Loading...
2008, 10-22 Permit App: 08004151 Repair Fire Damage Project Number: 08004151 Inv: 1 Application Date: 10/22/2008 Page 1 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Project Information: Permit Use: REBUILD FIRE DMANAGE OF HOME Contact: KLEIN'S HOME IMPROVEMENTS Address: PO BOX 3002 C-S-Z: HAYDEN,ID 83835 Setbacks:Front Left: Right: Rear: Phone: (208)772-7734 Group Name: Site Information Project Name: Plat Key: 005835 Name: RIVERWALK 07TH ADD PUD District: East Parcel Number: 55083.2301 Block: Lot: SiteAddress: 1826 N SALMON RIVER RD Owner:Name: FIFIELD,JOSHUA C/PORTER,LA Address: 1826 N SALMON RIVER LN Location::CSV SPOKANE VALLEY,WA 99016-948 Zoning: R-4 SF Res Urban District Water District: 134 CONSOLIDATED ID#19 Hold: ❑ Area: 7,693 Sq Ft Width: 54 Depth: 120 Right Of Way(ft): 50 Nbr of Bldgs: 1 Nbr of Dwellings: 1 Review Information: Review Building Plan Review Released By: Originally Released: 10/22/2008 By: tmelbourn Building Permit Contractor: KLEIN'S HOME IMPROVEMENT Firm: KLEIN'S HOME IMPROVEMENT Address: PO BOX 3002 Phone: (208)772-7734 HAYDEN ID 83835 This Application: Total Project: Description Grp Type Notes Sq Ft Valuation Sq Ft Valuation 1&2 FAMILY R-3 VB FIRE DMG 0 $85,000.00 0 $85,000.00 REPAIR Totals: 0 $85,000.00 0 $85,000.00 Item Description Units Unit Desc Fee Amount RESIDENTIAL PERMIT FEE 1 SELECT $888.75 WSBC SURCHARGE 1 SELECT $4.50 SF PLNS RVW<7999 SQ FT 1 SELECT $355.50 Permit Total Fees: $1,248.75 Operator: jmm Printed By: jmm Print Date: 10/22/2008 Project Number: 08004151 Inv: 1 Application Date: 10/22/2008 Page 2 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Notes .... OK TO ISSUE SEWER PERMITS PER ROGER 12/16/97 Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing Building Permit $1,248.75 $1,248.75 $0.00 $1,248.75 $1,248.75 $1,248.75 $0.00 $1,248.75 Disclaimer: Submittal of this application certifies the owner(or person(s)authorized by the owner)has both examined and finds the information contained within to be true and correct,and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for,or an approval of,any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: jmm Printed By: jmm Print Date: 10/22/2008 Noto Scx (Staff Use Only) perrrokane PERMIT NUMBER: % �) Valley. PERMIT FEE: CITY OF SPOKANE VALLEY Community Development Department ='r Permit Center �: 11703 East Sprague Avenue, Suite B-3 ��.. �. 200C Spokane Valley, WA 99206 Tel: (509) 688-0036 Fax: (509) 688-0037 + _. permitcenter@spokanevalley.org L -` RESIDENTIAL CONSTRUCTION PERMIT APPLICATION [❑ NEW CONSTRUCTION [_( ADDITION/REMODEL El ACCESSORY BUILDING DECK Eg OTHER SITE ADDRESS: L?)2'� NI 5AL-44A0r\ /cZkNita. ASSESSORS PARCEL NO.: Ssp$a 23O I LEGAL DESCRIPTION: BUILDING OWNER NAME: NAME: LQ,Vra 6 Jtt- ADDRESS: I 0 /3 %jet Lr1 �► CITY: 6CS ``r STATE: V"A ZIP: C/C/ PHONE: FAX: CELL: CONTACT NAME7/�eJ1�1 e/? 5 ^� Q'� PHONE: - vcc(F 51( FAX: U 77 C, 1 CELL: G .Q r,g 2,01 7 2 0 � CONTRACTOR NAME: g'I6(n 5 75/3S/(( u? MAILING ADDRESS: p. CJ . x ✓OO Z 2 CITY: �(Q l r�� -� STATE: T ZIP: -X�'7S f PHONE: � �� Q 1 I FAX: CELL:v819L( $ ( CONTRACTOR LICENSE No.: EXPIRES: CITY BUSINESS LICENSE NO.: DESCRIBE THE SCO:E OF WORK IN DETAIL ND INDICAJTE USE: ,7`_G l LJ S -A S o gee _ AMA O IP'U St IG • PROPOSED USE: Effective October 28, 2007 Page 1 of 2 http://www.spokanevalley.org/uploads/Community_Development/Documents/Forms/Building/Residential Construction Permit App.l.doc lowse Name ****YOU MUST COMPLETE THE FOLLOWING**** MARK N/A IF NOT T APPLICABLE Height to Peak: Dimensions: No. of Stories: Total Habitable ZZ 11(Z Space: /g Main Floor SQ Upper Floor SQ Unfinished Basement Finished Basement FT: O`sg FT: 4-1 (4 SQ FT: SQ FT: 5 Z L Garage SQ FPDeck/Covered Patio Impervious Surface 30% Slopes on Lk et g SQ FT: N( .r4- Area: Property: v(4 No. of7 Construction Heat Source: Sewer or Bedrooms: ..7 Type: 1945 Septic:ore_, e TOTAL COST OF PROJECT: $ g. o(K DISCLAIMER The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling,the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of Spokane Valley permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be subm and subsequently approved before this application can be processed. / of 20/l�/ Signature Date: // Method of payment: D Cash ,heck ❑ Visa ❑ Mastercard Bankcard #: EXP: VIN#: Authorized Signature: Effective October 28, 2007 Page 2 of 2 http://www.spokanevalley.org/uploads/Community_Development/Documents/Forms/Building/Residential Construction Permit App.1.doc For City Use Only CITY OF PLUS Project Number / pokaneProject Address 4000 a ° y 11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206 509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. Your application review TARGET DATE is b l `/ The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review > Submit complete, accurate plans and documents. Extra time may be required for re-submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. ➢ Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. > Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date,please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure,you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre-Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone,fax, email,or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re- submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre-construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE-APPLICANT PINK-BUILDING FILE REV 9/07 Building Division CITY ofCity of Spokane Valley Spokane 11703 E. Sprague Ave. Ste. B-3 000Valley® Spokane Valley, WA 99206-5.185 Phone 509-688-0054, Fax 509-688-0037 INSPECTION NOTICE DO NOT REMOVE THIS NOTICE ADDRESS: /r)G z �,A/mcg, Aver- Parcel #: - a) Ahe-d Se / 0 / p%. N5 y J 3-co vz Wok Ar �' 1)17/UC- ' ah /e of i/A j-°a D ) ?OtitAil'i-S ftli,,.,- J )i liIn mgi. A t P/ui44 1 zvecipita / 3) sk,,,h r6 / Ad r ct 1‘ Gs'-4' 4 Li--7-705Ete * A it/ ANA ii-,2 d IF YOU HAVE ANY QUESTIONS CALL `138 (D 509-688- 0°-s--- Call °s-Call for reinspection before cover WHEN CORRECTIONS HAVE BEEN MADE, CALL (509) 688- 054 FOR RE-INSPECTION. 7-) y- y DATE INSPECTOR