required for re-submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. ➢ Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. ➢ Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date,please feel free to contact us if,9bii nay RPti7 u p&vai our target date.Staff may contact you before the target date if the initial review is complete.By followi sedd you will save time and allow the reviewers to complete the work more expeditiously. �� L rL1-0/1IT CEN I tri BY: /Kw-14-- steps C-Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre-Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete,your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3.Technical Compliance.Once an application is administratively complete,it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re- submittals,each reviewer will approve their section of the application and route it to the Permit Center.When all sections of the application are received,a Permit Specialist will process the application and contact the person specified on your application for permit pick-up.Information regarding fees and pre-construction meetings(if required)will be provided by the Permit Specialist at that time. CD-003 V-7/06-21-11 Page 1 of 1 SPOKANE POST FRAME, INC. JOB NAME -r--F-1 [(A1 Engineered Pole Buildings PHONE sr c9 r —35i i shops ROLFE WILL ADDRESS lib 2-) f-r 2u*4.rz 79c- garages Owner C.Pbk-' - V 1 Wo ✓ //2k2-- . storage buildings 7 cabins 509-926-0865 • Fax 509-924-5161 LEGAL DESCRI PT ION kits-cost plus or 1-866-926-0865 PAIL + 35)2_‘ - 3 (,1)3 7001 E.2nd Ave Visit us at Spokane,WA 99212 www.spokanepostframe.com PLANNINC DEPT. APPROVED site P an �1 1 4- 6C,)-0- BY.' 4.--; "'UP" i • X14" ALOVA-eu DATE: Y7//1 °' .42 in U N Cf. p� � 23 'C 4 t_show 1 f f,Proseten< L Hof-th 26 3o ra _ aa) E.asB4.1id cu' .7-t. to - 0j �. —a 0c7): 7 N sg. CL a3 3 cl 6 I' � � t5 Show streets/alley f1 m Show septic/sewer/dralnfleldI9of 2 to a Show existing buildings l > -0 fl- o Show proposed building CO a/ - Show setbacks - front,rear, sides. -- N U Show lot size va as.3 -- m = 3 -t3 L .= Y as ,-> > > z — ro m 3 o_ 0_ E ZONING CRITERIA - SPOKANE - city If closer than 5'to property line -need firewall and parapet Out of rear 30'and closer than 5' -.-need waiver from neiohbor A _� Can't cover more than 508 of rear 25' q '�� � / Corner lot -building must be 20'from property line 50'minimum setback from front property line Less than 8'from residence-need f lrewal I i-iaximum square footage- 108 of lot area(Must be less than 3.000 sof t.) Hay not subdivide lot so that building is more than 108 of residual lot area csaioly CITY OF SPOKANE VALLEY If closer than 5' to property line -need firewall SEP 10' from septic/dralnfleld 7 2011 Less than 6'from residence-need firewall SzENERAL SETBACKS ARE SHOWN BELOW. WILL NEED TO CHECK CODE BOOK ',ER f f CENN1EH AND KNOW WHAT ZONING YOU'RE IN TO BE SURE. MAXIMUM BUILDING SIZE aY: Gk- ALSO CHANGES WITH DIFFERENT ZONING. 5'minimum side yard setback 5'minimum rear yard setback Minimum front and side street setback-25'from property line or 55' from center of road-whichever Is greater