2008, 10-22 Permit App: 08004151 Repair Fire Damage Project Number: 08004151 Inv: 1 Application Date: 10/22/2008 Page 1 of 2
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Project Information:
Permit Use: REBUILD FIRE DMANAGE OF HOME Contact: KLEIN'S HOME IMPROVEMENTS
Address: PO BOX 3002
C-S-Z: HAYDEN,ID 83835
Setbacks:Front Left: Right: Rear: Phone: (208)772-7734
Group Name:
Site Information Project Name:
Plat Key: 005835 Name: RIVERWALK 07TH ADD PUD District: East
Parcel Number: 55083.2301 Block: Lot:
SiteAddress: 1826 N SALMON RIVER RD Owner:Name: FIFIELD,JOSHUA C/PORTER,LA
Address: 1826 N SALMON RIVER LN
Location::CSV SPOKANE VALLEY,WA 99016-948
Zoning: R-4 SF Res Urban District
Water District: 134 CONSOLIDATED ID#19 Hold: ❑
Area: 7,693 Sq Ft Width: 54 Depth: 120 Right Of Way(ft): 50
Nbr of Bldgs: 1 Nbr of Dwellings: 1
Review Information:
Review
Building Plan Review Released By:
Originally Released: 10/22/2008 By: tmelbourn
Building Permit
Contractor: KLEIN'S HOME IMPROVEMENT Firm: KLEIN'S HOME IMPROVEMENT
Address: PO BOX 3002 Phone: (208)772-7734
HAYDEN ID 83835
This Application: Total Project:
Description Grp Type Notes Sq Ft Valuation Sq Ft Valuation
1&2 FAMILY R-3 VB FIRE DMG 0 $85,000.00 0 $85,000.00
REPAIR
Totals: 0 $85,000.00 0 $85,000.00
Item Description Units Unit Desc Fee Amount
RESIDENTIAL PERMIT FEE 1 SELECT $888.75
WSBC SURCHARGE 1 SELECT $4.50
SF PLNS RVW<7999 SQ FT 1 SELECT $355.50
Permit Total Fees: $1,248.75
Operator: jmm Printed By: jmm Print Date: 10/22/2008
Project Number: 08004151 Inv: 1 Application Date: 10/22/2008 Page 2 of 2
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Notes ....
OK TO ISSUE SEWER PERMITS PER ROGER 12/16/97
Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing
Building Permit $1,248.75 $1,248.75 $0.00 $1,248.75
$1,248.75 $1,248.75 $0.00 $1,248.75
Disclaimer:
Submittal of this application certifies the owner(or person(s)authorized by the owner)has both examined and finds the information
contained within to be true and correct,and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for,or an approval of,any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: jmm Printed By: jmm Print Date: 10/22/2008
Noto
Scx (Staff Use Only)
perrrokane PERMIT NUMBER: % �)
Valley. PERMIT FEE:
CITY OF SPOKANE VALLEY
Community Development Department ='r
Permit Center
�:
11703 East Sprague Avenue, Suite B-3 ��.. �. 200C
Spokane Valley, WA 99206
Tel: (509) 688-0036
Fax: (509) 688-0037 + _.
permitcenter@spokanevalley.org L -`
RESIDENTIAL CONSTRUCTION PERMIT APPLICATION
[❑ NEW CONSTRUCTION [_( ADDITION/REMODEL El ACCESSORY BUILDING
DECK Eg OTHER
SITE ADDRESS: L?)2'� NI 5AL-44A0r\ /cZkNita.
ASSESSORS PARCEL NO.: Ssp$a 23O I LEGAL DESCRIPTION:
BUILDING OWNER NAME:
NAME: LQ,Vra 6 Jtt-
ADDRESS: I 0 /3 %jet Lr1
�►
CITY: 6CS ``r STATE: V"A ZIP: C/C/
PHONE: FAX: CELL:
CONTACT NAME7/�eJ1�1 e/? 5 ^� Q'�
PHONE: - vcc(F 51( FAX: U 77 C, 1 CELL: G .Q r,g
2,01 7 2 0 �
CONTRACTOR NAME: g'I6(n 5 75/3S/(( u?
MAILING ADDRESS: p. CJ . x ✓OO Z 2
CITY: �(Q l r�� -�
STATE: T ZIP: -X�'7S f
PHONE: � �� Q 1 I FAX: CELL:v819L( $ (
CONTRACTOR LICENSE No.: EXPIRES: CITY BUSINESS LICENSE NO.:
DESCRIBE THE SCO:E OF WORK IN DETAIL ND INDICAJTE USE: ,7`_G
l LJ S -A S o gee _ AMA O IP'U St IG
•
PROPOSED USE:
Effective October 28, 2007 Page 1 of 2
http://www.spokanevalley.org/uploads/Community_Development/Documents/Forms/Building/Residential Construction Permit
App.l.doc
lowse Name
****YOU MUST COMPLETE THE FOLLOWING****
MARK N/A IF NOT T APPLICABLE
Height to Peak: Dimensions: No. of Stories: Total Habitable
ZZ 11(Z Space: /g
Main Floor SQ Upper Floor SQ Unfinished Basement Finished Basement
FT: O`sg FT: 4-1 (4 SQ FT: SQ FT: 5 Z L
Garage SQ FPDeck/Covered Patio Impervious Surface 30% Slopes on
Lk et g SQ FT: N( .r4- Area: Property: v(4
No. of7 Construction Heat Source: Sewer or
Bedrooms: ..7 Type: 1945 Septic:ore_,
e
TOTAL COST OF PROJECT: $ g. o(K
DISCLAIMER
The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling,the dwelling is/will
be served by potable water. 2) Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property
owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of
Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of
Spokane Valley permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional
information may be required to be subm and subsequently approved before this application can be processed. /
of 20/l�/
Signature Date: //
Method of payment: D Cash ,heck ❑ Visa ❑ Mastercard
Bankcard #: EXP: VIN#:
Authorized Signature:
Effective October 28, 2007 Page 2 of 2
http://www.spokanevalley.org/uploads/Community_Development/Documents/Forms/Building/Residential Construction Permit
App.1.doc
For City Use Only
CITY OF
PLUS Project Number /
pokaneProject Address
4000
a °
y 11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206
509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org
As part of our on-going commitment to customer service during the review process of your project
application, we are providing you with a TARGET DATE for the initial technical application review. If for
any reason we cannot meet this date, we will contact you with a revised target date.
Your application review TARGET DATE is b l `/
The TARGET DATE is the date we estimate your project application will have had its initial technical
review. It is not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
> Submit complete, accurate plans and documents.
Extra time may be required for re-submittals as project application reviewers work on multiple applications and it
may be several days before they can look at your new or revised information.
➢ Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one individual with the
expertise for dealing with reviewer comments would be the best choice for the entire review process.
> Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date,please feel free to contact us if you haven't heard from us
by your target date. Staff may contact you before the target date if the initial review is complete. By following this
procedure,you will save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required
documents, as indicated on your Pre-Application Checklist have been submitted or have been approved for deferred
submittal. This does not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free
from substantive flaws that would prevent technical staff from completing the technical review once it is started. When
this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it
comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance
review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by
phone,fax, email,or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re-
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections
of the application are received, a Permit Specialist will process the application and contact the person specified on your
application for permit pick-up. Information regarding fees and pre-construction meetings (if required) will be provided by
the Permit Specialist at that time.
WHITE-APPLICANT PINK-BUILDING FILE REV 9/07
Building Division
CITY ofCity of Spokane Valley
Spokane 11703 E. Sprague Ave. Ste. B-3
000Valley® Spokane Valley, WA 99206-5.185
Phone 509-688-0054, Fax 509-688-0037
INSPECTION NOTICE
DO NOT REMOVE THIS NOTICE
ADDRESS: /r)G z �,A/mcg, Aver- Parcel #: -
a) Ahe-d Se / 0 / p%. N5 y J 3-co vz
Wok Ar �' 1)17/UC- ' ah /e of i/A j-°a
D ) ?OtitAil'i-S ftli,,.,- J
)i liIn
mgi.
A t
P/ui44 1
zvecipita /
3) sk,,,h r6 / Ad r
ct 1‘ Gs'-4' 4 Li--7-705Ete * A it/
ANA ii-,2 d
IF YOU HAVE ANY QUESTIONS CALL `138
(D 509-688- 0°-s---
Call
°s-Call for reinspection before cover
WHEN CORRECTIONS HAVE BEEN MADE, CALL (509) 688- 054 FOR RE-INSPECTION.
7-) y- y
DATE INSPECTOR