Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
24972 PE-1414H TECHNICAL DRAINAGE REPORT
C~ ~ • S P O K A N E a;~. _ . C O U N T Y 1qq7 . , ~ BUILDING A1VD PLANNING • A DfVIS10N OF THE PUBLIC WOEtIS DEPARTMENT JAMFS L. MA,tsotv, C.B.O., D[REC'TOR DEiNNIS M. SCOTT, P.E., DtRECroR RECEIV,E,p DATE: July 30, 1997 . ~ i9gl TO: Spokane - County Division of Engineering; Pat Harper JUL 3 Spokane County Division of Utilities; Jim Red Ce#p EwqeEriq Spokane Regional Health District; Steve Holderby Fire District No. 1 FROM: John W. Pederson, Senior Planner Enclosed please find copies of the above referenced preliminary plat of record and a proposed revised preliminary plat for Riverwalk 9`h Addition. This revision is a modification to a portion of the revised preliminary plat of Riverwalk (formerly Riverway Villa) which was approved by the Division of Building & Planning on May 19, 1995. The revised design proposes westerly extension of Riverwalk Lane to Barker Road and southerly extension of Rivertivalk Lane to Indiana Avenue. The revised plat map illustrates the above revisions, and are proposed as a Change of Conditions without a public hearing. Please review the proposed revised preliminary plat for consistency with the original conditions of approval and forward any comments to me by August 11, 1997. kc Enclosure(s) 1026 WEST BI:UAD6VA1' AVENILJE • S['OKANE, WAsHrNcTON 99260 PHOVE: (509) 456-3b75 • FA.Y: (509) 4564703 TDD: (509) 324-3166 . ~ . . a~ S P O K A N E ,a~ C O U N T Y DIVISION OF ENGINEERING AND ROADS • A DIVISION OF THE PUBLIC WORKS DEPARTViENT William A. Johns, P.E., County Engineer Dennis M. Scott, P.E., Director Memorandum Date: August 13, 1997 _ To: Pat Harper From: Dean Franz, P.E. Transportation Development Services Dept. Project: Riverwalk, P-1414 Subject: Proposed Preliminary Plat Modification, Response to Planning's July 30, 1997 Memo Cc: Project File This memo is in response to the proposal to revise the preliminary plat of Riverwalk, as requested by a memo circulated by John Pederson in Planning. 1'he proposal is to connect a private road, Riverwalk Lane, to Barker Road. Upon reviewing the project file, and conducting a field investigation, I recommend the proposal be approved subject to the following conditions. At the Barker Road interchange, the centerline of Rivenvay Lane shall line up with the centerline of the eYisting opposing street of Riverway road. The Sponsor shall construct half-street improvements of Barker Road along ttie plat frontage. Barker Road is to be a 5-lane section per the County's Special Section for Barker Road. Right-of-Way dedication is required to conduct said improvements along this frontage. • The property between the plat and the Spokane R.iver, along the west side of Barker Road, has ownership under the control of the Spokane County Parks, Recreation and Fair Department. If the Spokane County Parks, Recreation and Fair Department is «illing to cooperate in widening Barker Road along its Barker Road frontage, then the Sponsor shall construct half-street improvements of Barker Road from the plat to the Spokane River. This will require right-of-Nvay dedication of Parks Dept. property. The Sponsor shal] make every effort to coordinate this improvement with the Spokane County Parks, Recreation and Fair Depardnent. If the Spokane County Parks, Recreation and Fair Departrnent is not willing to cooperate in the widening of Barker Road along its frontage, or does not desire to have the improvements of Barker Road done at the time of this plat, then an RID/CRP agreement can be done in lieu of the improvements along Barker Road from Riverway Lane to the Spokane River. In any event, the right-of-way dedication along the plat frontage to Barker Road shall be required. 1026 W. Broadway Ave. • Spokane, 4VA 99260-0170 •(509) 456-3600 FAX: (509) 324-3478 TDD: (509) 324-3166 c ro ~i~~ ~S P O K A N E ' B;'C O U N T Y • BUILDWC AND PLANNING • A DIVISION OF THE PUBLIC WORICS DEPART'MENT JAMES L. MANSON, C.B.O., DIRBCTOR DENrtIs M. Scorr, P.E., DIREC?OCZ RECEIVEp DATE: July 30, 1997 JUL 3 a 1997 To: Spokane County Division of Utilities; Jim Red cipio Eftg~ Spokane Regional Health District; Steve Holderby ~ Fire District No. 1 FROM: John W. Pederson, Senior Planner RE: Revised preliminary plat for River alk; PE-1414-81 Enclosed please find copies of the above referenced preliminary plat of record and a proposed revised preliminary plat for Riverwalk 9`h Addition. This revision is a modification to a portion of the revised preliminary plat of Riverwalk (formerly Riverway Villa) which was approved by the Division of Building & Planning on May 19, 1995. The revised design proposes westerly extension of Riverwalk Lane to Barker Road and southerly extension of Riverwalk Lane to Indiana Avenue. The revised plat map illustrates the above revisions, and are proposed as a Change of Conditions without a public hearing. Please review the proposed'revised preliminary plat for consistency with the original conditions of approval and forward any comments to me by August 11, 1997. kc Enclosure(s) 1026 WFST BROADWAI' AVENUL- • S['OKANE, WASHING7'ON 99260 PHONE: (509) 456-3675 • FAx: (509) 456-4703 TDD: (509) 324-3166 i S P O K A N E C O U N T Y DIVISION OF ENGINEERING AND ROADS • A DIVISION OF THE PUBLIC WORKS DEPARTMENT William A. Johns, P.E., County Engineer Dennis M. Scott, P.E., Director Memorandum Date: August 13, 1997 To: Pat Harper From: Dean Franz, P.E. PDevelopment Services Dept. Project: Riverwalk, P-1414 Subject: Proposed Preliminary Plat Modification, Response to Planning's July 30, 1997 Memo Cc: Pro j ect File 1'his memo is in response to the proposal to revise the preliminary plat of Riverwalk, as requested by a memo circulated by John Pederson in Pla.nning. The proposal is to connect a private road, Riverwalk Lane, to Barker Road. Upon reviewing the project file, and conducting a field investigation, I recommend the proposal be approved subject to the following conditions. At the Barker Road interchange, the centerline of Rivenvay Lane sha11 line up with the centerline of the existing opposing street of Riverway road. The Sponsor shall construct half-street improvements of Barker Road along the plat frontage. Barker Road is to be a 5-lane section per the County's Special Section for Barker Road. Right-of-Way dedication is required to conduct said improvements along this frontage. The property between the plat and the Spokane River, along the west side of Barker Road, has ownerslup under the control of the Spokane County Parks, Recreation and Fair Department. If the Spokane County Parks, Recreation and Fair Department is willing to cooperate in widening Barker Road along its Barker Road frontage, then the Sponsor shall construct half-street improvements of Barker Road from the plat to the Spokane River. This will require right-of-way dedication of Parks Dept. property. The Sponsor shall make every effort to coordinate this improvement with the Spokane County Parks, Recreation and Fair . Departrnent. If the Spokane County Parks, Recreation and Fair Depa.rtment is not willing to cooperate in the widening of Barker Road along its frontage, or dces not desire to have the improvements of Barker Road done at the time of this plat, then an RID/CRP agreement can be done in lieu of the improvements along Barker Road from Riverway Lane to the Spokane River. In any event, the right-of-way dedication along the plat frontage to Barker Road shall be required. . 1026 W. Broadway Ave. • Spokane, WA 99260-0170 •(509) 456-3600 FAX: (509) 324-3478 TDD: (509) 324-3166 ~ ~ - E • . . ~ . ~ ~ -~PE-2414-81 RIVERWAY VILLA . ~ ~ 1 - i : w ~ /'r~~~`~'~~ •r~,,,C~ .r~,~,~. ~ ~,-r, ~ ~ . ~ BUCK EYE AVF . ~ ~ i W (art Q • ~ ~ " _ _ • ~ . ~ ` ~e~, • ../~i / ~ ~ • ~ \ ~ 3~ ~ . _ . PE441441 y z PUDE-mlAPS?m ~ ° I18 AcRES . AVE ; i t Al.D N Q 'o~ W ~ .1 W > ~ r Q ~ • ~ . AIJGUSTA AvENuE - u ~i ~ MAXVYELL 4y ArCuvenG1Cr-cs SChool Q o W' w a,. a• g.NA~' ~ U o~ ~•Q.~ Q L1arnc~tae-r) AAW~ ~ . ac v . AV e ~ s ~ . , W R 80pN tu i . 500 NE E. gMET ~ - ~ i i • CQTALD.o. A-i"FEw19 ~ ~Q w .f P7-C/b ~ ; ' ~r ~ INLAND 1'ACIFI'~ ~NG~~~ER~NG, IIVC. R.~ l r ~ ~ i RECEIVED SEP 2 6 1%7 . . ~ , - ~~E Ccw "rrY ENG11vEER ~ ~~~ICI,AL PUOL1G DOCl,tkTNT SPAi{ANE COUNTY ENGINEER'S QFFlCE OR-G NAL RRO.1EGT s p- SUBMITTALO ~ . RETURN TO CC31JNTY EN~INEER SPOKANE ' CC] E UR D'ALE NE ' DRAINAGE TECHNICAL REPORT for the ~ RIVERWALK 9TH ADDITION PUD SEPTEMBER 1997 Prepared for: K.C. CONSTRUCTION P.O. Box 1455 Hayden Lakc, Idaho 8' ) 85 5 Prepared By: Inland Pacific Engineering Company 707 W. 7th Avenue Suite 200 Spokane, WA 99204 (509)458-6840 DRAINAGE REPORT , for the Riverwalk 9th Addition PiJD Plat Spokane County, Washington September 1997 The design improvements shown in this set of plans and calculations conform to the applicable editions of the Spokane Couaty Standards for Road and Sewer Construction and the Spokane Couaty Guidelines for Stormwater Management. All design deviations have been approved by the Spokane County Engineer. I approve these plans (calculations) for construction. This report has been prepared by Susan K. Murphy of Inland Pacific Engineering Company under the direction of the undersigned professional engineer whose al and signature appear hereon. . , 9t GNAL~ EXPIRE 9 Todd R. Wh p e, i Riverwalk 9th Addition PUD Drainage Narrative GENERAL Riverwalk 9th Addition PUD Plat is a 10.89 acre development of 38 single family residential lots and 5 tract areas located north and east of the intersection of Indiana Avenue and Barker Road, within Spokane County, Washington. The site is currently vacant with field grass, alfalfa and fallow fields as the predominant land cover and vegetation. Single family residential ~ development lies directly to the south and east. A vicinity and location map have been included within the technical section of this document. PURPOSE The purpose of this report is to determine the extent of storm drainage facilities which will be required to dispose of the increase in stormwater runoff created by the development of the Riverwalk 9th Addition plat. The storm drainage facilities on this project will be designed to dispose of runoff from a ten year design storm, as required by the Spokane County Guidelines for Stormwater Management, though calculations are also included to verify that the facilities also generally contain the 50-year storm. This development is within the Aquifer Sensitive Area of Spokane County and is subject to '208' requirements. For this project, the 10-year curve from the Spokane, Medical Lake, Reardon, Cheney and Rockford intensity curves was used, as well as the SCS iso-pluvial rainfall curves. ANALYSIS METHODOLOGY Per the Spokane County Guidelines for Stormwater Management, the Rational Method, which is recommended for basins less than ten acres in size, will be used to determine the peak discharges and runoff volumes for all onsite basins. PROJECT DESCRIPTION This phase of the Riverwalk 9th Addition plat comprises 38 lots of the approved 393 lots in the approved preliminary plat and SEPA documents. The Riverwalk 9th Addition subdivision is located in the NE 1/4 of the SW 1/4 of Section 8, T. 25 N., R. 45 E., W.M. within Spokane County, Washington. TOPOGRAPHY The existing site naturally drains to the north and west, sloping gently towards the Spokane River from Indiana Avenue. Within the plat the natural topography was used as much as possible to Inland Pacific Engineering Company D1 Rivenvalk 9th Addition Drainage Report , route storm drainage. However, due to the flat slopes and the County's minimum requirements for slope, the roadway profiles have been forced down to facilitate drainage by localizing low spots for pond placement. Due to the flat slopes encountered, no concentrated pre-existing flows were observed nor were there any signs that anything other than sheet flow and ground absorption have occurred on this site. The general slopes within this plat vary from flat to nearly flat with the maximum existing slope at 0.01 ft./ft. Generally, the area within this platted portion of the overall preliminary plat would be characterized as flat. For development purposes as stated the natural sloping was used for design and is maintained as possible throughout the project. ~ SOILS As can be seen from the accompanying soils map from the Spokane County Soils Survey as performed by the SCS, the site consists of one type of soils within the Class B type. This soil type is described as follows. GgA - Garrison gravelly loam, 0 to 5 percent slopes: Soils within this soil type are some what excessively drained soils formed in gravelly glacial outwash material from a variety of igneous rock. Surface runoff is slow, and the hazard of erosion is slight. Spokane County Guidelines for Starmwater Mana em indicate this to be a Soil Group Type B and pre-approved for drywell installation. Hydrologic Soil Classification - B DRAINAGE NARRA TIVE Offsite Based upon the general geographic tendencies of this site, no appreciable amounts of offsite flows are expected for this phase. Onsite As this plat is within the aquifer sensitive area of Spokane County all onsite drainage will be collected and treated using the "208" runoff inethod as described in the Spokane County Guidelines for Stormwater Management. To facilitate this analysis the Riverwalk 9th Addition plat was divided into 11 permanent sub-basins ( A through K). Although there are 11 basins, these basins have been combined where practical to utilize the same pond. Table 1 lists the basins and pond combinations for easy reference. Inland Pacific Engineering Company D2 Riverwalk 9th Addition Drainage Report Table No. 1 WEIGHTED "C"" SUMMARY Basins Total Area Street Imp. Weighted (SF/AC) . Area (SF/AC) "C" ; A 48590/1.12 10748/0.25 0.32 B 16900/0.39 4598/0.11 0.36 C 64650/1.48 11380/0.26 0.28 ~ D 32500/0.75 6174/0.14 0.29 -E 28040/0.64 11277/0.26 0.45 F 24650/0.57 5161 /0.12 0.31 G 27650/0.63 6092/0.14 0.32 HI, JK 60250/1.38 11470/0.26 0.29 , "208" Calculations Within each basin the streets are divided into sub-basins by high and low roadway profiles. These facilities capture upstream stormwater runoff from the impervious street surface and direct the runoff into grassy '208' ponds. As shown on the '208' calculation worksheets included, the '208' storage volume provided is adequate to perform '208' treatment for the runoff created by the first half inch of rainfall. Curb Inlets and Catch Basin Calculations _ It is necessary to check the adequacy of the curb inlets, inlets or catch basins provided to divert the runoff from the gutter into the '208' ponds. Should these be required, the curb inlet calculation sheets included show the required lengths of curb openings, as well as the adequacy of the inlet grates or catch basin grates. For curb inlets greater than 4.0', either multiple curb inlets are added or the curb inlets aze lengthened as required. DRAINAGE CALCULATIONS SUMMARY Calculations have been included for Drainage Basin considerations such as Peak Flow, Time of Concentration, "208" sizing, drywell requirements, inlet sizing and curb inlets, as well as culverts and pipe flows, some of which are summarized below with the remaining calculations included in the appendix. Inlarul Pacifte Engineering Company D3 Riverwalk 9th Addition Druinage Report , and pipe flows, some of which are summarized below with the remaining calculations included in the appendix. Within the calculation section and where it has been determined necessary for clarity, several sketches, as well as details from the plans have been incorporated to demonstrate assumptions and conclusions. BASIN DESCRIPTIONS Basins A through K ' Within this plat, and due to the general geographic features, several basic assumptions were followed and can be used to describe each basin. First, due to the relative flatness of the plat and project vicinity, minimum road grade is lunited to 0.005 ft./ft; second, large tract ponds if practical will be used in the open space azea; third, all other ponds will be of the lot pond configuration; fourth, that where practical, drywells will be minimized by combining basins and providing piping between ponds. All of these steps have been used in various basins throughout the drainage design ofthis.project. There are four basins, L, M, N, and O which have been analyzed in the predeveloped and developed condition to verify that the developed flow is less than the predeveloped flow. The four basins are backyard areas whose natural slope directs flow away from the front yazds, and is therefore not included in any of the other basins. They have been isolated and labeled on the basin map, and due to landscaping presumed to be installed in the developed condition, the runoff will be lower than the predeveloped state. No treatment is required in this condition. Inlctnd Pacif c Engineering Company D4 Rivenvulk 9th Addition Drui►ulge Repurt Table No. 2- Pond and 208 Basin Summary Riverwalk 9th Addition - BASIN SUMMARY ~ Basin Pond 208 Voiume 208 Area 208 Area Drywells ~ Required (co Required (sf} Provided (sf) Required * A A 377 754 1147 1-"B" ~ B B 192 384 422 1-44A" , C C 474 948 992 1-"B" D D 257 514 524 1-"A" E E 470 940 975 1-"A" F F 215 430 491 1-"A" G G 254 508 593 1-"A" HI H 133 266 272 - II HI I 95 190 190 - JK J 87 174 178.5 - JK K 163 326 370.5 - HI, JK - - - - 1 - - Type A is a Spokane Standard Drywell - Single Depth, Capacity 0.3 cfs - Type B is a Spokane Standard Drywell - Double Depth, Capacity 1.0 cfs Ltlaticl Pacific Engineering Company DS Rivenvalk 9th Additinn Drainage Repnrt _ , Table No. 3- Curb Inlet/Catch Basin Summar-v - V - ~ . , River~~~alk 8th Addition Plat - Curb Inlet and Catch $asins Summaary Basin Pond Curb Inlct Catch Basin Condition Condition) A A Sump - B B Sump - C C Sump Sump ~ D D S ump - E E Sump Sump F F Sump - G G Sump - HI H Continuous - HI I Sump - JK J Sump - JK K Continuous - Per Spokane County Guidelines curb drops in a sump condition have a capacity of 4.0 cfs Per WSDOT Hydraulics Manual, Grate Inlet, has a sump capacity of 13.0 cfs NOTE: Only curb drop and grate calculations were performed for those cases "On Grade", curb drops and catch basins in sump condition are assumed to handle 4.4 cfs. Inland Pacif c EriKineerinK Cvmpuny D6 Ri►~envalk 9tli Additic»i Druirtuge Report ~ ~ SPL}KAi~~ ~{IUNTY, WASHIN~T N- SF~E~~' NUMBER 67 ~ , ' w~4 ~ ~ ~Fa r, ~~Qt115 S~IC~~' J~ , ~ _ _ ~ . ~ y _ , . ~ . - t ~ ~ . Jorns shc-et 58) ~67 d` ~y ~u.-'.'4:' . !:r' r ~ l` ~i M ; _ , ;.,k~~.~. ~`+~y~~I ~i~~ ~ ~ . _ _ i '~k F< .fcrt Y "!i A ' .1 ~ ~ ~ 1 I ~ ~.Y ~ _ . ~ 1.41 y~• ir' y~y f , ..'~I~ F. 4 ~.:r ~r ,t~. k q t~. ~ -r.~~' t~:~~ j .t r.-~` FS'.~# ~t . rf~ 1 } / n ~ ~ ~ , , ~ y T i. 1 r , r, . P - ~ . i' ,~~t iti. ~M1'/,: ' °°}~1{.~?~. ^N~ ,~y't1[ ~rf: Jy,' k7 '1Y11~~~4 . ~~~r ".~}Cr' ~~..A~ '.t i~'~;1~;•~ ~ , _ ~ , h , . . ~ A tj~*µ'rs',is`„i~ .f~ . ~.1, ~ ~ n r •:n { i ° .,r't . t . ~ y t . , w r . ~A ~ . . . ^a*+. s i~v. , t~v / ~t r. . u.4 ' « ~ ~ ~i p ~ . ~r,. R ~p ~ r4 i i." r ~ . . , . . .~L.} .7...+uY .r- w~~.. A!~'~ r ~.e` y ~ ~ N~Sj-~' ~1k~~ .a~ j~ ~T - s i.i7~Y~ i..~ - y - ~',ty~t y ..P ;1 - • ~ t _`:a.. I ' , ' ~7~ ~T~ ~ ~ a . ~ g +..i. ' : hi ,~f~.y ~ ~1 ' t. ~ „ ~ . „ ~ ~s . . . r~ i ,A.,: ~f`t. . ~ ~,7~ ~ . - ~~,.rti~ . w a^~.~, . .j : x.a.;l r- , ~ . . _ g ~ , . ~ - , . - . .,X~ ~K'.a-,;.,•~ . . , s,~'~~- . ,.ti• °x:,',.u y :,•~iY6~~i~r a-~,~,' v ~ . . . _ . ~ $ ° .w ~ 3. . ~c'~`~ r 4 • • ~ ~ ' ~ c,,~ i , " i~li ~~~-a~ ~ _ . e .~y `+r i • , ~ . . , d , ~ a ; ' ~ , . , . - , ' e,aN~t - ~ 41 `!T\.~. ti l i ~i ~ ~ ~R; ~ 'd b ..-R~ P . . ..-,~I°. ~ ~S-; ~ti ~ , ~ ~ -'r, 4.~ ' . . ii4. . . ' , n r;' }~'t'. i` ~ ~ r,u ~ _ , 1.;.~ ? ~R ~ . , , , t . ' ~.iFo •;4 .~f~'' .i : . ;~i~~ ~ f~x~r . ~ ~ ,3 . , ' ~ ` ~ Y . _ . , . ~t . ~.;~rc . ~ T. _:fyy G, 7,.::~~ ~ ;R:,, , .w. , ~.f , i ~ ~ .'i. l. ::5 ~~~t~j' ~ ) ~..y N'~1Y ♦h. .!r ' • y. i ~ f. 1~. ~A tM~ _ - • If- f~ . ' ' 1 ~ ~ _ - . . . ~ - i i . ~ i „ k yb~: "4` . ~ ,;V. J- ~ ~ ,I1 . l~ ~L~ F~.. ti~..~.~~~, . .~1.. . Y 1~.' ,I ~ ~ ,y~ rl ~r ~ ~ ~ I'({ , t 4} • 'p , . .1.-{w :f''. .~a~!"'T~.a ~Y~ it,' ' V y~i f^'." 'I ~~I~'~ _ i_jkl~.,. l: ~~,1 fi;.~.l, ...:I ~ _a _rR~ ' ~k..~_~ ~~~..w ~:'?w- I '{i.~~ f,..~~~ ~ t'.,~~.- ' . .j' s°.:'~''"~rt'~' ~'7 ~ . C r ~~s ~ r~ ~~+~v~4a~ 'S: ~JY ? r' fl v~ ~ 6~`,~i-. r ' e "l'~ r.+1~1 ~ + F U~r'w aL*~ : 'S 'y `f Pb ~ , I .i w r r tT'.~y` .r)'o ^'a. . Y ~ .P~'" k.~-M' ~~i~nr~~,3.~Y,te _ '":r"s' • ~ ,r. ,'51~,~F~~,.-. 4 . , ~ ~ Y : ~t ! . ` ' 9 . '-y~~ ~f1:li ' k C ~..~,,~lt~ ~~~~-4'~l '.';,r `4..:41 t t,~r.r~T _ ..:~~p„c:. ~ ~c. ,~s. _ ~ ~ . ~ , . - ' ` ° . . ~ _ . . .r n.r. _ . ~j •sr~ ,y~., _ . ~ ~ -3 S' W'~ i I ~ y {~~1y ~ f ~i+ , _ _.rr i.~,.;,..'»~~ r. . ~ti~ r ,'t+w . . ' t.+;. ~ . ~ sl.,. i, i' •a~ ti! ~ H ~~1 - M Y.~i,-,r~: ! r ~{--s c'p,~~{'.t~~~ "va'" re ~ r r."' Y ~ ~ " .~A ~ ~ - .I.~}~~ ~1,4~r1+ ~ - "„'11i.?~~ ~sr.~.r~.a~.i~~1~ ilN~~t. ~•1~ 1~ - ~ . ~ ~ • ~k~ "1.9~~ ' , : „ ~ . , , ~ , c ~ ~~~;•b ..a - ~ m,;~, F~~ ; . tr~..~ e ox y, ~ • - = . - • ~ y . ~ I . ~i~' _..,,~f~ ~v'3' , 3r.{,G~`,~,.~„1~~k~~i 1~~ ~J ~.,~'z~~ ri.- ~ . ,i . ~4• • e *~i'~i+" ~ IvF : i. .~'~r• 1 r ' ~~~~p .t y". e . I~ q~ ~ ~ a__ i .r . . - . , . . ~ . P E- _ ~'-~.~T . ° ' ~ ~~~'4 , + . ~ . t ~ . ~.-s,~y, ,1 . -T .~v r - ~.4.5 i. ~l~; . :1 ~ k,~ . - iC~ - E f ~ ~ , .1--~ ~J` . . " i~~. L ,,1 , 1~~„-~~h`~.,~~ r• - .-r- ~ „ a. . e~~ 's ",..'ydRx: .,I,~ .1~~,-~. r5p6 'n ~ ..4." , m1.. ~?L'~~•. ` C~/~ft . cr~ ~'i" r„~ 'f py- ~ i s ' _ l • .L , ~ ,r ~ ~ k ~ 1,l ~ .i i, , _ ti ~ ~,~'.~y,~1~' =.~`y ; e'r r ~ - - W 1., ~ ~ f I'~ ~r. ~y - ~ 4~, - , A S~ ~',~h ~ 't " a~ ~ .;i' r, - ry''~' ti r' ,~T I ~ ~ .N ~ ~..r : ~Yi":'~%+' C ~ " ~ ~ ' ~ L, ~ rr " r r ~ i~. ~.)~1~~:.~. ~i .':'it,,,, . ~ . ~r. ~ ~AV n` 41~wcN*: ~ ~.Fl` P P , . ~ _ ~1 C. I',P` ~ c.-s;il~.i'~ ~rf~~ . ` . . . ~ . ~ ~ , W ~ ° . ~ ~ y ! . I ~ `~Vi4 1.. ' ~r~,~,...- _ ~u:f~~~,.s.~. S...I • ' ,~x ~'~l~j~e~{~+ ,~,i~~,~ ' . . . . ~Y+S~ SU~:- v'7 ~ ~1r"~.`. k..'. ,~.y.. ,R le .J ~~h~. .1 , ~,,:.9i,~, ~ ~ „1 ~ .~Y, ~ ~ _y. /i 1. .'i 1,- - - i;~. : F`''- ~ -a='"'^',--C ~ J. ~i` ~.l`#a r,.y., , y a t'~l .ti ~ i. . , r -1 f ' ~'r; ~ .t._, , 5"y~~ ~ w. k. 4+ ! . iL.~~ ,+M ~ ~ *.1 w. ~ , ~ { ~ -t 1 : . . ~ , r~ ~ y ~ ~t~ "i+~ ~ .t~' u, - -f,.,~ ~ " a.. _ f A~zh~, ti.,~.. 4.. ~a I ,a ~.ra . 1 ~ ti l ~ ~ . . ~ i , . , . 1~ t ' a~_~ ~ ,.r. ~ . ;.f , , . , ~i , - . L I,t,• , . ,~ML , . . r c,~'y, .~,.~r' ~ ~ I ~4 r„- ,.n. , _ y. ; ~ 1.. .-.,.~,-.~r•r4-~~ ~ - ~ ~S; 1 . . I• P.F .-e . . . ~ . ~k' ~ ;s~~,rf s:.v!{`.~ . fw._s ' . . , w~ ~'x.~ . ~ t . y~~~~r i• ~:~,~4 ~ tl ~ ° `a ~ 4, . ~ C ~ . ~ M~'~ ; , , w ,z., i iAFa ~w, ,i E• iy ~ -ri' } . w ~S~y ' - - y . ..c. ` ~ ~ ~ r:~.^ ~ - - - ~.++~.r.... . ~ ~a,Jlf.: . • - y~~}; ;.i7 t t f ~ ~.~7i~.. f~ ti ~ ~9A•'~ T ~st,.~.`n~i: i. + ly ~ :.,r~q~,•`~b~rrr~i~`. {y f -I 'r'. T4~'~•, + ~ F~u 7. .,w~~ i+a. ~3 . . _ ~ , ~ _ ~ C~r_Y'F~'.n . 5~`t ~if . "~"'ltu:t• i ~-1 ~n'~ ~~~i,l 5~,~' . . ~ _ , . . ~~1~~~~ ~s~ . ~.~Fffl !~r :R[~~~ 1 f~` ~ 4J . . ~ , - ~ y , . ~ , r ~ ~t „ ~ ~ , , . . . . 6, ~'i;F~;i+~ ~ yN: ~ ~ 1 ~ y!~i_~ht ~ a + Y. ; ~ •1: ~ `ti ~ . . f` ~ . r . . ~ ' . . . ~ . ` .~...e~.• . ~ _ ~ ~ v q . • ~ ' ~r ' - - l r tiJ . , . . , ' . J ~ ~ y E• , 1 ~ ~ -°M1.~~ ~,`tr~. - . i f i~ ;i~' i~c,. - - .~~~-,i . , .r 7 .~+t ~ p ~ x.~, r~ ~ . ~ ii . , . . , , _ ~ .ry~. . , . . i~.- ~ y' ~ ~T~ ~ ~ i ~;,'~,~,L ~i . + ~ ~V~~ . h af . ~~i`f1,:', ~1~~ ' , . " 1.~ ti,~. ' ~ . , • , I ~ , , rr ~ ~ . ; r•, ~ Y` ~~.s? . w , - , ' ~ ~ v+ .t~.~ . ~ .r. ; • ~ . , . v y A • . ..r . . , ~ i, . - r at ~ ~ . L~ti ~t.'^L,.If;.;, ~ ~ i _ r . , . i + ~ t . ~ . ~ei~,t. . r ~;i. ~ri'~,~.~._4a,^'...' hp,. r--t.T,1 i K i ;~~Ge~y~r~i t4,~ ' I s.,.,~,'~~•.' . ~ ~ ~ ~ ~ , .~1~+~~ 1 . . . ~ ~ ~ ~ .W~I ~ , . ~ : . , . ~r s _ 1 t~ ,-~i ~ ~ ~ ta~~~f. ~ I~ 3 ~ y` . - . . ~ ~ G. . .~E . .4.. _ . ~ . 4 C ~ , . . ~ iS ~ ~ a , y ~ ~ i ~~wl ' :E _ ` .,~I =P r_~.,. II ~ ~1 ~ ;s ~f '1. . ' r..~i. `~~f. ' , ti ' ~.h~.. , Y .i. ~ . . l~. I~~'1 ~11J~1 ~ .A ~U fi IT~~. i ..'~:1 . • ~ ~ f_ ~ ~ ' ' ; ~ , , : . ~ ~ ~ °.w'. 1! ' -..."iy : ~ . , r ~ . - ^l,,,=~"`~ ~ ' . ~ ~ _ ~ .f ~1 Y " i ~ ' ~ , , r , -'__..~..i r ' _ r f. p,~. ; ~+i„'y _ - d II~. ~ ~ ~ ,+.;r` - - ' , {-~I fl• i .4' . ~ . . tl L ~ ~ ~ ~ . , ' , . ~ r ~ , , , , ~.dw ~'t ~ : . , . . ~ ~ ; ~ , k~,,,._1,., l~ , x ~s. ~ _.~~~~i. ~ .,t° ~ , " . . 1 ~ ~ G c4 .3~ ,~p`, ; , o ~ ` ~ ~ f;rr,~ . - w,~ ' r,j E „'~~i~ ~ ' ~ • - ~ 1. r . ~ ~~R ~ ~ ~ ~ ~ . , ` , , ~ i , , E•~-s, r ± ~ ~ i ~ , ~~~y+ . , i~ ° ,e ~ .r~,, . ,,N.,~. . . '°M ~ t - ~r.. , ?'t~ _ . . + ~ . . .f1. . . ..i j ~~2' 'i` . ~f.~'`-+~..1?n ~~L` . ~ - rr~,_".°.~ ~ ~ 'ar. wir. ' ~Yj. x. ~ ~ rS~..`, Fji,~• -a ~r . . . r ,~i ;j~t~ - ~~'~l . . !~``l. , . - ~ ~.~I` . ~ 4 i~j- . . ~ l..~♦I,~ ~ µ ~~'1' ~ J~4'v. .!ti'1 M ' + _ k . ~ r~ ti'~ _ far,e.. . ° ii+~~,5 ~„7i~. p ~~~,b1' r'1~ . G. C' ~r.l~'~'~~f N ,r1,; ~ Y S: ~ ~.~'~~~h .f~ 1'..y a i'~ . ~ . j ra~u ~ . ~y . t, .J; , , . .~t'' S'z" ~ ~,^J) 'EZi~, ~~6 ~ .t- ~ r fi: • 1 . . . j r r, i . ~ ~I- -~-~,,•~,-+9•..R•."r ~ . ...'.:r.Cl 'Y~_ '~~'t17 ~i. y~ ~V+,^F f~ ~A\~ i~N. , . ~k.~. .y.~- - ' w ~ 1,+, Il { ; . i~. . .,R~: . 1 ~i , - . ..K. ~ q.<i".IJ~~ ~}i. j, ~ P _~~i , y,. q.. arS~l ` . - . , v f~ i } t•~., 7' r~. - 7,.{;'~ a'~ ~ a~I L I w..~Y " ' ~ 4.i~i'~ r ~~trdl "r~ .{.~y ~~tl~.l~.;, F{..~:~ ~5 l' F "~a~l t . . ~ . - ~ ~ , ~ . 1 ~ ~ •i- ~ ~ a m !Gt~tE3 , , ~a7 ~,n:?~` ~j f G~I$ ~s ~,.rl ~ tr .~a~, I . a "v? '~i~4f' ~~a.y~r: . ' ~ a` . S~ ti_ r~^;,' i.•r.'. 4 1+}.FF ~ k 1 r ~ ~ j '~~,.1~+4 ~ ts~f ~ ~~E.•,.c 1~ ,j~SlT`~~ '~L~ , ,f~ ~ .r.~~ro~"'1~~• ~,ti A• ~ r~ «rnea, ',.c~,~ ~k ~ ,~t ~ . . i ,h.,9+a, I r~+~.. i~ ~ '~y ~ ~~~3~~ 'ag+4 ; i' n ' ^`x~ ~e k,~, . ~ ~ H+ , .y.; ~ ,j~ , , ~ • i, ~ r ,;~4,,, ~ ' +r, ,f`: _q,1 1, ~ , y~1 , . ~ ~ ~ ii ~ . ~ ~ r ~I. ~ f' .:I,~ ~ S-~ ei Lt ' '~I ~ . ,t,,P~~~(,~ ~4 ~ ~ j'} ~•!~a ~ ~i { 5 ~;~'y ~ . - ~ . G e ,x . ' ' f - r., / i,~.~~ r , 'f~ 'r1'~ ~1 ~i ~7C~ - ; ' p--. -.+-~r-- ~r - -~.e n r k:.7 r ~ ..r, t . ~d ~ m~" ~r- A L ~ ~ i,.i ~ } } :.~.SC~. . y~.e. ~ ~ { ` p: Pi y 4 . I~..N II ~-,e.~ : ' , . . ~ ~ V~ i ✓ : ~y:. ; ~ .i . 't .,f Sw,y} ~ ~ . . -R ii ~ . , , r n - , i , f o ~ ~C • - ~ w R ~w~ ! a . ~ , " . . . , ~ 6 • ---ir ,F_-; ,t - n n ■ ~~,~I!~_,. . #o~ r, o r . ~ r ~ ~ 1 ~,y j.t.~ t^ ~ N ~ . - • { . , r ~ J , ~~'~~ifa~_~- , ~ J ~G,~tit. 5r .S'~~cr' 7~.i! ~ t i • SK '.~~r 4. ^ I3 . , f- * , > _ . - ~ . ; ~ 1.-~!_ ~-t,_y~.J'...,;, ~r,'~4~- ; ~ ~-'Sj~ - .~h~~'. ~'.e~ _ ,~~d~-~P .r ,,w. t. • z. r ti V_ ~ • i .'~r1 r , ,,wlGg~ .r~ , 1,' i ~ ' " ' - '6! . , ~ u. ~~~i:- : , ~ 'r . ~:SC~':"k ~r 1 ..~i~ i ~ `.f , ~~~lv..~-~' } ~ W , ,s-i : . ~1q ' ~ . . ' . .7.~, ,.r' ; R'.4 , . r~.' ~yl '!e ti' ~y~ ~ ~ . , ll • co r , , ~ y . ,q. ~j~ ~ y - ~n`~ , I { ' ~ ( -t- . . _ ci_ ° ~ r .c~~T.' ~~"•i:M a..S'~t~ it' . .r'~ ~~i ~ t~t I , ~~Y' y SFfb , 2. .N. P; ~ ~L~ .J... .M . ' ~l- . ~ ~~c. _ I~ "~t Jl ~ - ytk' i"~~ " ~ ti ',i . . . , -~L- p,~ . ' r t~ ~ ♦ fi+ p A'y . i 3jl - 1~ ' .1~•~. 4 r°{, 'i ~ w ~ %0 rt- s i ~ ~ ' Ktl - I~ ~'jI+ -`'~,F ~ ; .1.' ' 11~ ~':i *~r t^#~. ~~:~r} ~ ,~q ,K ~ q , e•. r > . ~ ~ s, ' ~~f ~ ~ ,w . E•t, • ~ ~ ti, , - . ~ , ' ` j;~ . "nC ; ~ , , . a ,i~+ ► . ~i y,~ f-II - n ~ .r.~, i~ ~ ~C' . . ~ , , , t~ ~ ~ ~ . + : , = . ~.-'1 , " ~ ~ ~ -T ^ M, 1 t , , ~ ' ~ ~ " 4 ;r~ n~. - ~ _ ,,R , ~.y, . . r~~~_ , ~ _ r._ , ~i ~ ~t~~ " - „ ~ . S ~ , , ~ ~ ~ ~ ~ ~ , ~ ~ f~ . ~ ~ F' +'st "NAr _ ~ I i' i b~}~ ~I r :i'7,`} I_ _ f r~ .,i E . . . . l 1 ^r i ~ . . . S ~ ~ K ~ ~g 13' vx ~ , ~ , : ~ ~ ~ ~~'t ' .ej -',~J~~ i + • ~r ! ~ 3¢ , ~ s * , I/ r . ~ - ~ti , y r y , : C , ; " ~ .,v . i irt .,`~e;Po s ~w . t s ~ ~ ~ , t~ M~ ~i 4. i ,a ~ ~ ~L~ ' - .I' . a i~ t i - ~ , , - • ; M1 - *r, . 3~ Y ' _ ~ I~' sj~ r 11~ ~II '~`~'k ~y_r y;~nti:~ ) a~'-~~~~ 1i.~i; ~ . I , 4 I~i~", -.,a4s. _ ~ ' ~ . `,acs I~ , ; PgA % ~~i' t +~F a ~ ti'_+~ trn f+~, 'r ;f•k"~ ' 't~" 1~i~~ .,~t . M . ~ - . . 1 It'~ . ~4_ ~ ~jJ. ~ ~t ~ ~~'Y i , t4 u f 1 .p~ ; a~~Y w ~yl~. ~ ,t . ~ ry, . ' ~ .~'i~~ C.'i ~l. ~ w~ ~~~I ~ T. !k-Y'~Fi- ;I~~.a~~~ ~ rr. . ~ y`~ .~~,1 . ~t ~ . . w r . .~7'.~~'~ ~4 . ~i r ~7 v:i~Y~- 'it~~ ~1r,~ip,,t.r _1~ ~ y~ .3~;~ .i ~':s•~,,~~. ~r , 7' rrs~al + ',a~t~ . tiJ ~ ~~7~1' .J.~~- ~ti .1~-', _ ~n , a\\ .,Y~ _ i~~ t~• i -d~} ' m. ?f . I,Ur I~r~kl r ~ Y' 1. ~Yr~~ :.I,~ N~.Fy ~ . . ~ L ~ _ 'Q . ~ , r~ • ~ , . . - ~ s ~ Y t - w ~ i~ ~ I - '~r a ~ ~ ~ ~ . . - . , , , , , _ ~ a~ . . t f,~,f,~, V . .*.J i L li ~.i; ~n r . . F , r . p ~ ~ ~ } ';«1 .~1F4 ~l? ~ • 1 ~ ~ ~ ~ ~~1 C 1{ s ~ ylti 1~1 . y: { i . ~ . c_, ~ ~ ~ ~ a _ +~--t:r - , . , y . ~ . . . Gl ~ , ' . ~ N~(k- .,r+,~.rrr r ti,.~~ , rts rJ 5. r z ~L'~N- ~I` -r"R' 151Y~ tr ,t,~~ t~, i ~ ~ ~ , . . N ,.~s; ~ .a r, :.'t: i~ '1 . • i'. , ti , t Y 'it ~ - , . ~ . , - ~r ~ H~ • ~ r r~ Si~~, ~ r}~ fi~ ~ _ .'rrA C.,!-,t__ } ~,.f~~, ~ . ~ri ~ • Y 1 ~ , . , . ~ p ~ b ~ ~ . ~ i.ar {i r !~S ~ ' ~ " ~7 w ~ ' . ' i ' ~ X ti 4k~ i~ ° ~ i ~ ~ t ~ i~ Y , ~ • 'I ~ r k~ r i ' ! i ~ 6•,p. ~ ~j' t . r,. t. I a. lI ' . ' ~.t4 r f = # ~ - . R- ~ ~ 1 ~ r FY ~ ' . ~ ~ . ~ 1i ' . : ~ , ~ • ~ , ~ r7 ~ ' . 4~ ~ ~ , t ' ' c ~ .."~~~`Z,~P,~sy .~.'s.~~ ~ 'nu'.~ '.~°~1~ ~ t ` 1t~' , `.'E ' ~l~. .l ' /Nd'FiY ~.n '.~~.~i_!i~'~`~~,5 i: ey+dq . F • 's' " < w ~ - - ~ , - / , ' . J~~ }~'r, ~avi =o'~ eiY-.~ ~3~ .r .TV =ei . r~ . , _ . - " ~ - . _ ~R ~ ~ , . . . . ~ . ay ' i'. ~ :f' ~,1 „(-p,kJ' ~ ~.3~- Ik •`~c.. 1 , ~~`~y~ i V~ ~.~1 ~ ~ . ' i . ~ ~ ~ . . , ; • _ , a ~ - ~ r~ 1' _ ` _ , .R ~ . ~ ~ n . . ~ 1 a-~ ~~I . •¢k c.:.~r. ~~.~°ro!'..~: ' . ~1 ~..y~, .~'F7,,. ~ . . 'i~~ <i.~2• } 4.~ i 1,~'r~~,.~i ~ ~~y y ~ ~ -.IJf":'~y.~,.Ar'k . ~.~4 ~r L .~i.,. ~C.. ~,~yW +.,.ra.•~~~ . ~ ~!7;r~. ` , , , • , ~ . - , ~ r•, F y : F ~ ~ , ~ ; = ~ s" r °4 ' ? .~t _r,~,~ 3 e Y A,~~~if ~ • ~~~7~1da~ ~ ~._,~-~~.'..j~[,i'~':' ' ,"iyk'~y~. , ~'h; ~ : .a ~ ~ ~ 'y~~ - - _ _ ~ y sa- . °i~~ t . ~ - 'M .r~~ . ~ ~ 1 . - , . . i'lf- ~ , ~ , e - ax~ v.'~ , e. . . '~Al L~~ `Y„~!, YI . r~ "l.~ ' ' ~"Y:7, ~ f . ~ i r r ;'r . ..r ~ ~ , j . - ~a~~ , „d: I~ , , „"r~~ . ~rv~.~ ~I; , ~,,r . . YI ~ - ~ F ' ~ ~+sr , ~ " ' . ~ , _ ht ~ ~4~ . iPi.~ r r~f- ' S.,~L~, lMIL~. I y~~°a.. ~.~.ts_1.6L;. .~.~h+5' ~ . ~'r~.tye ; , ~ ~ ,~ti~ ~ , ~ ~ ' ~ ~ = ~ . ~ 4 ~ w 1r w t'' . S , ` ~1 . , z._~~ J ,~s i: ' ~ ` c !G7! w c • ' _ , , . ,'Y', ~ ~ t:, . . ~ l:~A' ~ r ~ ~4, y ;i s ~ - i~ ~ ~ ~ ~ ..:r-r - . g y ' ,"`J~, - ~~l r +y '~.r ~ F ,`.f~l'?`~, 14: ~y~' ~ `,1~~ ~ ~ ~.tie . - 'ti t~i~.. I L ,l ~R.,I~. J~~.'~.~k'~`~ ~~-]4....~.~~! .o.-~,~,y. 1~~~"s.. - 1 tr I~~ ,+~ti,p .1..:.1d . r~141,~ .+4 ``"v' I~ t~~-w - .i ~ . ' .f}f-+J,1~- ~ y~..i-~ ~,~,p4'~ +:Y*~ A~~ ~.f.P~.'__._I~a- ..d.~..~r . ~j~~;•~x5 `}~7 { n { .THr . ~'~l~ ' _ ~ `.l ' . ~ ~ ,.R~ .9 W ,~.6' ~4. ~a. ~ fa'~iti+~., ~1'j ~ t~,l ~ _~~.z.y. ; , ~ ~ ~-y}~ ,r ~~A. ~ ~ ~ ~ke~• -:3= I ~ _`~~~:'y.~ ~ ~ . ~ . i , . , . - ' i~. ~ ~ ~,~y,,.r s~ ~5 ~~i ~ • 1k~F~ . ~M ~ ~ C, II * ;y„ . ~ . • ~~"C::`,_ } L', n~ ~ ~ + ~ , f . w, t i,. - ~ ~c II ~ ~ ~9 - . ~r I , --a . y~.. . ,~y. ~ , ;_'~'~4 y4. 41 ~ , ,~i,~•.i', ~y , :'~'~;~v~ ~ 1~`~{ ~ ` ~ i' ' i~~~j m~i y~,~i ti.~~S~ e ~ g .t ~ ..1:?,r '1~`~..~'.a. V. i\. ~ . t~~'. '~~~T ~ t ~~.~I;aIMk-.. I., y ~ l. 'i. °4 . . ` x.' ~ ~ ~ 1~#~ ~ ~~i' ~ ~n:°-.:- ' ' ' `C.11' ~ ~ ..4 M+ G f ~ ,--~1 ' f~ ~ . r . _ . ~ - . _ ~ I! . ~..f 1 ~ 3~±~~ ~ ~-Ei ' . P~ , ' - . ~ ~j~ ^ _L- ~ ~ ~~I ~ ~ 4 i. ~i ti = ~ r ~ r . ; ti - i ~ r . , ~ ^ }i~ ~ ~ . ~fi~ ~ ~ T4 1 • If "y" ~.Z~ Ie~~ ~flg ..4`~ . ~~1~'M.~ ~ e .~,M ~ it~~ C+,A ~`y~''~~j ,.~~~~a '.~4F, r~: `.~~x:~~1 I~..1.. ~il ~ S.ti~. . ' _ ' . iv+,.~'I. :4~~ ~ ~ . ~a' .`4n ,a,=~t w ~ , . y y y~ ~wg I r~~~ ~ y~ ;^~y` T~ ~ `tti ~ . _ ~ , ';~r^ '`r; ~ `t~" ~ , ~:r. ilti~` ,ar ~ ; ~1.Pr 4{ ~ I ~ .iY , t...~ I y 5 , ' ~~w -.~l~. ,~t,~ '.~P ~ =,~'~AI.I y,, ~l~y .,~il~ ;11~,`~ _ ~ ~i 5~. . ~ 1. i - ~ :+~~1~'. i ..k.. I ~i.t I ~ ,l ' . .'t -r~~ i. F., . .5Y .i ~ } ~4 i~ J • S IP~y x~' i 4' ~ .5. 4~, ~kl~ #_;h'f! v . I } W~ ~ tl ~ ~ '^~k~ i- ~~n, ~y..a ~i; t~jn ~~L:~I„4 .1 7~"~~ r, r~A~• . 6 , _ A~ ~ e ..~"~Z ~ ~ ~'r ~-~'s ~ `~a I ~ ' ~ - ' , t ,I~ ~-t---~-=-t`+" _ - - . _ _ _ - N , r. s - , . . . ~ r I ' , _ ~ , E !I. ~;~L A..~i I.~,r,.r.. + ' I . . !~'~y. , _.'Y.~~`5 .v~~ -~.'_tG. ..TI_,~"ti~'_ ''r~~.^~...~:-~.~~.~ _ - ,i t:E ~r~ .s - .iE,; •b r;~„ - . i ~ r s 'i I_ y: - II , II , ~ . ~ a~:~ a -r . r y _ ir• i _ +.:a ~ 1, .F r ~ ' { ~ i~- ~ , q( _ ~'ll~r~ ~ri , ~i C''""' d. » •y" ,-,~tJ'E?~IidG~'C-~~. ydSi~:' I•it_< .~.a~i,~ Pt-~ 'r ~ ~ II• ~ , i , _ , ! ~ - , ,v~..~4~' ,~.1 ?i• ~'f~-~~. L, S,`- 1~±l~. . r~~ ~ ~ ' . , • ~ ~x. ~ ~ 'y;1 ~ ~ ~ ~ ~ . ~v~[ ~ ~ r - ' ; _ _ _ - _ .~i ~ ~ ~ ~ u~ i~' r . v=~k- ~ f ~ . ' , ~ „ ~ . . . _ . . ! ~i ~5~ ~ ~~t~.~~:~ ;tri • _ _ ~ - , iM' I' ~ 'ra~`' . r,~.~~k, '-s :~y , . , --7' . r. f . ~G y~, . 1.7 " Y • . „ , :~a ~ . ' ` ' . , , ~ _ . • - • - , . ~ ~ i~•.~ ~ j'y~ , ti 'j 71 ~.'1 ~ . _ ~f~+~ ~ k~+'i ~`.3„ M1 q~` .tt~1 .f'`~.~~~~`_~ ~+~p~!'w. y Tt ~,y, ~'4 r . _ f • . m. f~ W + , ~ ~ . , ~~,.i ,,~1 f~,' . . ~ i;a j ~f~~ ~11 ~,.A { - ~"F,.~. _ . . . a. . ~a . . r ~ „ ' ~r`~ . . _ ' . - ~ . . , , i:i ~ ea:.d4 ~~y - :'~p - - ~~~y. . , , . _ I~: ~ . , _ t... , : - ~ - _ ' ~ _ . 3a~ , , -~-.--r^ - - C,a NAL ~i~ ~r s? ~7`_U►>~~ , , .t. q.,:., R ~a-w~-1L;n~. , . :~~~'~.I~.~- J ~ ~^u.! rd. .:s~~~uL` ~,.~4 . , - I~.' . ~ '4:.4a4; ~~i ;~'7 7 .1'~ - Y ~ f~ 'v.y~ 41i,? ~r~pi~ ,t+~' .~I. . ~ _ .~r4~1 . . . , . ~ ~ ' ' ' - , ~ „ v + - a~ , , . ~ ~ . ~ r's.,'~ M~: h- ~ s~'~a, t','1 , ; . , t~,ll.~ ~ } `F`' , - ~ ~ ~4 4~ a" f ~ ' ` '~''x-'- , ~G`~l . ~iC. . r~ ~ , . , , . a x~_ C_ , • ~ t.~a ' h 3r i~ - ~ _ P~ , - - ' 1 ,-~;~y 1~. ~ "I , .p _ f ~ r~ "~.rG",; t ;it~J ~'~~.r ,~`~i~ i~ _ .sr : ~ ~.y~~F . ;e~~~ 1.¢,h ~ ~ 'r t'ry • ,'~'ll ~s~, .Y~. a et,. - i - , ---m :R .I~~ ~ -'~i' yi. i a~ ~ , ..~~~.~'-r ~ ~j -"7f I~, R ~q'~~ ~{F~'~- ~ I' i ~ , r ~t" ~ ~ . , -_a. wi~'~i r~~. , „ ~ ~ f~ r~►~'~` Gga ~ 141) 'ht' ~ y ~ d~~'~"C;' :.y. . ,R `r, ~r~ r~y ..~„t. r•i ~y.~.'iy - , ~1,. w ~._1. 'w . i I~,ye.4. ~ 6~.~„il e'F'~ . i' t~ Ir J,,..1 _:~ta~._~ Pa:- ' ~f ~ ' ~ 1'v. . ~ ,A . - . ' ~.:.3 ~ ..e ~ .~....._-.'s~° 'x~." " . -`~'~n ~ -~:Y. ~ ~ ~ _ - ~ . i . . , ,~~T~~',~•_ . . , ,F~ g _ ..~ht.~- ' ~ ; ~f~.: ~,~p , - L ~ e . M`i ~ ~w ~ ~ "s'', -~,~.i.' P~? ~,r~ .,~~7t~,1 F~ f, t ~{.7-. + ~ , . ~'.~`~1 . I ~ ~ r` ~ 7 ~~~~..,ry " ~Ji ~ . . , ~ ' ~ ~ f . . ~~4 . . 's~l 1~ S.. . - , ' ~ ~i~~' . . . ~ G. ~.i"''' ~ u.i~ ~i~,~ ~ ~ s''+~ ; ~,,s._. + F'r~.~1. . $~w w~ ~ ~ ,7k~,,~ ~j~+.C„ ~ , p , , , ` ,3 . . . . ~ '~iF` . . a ~ . t [-~1~ ~ • , ~ ~ , P t' ! i 'p II r . r~,.~._ r r( Il. _ 4 ~ q , 1 _ , ~ ~ ' . . . i- ~ , ~,.l.s • fl~~~ ~ !.F/''~'~J ~~~e; ' ~ - ~ "~t:«r. 6~~•~~• ~ ~ - ~~yf~ ~ , ,PS~1 ~ r'~.~,.: ~.~f" r a " ~ . w t. ; ~ ,~i':~ fi~'~ r ~r~ 1~. I R {J ~ . ~ . . ~li'~ 4 r 1 ~ • _ . ~ 4 - - ~ i, ~ - ~i I ~ r ' ~ . . i . i - r ~ . ~ ~ , ~ ~ , . ~ 'L~ ~~~~~~i~~e ~ ~ ~ fe.~, . ;~~r ~ • „ . t~,~l~ .',~=:'i~' ~ ' ~ '~~tf ~o-_, _ p IG'~~~t1. " S~~ 'w `r:; " . r.n~,o . ~ 4 ~~~~F~. ? 1 5~~.•l{ l.j~ ::~aCe. ~ r~. it . , . ~r~ . . . ~ . b . I S , 1~+ : ~ ~ Y. y~ a. I ~ A~ 5 ' w A . ~ 1. I~ ,~-r ~ . J ` ;~a .f ~ ~ nl'~ ..i~ ~a'~ j . ~ . ~ ,~Y~#~°M1. ~ ~ , , ~ , _r " ` . . ~ ~ ,k ±r ~ _ . ,a _ _ . M ( , _ ~ ~ ~ 1 ' ' " P _ • A~~'~` ~ ~ • ' , . - - . ° ~ 'E' - - ~ '~~II~S S~~t's ~ '~i~UU f.~,,. ~~'~rns s~r~~P 76J l~ ~ M~I~: , U , , ~ ~ ' ~ Sca~e . ~~J Q~U i ~ t II . Yan~l.+A- . u v ' 2g0 f f DaOu ~s. c ` . ~ • J ~ • f ~ . . i ~ AarM ~v`' a . J~ ' s . ~ • o ~ ; ~ ~ ~ ~~•a~ ~ ~ ` q • ~ r • ~ a 6 S Y a ~'n. t'Ct ta ti c+, v, ~s P_ a ~Met0106'N ~ ~ - o . ,c E ~ e~p Ars s ~i 'c Y . ~ ,n ~i • ~ t)lis t)rcl►.~r c.~~"..='~ 1 C ' ' ' ' 1 ¢ r Y' d ~ MN. ~ ~ • 6 q g ~ \ 'Ci u1 j ~ / / . . - 'j . ~ 7~ 1 ' ~ ' ~ ~ ~ ~ • 1 , , ♦ . ~ C ~ ~ • , ~ q 4 ~ ' l • 1 ~ Q n yr • 1 C _ nd t ' enc'pdAr.. ~ - ~ ~ - ~ V Q e ~ ~ G v a a y..-- oc utp'.Yr ltysslM~ ~,K- ~ W ~ SN~P ~ ~ F OooM V.faN Vat►eYaieurs ~ • c , ~ . g g U Gatl C . Vqood S t ~ ~ ~ep• -~s:~ ` Moado'n' ur«~~N• t 7 ~ ~ , Galf Course yut~~~ U ~ ~ d , uss ¢ ~ ~1 ~ , - • • • ubenYtS Course . `eea» c.vw°A«. _ ~ , g $ } •~Pubiic Go *Vh. ZI-TS ~ V A, ~ t;►~en ~ ~ d,s . ,W A... % ~y- ~ • . . a Posi° p111ce F ~ r~. na. u.r jri AWQ. xw• c `P v '"'r~ ''u~ ~ ,a u ~ ~ • . '',i ~ c posl a . Cjttiee : • F o.r - C ~ - 1l as' ~ + ~ ~ O ~ 'Z ~ • • s"° r. ' E ine i~+►.t. ~ u~r ~ . S s 'O u ~b ttpo~ JLt 0 , Q 1ttl~~ • .y~ .~4~►ts ~~i/ j , ~ ~ l~ . • ~ V _ , s,.• . ~ ' • 1 w ~ ` . . . ~ • ~ ~ Weighted Runoff Coefficient Calculation Project: Riverwalk 9th Addition ~ Basin: A IPE Job 96238 ~ Total Area (acres): 1.12 Designer: SKM Imp. Area (acres): 0.25 Date: 09/22 v Grass Area (acres): 0.87 ~ Imp. Area "C": 0.90 Grass Area "C": 0.15 ~ (Imp. Area)(Imp. "C")= 0.2250 ~ (Grass Area)(Grass "C")= 0.1305 ~ 1.1200 0.3555 _ ~ Weighted "C"= ~ 0.3555 0.32 1.1200 ~ . ~ ~ ~ ~ , - ~I = J ~ Weighted Runoff Coefficient Calculation Project: Riverwalk 9th Addition Basin: B IPE Job 96238 - Total Area (acres): 0.39 Designer: SKM s ~ Imp. Area (acres): 0.11 Date: 09/22 Grass Area (acres): 0.28 Imp. Area "C": 0.90 Grass Area "C": 0.15 a , ~ . . (Imp. Area)(Imp. "C")= 0.0990 ^ (Grass Area)(Grass "C")= 0.0420 . 0.3900 0.1410 ~ Weighted "C"= 0.1410 0.36 Y 0.3900 3 o£+'~r~- o . L ~ o~ Weighted Runoff Coefficient Calculation s Project: Riverwalk 9th Addition ~-Basin: C IPE Job 96238 Total Area (acres): 1.48 Designer: SKM Imp. Area (acres): 0.26 Date: 09/22 Grass Area (acres): 1.22 Imp. Area "C": 0.90 Grass Area "C": 0.15 . , ~ (Imp. Area)(Imp. "C")= 0.2340 (Grass Area)(Grass "C")= 0.1830 . ^ 1.4800 0.4170 ~ Weighted "C"= 0.4170 0.28 1.4800 ~ ; ~ ~ ~ ~ ~ J _"1 Weighted Runoff Coefficient Calculation Project: Riverwalk 9th Addition v Basin: D IPE Job 96238 ~ Total Area (acres): 0.75 Designer: SKM Imp. Area (acres): 0.14 Date: 09/22 Grass Area (acres): 0.61 ~ Imp. Area "C": 0.90 Grass Area "C": 0.15 ~ ~ (Imp. Area)(Imp. "C")= 0.1260 (Grass Area)(Grass "C")= 0.0915 ~ 0.7500 0.2175 ~ Weig hted "C"= 0.2175 0.29 , ~ 0.7500 ~ a ~ ow-- e-- ~ Weighted Runoff Coefficient Calculation ~ . £ Project: Riverwalk 9th Addition Basin: E IPE Job 96238 ~ Total Area (acres): 0.64 Designer: SKM e Imp. Area (acres): 0.26 Date: 09/22 Grass Area (acres): 0.38 , Imp. Area "C": 0.90 Grass Area "C": 0.15 (Imp. Area)(Imp. "C")= 0.2340 (Grass Area)(Grass "C")= 0.0570 0.6400 0.2910 . ~ Weighted "C"= 0.2910 0.45 0.6400 ~ U ~ - - ~ 0 e, ~ r Weighted Runoff Coefficient Calculation ~ Project: Riverwalk 9th Addition ~ Basin: F IPE Job 96238 Total Area (acres): 0.57 Designer: SKM Imp. Area (acres): 0.12 Date: 09/22 Grass Area (acres): 0.45 ~ Imp. Area "C": 0.90 ` Grass Area "C": 0.15 ~ w (Imp. Area)(Imp. "C")= 0.1080 (Grass Area)(Grass "C")= 0.0675 0.5700 0.1755 ~ . ~ Weighted "C0.1755 0.31 0.5700 ~ ~ ~ . - Li ~ {~~m ~ - r . ~ ~ : . ~ b "J ~l Weighted Runoff Coefficient Calculation Project: Riverwalk 9th Addition Basin: G IPE Job 96238 Total Area (acres): 0.63 Designer: SKM Imp. Area (acres): 0.14 Date: 09/22 Grass Area (acres): 0.49 ~ Imp. Area "C": 0.90 Grass Area "C": 0.15 . v(Imp. Area)(Imp. "C")= 0.1260 (Grass Area)(Grass C„)_ - 0.0735 ~ 0.6300 0.1995 Weighted "C"= 0.1995 0.32 ~ 0.6300 , ~ ° Weighted Runoff Coefficient Calculation Project: Riverwalk 9th Addition e Basin: H IPE Job 96238 Total Area (acres): 0.07 Designer: SKM a Imp. Area (acres): 0.07 Date: 09/22 Grass Area (acres): 0.00 ~ Imp. Area "C": 0.90 Grass Area "C": 0.15 . (Imp. Area)(Imp. "C")= 0.0630 (Grass Area)(Grass "C")= 0.0000 ~ 0.0700 0.0630 E ~ Weighted "C"= 0.0630 0.90 ~ 0.0700 ~ a ` I i` odo ' ' a 1 ~ LJ , Weighted Runoff Coefficient Calculation ~ ~ Project: Riverwalk 9th Addition ~ Basin: I IPE Job 96238 Total Area (acres): 0.46 Designer: SKM ' Imp. Area (acres): 0.13 Date: 09/22 Grass Area (acres): 0.33 o^ Imp. Area "C": 0.90 o Grass Area "C": 0.15 , , i ~ (Imp. Area)(Imp. "C")= 0.1170 (Grass Area)(Grass "C")= 0.0495 0.4600 0.1665 - Weighted "C"= 0.1665 0.36 0.4600 ~ ; , 3 ~ ~ a H~. ~1 . ~ , - ~ E ) 7 ~ ~ ; - Weighted Runoff Coefficient Calculation Project: Riverwalk 9th Addition Basin: J IPE Job 96238 ~ Total Area (acres): 0.92 Designer: SKM ; Imp. Area (acres): 0.14 Date: 09/22 Grass Area (acres): 0.78 ~ Imp. Area "C": 0.90 . . Grass Area "C": 0.15 ,(Imp. Area)(Imp. "C")= 0.1260 ~ (Grass Area)(Grass "C")= 0.1170 0.9200 0.2430 . ~ Weighted "C"= 0.2430 0.26 0.9200 ~ - ~ ~ o~ ~ 1 . a . -1 ~ . . ; i i : . , li ~ Weighted Runoff Coefficient Calculation o Project: Riverwalk 9th Addition ~ Basin: K IPE Job 96238 ~ Total Area (acres): 0.09 Designer: SKM Imp. Area (acres): 0.09 Date: 09/22 Grass Area (acres): 0.00 Imp. Area "C": 0.90 ~ s Grass Area "C": 0.15 (Imp. Area)(Imp. "C")= 0.0810 (Grass Area)(Grass "C")= 0.0000 - . 0.0900 0.0810 . Weighted "C"= 0.0810 0.90 0.0900 1 f ~ - ~ ~ ~ . a~ I . ~1 ~ ; Weighted Runoff Coefficient Calculation ~ Project: Riverwalk 9th Addition ~ ~ Basin: HI & JK IPE Job 96238 Total Area (acres): 1.38 Designer: SKM 1 Imp. Area (acres): 0.26 Date: 09/16 `J Grass Area (acres): 1.12 7 Imp. Area "C": 0.90 11 Grass Area "C": 0.15 i , (tmp. Area)(Imp. "C")= 0.2340 ~I (Grass Area)(Grass "C")= 0.1680 . ~ 1.3800 0.4020 ~ ~ Weig hted "C"= ~ 0.4020 0.29 ~ 1.3800 ~ ~ . . . f ~ r ~ ~ ~ ~i • I ~ BOWSTRING METHOD PROJECT: Riverwalk 9th Addition PEAK FLOW CALCULATION PROJECT Riverwalk 9ih Addition DETENTION BASIN DESIGN BASIN: A BASIN: A 10-Year Design Storm DESIGNER: S. Murphy Tot. Area 1.12 Acres . , DATE: 09122 Imp. Area 10748 SF C = 0.32 Time Increment (min) 5 CASE 1 Time of Conc. (min) 7.00 Outflow (cfs) 1 120 ft. Overland Flow Design Year Flow ' 10 Area (acres) 1.12 Ct = 0.15 Impenrious Area (sq ft) 10748 L= 120 ft. 'C' Factor 0.32 n= 0.40 ' '208' Volume Provided 573.5 S= 0.020 Area' C 0.358 Tc = 4.95 min., by Equation 3-2 of Guidelines Time Time Inc. Intens. Q Devel, Vol.ln Vol.Out Storage 202 ft. Gutter 8ow (min) (sec) (iNhr) (cfs) (cu fl) (cu ft) (cu ft) Z1 = 50,0 For Z2 7.00 420 2.68 0,96 541 420 121 Z2 = 3.5 Type B =1.0 'n= 0.016 Rolled = 3.5 5 300 3.18 1.14 458 300 158 S= 0.010 10 600 224 0.80 596 600 -4 15 900 1.71 0.63 662 900 -238 d= 0.148 ft. 20 1200 1.45 0.52 698 1200 -502 25 1500 121 0.43 712 1500 -788 A R Q Tc Tc total I Qc 30 1800 1.04 0,37 724 1800 -1076 35 2100 0.91 0.33 732 2100 -1368 0.59 0.07 0.96 2.05 7.00 2.68 0.96 40 2400 0.82 0,29 747 2400 -1653 45 2700 0.74 0.27 754 2700 -1946 Qpeak for Case 1= 0.96 cfs 50 3000 0.68 024 766 3000 -2234 55 3300 0.64 0.23 790 3300 -2510 60 3600 0.61 0.22 818 3600 -2782 CASE 2 65 3900 0.60 0.22 869 3900 -3031 70 4200 0.58 0.21 903 4200 -3297 Case 2 assumes a Time of Concentration less than 5 minutes so that Ihe 75 4500 0.56 020 932 4500 -3568 peak flow =.90(3.18)(Imp. Area) = 0.71 cfs 80 4800 0.53 0,19 939 4800 -3661 65 5100 0.52 ' 0,19 ' 977 5100 -4123 ' 90 5400 0.50 0.18 993 5400 -4407 So, the Peak flow for the Basin is the greater of the two flows, 95 5700 0.49 0,18 1026 5700 -4674 0.96 cfs 100 6000 0.48 0.17 1057 6000 -4943 208' DRAINAGE POND CALCULATIONS Required'208' Storage Volume = Impervious Area x.5 in ! 12 inlft 448 cu ft 208' Storage Volume Provided 573.5 cu ft DRYWELL REQUIREMENTS • 10 YR. DESIGN STORM Maximum Storage Required by Bowstnng 158 cu ft Number and Type of Drywells Required 0 Single . 1 Dauble J ~_-J L...-1 BOWSTRING METHOD PROJECT: Rivenwalk 9th Addition PEAK FLOW CALCULATION PROJECT Riverwalk 9th Addition DETENTION BASIN OESIGN BASIN: B BASIN: B , 10-Year Design Storm DESIGNER: S. Murphy Tot. Area 0.39 Aaes DATE: 09115 Imp. Area 4598 SF C = 0.36 Time Increment (min) 5 CASE 1 Time of Conc. (min) 6.59 Outflow (cfs) 0.3 65 ft. Overland Flow Design Year Flow 10 • Area (acres) 0.39 Ct = 0.15 ImpeNious Area (sq fl) 4598 L= 65 ft. 'C' Factor 0.36 n= 0.40 '208' Volume Provided 211 S= 0.020 Area " C 0.140 Tc = 3.43 min., by Equation 3-2 of Guidelines Time Time Inc. Intens. Q Devel. Vol.ln Vol.Out Storage 249 ft. Gutter flow (min) (sec) (inlhr) (cfs) (cu fl) (cu fl) (cu ft) Z1 = 50.0 For Z2 6.59 395 2.75 0.39 205 119 86 Z2 = 3.5 Type B =1,0 n= 0.016 Rolled = 3,5 5 300 3.18 0.45 179 90 89 S= 0,010 10 600 2.24 0,31 231 180 51 15 900 1.77 0,25 257 270 -13 d= 0.106 ft. 20 1200 1.45 0,20 272 360 -88 25 1500 1.21 0.17 278 450 -172 A R Q Tc Tc total I Qc 30 1800 1.04 0.15 282 540 -258 35 2100 0.91 0.13 285 630 -345 0.30 0.05 0.39 3.16 6,59 2.15 0.39 40 2400 0.82 0,12 292 720 428 45 2700 0.74 0,10 294 810 -516 Qpeak for Case 1= 0.39 cfs 50 3000 0.68 0.10 299 900 -601 55 3300 0.64 0.09 309 990 -681 60 3600 0.61 0.09 320 1080 -760 CASE 2 65 3900 0.60 0.08 340 1170 -830 70 4200 0.58 0.08 353 1260 -907 Case 2 assumes a Time of Concentration less than 5 minutes so that the 75 4500 0.56 0.08 364 1350 -986 peak flow =.90(3.18)(Imp. Area) = 0.30 cfs 80 4800 0,53 0.07 367 1440 -1073 85 5100 0.52 0.07 382 1530 -1148 ' 90 5400 0.50 0.07 389 1620 -1231 So, the Peak flow for the Basin is the greater of the two flows, 95 5700 0.49 0.07 401 1710 -1309 0,39 cfs 100 6000 0.48 0.07 413 1800 -1387 208' DRAINAGE POND CALCULATIONS Required'208' Storage Volume = Impervious Area x.5 in ! 12 in/ft 192 cu ft 208' Storage Volume Provided 211 cu fl , DRYWELL REQUIREMENTS -10 YEAR DESIGN STORM Maximum Storage Required by Bowstnng 89 cu ft . . Number and Type of Drywells Required 1 Single ' 0 Double BOWSTRING METH00 PROJECT: Rivenrvalk 9th Addition PEAK FLOW CALCULATION PROJECT Rivenrralk 9th Addition DETENTION BASIN OESIGN BASIN: C BASIN: C 10-Year Design Storm DESIGNER: S. Murphy Tot. Area 1.48 Acres DATE: 09115 Imp. Area 11380 SF C = 0.28 Time Increment (min) 5 CASE 1 Time of Conc. (min) 6.96 Outflow (cfs) 1 50 ft. Overland Flow Design Year Flow ' 10 Area (acres) 1.48 Ct = 0.15 Impen,ious Area (sq ft) 11380 L= 50 fl. 'C' Factor 028 , n= 0.40 '208' Volume Provided 496 S= 0.020 Area " C 0.414 Tc = 2.93 min., by Equation 3-2 of Guidelines Time Time Inc. Intens. Q Devel. Vol.ln Vol,Out Storage 447 ft, Gutter flow (min) (sec) (inmr) (cfs) (cu ft) (cu ft) (cu ft) Z1= 50.0 For Z2 6.96 417 2.69 1.11 623 417 206 Z2 = 3.5 Type B =1.0 n= 0.016 Rolled = 3.5 5 300 3.18 1.32 530 300 230 S= 0.013 10 600 2.24 0.93 689 600 89 15 900 1.71 0,73 764 900 -136 d= 0.150 ft. 20 1200 1.45 0.60 806 1200 -394 25 1500 1.21 0.50 823 1500 -671 A R Q Tc Tc total I Qc 30 1800 1.04 0.43 837 1800 -963 35 2100 0.91 0.38 845 2100 -1255 0.60 0.07 1.11 4.03 6.96 2.69 1.11 40 2400 0.82 0.34 864 2400 -1536 45 2700 0.74 0.31 871 2700 -1829 Qpeak for Case 1= 1.11 cfs 50 3000 0.68 0.28 885 3000 -2115 55 3300 0.64 0.27 913 3300 -2387 60 3600 0.61 0.25 946 3600 -2654 CASE 2 65 3900 0.60 0.25 1005 3900 -2895 70 4200 0.58 0.24 1044 4200 -3156 Case 2 assumes a Time of Concentration less than 5 minutes so that the 75 4500 0.56 0.23 1077 4500 -3423 peak flow =.90(3,18)(Imp, Area) = 0.75 cfs 80 4800 0.53 0.22 1085 4800 -3715 , 85 5100 0.52 0.22 1130 5100 -3970 ' 90 5400 0.50 0.21 1148 5400 -4252 So, the Peak Flow for the Basin is the greater of the two flows, 95 5700 0.49 0.20 1186 5700 -4514 1.11 cfs 100 6000 0.48 0.20 1222 6000 -4778 208' DRAINAGE POND CALCULATIONS Required'208' Storage Volume = Impervious Area x.5 in 112 iNft 474 cu ft 208' Storage Volume Provided 496 cu ft ORYWELL REQUIREMENTS -10 YEAR DESIGN STORM Maximum Storage Required by Bowstring 230 cu ft Number and Type of Drywells Required 0 Single 1 Double fI ~ J, BOWSTRING METHOD PROJECT: Riverwalk 9th Addition PEAK FLOW CALCULATION PROJECT Riverwalk 9th Addition DETENTION BASIN DESIGN BASIN: D BASIN: D 10-Year Design Storm DESIGNER; S. Murphy Tot. Area 0.75 Acres DATE: 09115 Imp. Area 6174 SF ' C = 0.29 Time Increment (min) 5 CASE 1 Time of Conc. (min) 6.87 Outflow (cfs) 0,3 120 ft. Overland Flow Design Year Flow 10 Area (acres) 0.75 Ct = 0.15 Impervious Area (sq ft) 6174 L= 120 ft. 'C' Factor 0.29 n= 0.40 '208' Volume Provided 262 S= 0.020 Area' C 0.217 Tc = 4.95 min., by Equation 3-2 of Guidelines Time Time Inc. Intens. Q Devel. Vol.ln Vol.Out Storage 200 ft. Gutter flow (min) (sec) (inmr) (cfs) (cu ft) (cu ft) (au R) Z1 = 50.0 For Z2 6.87 412 • 2.70 0.59 325 124 201 Z2= 3.5 TypeB=1,0 n= 0.016 Rolled = 3.5 5 300 3.18 0.69 278 90 188 S= 0.016 10 600 2.24 0.49 361 180 181 15 900 1.77 0.38 400 270 130 d= 0.113 ft. 20 1200 1.45 0.32 423 ' 360 63 , 25 1500 1.21 0.26 432 450 -16 A R Q Tc Tc total I Qc 30 1800 1.04 023 439 540 -101 35 2100 0.91 0.20 443 630 -187 0.34 0.06 0.59 1.93 6.87 2.70 0.59 40 2400 0.82 0.18 453 720 -267 45 2700 0.74 0.16 457 810 -353 Qpeak for Case 1= 0.59 cfs 50 3000 0,68 0.15 464 900 -436 55 3300 0.64 0.14 479 990 -511 ' 60 3600 0.61 0.13 496 1080 -584 CASE 2 65 3900 0.60 0.13 527 1170 -643 70 4200 0,58 0.13 548 1260 -712 Case 2 assumes a Time of Concentration less than 5 minutes so that the 75 4500 0.56 0.12 565 1350 -785 peak Flow =.90(3.18)(Imp. Area) = 0.41 cfs 80 4800 0.53 0.12 569 1440 -871 85 5100 0.52 0.11 593 1530 -937 90 5400 0.50 0.11 603 1620 -1017 So, ihe Peak flow for ihe Basin is the greater of the two 8ows, 95 5700 0.49 0.11 622 1710 -1088 0.59 cfs 100 6000 0.48 0.10 641 1800 -1159 208' DRAINAGE POND CALCULATIONS Required'208' Storage Volume = Imperoious Area x.5 in ! 12 in/ft 257 cu ft 208' Storage Volume Provided 262 cu ft DRYWELL REQUIREMENTS -10 YEAR DESIGN STORM „ Maximum Storage Required by Bowstring 201 cu ft Number and Type of Drywells Required 1 Single . • • 0 Double _.J BOWSTRING METHOD PROJECT: Riverwalk 9th Addition PEAK FLOW CALCULATION PROJECT Riverwalk 9th Addition DETENTION BASIN DESIGN BASIN: E BASIN: E 10-Year Design Storm DESIGNER: S. Murphy Tot. Area 0.64 Acres DATE: 09115 )mp. Area 11277 SF C = 0.45 . Time Increment (min) 5 CASE 1 Time of Conc. (min) 5.00 Outflow (cfs) 0.3 30 ft. Overland Flow Design Year Flow ' 10 Area (acres) 0.64 Ct = 0,15 Impervious Area (sq ft) 11277 L= 30 ft. 'C' Factor 0.45 n= 0.02 '208' Volume Provided 481.5 S= 0.020 Area " C 0288 Tc = 0.31 min., by Equation 3-2 of Guidelines Time Time Inc. Intens. Q Devel, Vol.ln Vol.Out Storage 186 ft. Gutter 8ow (min) (sec) (inmr) (cfs) (cu ft) (cu ft) (cu ft) • Z1= 50.0 For Z2 5,00 300 3.18 0.92 • 368 90 278 Z2 = 3.5 Type B =1.0 n= 0.016 Rolled = 3.5 5 300 3.18 0.92 368 90 278 S= 0.010 • 10 600 2.24 0.65 453 180 273 15 900 1.77 0.51 511 270 241 d= 0.146 fl. 20 1200 1.45 0.42 544 360 164 25 1500 1.21 0.35 558 450 108 A R Q Tc Tc total I Qc 30 1800 1.04 0.30 570 540 30 35 2100 0.91 0.26 577 630 -53 0,57 0.07 0.92 1.91 5.00 3.18 0.92 40 2400 0.82 0.24 591 720 -129 45 2700 0.74 0.21 597 810 -213 Qpeak for Case 1= 0.92 cfs 50 3000 0.68 0.20 607 900 -293 55 3300 0,64 0.18 627 990 -363 60 3600 0,61 0.18 650 1080 -430 CASE 2 65 3900 0.60 0.17 692 1170 -478 70 4200 0.58 0.11 719 1260 -541 Case 2 assumes a Time of Concentration less than 5 minutes so that the 75 4500 0.56 0.16 742 1350 -608 peak flow =.90(3.18)(Imp. Area) = 0.74 cfs 80 4800 0.53 0,15 746 1440 -692 85 5100 0.52 0.15 779 1534 -751 ' 90 5400 0.50 0.14 792 1620 -828 So, the Peak flow for the Basin is the greater of the two flows, 95 5100 0.49 0.14 819 1710 -891 0.92 cfs 100 6000 0.48 0.14 844 1800 -956 208' DRAINAGE POND CALCULATIONS Required'208' Storage Volume = Impervious Area x.5 in / 12 iNft 470 cu fl , • 208' Storage Volume Provided 487.5 cu ft DRYWELL REQUIREMENTS -10 YEAR DESIGN STORM Maximum Storage Required by Bowstring 278 cu ft Number and Type of Drywells Required 1 Single 0 Double L-J _ J L-! BOWSTRING METHOD PROJECT: Riverwalk 9th Addition PEAK FLOW CALCULATION PROJECT Riverwalk 9th Addition DETENTION BASIN DESIGN BASIN; F BASIN: F 10-Year Design Storm DESIGNER: S. Murphy Tot. Area 0.57 Acres DATE: 09115 Imp. Area 5161 SF C = 0.31 Time Increment (min) 5 CASE 1 , Time of Conc. (min) 5,95 Outflow (cfs) 0.3 100 ft. Overland Flow Design Year Flow 10 • Area (acres) 0.57 Ct = 0.15 Imperoiaus Area (sq ft) 5161 L= 100 ft, 'C' Factor 0,31 n= 0.40 '208' Volume Provided 223.5 S= 0.020 Area' C 0.177 Tc = 4.44 min., by Equation 3-2 of Guidelines Time Time Inc. Intens. Q Devel. Vol.ln Vol.Out Storage 146 ft. Gutter flow (min) (sec) (iNhr) (cfs) (cu fl) (cu fl) (cu R) Z1 = 50.0 For Z2 5.95 357 2.90 0.51 246 107 139 Z2 = 3.5 Type B =1.0 n= 0.016 Rolled = 3.5 5 300 3.18 0,56 226 90 136 S= 0.014 10 600 2,24 0,40 286 180 106 15 900 1.77 0.31 319 270 49 d= 0,109 ft. 20 1200 1,45 0.26 339 360 -21 25 1500 1.21 0.21 347 450 -103 A R Q Tc Tc total I Qc 30 1800 1.04 0.18 353 540 -187 35 2100 0.91 0.16 357 630 -273 0.32 0.05 0.51 1.52 5.95 2,90 0.51 40 2400 0,82 0.14 365 720 -355 45 2700 0.74 0.13 369 810 -441 Qpeak for Case 1, = 0.51 cfs 50 3000 0.68 0.12 375 900 -525 ' , 55 3300 0.64 0.11 387 990 -603 60 3640 0.61 0.11 401 1080 -679 CASE 2 65 3900 0.60 0.11 426 1170 -744 70 4200 0.56 0.10 443 1260 -817 Case 2 assumes a Time of Concentration less than 5 minutes so that the 75 4500 0.56 0.10 457 1350 -893 peak (low =,90(3.18)(Imp. Area) = 0.34 cis 80 4800 0.53 0.09 461 1440 -979 85 5100 0.52 0.09 480 1530 -1050 • 90 5400 0.50 0.09 488 1620 -1132 So, the Peak flow for the Basin is lhe greater of the two flows, 95 5700 0.49 0.09 504 1710 -1206 0.51 cfs 100 6000 0.46 0.08 519 1800 -1281 208' DRAINAGE POND CALCULATIONS Required'208' Storage Volume = Imperoious Area x.5 in 112 iNft 215 cu ft 208' Storage Volume Provided 223.5 cu ft DRYWELL REQUIREMENTS -10 YEAR DESIGN STORM Maximum Storage Required by 8owstring 139 cu fl Number and Type of Drywells Required 1 Single 0 Double 1--~ BOWSTRING METHOD PROJECT: Riverwalk 8th Addition PEAK FLOW CALCUlATION PROJECT Riverwalk 8th Addition DETENTION BASIN DESIGN BASIN: G BASIN: G 10-Year Qesign Storm DESIGNER: S. Murphy Tot. Area 0.63 DATE: 09115 Imp. Area 6092 SF C = 0.32 , Time Increment (min) 5 CASE 1 Time of Conc, (min) 5.00 Oulflow (cfs) 0.3 50 ft. Overland Flow Design Year Flow ' 10 Area (acres) 0.63 Ct = 0.15 Impervious Area (sq ft) 6092 L= 50 ft. 'C Factor 0.32 n= 0.40 '208' Volume Provided 296.5 S= 0.020 Area' C 0.202 Tc = 2.93 min., by Equation 3-2 of Guidelines Time Time Inc. Intens. Q Devei. Vol.in Vol.Out Storage 210 ft. Gutter flow (min) (sec) (inlhr) (cfs) (cu ft) (cu ft) (cu ft) 'Z1 = 50.0 ForZ2 5.00 300 3.18 0.64 258 90 168 Z2 = 3.5 Type B =1.0 n= 0.016 Rolled = 3.5 5 300 3.18 0.64 258 90 168 S= 0.016 10 600 224 0.45 317 180 137 • 15 900 1.77 0.36 358 270 88 d= 0.117 ft. 20 1200 1.45 0.29 381 360 21 ' 25 1500 1.21 0.24 391 450 -59 A R Q Tc Tctotal I Qc 30 1800 1,04 0.21 399 540 -141 35 2100 0,91 0.18 404 630 -226 0.36 0.06 0.64 1.98 5.00 3.18 0.64 40 2400 0.82 0.17 414 720 -306 45 2700 0.74 0.15 418 810 -392 Qpeak for Case 1= 0,64 cfs 50 3000 0.68 0.14 425 900 -475 55 3300 0.64 0.13 439 990 -551 60 3600 0.61 0.12 455 1080 -625 CASE 2 65 3900 0.60 0.12 484 1170 -686 70 4200 0.58 0.12 503 1260 -757 Case 2 assumes a Time of Concentration less than 5 minutes so that the 75 4500 0.56 0.11 520 1350 -830 peak tlow =.90(3.18)(Imp. Area) = 0.40 cfs 80 4800 0.53 0,11 524 1440 -916 85 5100 0.52 0.10 545 1530 -985 ' 90 5400 0.50 0.10 555 1620 -1065 So, the Peak flow for the Basin is the greater of the two flows, 95 5700 0.49 0.10 573 1710 -1131 0.64 cfs 100 6000 0.48 0.10 590 1800 -1210 208' DRAINAGE POND CALCULATIONS Required'20B' Storage Volume = Impervious Area x.5 in I 12 inlft 254 cu ft • . 208' Storage Volume Provided 296.5 cu ft DRYWELL REQUIREMENTS -10 YEAR DESIGN STORM Maximum Storage Required by Bowstring 168 cu ft Number and Type of Drywells Required 1 Single 0 Double BOWSTRING METHOD PROJECT: Riverwalk 9th Addition PEAK FLOW CALCULATION PROJECT Riverwalk 9th Addition DETENTION BASIN DESIGN BASIN: H BASIN: H 10-Year Design Storm DESIGNER: S. Murphy Tot. Area 0.07 Acres DATE: 09I16 Imp. Area 3188 SF C = 0.90 Time Increment (min) 5 CASE 1 Time of Conc. (min) 5.00 • Outflow (cfs) 0 40 ft. Overland Flow Design Year Flow 10 Area (acres) 0.07 Ct = 0.15 Impervious Area (sq ft) 3188 L= 40 ft. 'C' Factor 0.9 n= 0.40 '208' Volume Provided 136 • S = 0.020 Area "C 0.063 Tc = 2.56 min., by Equatian 3-2 of Guidelines Time Time Inc. Intens. Q Devel. Vol.ln Vol.Out Storage 143 ft. Gutter flow (min) (sec) (iNhr) (cfs) (cu ft) (cu ft) (cu ft) Z1= 50.0 For Z2 5.00 300 3.18 0.20 81 0 81 Z2 = 3.5 Type B =1.0 n= 0.016 Rolled = 3.5 5 300 3.18 0.20 81 0 81 S= 0.011 10 600 2.24 0.14 99 0 99 15 900 1,77 0.11 112 0 112 d= 0.080 ft. 20 1200 1.45 0.09 119 0 119 25 1500 121 0.08 122 0 122 A R Q Tc Tctotal I Qc 30 1800 1,04 0,07 125 0 125 35 2100 0.91 0,06 126 0 126 0.17 0.04 0.20 2.09 5.00 3.18 0.20 40 2400 0.82 0.05 129 0 129 45 2700 0.74 0,05 131 0 131 Qpeak for Case 1= 0.20 cfs 50 3000 0.66 0.04 133 0 133 • 55 3300 0.64 0.04 137 0 137 60 3600 0.61 0.04 142 0 142 CASE 2 65 3900 0,60 0.04 151 0 151 70 4200 0.58 0.04 157 0 157 Case 2 assumes a Time of Concentration less than 5 minutes so Ihat the 75 4500 0.56 0.04 162 0 162 peak flow =.90(3.18)(Imp. Area) = 0.21 cfs 80 4800 0.53 0.03 164 0 164 85 5100 0.52 0.03 170 0 170 • 90 5400 0.50 0.03 173 0 173 So, the Peak flow for the Basin is the greater of the two flows, 95 5700 0.49 0.03 179 0 179 0.21 cfs 100 6000 0.48 0.03 185 0 185 208' DRAINAGE POND CALCULATIONS Required '208'Storage Valume = Impervious Area x.5 in I 12 inlft 133 cu ft 208' Storage Volume Provided 136 cu ft DRYWELL REQUIREMENTS -10 YEAR DESIGN STOR Maximum Storage Required by Bowstring 170 cu ft , Number and Type of Drywells Required ERR Single ERR Double L - 80WSTRING METHOD PROJECT: Riverwalk 9th Addition PEAK FLOW CALCULATION PROJECT Riverwalk 9th Addition DETENTION BASIN DESIGN BASIN: I . BASIN: I 10-Year Design Storm DESIGNER: S. Murphy Tot, Area 0,46 Acres DATE: 09h8 Imp. Area 5472 SF C = 0.36 Time Inaement (min) 5 CASE 1 Time of Conc. (min) 5.43 OuHiow (cfs) 0.3 40 ft. Overland Flow Design Year Flow ' 10 Area (acres) 0.46 Ct = 0.15 Impenrious Area (sq ft) 5472 L= 40 ft. 'C' Factor 0.36 n= 0.40 '208' Volume Provided 231 S= 0.020 Area " C 0.166 Tc = 2.56 min., by Equation 3-2 of Guidelines Time Time Inc. Intens. Q Devel. Vol.in Vol.Out Storage 250 ft. Gutter flow (min) (sec) (iNhr) (cfs) (cu ft) (cu ft) (cu ft) Z1= 50.0 For Z2 5.43 326 3.07 0.51 222 98 124 Z2 = ' 3,5 Type B =1.0 n= 0.016 Rolled = 3.5 5 300 3.18 0.53 212 90 122 S= 0.011 10 600 224 0.37 264 180 84 15 900 1.77 0.29 296 270 26 d=0,115 ft. 20 1200 1.45 0.24 315 360 -45 25 1500 1.21 0.20 323 450 -127 A R Q Tc Tc tolal I Qc 30 1800 1.04 0.17 329 540 -211 35 2100 0.91 0.15 333 630 -297 0.35 0.06 0.51 2.81 5.43 3.07 0.51 40 2400 0.82 0.14 341 720 -379 45 2700 0.74 0.12 344 810 -466 Qpeak for Case 1= 0.51 cfs 50 3000 0.68 0.11 350 900 -550 55 3300 0.64 0.11 361 990 -629 60 3600 0.61 0.10 375 1080 -705 CASE 2 65 3900 0.60 0.10 399 1170 -771 70 4200 0.58 0.10 414 1260 -846 Case 2 assumes a Time of Concentration less than 5 minutes so that the 75 4500 0,56 0.09 428 1350 -922 peak Oow =.90(3.1 B)(Imp. Area) = 0.36 cfs 80 4800 0,53 0.09 431 1440 •1009 85 5100 0,52 0.09 449 1530 -1081 90 5400 0.50 0.08 456 1620 -1164 So, the Peak flow for the Basin is the greater of the two flows, 95 5700 0,49 0.08 472 1710 -1238 0.51 cfs 100 6000 0.48 0.08 466 1800 -1314 208' DRAINAGE POND CALCULATIONS Required'208' Storage Volume = Impervious Area x.5 in ! 12 inlft 228 cu ft 208' Storage Volume Provided 231 cu ft • DRYWELL REQUIREMENTS -10 YEAR DESIGN STORM ' Maximum Storage Required by Bowstring 124 cu ft Number and Type of Drywells Required 1 Single 0 Doubie E ~ ~ ~ E--~~ l r f 1 ! n1 ( l" ~ . 1 I r } ( ~ f ~ ! ► ~~~1 J C ~ ! m~ ~~~J BOWSTRING METHOD PROJECT: Riverwalk 9th Addition PEAK FLOW CALCUlATION PROJECT Riverwalk 9th Addition DETENTION BASIN DESIGN BASIN: J BASIN: J 10-Year Design Storm DESIGNER: S. Murphy Tot. Area 0.92 Acres DATE: 09115 Imp, Area 5998 SF C = 0.14 Time Inaement (min) 5 CASE 1 Time of Conc. (min) 6.84 Outflow (cfs) 0.3 50 ft. Overland Flow Design Year Flow ' 10 . Area (acres) 0.92 Ct = 0.15 Impervious Area (sq ft) 5998 L=, 50 ft, 'C' Factor 0.14 n= 0.40 ' '208' Valume Provided 274.5 S= 0.020 Area ' C 0.129 Tc = 2.93 min., by Equation 3-2 of Guidelines Time Time Inc. Intens. Q Devel. Vol.ln Vol.Out Storage 311 ft. Gutter flow (min) (sec) (in/hr) (cfs) (cu ft) (cu ft) (cu ft) Z1= 50.0 For Z2 6.84 411 2.71 0.35 192 123 69 Z2 = 3.5 Type B =1.0 n= 0.016 Rolled = 3.5 5 300 3.18 0.41 165 90 75 S= 0.011 10 600 2.24 0Z9 213 160 33 ' 15 900 1.77 023 237 270 -33 d= 0.100 ft. 20 1200 1.45 0.19 250 360 -110 . 25 1500 1,21 0.16 256 450 -194 A R Q Tc Tc total I Qc 30 1800 1.04 0.13 260 540 -280 35 2100 0.91 0.12 263 630 -367 0.27 0.05 0.35 3.92 6.84 2.71 0.35 40 2400 0.82 0.11 268 720 -452 45 2700 0.74 0.10 271 810 -539 Qpeak for Case 1= 0.35 cfs . 50 3000 0.68 , 0.09 275 900 -625 55 3300 0.64 0.08 284 990 -706 60 3600 0.61 0.08 294 1080 -786 CASE 2 65 3900 0.60 0.08 312 1170 -858 70 4200 0.58 0.07 324 1260 -936 Case 2 assumes a Time of Concentration less than 5 minutes so that ihe 75 4500 0.56 0.07 335 1354 -1015 peak flow =.90(3.18)(Imp. Area) = 0.39 cfs 80 4800 0.53 0.07 337 1440 -1103 85 5100 0.52 0.07 351 1530 -1179 90 5400 0.50 0.06 357 1620 -1263 So, the Peak flow for the Basin is the greater of the two flows, 95 5700 0.49 0,06 369 1710 -1341 0.39 cfs 100 6000 0.48 0.06 380 1800 -1420 208' DRAINAGE POND CALCULATIONS Required'206' Storage Volume = Impervious Area x.5 in I 12 inlft 250 cu ft 208' Storage Volume Provided 274.5 cu ft • DRYWELL REQUIREMENTS -10 YEAR DESIGN STORM Maximum Storage Required by Bowstnng 75 cu ft • Number and Type of Drywells Required 1 Single 0 Double I ( 1 L -J BOWSTRING METHOD PROJECT: Riverwalk 9th Addition PEAK FLOW CALCULATION PROJECT Riverwalk 9th Addition DETENTION BASIN DESIGN BASIN: K BASIN: K' 10-Year Design Storm DESIGNER: S. Murphy Tot. Area 0.09 Acres DATE: 09115 Imp. Area 3908 SF C = 0.90 Time Increment (min) 5 CASE 1 • Time of Conc. (min) 5.00 Outflow (cfs) 0 50 ft, Overland Flow Design Year Flow ' 10 Area (acres) 0.09 Ct = 0.15 Impervious Area (sq ft) 3908 L= 50 ft. 'C' Factor 0.9 n= 0.40 '208' Valume Provided 185 S= 0.020 Area " C 0.081 Tc = 2.93 min., by Equation 3-2 of Guidelines Time Time Inc. Intens. Q Devel. Vol.ln Vol.Out Storage 143 ft, Gutter flow (min) (sec) (inlhr) (cfs) (cu ft) (cu ft) (au ft) Z1= 50.0 For Z2 • 5.00 300 3.18 0.26 104 0 104 Z2 = 3.5 Type B =1.0 n= 0.016 Rolled = 3.5 5 300 3.18 0.26 104 0 104 S= 0.011 10 600 2.24 0.18 127 0 127 15 900 1.77 0.14 144 0 144 d= 0.089 ft. 20 1200 1.45 0.12 153 0 153 25 1500 1.21 0.10 157 0 157 A R Q, Tc Tc total I Qc 30 1800 1.04 0.08 160 0 160 35 2100 0.91 0.07 162 0 162 0.21 0.04 026 1.95 5.00 3,18 0.26 40 2400 0.82 0.07 166 0 166 45 2700 0.74 0.06 168 0 168 Qpeak for Case 1= 0.26 cfs 50 3000 0.68 0.06 171 0 171 55 3300 0.64 0.05 176 0 176 60 3600 0.61 0.05 183 0 183 CASE 2 • 65 3900 0.60 0.05 194 0 194 70 4200 0.58 0.05 202 0 202 Case 2 assumes a Time of Concentration less than 5 minutes so that the 75 4500 0.56 0.05 209 0 209 peak flow =.90(3.18)(Imp. Area) = 0.26 cfs 80 4800 0.53 0.04 210 0 210 85 5100 0.52 0.04 219 0 219 90 5400 0.50 0.04 223 0 223 Sa, the Peak flow for the Basin is the greater of the two fiows, 95 5700 0.49 0.04 230 0 230 0.26 cfs 100 6000 0.48 0.04 237 0 237 208' DRAINAGE POND CALCULATIONS Required'208' Storage Volume = Impervious Area x.5 in ! 12 iNft 163 cu ft 208' Storage Volume Provided 165 cu ft DRYWELL REQUIREMENTS -10 YEAR DESIGN STOR Maximum Storage Required by Bowstring 219 cu ft . Number and Type of Drywells Required ERR Single ERR Double BOWSTRING METHOD PROJECT: Riverwalk 9th Addition PEAK FLOW CALCULATION PROJECT Riverwalk 9th Addition DETENTION BASIN DESIGN BASIN: Combined HI & JK BASIN: Combined HI & JK 10-Year Design Starm DESIGNER: S. Murphy Tot. Area 1.38 Acres DATE: 09116 Imp. Area 11470 SF C = 0.29 Time Increment (min) 5 CASE 1 Time of Conc. (min) 5.83 Outflow (cfs) , 1 50 ft. Overland Flow Design Year Flow ' 10 Area (aaes) 1.38 Ct = 0.15 Impervious Area (sq ft) 11470 L= 50 ft. 'C' Factar 0.29 n= 0.40 '208' Volume Provided 505.5 S= 0.020 Area' C 0.400 Tc = 2.93 min., by Equation 3-2 of Guidelines Time Time Inc. Intens, Q Devel. Vol.ln Vol.Out Storage 311 ft. Gutter flow ' (min) (sec) (iNhr) (cfs) (cu ft) (cu ft) (cu ft) Z1= 50.0 For Z2 5.83 350 2.95 1.18 552 350 203 Z2 = 3.5 Type B =1,0 n= 0.016 Rolled = 3.5 5 300 3.18 1.27 512 300 212 S= 0,011 10 600 2.24 0.90 644 600 44 15 900 1.77 0.71 722 900 -178 d= 0.157 ft. 20 1200 1.45 0.58 765 1200 -435 25 1500 1.21 0.48 784 1500 -716 • A R Q Tc Tc total I Qc 30 1800 1.04 0.42 799 1800 -1001 35 2100 0.91 0.36 808 2100 -1292 0.66 0.08 1.18 2.90 5,83 2.95 1.18 40 2400 0.82 0.33 827 2400 -1573 45 2700 0.74 0.30 835 2700 -1865 Qpeak for Case 1= 1.16 cfs 50 3000 0.68 0.27 849 3000 -2151 55 3300 0.64 0.26 876 3300 -2424 60 3600 0.61 0.24 906 3600 -2692 CASE 2 65 3900 0.60 0.24 965 3900 -2935 70 4200 0.58 0.23 1002 4200 -3198 Case 2 assumes a Time of Concentration less than 5 minutes so that the 75 4500 0.56 0.22 1035 4500 -3465 peak ilow =.90(3.18)(Imp. Area) = 0.75 cfs 80 4800 0.53 021 1043 4800 -3757 85 5100 0.52 0.21 1086 5100 -4014 90 5400 0.50 0.20 1104 5400 -0296 So, the Peak flow for the Basin is lhe greater of the two flows, 95 5700 0.49 020 1141 5700 -4559 1.18 cfs 100 6000 0.48 0.19 1175 6000 -4825 208' DRAINAGE POND CALCULATIONS ' Required'208' Storage Volume = Impervious Area x.5 in ! 12 in/fl 478 cu ft ' 208' Storage Volume Provided 505.5 cu ft DRYWELL REQUIREMENTS -10 YEAR DESIGN STORM Maximum Storage Required by Bowstring 212 cu ft , Number and Type of Drywells Required 0 Single 1 Double 50-year STORM BOWSTRING METHOD PROJECT: Riverwalk 9th Addition PEAK FLOW CALCULATION PROJECT Riverwalk 9th Addition DETENTION BASIN DESIGN BASIN: A BASIN; A DESIGNER: S. Murphy Tot. Area 1.12 Acres ' DATE: 09/22 Imp. Area 10748 SF C = 0.32 ' Time Increment (min) 5 CASE 1 Time of Conc. (min) 6.81 Outflow (cfs) 1 120 ft. Overland Flow Design Year Flow ' 50 Area (acxes) 1.12 Ct = 0.15 Impervious Area (sq fl) 10748 L= 120 ft. 'C' Factor 0.32 n= 0.40 , 50-year Volume Provided 573.5 S= 0.020 Area' C 0.358 Tc = 4.95 min., by Equation 3-2 of Guidelines Time Time Inc. Intens. Q Qevel. Vol.ln Vol.Out Storage 202 ft. Gutter flow (min) (sec) (inmr) (cfs) (cu ft) (cu ft) (cu ft) Z1= 50.0 6.81 409 3.95 1.42 776 409 368 Z2 = 3.5 n= 0,016 5 300 4.58 1.64 660 300 360 S= 0.010 10 600 3.20 1.15 847 600 247 15 900 2.45 0.68 912 900 12 d= 0.172 ft. 20 1200 1,95 0.70 936 1200 -264 25 1500 1.62 0,58 952 1500 -548 A R Q Tc Tc total I Qc 30 1800 1.56 0.56 1084 1800 -716 35 2100 1.28 0.46 1027 2100 -1073 0.79 - 0.09 1.42 1.86 6.81 3.95 1.42 40 2400 1.19 0.42 1076 2400 -1322 45 2700 1.08 0.39 1099 2700 -1601 Qpeak for Case 1= 1.42 cfs 50 3000 0.99 0.35 1114 3000 -1886 55 3300 0.92 0.33 1134 3300 -2166 60 3600 0.87 0.31 1166 3600 -2434 CASE 2 65 3900 0.82 0,29 1187 3900 -2713 70 4200 0.80 029 1244 4200 -2956 Case 2 assumes a Time of Concentration less than 5 minutes so that the 75 4500 0,77 0.28 1280 4500 -3220 peak Flow =,90(4.58)(Imp. Area) = 1.02 cfs 80 4800 0,75 027 1328 4800 -3412 85 5100 0,72 0,26 1352 5100 -3748 90 5400 0.71 0.25 1449 5400 -3991 So, the Peak flow for the Basin is the greater of the iwo flows, 95 5700 0.69 0,25 1444 5700 -4256 1.42 cfs 100 6000 0.67 0,24 1474 6000 -4526 208' DRAINAGE POND CALCULATIONS Required'208' Storage Volume = Impervious Area x.5 in ! 12 in/ft 448 cu ft '208' Volume Provided 573.5 cu ft DRYWELL REQUIREMENTS - 50 YEAR OESIGN STORM Maximum Storage Required by Bowstring 368 cu ft • Number and Type of Drywells Required 0 Single 1 Double INLAND PACIfIC ENGINEERING 0 50-year STORM 80WSTRING METHOD PROJECT: Riverwalk 9th Addition PEAK FLOW CALCULATION PROJECT Riverwalk 9th Addition DETENTION BASIN DESIGN BASIN: B BASIN: B DESIGNER: S. Murphy , Tot. Area 0.39 Acres DATE: 09115 Imp. Area 4598 SF C = 0.36 Time Increment (min) 5 CASE 1 Time of Conc, (min) 6.30 Outflow (cfs) 0.3 65 ft. Overland Flow Design Year Flow 50 Area (aaes) 0.39 Ct = 0.15 Imperoious Area (sq ft) 4596 L= 65 ft. 'C' Factor 0.36 n= 0.40 50-year Volume Provided ' 211 S= 0.020 Area " C 0.140 Tc = 3.43 min., by Equation 3-2 of Guidelines Time Time Inc. Intens. Q Devel. Vol.ln Vol.Out Storage 249 ft. Gutter flow (min) (sec) (iNhr) (cfs) (cu ft) (cu ft) (cu ft) Z1= 50.0 6.30 378 4.13 0.58 294 113 180 Z2 = 3.5 n= 0.016 5 300 4.58 0.64 258 90 168 S= 0.010 10 600 3.20 0.45 327 180 147 • 15 900 2.45 0.34 354 270 84 d= 0.123 ft. 20 1200 1.95 0.27 364 360 4 25 1500 1.62 0.23 370 450 -80 A R Q Tc Tc total I Qc 30 1800 1.56 0.22 422 540 -118 35 2100 1.28 0.18 400 630 -230 0.40 0.06 0.58 2.87 6.30 4.13 0.58 40 2400 1.19 0.17 421 720 -299 45 2700 1.08 0.15 429 810 -381 Qpeak for Case 1= 0.58 cfs 50 3000 0.99 0.14 435 900 -465 55 3300 0.92 0.13 443 990 -547 60 3600 0.87 0.12 455 1080 -625 CASE 2 65 3900 0.82 0.12 464 1170 -106 70 4200 0.80 0.11 486 1260 -774 Case 2 assumes a Time of Concentralion less than 5 minutes so that the 75 4500 0.17 0.11 500 1350 -850 peak flow =.90(4.58)(Imp. Area) = 0.44 cfs 80 4800 0.75 0.11 519 1440 -921 85 5100 0.72 0.10 529 1530 -1001 90 5400 0.71 0.10 551 1620 -1069 So, the Peak flow for the Basin is the greater of the two flows, 95 5700 0.69 0.10 565 1710 -1145 0.58 cfs. 100 6000 0.67 0.09 576 1800 -1224 208' DRAINAGE POND CALCULATIONS Required'208' Storage Volume = Impervious Area x.5 in / 12 in/ft 192 cu ft 50 year Volume Provided 187.5 cu ft DRYWELL REQUIREMENTS - 50 YEAR DESIGN STORM Maximum Storage Required by Bowstring 180 cu ft , Number and Type of Drywells Required 1 Single 0 Double INLAND PACIFIC ENGINEERING _I 50-year STORM BOWSTRING METHOD PROJECT: Riverwalk 9th Addition PEAK FLOW CALCULATION PROJECT Riverwalk 9th Addition DETENTION BASIN DESIGN BASIN: C BASIN: C DESIGNER: S. Murphy Tot. Area 1.48 Acres DATE: 09l15 Imp. Area 11380 SF C = 0.28 , Time Increment (min) 5 CASE 1 Time of Conc, (min) 6,51 Outflow (cfs) ' 1 ' 50 ft, Overland Flow Design Year Flow ' 50 Area (acres) 1.48 Ct = 0.15 Impervious Area (sq ft) 11380 L= 50 ft. 'C' Factor 0.28 n= 0.40 ' 50-year Volume Provided 496 S= 0,020 Area " C 0.414 Tc = 2.93 min., by Equalion 3-2 of Guidelines Time Time Inc. Intens. Q Devel. Vol.ln Vol.Out Storage 447 ft, Gurter flow (min) (sec) (inmr) (cfs) (cu ft) (cu ft) (cu ft) Z1= 50.0 6.51 391 4.06 1,68 880 391 490 Z2 = 3.5 n= 0.016 5 300 4.58 1.90 763 300 463 S= 0.013 10 600 320 1.33 972 600 372 15 900 2,45 1.02 1049 900 149 d= 0.174 ft. 20 1200 1.95 0.81 1077 1200 -123 25 1500 1.62 0.67 1096 1500 -404 A R Q Tc Tc total I Qc 30 1800 1.55 0.65 1249 1800 -551 35 2100 1.28 0.53 1184 2100 -916 0.81 0.09 1.68 3.58 6,51 4.06 1.68 40 2400 1.19 0.49 1244 2400 -1156 45 2700 1.08 0.45 1268 2700 -1432 Qpeak for Case 1= 1.68 cfs • 50 3000 0.99 0.41 1285 3000 -1715 55 3300 0.92 0.38 1309 3300 -1991 60 3600 0.87 0.36 1346 3600 -2254 CASE 2 • 65 3900 0.82 0.34 1370 3900 -2530 70 4200 0.80 0.33 1436 4200 -2764 • Case 2 assumes a Time of Concentration less than 5 minutes so lhat the 75 4500 0.77 0.32 1478 4500 -3022 peak flow =.90(4.58)(Imp. Area) = 1.08 cfs 80 4800 0.75 0.31 1533 4800 -3267 85 5100 0.72 0.30 1561 5100 -3539 90 5400 0.71 0.29 1628 5400 -3772 So, the Peak tlow for the Basin is the greater of lhe two nows, 95 5700 0.69 0.29 1668 5700 -4032 1.68 cfs 100 6000 0.67 0.28 1703 6000 -4297 208' DRAINAGE POND CALCULATIONS Required'208' Storage Volume = Impervious Area x.5 in I 12 iNft 474 cu ft 50 year Volume Provided 496 cu ft DRYWELL REQUIREMENTS - 50 YEAR DESIGN STOR Maximum Storage Required by 8owstring 490 cu ft Number and Type of Drywells Required 0 Single 1 Oouble INLAND PACIFIC ENGINEERING L-A L- ~ 50-year STORM BOWSTRING METHOD PROJECT: Riverwalk 9th Addition PEAK FLOW CALCULATION PROJECT Riverwalk 9th Addition DETENTION BASIN DESIGN BASIN: 0 BASIN: D DESIGNER: S. Murphy Tot. Area 0.75 Ac,res DATE: 09115 Imp. Area 6174 SF C = 0.29 Time Increment (min) 5 CASE 1 Time of Conc. (min) 6.70 Outflow (cfs) 0.3 120 ft. Overiand Flow Design Year Flow 50 Area (acres) 0.75 Ct = 0.15 Impervious Area (sq ft) 6174 L= 120 ft. 'C' Factor . 029 n= 0.40 50-year Volume Provided 262 S= 0.020 Area * C 0.217 Tc = 4.95 min., by Equation 3-2 of Guidelines Time Time Inc. Intens. Q Devel. Vol.ln Vol.Out Storage 200 fl. Gutter flow (min) (sec) (inmr) (cfs) (cu ft) (cu fl) (cu ft) Z1= 50.0 6.70 402 3.99 0.87 468 121 347 Z2 = 3.5 - n= 0.016 5 300 4.58 1.00 400 90 310 S= 0.016 10 600 3.20 0.70 513 180 333 . 15 900 2.45 0.53 552 270 282 d= 0.131 ft. 20 1200 1.95 0.42 567 360 207 25 1500 1.62 0.35 577 450 127 A R Q Tc Tc total I Qc 30 1800 1.56 0.34 657 540 117 35 2100 1.28 0.28 623 630 -7 0.46 0.07 0.87 1.75 6.70 3.99 0.87 40 2400 1.19 0.26 654 720 -66 45 2700 1,08 0.23 666 810 -144 Qpeak for Case 1= 0.87 cfs 50 3000 0.99 0.22 675 900 -225 55 3300 0.92 0.20 688 990 -302 60 3600 0.87 0.19 707 1080 -373 CASE 2 65 3900 0.82 0.18, 720 1170 450 70 4200 0.80 0.17 755 1260 -505 Case 2 assumes a Time of Concentration less than 5 minutes so that the 75 4500 0.77 0.17 777 1350 -573 peak flow =.90(4.58)(Imp. Area) = 0,58 cfs 80 4800 0.15 0.16 805 1440 -635 85 5100 0.72 0.16 820 1530 -710 • 90 5400 0.71 0.15 855 1620 -765 So, the Peak flow for the Basin is the greater of the two Oows, 95 5700 0.69 0.15 876 1710 •834 • 0.87 cfs 100 6000 0.67 0.15 894 1800 -906 208' DRAINAGE POND CALCULATIONS Required'208' Storage Volume . . = Impervious Area x.5 in f 12 iNN 257 cu ft 50 year Volume Provided 262 cu fl DRYWELL REQUIREMENTS - 50 YEAR DESIGN STORM Maximum Storage Required by Bowstring 347 cu ft Number and Type of Drywells Required 1 Single 0 Double INLAND PACIFIC ENGINEERING 50-year STORM BOWSTRING METHOD PROJECT: Riverwalk 9th Addition PEAK FLOW CALCULATION PROJECT Riverwalk 9ih Addition DETENTION BASIN DESIGN • BASIN: E BASIN; E DESIGNER: S. Murphy Tot. Area 0.64 Acres DATE: 09115 Imp. Area 11277 SF C = 0.45 Time Increment (min) 5 CASE 1 Time of Conc. (min) 5.00 Oufflow (cfs) 0.3 30 ft. Overland Flaw Design Year Flow 50 Area (acres) 0.64 Ct = 0.15 Imperoious Area (sq ft) 11277 L= 30 ft. 'C' Factor 0.45 • n= 0.02 50-year Volume Provided 487.5 S= 0.020 Area * C 0.288 Tc = 0.36 min., by Equation 3-2 of Guidelines Time Time Inc. Intens. Q Devel. Vol.ln Vol.Out Storage 186 ft. Gutter flow (min) (sec) (inlhr) (cfs) (cu ft) (cu ft) (cu ft) Z1 = 50.0 5.00 300 4.58 1.32 530 90 440 Z2 = 3.5 n= 0.016 5 300 4.58 1.32 530 90 440 S= 0.010 10 600 3.20 0.92 647 180 467 15 900 2.45 0.71 707 270 437 d= 0.167 ft. 20 1200 1.95 0.56 731 360 • 371 25 1500 1.62 0.47 747 450 297 A R Q Tc Tc total I Qc 30 1800 1.56 0.45 855 540 315 35 2100 1.28 0.37 812 630 182 0.75 0,08 1.32 1.75 5.00 4.58 1.32 40 2400 1.19 0.34 854 720 134 45 2700 1.08 0.31 872 810 62 Qpeak for Case 1= 1,32 cfs 50 3000 0.99 0.29 664 900 -16 , 55 3300 0.92 0.26 901 990 -89 60 3600 0.87 0.25 928 1080 -152 CASE 2 65 3900 0.82 0.24 945 1170 -225 70 4200 0.80 0.23 991 1260 -269 Case 2 assumes a Time of Concentration less than 5 minutes so that the 75 4500 0.77 0.22 1021 1350 -329 peak flow =.90(4.58)(Imp. Area) = 1.07 cfs 80 4800 0.75 0.22 1059 1440 -381 85 5100 0.72 0.21 1079 1530 451 ' 90 5400 0.71 0.20 1125 1620 495 So, the Peak flow for the Basin is Ihe grealer of the two flows, , 95 5700 0,69 0.20 1153 1710 -557 1.32 cfs 100 6000 0,67 0.19 1177 1800 -623 208' DRAINAGE POND CALCULATIONS Required'208' Storage Volume • = Impervious Area x.5 in ! 12 iNft 470 cu ft 54 year Volume Provided 487.5 cu ft DRYWELL REQUIREMENTS - 50 YEAR DESIGN STORM Maximum Storage Required by Bowstring 467 cu ft Number and Type af Drywelis Required 1 Single 0 Double INLAND PACIFIC ENGINEERING , 50-year STORM BOWSTRING METHOD PROJECT: Riverwalk 9th Addiiion ' PEAK FLOW CALCULATION PROJECT Riverwalk 9th Addition DETENTION BASIN DESIGN BASIN: F BASIN: F DESIGNER: S. Murphy Tot. Area 0.51 Acres DATE: 09115 Imp. Area 5161 SF C = 0.31 Time Increment (min) 5 CASE 1 Time of Conc. (min) 5.83 Oulnow (cfs) 0.3 100 fl. Overland Flow Design Year Flow ' 50 ' Area (acres) 0.57 Ct = 0.15 Impervious Area (sq ft) 5161 L= 100 ft. 'C' Factor 0.31 n= 0.40 50-year Votume Provided 223.5 S= 0.020 Area * C 0.177 Tc = 4.44 min., by Equation 3-2 of Guidelines Time Time Inc. intens. Q Devel. Vol.ln Vol.Out Storage 146 ft. Gutter flow (min) (sec) (iNhr) (cfs) (cu ft) (cu ft) (cu ft) •Z1 =50.0 5.83 350 4.29 0.76 356 105 251 Z2 = 3.5 n= 0.016 5 300 4.58 0.81 325 90 235 S= 0.014 ' 10 600 3.20 0.57 406 180 226 15 900 2.45 0,43 441 270 171 d= 0.127 ft, 20 1200 1.95 0,34 454 360 94 25 1500 1.62 0.29 463 450 13 A R Q Tc Tc total I Qc 30 1800 1.56 028 529 540 -11 35 2100 1.28 023 502 630 -128 0,43 0.06 0.76 1,39 5.83 4.29 0.76 40 2400 1.19 0.21 527 720 -193 45 2700 1.08 0.19 538 810 -272 Qpeak for Case 1= 0.76 cfs 50 3000 0.99 0.17 546 900 -354 55 3300 0.92 0,16 556 990 -434 60 3600 0.87 0.15 572 1080 -508 C;4SE 2 65 3900 0.82 0,14 582 1170 -588 70 4200 0.80 0.14 611 1260 •649 Case 2 assumes a Time of Concentra6on less than 5 minutes su that the 75 4500 0.77 0.14 628 1350 -722 peak flow =.90(4.58)(Imp. Area) = 0.49 cfs 80 4800 0.75 0.13 652 1440 -788 85 5100 0.72 0.13 664 1530 -866 ' 90 5400 0.71 0.13 692 1620 -928 So, the Peak flow for the Basin is the greater of the two flows, 95 5700 0.69 0.12 709 1710 -1001 0.76 cfs , 100 6000 0.67 , 0.12 724 1800 -1076 208' DRAINAGE POND CALCULATIONS Required'208' Starage Volume = Impervious Area x.5 in / 12 inlft 215 cu ft • 50 year Volume Provided 223.5 cu ft DRYWELL REQUIREMENTS - 50 YEAR DESIGN STORM Maximum Slorage Required by Bowstring 251 cu ft . Number and Type of Drywells Required 1 Single 0 Double INLAND PACIFIC ENGINEERING , L__ I 50-year STORM BOWSTRING METHOD PROJECT: Rivenvalk 9th Addition PEAK FLOW CALCULATION PROJECT Riverwalk 9th AddiUon DETENTION BASIN DESIGN BASIN: G BASIN; G DESIGNER: S. Murphy Tot. Area 0.63 Acres DATE; 09115 Imp. Area 6092 SF C = 0.32 Time Increment (min) 5 CASE 1 Time of Conc. (min) 5.00 Oulflow (cfs) 0.3 50 fl. Overland Flow Design Year Flow 50 Area (acres) 0.63 Ct = 0.15 Impervious Area (sq ft) 6092 . , L = 50 ft. . , , 'C' Factor 0.32 n= 0.40 50-year Volume Provided 296.5 S= 0.020 Area' C 0202 Tc = 2.93 min., by Equation 3-2 of Guidelines Time Time Inc. Intens. Q Devel. Vol.ln Vol.Out Storage 210 ft. Gutter flow ' (min) (sec) (iNhr) (cfs) (cu ft) (cu ft) (cu ft) Z1 = 50.0 5.00 300 4.58 0.92 371 90 281 Z2 = 3.5 n= 0.016 5 300 4.56 0.92 371 90 281 . S= 0.016 10 600 3.20 0.65 453 180 273 15 900 2.45 0.49 495 270 225 d= 0.221 ft. 20 1200 1,95 0.39 512 360 152 25 1500 1.62 0.33 523 450 73 A R Q Tc Tc total I Qc 30 1800 1,56 0.31 598 540 58 35 2100 1.28 0.26 568 630 -62 1.30 0.11 3.52 1.29 5.00 4.58 0.92 40 2400 1,19 0.24 598 720 -122 45 2700 1,08 0.22 610 810 -200 Qpeak for Case 1= 0.92 cfs ' 50 3000 0,99 0.20 619 900 -281 55 3300 0.92 0.19 631 990 -359 60 3600 0.87 0.18 649 1080 431 CASE 2 65 3900 0.82 0.17 662 1170 -508 70 4200 0.80 0.16 694 1260 -566 Case 2 assumes a Tme of ConcQntration less than 5 minutes so that the 75 4500 0.77 0.16 714 1350 -636 peak flow =.90(4.58)(Imp, Area) = 0.58 cfs , 80 4800 0.75 0.15 741 1440 -699 . 85 5100 0.72 0.15 755 1530 -775 • 90 5400 0.71 0.14 788 1620 -832 So, the Peak flow for the 8asin is the greater of the iwo flows, , 95 5700 0.69 0.14 807 1710 -903 0.92 cfs 100 6000 0.67 0.14 824 1800 -976 208' DRAINAGE POND CALCULATIONS Required '208'Storage Volume = Impenrious Area x.5 in ! 12 inlft 254 cu ft . 50 year Volume Provided 296,5 cu ft DRYWELL REQUIREMENTS - 50 YEAR DESIGN STORM Maximum Storage Required by Bowstring 281 cu ft Number and Type of Orywells Required 1 Single 0 Double INLAND PACIFIC ENGINEERING L_j • 50-year, STORM BOWSTRING METHOD PROJECT: Riverwalk 9th Addition PEAK FLOW CALCULATION PROJECT Riverwaik 9th Addition DETENTION BASIN DESIGN BASIN: H BASIN: H DESIGNER: S. Murphy Tot. Area 0.07 Acres DATE: 09115 Imp. Area 3188 SF C = 0.90 Time Increment (min) 5 CASE 1 Time of Conc. (min) 5.00 Oufflow (cfs) 0 40 ft. Overland Flow Design Year Flow ' 50 Area (acres) 0.07 Ct = 0.15 Impervious Area (sq ft) 3188 L= 40 ft. 'C' Factor 0.9 n= 0.40 50-year Volume Provided 136 S= 0.020 Area " C 0.063 Tc = 2.56 min., by Equation 3-2 of Guidelines Time Time Inc. Intens. Q Devel. Vol.ln Vol.Out Storage 143 ft. Gutter flow (min) (sec) (inmr) (cfs) (cu ft) (cu ft) (cu ft) Z1= 50.0 5.00 300 4.58 029 116 0 116 Z2 = 3.5 n= 0.016 5 300 4.58 029 116 0 116 S= 0.011 10 600 320 0.20 142 0 142 15 900 2.45 0.15 155 0 155 d= 0.093 ft. 20 1200 1.95 0.12 160 0 160 ' 25 1500 1.62 0.10 164 0 164 A R Q Tc Tc total I Qc 30 1800 1.56 0.10 187 0 187 35 2100 1.28 0.08 178 0 178 0.23 0.05 0.29 1.89 5.00 4.58 0.29 40 2400 1.19 0.07 187 0 187 45 2700 1.08 0,07 191 0 191 Qpeak for Case 1= 0.29 cfs 50 3000 0.99 0.06 193 0 193 55 3300 0.92 0.06 197 0 197 60 3600 0.87 0.05 203 0 203 CASE 2 65 3900 0.82 0.05 207 0 207 70 4200 0.80 0.05 217 0 217 Case 2 assumes a Time of Concentration less than 5 minutes so that the 75 4500 0.77 0.05 223 0 223 peak flow =.90(4.58)(Imp. Area) = 0.30 cfs 80 4800 0.75 0.05 232 0 232, 85 5100 0.72 0.05 236 0 236 90 5400 0.71 0.04 246 0 246 So, the Peak flow for the Basin is the greater of the two flows, 95 5700 0.69 0.04 252 0 252 0.30 cfs 100 6000 0.67 0.04 258 0 258 208' DRAINAGE POND CALCULATIONS Required'208' Storage Volume = Impervious Area x.5 in 112 in/ft 133 cu ft 50 year Volume Provided 136 cu ft DRYWELL REQUIREMENTS -10 YEAR DESIGN STOR , Maximum Storage Required by Bowstring 236 cu ft , Number and Type of Drywelis Required. 0 Single ERR Double INLAND PACIFIC ENGINEERING 50-year STORM BOWSTRING METHOD PROJECT; Riverwalk 9th Addition PEAK FLOW CALCULATION PROJECT Riverwalk 9th Additian DETENTION BASIN DESIGN BASIN: I BASIN: I DESIGNER; S. Murphy Tot. Area 0.46 Acres DATE: 09115 Imp. Area 5472 SF C = 0.36 Time Increment (min) 5 CASE 1 Time of Conc. (min) 5.00 • Outflow (cfs) 0.3 40 ft. Overland Flow Design Year Flow ' 50 Area (acres) 0.46 Ct = 0.15 Impervious Area (sq ft) 5472 L= 40 ft. 'C' Factor 0.36 n= 0.40 50-year Volume Provided 231 S= 0.020 Area " C 0.166 Tc = 2.56 min., by Equation 3-2 of Guidelines , Time Time Inc. Intens. Q Devel. Vol.ln Vol.Out Slorage 143 ft. Gutter flow (min) (sec) (inmr) (cfs) (cu ft) (cu ft) (cu ft) Z1 = 50.0 5.00 300 4.58 0.76 305 90 215 Z2 = 3.5 n= 0,016 5 300 4.58 0.76 305 90 215 S= 0,011 10 600 3.20 0.53 372 180 192 15 900 2.45 0.41 407 270 137 d= 0,133 ft. • 20 1200 1.95 0.32 420 360 60 25 1500 1.62 0.27 430 450 -20 A R Q Tc Tc total I Qc 30 1800 1.56 0.26 491 540 -49 35 2100 1.28 0,21 467 630 -163 0.47 0.07 0.76 1.49 5.00 4.58 0.76 40 2400 1.19 0.20 491 720 -229 45 2700 1.08 0.18 501 810 -309 Qpeak for Case 1 = 0.76 cfs 50 3000 0.99 0.16 509 900 -391 55 3300 0.92 0.15 518 990 -472 60 3600 0.87 0.14 533 1080 -547 CASE 2 65 3900 0.82 0.14 543 1170 -627 70 4200 0,80 0,13 570 1260 -690 Case 2 assumes a Time of Concentration less than 5 minutes so that lhe 75 4500 0.77 0.13 587 1350 -763 peak flow =.90(4.58)(Imp. Area) = 0.52 cfs 80 4800 0.75 0.12 609 1440 -831 85 5100 0.72 0.12 620 1530 -910 ' 90 5400 0.71 0.12 647 1620 -973 So, the Peak flow for the Basin is the greater of the two flows, 95 5700 0.69 0.11 663 1710 -1047 0.76 cfs 100 6000 0.67 0.11 677 1800 -1123 208' DRAINAGE POND CALCULATIONS Required'208' Storage Volume = Impervious Area x.5 in 112 iNft 228 cu ft 50 year Volume Provided 231 cu ft DRYWELL REQUIREMENTS -10 YEAR DESIGN STOR Maximum Storage Required by Bowstring 215 cu ft Number and Type of Drywells Required 1 Single 0 Double INLAND PACIFIC ENGINEERING m o . o 0 0 0 -7j ! 1 50-year STORM BOWSTRING METHOD PROJECT: Riverwaik 9lh Addition PEAK FLOW CALCULATION PROJECT Riverwalk 9th Addition DETENTION BASIN DESIGN BASIN: J BASIN: J DESIGNER: S. Murphy Tot. Area 0,92 Acres DATE: 09I15 Imp. Area 5998 SF C = 0,14 , Time Increment (min) 5 CASE 1 Time of Conc, (min) 6.49 OutFlow (cfs) 0.3 50 ft. Overland Flow Qesign Year Fiow ' 50 Area (acres) 0.92 Ct = 0.15 Impervious Area (sq ft) 5998 L= 50 ft. 'C' Factor 0.14 n= 0,40 50-year Volume Provided 274.5 S= 0.020 Area' C 0.129 Tc = 2.93 min., by Equation 3-2 of Guidelines Time Time Inc. Intens. Q Devel. Vol,ln Vol.Out Storage 311 ft. Gutter flow (min) (sec) (inlhr) (cfs) (cu ft) (cu ft) (cu ft) Z1 = 50.0 6.49 389 4.07 0.52 273 117 156 Z2 = 3.5 n= 0.016 5 300 4.58 0.59 237 90 147 S= 0.011 10 600 3.20 0.41 302 180 122 15 900 2.45 0.32 326 270 56 d= 0,116 ft. 20 1200 1.95 0.25 335 360 -25 25 1500 1.62 0.21 341 450 -109 A R Q Tc Tc total I Qc 30 1600 1.56 0.20 388 540 -152 35 2100 1.28 0.16 368 630 -262 0.36 0.06 0.52 3.56 6.49 4.07 0.52 40 2400 1.19 0.15 387 720 -333 45 2700 1.08 0.14 394 810 -416 Qpeak for Case 1= 0.52 cfs 50 3000 0.99 0.13 399 900 -501 55 3300 0.92 0.12 407 990 -583 60 3600 0.87 0.11 418 1080 -662 CASE 2 65 3900 0.82 0.11 426 1170 -744 ~ 70 4200 0.80 0.10 446 1260 -814 Case 2 assumes a Time of Concentration less lhan 5 minutes so that ihe 75 4500 0.77 0.10 459 1350 -891 peak flow =.90(4.58)(Imp. Area) = 0.57 cfs 80 4800 0.75 0.10 476 1440 -964 85 5100 0.72 0.09 485 1530 -1045 ' 90 5400 0.71 0.09 506 1620 -1114 " So, the Peak flow for the Basin is the greater of the two Flows, 95 5700 0.69 0.09 .518 1110 -1192 0.57 cfs 100 6000 0.67 0.09 529 1800 -1271 208' DRAINAGE POND CALCULATIONS Required '208'Storage Volume = Impervious Area x.5 in ! 12 in/ft 250 cu ft' - 50 year Volume Provided 274.5 cu ft DRYWELL REQUIREMENTS -10 YEAR DESIGN STOR Maximum Storage Required by Bowstring 156 cu ft Number and Type of Drywells Required 1 Single ' 0 Double INLAND PACIFIC ENGINEERING . ~ ) J L 50-year STORM BOWSTRING METHOD PROJECT: Riverwalk 9th Addition PEAK FLOW CALCULATION PROJECT Riverwalk 9th Addition DETENTION BASIN DESIGN BASIN: K BASIN: K DESIGNER: S. Murphy Tot. Area 0.09 Acres DATE: 09115 ' Imp. Area 3908 SF C = 0.90 Time Incxement (min) 5 CASE 1 Time of Conc, (min) 5.00 Outflow (cfs) 0 50 ft. Overland Flow Design Year Flow 50 Area (acres) 0.09 Ct = 0.15 Impervious Area (sq ft) 3908 L= 50 ft. 'C' Factor 0.9 n= 0.40 '208' Volume Provided 185 S= 0.020 Area ' C 0.081 Tc = 2,93 min., by Equation 3-2 of Guidelines Time Time Inc. Intens. Q Devel. Vol.ln Vol.Out Storage 143 ft. Gutter flow (min) (sec) (inmr) (cfs) (cu ft) (cu ft) (cu ft) Z1= 50.0 5.00 300 4.58 0.37 149 0 149 Z2 = 3.5 n= 0.016 5 300 4.56 0.37 149 0 149 ' S= 0,011 10 600 3,20 0.26 182 0 182 15 900 2.45 0.20 199 0 199 d= 0.102 ft. 20 1200 1,95 0.16 206 0 206 25 1500 1.62 0.13 210 0 210 A R Q Tc Tc total I Qc 30 1800 1.56 0.13 240 0 240 35 2100 1,28 0.10 228 0 228 0.28 0,05 0.37 1,78 5.00 4.58 0.37 40 2400 1.19 0.10 240 0 240 45 2100 1.08 0,09 245 0 245 Qpeak for Case 1= 0.37 cfs 50 3000 0.99 0.08 249 0 249 55 3300 0.92 0.07 254 0 254 60 3600 0.87 0.07 261 0 261 CASE 2 65 3900 0.82 0.07 266 0 266 . 70 4200 0.80 0.06 279 0 279 Case 2 assumes a Time of Concentration less than 5 minutes so that the 75 4500 0.77. 0.06 287 0 287 peak flow =.90(4.58)(Imp. Area) = 0.37 cfs 80 4800 0.75 0.06 298 0 298 85 5100 0.72 0.06 303 4 303 • 90 5400 0.71 0.06 316 0 316 So, the Peak flow for the Basin is the grealer of the two flows, 95 5700 0.69 0.06 324 0 324 0,37 cfs 100 6000 0.67 0.05 331 0 331 208' DRAINAGE POND CALCULATIONS Required'208' Storage Volume . = Imperoious Area x.5 in /12 iNft 163 cu ft 50 year Volume Provided 185 cu ft DRYWELL REQUIREMENTS -10 YEAR DESIGN STOR Maximum Storage Required by Bowslring 303 cu ft Number and Type of Drywells Required 0 Single ERR Double INLAND PACIFIC ENGINEERING _J I --J i 50-year STORM BOWSTRING METHOD PROJECT: Riverwalk 9th Addition PEAK FLOW CALCULATION PROJECT Riverwalk 9th Addilion DETENTION BASIN DESIGN BASIN: HI & JK BASIN; HI & JK DESIGNER: S. Murphy Tot. Area 1.38 Acres DATE: 09118 Imp. Area 11470 SF C = 0.29 Time Increment (min) 5 CASE 1., Time of Conc. (min) 5.02 Outflow (cfs) 1 50 ft. Overland Flow Design Year Flow 50 Area (acres) 1.38 Ct = 0.15 Imperoious Area (sq ft) 11470 L= 50 ft. 'C' Factor 0.29 n= 0.40 '208' Volume Provided 505.5 S= 0,020 ' Area' C 0.400 Tc = 2.93 min., by Equation 3-2 af Guidelines Time Time Inc. Intens. Q Devel. Vol.ln Vol.Out Storage 250 ft. Gutter flow (min) (sec) (in/hr) (cfs) (cu ft) (cu ft) (cu ft) Z1 = 50,0 5.02 301 4.57 1.83 738 301 437 Z2 = 3,5 n= 0.016 5 300 4.58 1.83 737 300 437 S= 0.011 10 600 3.20 1.28 899 600 299 15 900 2.45 0.98 983 900 63 d= 0.185 ft. 20 1200 1.95 • 0.78 1016 1200 -164 25 1500 1.62 0,65 1039 1500 -461 A R Q Tc Tc total I Qc 30 1800 1.56 0.62 1188 1800 -612 35 2100 1.28 0.51 1128 2100 -972 0.92 0.09 1.83 2.09 5.02 4.57 1.63 40 2400 1.19 0.47 1187 2400 -1213 45 2700 1.08 0.43 1211 2700 -1489 Qpeak for Case 1= 1.83 cfs 50 3000 0.99 0.40 1229 3000 -1771 55 3300 0,92 0.37 1253 3300 -2047 60 3600 0.87 0.35 1289 3600 -2311 CASE 2 65 3900 0,82 0.33 1313 3900 -2587 10 4200 0.80 0.32 1377 4200 -2823 Case 2 assumes a Time of Concentration less than 5 minutes so that Ihe 15 4500 0.77 0.31 1418 4500 -3082 peak flow =.90(4.58)(Imp, Area) = 1,09 cfs 80 4800 0,75 0.30 1471 4640 -3329 85 5100 0.72 0.29 1499 5100 -3601 • 90 5400 0.71 0.28 1563 5400 -3837 So, the Peak flow for the Basin is the greater of lhe two Oows, 95 5700 0.69 0.28 1602 5700 -4096 1,83 cfs 100 6000 0.67 0.27 1636 6000 -4364 208' DRAINAGE POND CALCULATIONS Required'208' Storage Volume = Impervious Area x.5 in 112 inlft 478 cu ft 50 year Volume Provided 505.5 cu ft DRYWELL REQUIREMENTS -10 YEAR DESIGN STOR Maximum Storage Required by Bowstring 437 cu ft Number and Type of Drywells Required 0 Single 1 Double INLAND'PACIFIC ENGINEERING ~ L_ J I ~ ~ BOWSTRING METHOD PROJECT: Riverwalk 9th Addition PEAK FLOW CALCULATION PROJECT Riverwalk 9th Addition DETENTION BASIN DESIGN BASIN: Predeveloped L BASIN: Predeveloped L 10-Year Design Storm DESIGNER: S. Murphy Tot. Area 0.76 Acres DATE: 09118 Imp. Area 0 SF C = 0.30 Time Increment (min) 5 CASE 1. , Time of Conc. (min) 14.78 Outflow (cfs) 0 470 ft. Overland Flow Design Year Flow ' 10 ' 'Area (acres) 0.76 Ct = 0.15 Impervious Area (sq ft) 0 L= 470 ft. 'C' Factor 0.3 n = 0.40 '208' Valume Provided S= 0.008 Area' C 0.228 Tc = 14,78 min., by Equation 3-2 of Guidelines Time Time Inc. Intens. Q Devel. Vol.ln Val.Out Storage 0 ft. Gutter flow (min) (sec) (inmr) (cfs) (cu ft) (cu ft) (cu fl) Z1= 50.0 For Z2 14.78 887 1.80 0.41 486 0 486 Z2 = 3.5 Type B =1.0 n= 0.016 Rolled = 3.5 5 300 3.18 0.73 291 0 291 S= 0.005 10 600 2.24 0.51 411 0 411 15 900 1.77 0.40 485 0 485 d= 0.122 ft. 20 1200 1.45 0.33 496 0 496 25 1500 1.21 0.28 497 0 497 A R Q Tc Tc total I Qc 30 1800 1.04 0.24 498 0 498 35 2100 0.91 ,021 498 0 498 0.40 0.06 0.41 0.00 14.78 1.80 0.41 40 2400 0.82 0.19 505 0 505 45 2700 0.74 0.17 506 0 506 Qpeak (or Case 1= 0.41 cfs 50 3000 0.68 0.16 512 0 512 55 3300 0.64 0.15 526 0 526 60 3600 0.61 0.14 543 0 543 CASE 2 65 3900 0.60 0.14 575 0 575 • 70 4200 0.58 0.13 595 0 595 Case 2 assumes a Time of Concentration less than 5 minutes so that the 75 4500 0.56 0.13 613 0 613 peak flow =.90(3.18)(Imp. Area) = 0.00 cfs 80 4800 0,53 0.12 616 0 616 85 5100 0.52 0.12 640 0 640 ' 90 5400 0.50 0.11 650 0 650 So, the Peak 8aw for the Basin is the greater of the lwo flows, 95 5700 0.49 0.11 670 0 670 0.41 cfs 100 6000 0.48 0.11 690 0 690 206' DRAINAGE POND CALCULATIONS Required '208'Storage Volume = Impervious Area x,5 in 112 inlft 0 cu ft 208' Storage Volume Provided cu ft DRYWELL REQUIREMENTS -10 YEAR DESIGN STORM Maximum Storage Required by Bowstring 640 cu ft Number and Type of Drywells Required 0 Single ERR Double BOWSTRING METHOD PROJECT: Riverwalk 9th Addition PEAK FLOW CALCULATION PROJECT Riverwalk 9th Addition DETENTION BASIN DESIGN BASIN: Developed L BASIN: Developed L 10-Year Design Storm DESIGNER: S. Murphy Tol. Area 0.76 Acres DATE: 09118 Imp. Area 0 SF C = 0.15 Time Increment (min) 5 CASE 1 Time of Conc. (min) 14.78 Outflaw (cfs) 0 470 ft. Overland Flow Design Year Flow 10 • Area (acres) 0.76 Ct = 0.15 Imperoious Area (sq ft) 0 L= 470 ft. 'C' Factor 0.15 n = 0.40 '208' Volume Provided S= 0.008 Area' C 0.114 Tc = 14.78 min., by Equation 3-2 of Guidelines , Time Time Inc. Intens, Q Devel. Vol.ln Vol.Out Storage 0 ft. Gutter flow (min) (sec) (iNhr) (cfs) (cu ft) (cu ft) (cu ft) Z1 = 50.0 For ZZ 14.78 887 1.80 0.20 243 0 243 Z2 = 3.5 Type B =1.0 n= 0.016 Ralled = 3.5 5 300 3.18 0.36 146 0 146 S= 0.005 10 600 2.24 0,26 205 0 205 15 900 1.77 0.20 242 0 242 d= 0.093 ft. 20 1200 1.45 0.17 248 0 248 25 1500 1.21 0.14 248 0 248 A R Q Tc Tc total I Qc • 30 1800 1.04 0.12 249 0 249 35 2100 0.91 0.10 249 0 249 0.23 0.05 0.20 0.00 14.78 1.80 0.20 40 2400 0.82 0.09 253 0 253 45 2100 0.74 0.08 253 0 253 Qpeak for Case 1= 0.20 cfs 50 3000 0,68 0.08 256 0 256 55 3300 0.64 0.07 263 0 263 60 3600 0.61 0.07 271 0 271 CASE 2 65 3900 0.60 0.07 287 0 287 70 4200 0,58 0.07 298 0 298 .Gase 2 assumes a Time of Concentration less than 5 minutes so ihat the 75 4500 0.56 0.06 307 0 307 peak Flow =,90(3.18)(Imp. Area) = 0.00 cfs 80 4800 0.53 0,06 308 0 308 85 5100 0.52 0.06 320 0 320 • 90 5400 0.50 0.06 325 0 325 So, the Peak flow for the Basin is the greater of the two flows, 95 5700 0.49 0.06 335 0 335 0.20 cfs 100 6000 0.48 0.05 345 0 345 208' DRAINAGE POND CALCULATIONS Required '208'Storage Volume = Imperoious Area x.5 in 112 iNft 0 cu ft 208' Storage Volume Provided cu ft DRYWEII REQUIREMENTS -10 YEAR DESIGN STORM Maximum Storage Required by Bowstring 320 cu ft , Number and Type of Orywells Required 0 Single ERR Double ~ '7 ~ ) ~ I I1 I 1 I 1 ~ ~ (1 ~ 1 ~ ~ 1 L._J f- _J I 1 l__~ ~ ~ ~ 1 [ ) BOWSTRING METFIOD PFtOJECT: Riverwalk 9th Addition PEA9C FLOW CALCUTATIaN PRQJEC"f Rfverwalk 9fh Additian DETEhIT10N BRSIN DESIGN BASIN; Predeveloped M BASIN: Predeveloped M 10-Year Design Storm QESIGNER: S. Murphy Tot. Rrea 0.1 fi Rcres DATE: 09118 Imp Area a SF C = 0.30 - Time Increment (min) ' 5 CASE 1 Time of Conc, (min) 5,00 OutRow (cfs) p 80 ft. Over[and Flow Qesign Year Flaw ' 10 Area (acres) 016 Gt = 0.15 Imperviaus Area (sq ft) a L= 80 ft. . 'C' Factor 0.3 n = 0.40 '208' Valume Provided S= 4.010 Area * C 0.048 Tc = 4.18 min., by Equatian 3-2 of Guidelines Time Tme Inc. Intens. 4 Deve1. Val.ln VoI,Out Storage 0 ft. Gutter flow (min) {sec) (inlhr) (cts) (cu ft) (cu ft) (cu rt) Z1 = 50.0 Far Z2 5.00 304 3.18 0.15 61 0 69 Z2 - 3.5 Type 8 ~ 1.0 n= 0,016 Ralled = 3.5 5 300 119 015 61 0 61 S= 0.405 14 600 2.24 0.11 75 p 75 15 900 1.71 0.08 85 4 85 d= 4.085 R. 20 1200 1.45 O.07 91 0 91 25 1500 1.21 0.06 33 0 93 A R Q Tc Tc total I Qc 34 1800 1.04 0.05 95 0 95 =-W=____ 35 2900 4.99 0.04 86 a 96 0119 0.04 4.15 0.00 5.04 3.18 0.15 40 2400 0.82 0.04 98 0 98 45 2700 6.74 0.04 104 0 100 Qpeak far Case 1= 0.15 cfs 50 3000 0.68 0,03 101 0 101 55 3300 0.64 0.03 105 4 105 60 3600 a.61 0.03 108 0 108 GASE 2 65 3904 4M 0.03 115 0 115 70 4204 0.58 0,03 120 6 120 Case 2assume5 a Time af Goncentraiian less than 5 minutes so that fhe 75 4500 4.56 0.03 124 0 124 peak flow =.90(3.18)(Imp. Rrea) = 0.08 cfs 80 4800 0.53 0.03 125 4 125 85 5100 0.52 O.02 130 a 130 cY4 • 90 5400 0.50 0,02 137 a 132 So, the Pea k fipw fpr the Basin is the greater of the kwo flows, 95 SlpQ 0.49 0.02 136 a 186 0.15 cfs 100 GOOQ 0.48 4,02 141 0 141 24$' QRAINAGE PDND CALCULATION$ Required'2Q8' Starage Volume = Imperviaus Area x.5 in ! 12 rrJft D cu ft 248' Starage Volume Provided cw fl QRYWELL REQUIREMENTS - 10 YEAR QES1GN STORM Maximum Stnrage Required b}r Bawslring 130 cu fl , IVumber and Type of Qryurells Required 0 5ir,gle ERR Qou6le . , BOWSTRING METHOD PROJECT: Riverwalk 9th Addition PEAK FLOW CALCULATION PROJECT Riverwalk 91h Addition DETENTION BASIN DESIGN BASIN: Developed M . BASIN: Developed M 10-Year Design Storm DESIGNER: S. Murphy Tot. Area 0.16 Acres DATE: 09118 Imp. Area 0 SF . C = 0.15 Time Incremeni (min) 5 CASE 1 Time of Conc. (min) 5.00 OuMow (cfs) 0 80 ft. Overland Flow Design Year Flow ' 10 Area (acres) 0.16 Ct = 0.15 Impervious Area (sq ft) 0 L= 80 ft. , 'C' Factor 0,15 n = 0.40 '208' Volume Provided S= 0.010 Area " C 0.024 Tc = 4.78 min., by Equation 3-2 of Guidelines Time Time Inc. Intens. Q Devel. Val.ln Val.Out Storage 0 ft. Gutter flow (min) (sec) (iNhr) (cfs) (cu ft) (cu ft) (cu ft) , Z1= 50.0 For Z2 5.00 300 3.18 0.08 31 0 31 Z2 = 3.5 Type B =1,0 n= 0.016 Rolled = 3.5 5 300 3.18 0,08 31 0 31 S= 0.005 10 600 2.24 0.05 38 0 38 15 900 1.77 0.04 43 0 43 d= 0.065 ft. 20 1200 1.45 0.03 45 0 45 25 1500 1.21 0.03 47 0 47 A R Q Tc Tc total I Qc 30 1800 1.04 0.02 47 0 47 35 2100 0.91 0.02 48 0 48 0.11 0.03 0.08 0.00 5.00 3.18 0.08 40 2400 0.82 0.02 . 49 0 49 45 2700 0.74 0.02 50 0 50 Qpeak for Case 1= 0.08 cfs 50 3000 0.68 0.02 51 0 51 55 3300 0.64 0.02 52 0 52 60 3600 0.61 0.01 54 0 54 CASE 2 65 3900 0.60 0.01 58 0 58 70 4200 0.58 0.01 60 0 60 Case 2 assumes a Time of Concentration less ihan 5 minutes so that the 75 4500 0.56 0.01 62 0 62 peak Oow =.90(3,18)(Imp. Area) = 0.00 cfs 80 4800 0.53 0.01 62 0 62 85 5100 0.52 0.01 65 0 65 90 5400 0.50 0.01 66 0 66 So, the Peak flow for the Basin is the greater of the two flows, 95 5700 0.49 0.01 68 0 68 0.08 cfs 100 6000 0.48 0.01 70 0 70 208' DRAINAGE POND CALCULATIONS Required'208' Storage Volume = Impervious Area z.5 in 112 iNft 0 cu ft 208' Storage Valume Provided cu ft DRYWELL REQUIREMENTS -10 YEAR DESIGN STORM Maximum Storage Required by 8awstring 65 cu ft ' Number and Type of Drywells Required 0 Single ERR Double L- BOWSTRING METHOD PROJECT; Rivenrralk 9th Addition PEAK FLOW CALCULATION PROJECT Riverwalk 9th Addition DETENTION BASIN DESIGN BASIN: Predeveloped N • BASIN: Predeveloped N 10-Year Design Storm DESIGNER; S. Murphy Tot. Area 0.26 Acres DATE: 09118 Imp. Area 0 SF C = 0.30 Time Increment (min) 5 CASE 1 Time of Conc, (min) 5,00 Outflow (cfs) 0 50 ft. Overland Flow Design Year Flow 10 Area (acres) 026 Ct = 0.15 Impervious Area (sq ft) 0 L= 50 ft. 'C' Factor 0.3 n = 0.40 '208' Volume Provided S= 0.008 Area " C 0,078 Tc 3.85 min., by Equation 3-2 of Guidelines Time Time Inc. Intens. Q Devel. Vol.ln Vol.Out Storage 0 ft. Gutter flow (min) (sec) (iNhir) (cfs) ' (cu ft) (cu ft) (cu ft) Z1= 50.0 For Z2 5.00 300 3.18 0.25 100 0 100 Z2 = 3.5 Type B =1.0 n= 0.016 Rolled = 3.5 5 300 3.18 0.25 100 0 100 S= 0.005 ' 10 600 2.24 0.17 123 0 123 15 900 1.77 0,14 138 0 138 d= 0.102 ft. 20 1200 1.45 0,11 147 0 147 25 1500 1,21 0,09 151 0 151 A R Q Tc Tc total I Qc 30 1800 1.04 0.08 154 0 154 35 2100 0.91 0.07 156 0 156 0.28 0.05 0.25 0.00 5.00 3.18 0.25 40 2400 0.82 0.06 160 0 160 45 2700 0.74 0.06 162 0 162 Qpeak for Case 1= 025 cfs 50 3000 0.68 0.05 165 0 165 55 3300 0.64 0.05 170 0 170 60 3600 0.61 0.05 176 0 176 CASE 2 65 3900 0.60 0.05 187 0 187 70 4200 0.58 0.05 195 0 195 Case 2 assumes a Time of Concentration less than 5 minutes so lhat the 75 4500 0.56 0.04 201 0 201 peak flow =.90(3.18)(Imp. Area) = 0.00 cfs 80 4800 0.53 0.04 203 0 203 85 5100 0.52 0.04 211 0 211 90 5400 0.50 0.04 215 0 215 So, lhe Peak flow for lhe Basin is the greater of the two flows, 95 5700 0.49 0.04 222 0 222 0.25 cfs 100 6000 0.48 0.04 228 0 228 , 208' DRAINAGE POND CALCULATIONS Required '208'Storage Volume = Impervious Area x.5 in I 12 inlft 0 cu ft 208' Storage Volume Provided cu ft DRYWELL REQUIREMENTS -10 YEAR DESIGN STORM Maximum Storage Required by Bowstring 211 cu fl Number and Type of Orywells Required 0 Single ERR Double BOWSTRING METHOD PROJECT: Riverwalk 9th AddiGon PEAK FLOW CALCULATION PROJECT Riverwalk 9th Addition DETENTION BASIN DESIGN BASIN: Developed N BASIN: Developed N 10-Year Design Storm DESIGNER: S. Murphy Tot. Area 0.26 Acres DATE: 09l18 Imp. Area 0 SF C = 0.15 Time Increment (min) 5 . CASE 1 Time of Conc, (min) 5.00 • Outflow (cfs) 0 50 ft. Overland Flow Design Year Flow 10 Area (acres) 0.26 Ct = 0.15 Imperoious Area (sq ft) 0 L= 50 ft. 'C' Factor 0.15 n = 0.40 '208' Volume Provided S= 0.006 Area' C 0.039 Tc = 3.85 min., by Equation 3-2 of Guidelines Time Time Inc. Intens. Q Devel. Vol.ln Vol.Out Storage 0 ft. Gutter flaw •(min) (sec) (iNhr) (cfs) (cu ft) (cu ft) (cu ft) - Z1 = 50.0 For Z2 5.00 300 3.18 0.12 50 0 50 Z2 = 3.5 Type B =1.0 n= 0.016 Rolled = 3.5 5 300 3.18 0.12 50 0 50 S= 0.005 10 600 2,24 0,09 61 0 61 15 900 1.77 0.07 69 0 69 d= 0.078 ft. 20 1200 1.45 0.06 74 0 74 25 1500 1,21 0.05 76 0 76 A R Q Tc Tc total I Qc 30 1800 1.04 0,04 77 0 77 35 2100 0.91 0.04 78 0 78 0.16 . 0.04 0.12 0.00 5.00 3.18 0,12 40 2400 0.82 0.03 80 0 80 . 45 2700 0.74 0.03 81 0 81 Qpeak for Case 1= 0.12 cfs 50 3000 0.66 0.03 82 0 82 55 3300 0.64 0.02 85 0 85 . 60 3600 0.61 0.02 88 0 88 CASE 2 65 3900 0.60 0.02 94 0 94 70 4200 0.56 0.02 97 0 91 . Case 2 assumes a Time of Concentration less than 5 minutes so that Ihe 75 4500 0.56 0.02 101 0 101 peak flow =.90(3.18)(Imp. Area) = 0.00 cfs 80 4800 0.53 0.02 101 0 101 85 5100 0.52 0.02 105 0 105 90 5400 0.50 0.02 107 0 107 So, the Peak flow for the Basin is the greater of the two flows, 95 5700 0,49 0.02 111 0 111 0.12 cfs 100 6000 0,48 0.02 114 0 114 208' DRAINAGE POND CALCUTATIONS Required '208'Storage Volume = Impervious Area x.5 in 112 inlft 0 cu ft 208' Storage Volume Provided cu ft DRYWELL REQUIREMENTS -10 YEAR DESIGN STORM Maximum Storage Required by Bowstring 105 cu ft . , Number and Type of Drywells Required 0 Single ERR Dauble ~ L__J A BOWSTRING METHOD PROJECT: Riverwalk 9th Addition PEAK FLOW CALCULATION PROJECT Riverwalk 9th Addition DETENTION BASIN DESIGN BASIN: Predeveloped 0 BASIN: Predeveloped 0 10-Year Design Storm DESIGNER: S. Murphy Tot. Area 0.85 Acres DATE: 09l18 Imp. Area 0 SF C = 0.30 Time Inaement (min) 5 CASE 1 Time of Conc. (min) 5.46 Outflow (cfs) 0 100 ft. Overland Flow Design Year Flow ` 10 Area (acres) 0.85 . Ct = 0.15 Imperoious Area (sq ft) , 0 L= 100 ft. 'C' Factor 0.3 n = 0.40 '208' Volume Provided S= 0.010 Area * C 0,255 Tc = 5,46 min., by Equation 3-2 of Guidelines Time Time Inc. intens, Q Devel. Vol.ln Vol.Out Storage 0 ft. Gutter flow , (min) (sec) (inlhr) (cfs) (cu ft) (cu ft) (cu ft) Z1= 50.0 For Z2 5.46 328 3.06 0.78 343 0 343 Z2= 3.5 TypeB=1.0 n= 0.016 Rolled = 3.5 5 300 3.18 0.81 326 0 326 . • S= 0.005 • 10 600 2.24 0.57 406 0 406 15 900 1.77 0.45 457 0 457 d= 0.156 ft. 20 1200 1.45 0.37 485 0 485 25 1500 121 0.31 497 0 497 A R Q Tc Tc total I Qc 30 1800 1.04 0.27 507 0 507 35 2100 0.91 0.23 513 0 513 0.65 0.08 0.18 0.00 5.46 3.06 0.78 40 2400 0.82 0.21 525 0 525 45 2700 0.74 0.19 531 0 531 Qpeak for Case 1= 0.78 cfs 50 3000 0.68 0.17 540 0 540 55 3300 0.64 0.16 557 0 557 60 3600 0.61 0,16 577 0 577 CASE 2 65 3900 0.60 0,15 614 0 614 70 4200 0.58 0,15 638 0 638 Case 2 assumes a Time of Concentration less than 5 minutes so that the 75 4500 0.56 0,14 659 0 659 peak flow =.90(3.18)(Imp. Area) = 0.00 cfs 80 4800 0.53 0,14 664 0 664 85 5100 0.52 0,13 691 0 691 90 5400 0.50 0.13 103 0 703 So, the Peak flow for the Basin is the greater of the two flows, 95 5700 0.49 0.12 126 0 726 0.78 cfs 100 6000 0.48 0.12 748 0 748 208' ORAINAGE PONO CALCULATIONS , , . . Required'208' Storage Volume ' = ImpeNious Area x.5 in 112 inlfl 0 cu ft 208' Storage Volume Provided cu ft DRYWELL REQUIREMENTS -10 YEAR DESIGN STORM Maximum Storage Required by Bowstring 691 cu ft Number and Type of Drywells Required 0 Single ERR Double BOWSTRING METHOD PROJECT: Riverwalk 9th Additian PEAK FLOW CALCULATION PROJECT Riverwalk 9th Addition DETENTION BASIN DESIGN ' BASIN: Developed 0 BASIN: Developed 0 10-Year Design Storm DESIGNER: S. Murphy Tat. Area 0.85 Acres DATE: 09I18 Imp. Area 0 SF C = 0.15 Time Increment (min) 5 CASE 1 Time of Conc. (min) 5.46 OutFlow (cfs) 0 100 ft. Overland Fiow Design Year Flow 10 Area (acres) 0.85 Ct = 0.15 Impervious Area (sq ft) 0 L= 100 ft. 'C Factor 0.15 ' n = 0.40 '208' Volume Provided S= 0.010 Area' C 0.128 Tc = 5.46 min., by EquaGon 3-2 of Guidelines Time Time Inc, Intens, Q Devel. Vol.ln Vol.Out Storage 0 ft. Gutter flow (min) (sec) (inmr) (cfs) (cu ft) (cu ft) (cu ft) Z1= 50.0 For Z2 5.46 328 3.06 0.39 171 0 171 Z2 = 3.5 Type B =1.0 n= 0.016 Rolled = 3.5 5 300 3.18 0.41 163 0 163 S= 0.005 10 600 2.24 0.29 203 0 203 15 900 .1.77 0.23 228 0 228 d= 0,120 ft. 20 1200 1.45 0.18 242 0 242 25 1500 1.21 0.15 249 0 249 A R Q Tc Tc total I Qc 30 1800 1.04 0.13 253 0 253 35 2100 0.91 0,12 257 0 257 0.39 0.06 0.39 0.00 5.46 3,06 0.39 40 2400 0.82 0.10 263, 0 263 45 2700 0.74 0.09 265 0 265 Qpeak for Case 1= 0.39 cfs 50 3000 0.68 0.09 270 0 270 . 55 3300 0.64 0.08 278 0 278 60 3600 0.61 0.08 289 0 289 CASE 2 65 3900 0.60 0.08 307 0 307 70 4200 0.58 0.07 319 0 319 Case 2 assumes a Time of Concentration less than 5 minutes so that the 75 4500 0.56 0.07 329 0 329 peak flow =.90(3.18)(Imp, Area) = 0.00 cfs 80 4800 0,53 0.07 332 0 332 85 5100 0,52 0.07 346 0 346 90 5400 0,50 0,06 351 0 351 So, the Peak flow for the Basin is the greater of the two flows, , 95 5700 0,49 0.06 363 0 363 0.39 cfs 100 6000 0.48 0,06 374 0 374 208' DRAINAGE PONO CALCULATIONS Required'208' Storage Volume = Impervious Area x.5 in ! 12 inlft 0 cu ft 208' Storage Volume Provided cu ft DRYWELL REQUIREMENTS -10 YEAR DESIGN STORM Maximum Storage Required by Bowslring 346 cu ft . Number and Type of Drywells Required 0 Single ERR Double J 2o2 ~ 3 . 4 • i i n-r-r r n • •.I 2 ' vlvi I..nl / ~ . . ~ ~ . I Iro-.WIDE UTILITY & . , . SIDEWACR -F~ASEMENT ( P.) ~ A't BOUNDARY , ~ ~ 1 • 16+62,50 / ~ ~ , 'r~ 5 j ' t • *i1CvY, . ~ ':2. L ,ub'+.E~~~~~ ~l~ . ii ~ Ci • • • 15 .q N ' 9'55"E 16, 17 , M ~ . SHANNOW-,.1rANE ` / ~ M----- ♦ 0~ . 10~ WIDE UTIUTY' EASEMENT (TYPY ~ It\ i i n t/ 7 8 10 9 . ~ STA 13+41,30 SHANNON LN- , 5TA 33+20.68 HARMONY W , ~ ~ ~ ; ~ 4 . j ' • . ; , , ~ , . ~ - . ~ , , ' . { ~ • , ~ ~ . . ~ , ~ w , . ~ . - - i r ~ r', r ~ ' r,: - - s I~i ~ , . ~N~ ~ ~ r'^ { ~ _ ' ~ ~ ~ ~ TI ~ ~r . 1 ~ . ~ ~ , ~ ~ I s ~ ~ sJ~~~- . - ~ ~ ! r i 3 ~ • ' A j, 1 j' i ~~a ~ ~ ~ i ~ f I S;~'C ~94C532a39~ 1 1 j ) UNPU11'TED . ~ _ ~ ' ' . ~ e r 4 ~ t , ' ~i S4'~ r~J~C5,24393 r~ ! ~ d 1 ~ - , i r. t 4 ~ ~ 7~ e ~ i ~ SAh~IPLE 5~-3 I ~ E~ APPRQ7L STA 13i34 SA~IPIE S-2 ~ ~ TRACT 'D' ~1 ~ ~4PPft4k t~' LEFT ~~PRO}f. 5TA 32+2b ~ i , A€~8~. 1$' LffT i , 1 RR+ERWAY LAFf~ ~ ' ~ HAR~IONY Lfl. 1 1.9 - 2' QE~ ~ ~L . SAkIPI~ S-1 T.2' - 2` OEEF . 1 r ' ,~~a~. srn 2s+~9 ~ l ~ _ • • 1~PPR4k. 18' lEF~ ~;,R~ ^8" ~ ~ ' ~a~c~r w. . s ~ .sacs; ~c~~s ~ ~ - ~.s~ ~ n~ ~ t ~ r z E ~ , ~ ~ . , ~ { „ , K ~ z . ~ a r , l y~ 3 ~ ~ ~ g ~ ~ 4 ~ ~ ~ ~ ~ ~5 ~ tl `t ~ m 1 ~ ~ " i 1 ~ E ~ , ~ s I, . ~cr ~ ~ t ~ ~ 1~r 3 A ~ , ~ ~II 1~4 r8 ,7 6 ~ j 1 ERW ~1 ~ , ~ i 1~ - . 1 ! , ~ ~ ~ , w ~ i ~ 3 ~ 3 , . ~ ~ ~ 1 ~ ~ ; ~ ~ ~ ~ i ' ;1 ~ f ` ! ~~I ~ , ~ ~ ~ k ~ ._._.ti ~ } ~ ~ , H►~~r LANE , ~ . . ~ ~ i ~ ~w. ti ~ - . ~ W ~ > > ~ ' i e~ ~ ry~ O ~ i ~ r E e ,S 4 ~ ~ i 1 1 ~1~ a I / ~ , b C ~ . I ~ t ~~si ~ ■ I 1 i ti!'~ C' 1 , 1 ~ , I ~ • } f ~ ~ ~ d ~ f t ~ ,s1 . ~9~ , , 1RA{C'; ~ ~ ~ : ~}.q~ ~i , g ~ { , r t~ ~ ~T I . ~ r ~ i ~ { } ~ ■ 'ti~lf j l1HP~.A~f i~ . 'w.t t , ~ ~ti ~ ~ 5 ` 1 ~ 1 r ~ . 4 ~ + ` ` ~ ~ ~ ' 1'1 , . ~ q 'l ~ 1 l ; ~ ~ + ~ ~ ~ ~ a 1 ! f I ~ 44~ . ; ~ ~ ~ s 6 ~ ' t~~{ 4 ij 1 i + h~{t1 ' } ~ ~ ~ ~ 5 ~ ~ 11ti4 M1 ~ y y` r ~ ~ ;~i~~! . • { f P f I 7~ y S t ~ ~ ~ L ~ ~ I ~ .w, ~ ~ n5 ~ ~ _ , ~ t ; ~ ~ ~I ~ ~ ~ ~ ~ I ~ ~ 1 r., . ~ Rl~ ~ • ~ ~ s 4 ~ J [t , ~ ~ , i f ~ ~ ~S . 1 ~ . ~ ~ ~ ~ ; w . ~ i ~ ; r ~ {~~a ~ 1 # R ~ , ~ ~ ~ . ~ , 1 ~ 1 , ~ ~ ~ , ~ - ~ } , ~ ~ r 1~~ M1~ ~ ~ ~ ~ ~ , ~ ~ ~ ~ ~ ~ ~ ~ 1! ~ . ~ ~ ~ i ,1 T ~ . . , • y 2 ~ ~ !t~ ' - - 1 x 1 ~ to = ►1 I ~ ~ ~ , ~ , ; ~ ~ ~ ; ~ C. ~r~ y ~ - ~ ~ _ ~ , , ~ 1,, ~ ~ e~, ~ 1 ~ ~ ~ ~ ~ 14 ~ ► 4r ~ ,1 : ' 4 ~ ~ E . 1 ~ ~ d y~~ - ~ f 1 1 ~C/ ; ; ~3 . ~ r ~ ~ ~ 4 r t I ~ ~ ~ ~ ~ G ~ , ~ ~ ~ ~ ~ ~ ~ , ~F ~ ~ ~ ~ I ~ ~ ~ ~ , ~ , i J + ~'1 ti i ~ # ~ i ~ ~ ± ~ 1 ' ~ Z / ~ ~ e;t sa1 ~ i ; ~y 1 B - ~ ; F i ~ ~ r ~ ~ Ij f 1 1 ] ~ ' 1 r I ~ 1 . E ' 6 1 4r ~ f ~ ~lEi; , ! + ~ ~ ~c7 ~+~r ~ ? u~P~+tYm : ~ ~ ~ ~ ~ k G~ ~ ~ ~ ~ 1~ ~~c? r. l ~ ~ ~ ~ s ~ qfp ~ ~ ~ ~ 2 # • 8 ~ 3 # ~ ~ ~ y E ~ 1` . ~ ~ ~ ~ ~ ~ t~ ! ~ s 1 i / ~ ~ ~ { ~ ~ ~ ~ ~ ~ / 3 ~ ~ E ,1 ~I ~ ~ ~ 1 ~ f . ~ ~ I ~ r ~4 t ~!1 I , : ~ a ~ t ~ . ~ j ~ ~ t ;';li ~ . ~ , 1 . ~ . 1 ~ cl } 1 . , ~ , ~ ~ ~ ~ ~ ~ ~ ~ ► l 1 , 1 / ~ . ~ ~ 1 ~ ~ ~ ~ a r , . 4 ~ ~r~ , 1 ~ ~ , ~ ~ • . • ~ - ~ , s`~ ~ C t ' a ScALE; 1°'_20' ~ :i~L 'Yi , , , i i . ili i ii i/ . I ~ r ~ ~ I . ~IT~~ ^ - ' ~ ~ r~. - ' ' ~~~~I~ I ~ I~~~NEER~1~~ ~ 7~7 H~~~ ~#h ~ Su?te 2~Q ~~Q9) A56-69~b ~ ~ane. wA 99204 ~p~: ~os #58-~8~4 ~ ~ DA1 . ~ ) . . ! . ~ . ~ATE: os/, s/97 7 ~ • - ~ . INLAND PACIFIC ENGINEERING, INC. September 16, 1997 W.O. 96238 Office of the County Engineer ' Engineenng Development Services RIECO\JF-0 1026 W. Broadway Ave. 6~t~~ Spoka.ne, WA 99260-0170 SEP 2 ~~v~ E~y~iNEEA ATTN: Paul Lennemann, P.E. SPO~E RE: Results of Soil Classification Testing Riverwalk 9' Addition Please find enclosed the results of sqils classification testing performed by Inla.nd Pacific Engineering Company, Inc. (IPEC) bn three soil samples obtained from the above referenced residential development. Soil Sample # S-1 was obtained froic Harmony Lane, approximate Sta. 28+78, approximately 16 feet left of proposed centerline, at 1 5 to 2 feet below existing adjacent grades. Soil Sample # S-2 was obtained from Harmony Lane, Ipproximate Sta. 32+28, approximately 16 feet left of proposed centerline, at 1.2 to 2 feet below existing grades. Soil Sample # S-3 was obtained from Riverway Lane, approximate Sta. 1+34, approkiinately 18 feet left of proposed centerline, at 1.5 to 2 feet below existing adjacent gr des at time of sampling. The sa.mple locations were obta.ined by use of a hip cha.in and hand-held ompass, with the northern curb line of Indiana at the intersection of Harmony Lane and I diana Avenue used as horizontal control, and should be considered accurate to the degree i plied by the methods used. We certify herein that the samples tested were obtained by members o our staff from the approximate locations stated above, and that based on the data enclosed, the USCS soil classification of GM is correct for a11 three of the samples tested. Please do not hesitate to ca11 if you iave any questions regarding this letter or other aspects of the project. Sincerely, INLAND PACIFIC EN INE NY Ot wASyl .~n . ~ ~ • c~ •C)x, G ~ :r . " Je E. . Peterson P.E. ~~c ~r3sit~~~ Geotechnical Engineer ~~NAL~ EXPIRE 11 27~ ' Enclosures: Sample Gradations wit tions J:VDocument\962384S01Lc1assavpd 707 West 7th • uite 200 2020 Lakewood Drive • Suite 205 Spokane, WA 99204 Coeur d'Alene, ID 83814 509-458-6840 • FAX 509-458-6844 208-765-7784 • FAX: 208-769-7277 i • , GRA S ZE DISTR BUT-ON . SIZE OF OPENING IN INCHEIS U.S. STANDARD SIEVE SIZE I HYDROMETER ~ 1.5 3/4' 3/T 4 0 16 ~1 I 0 30 40 5060 gp100 2p0 144 ~ 1 I ~I I 1 1 I-f 1 T -100 90-•------- -90 gp...___--_ •-gb _ . ~ 70--------- W -70 ~ 60-•------- -60 m ~ (11 50-~------- ~ -50 Z ~ t1.. F- 40.._____-- - ,o Z W U - ao W ~ 20-..___--- - 20 ~o-•------- - 1o 0 0 1000 100 10 1.0 0.1 0.01 0.001 GRAIN SIZE IN MILLIMETERS c 5ow 0 Z'S /A f q- KG5 I~ _ C08BLES GRAVEL --OARSd MEDIUM I FINE FINES (SILT, CLAY) ~ SAND EXPLORATION SAMPLE DEPTH % MOISTURE % PASSING 200 I I I I . I _ I I I - I_ I I I u~s G~r I I I I_ . ' . PROJECT Np.: PROJECT NAME g/ l 7 6-0 DnrE. t ► • r , , . ~ INLAND PactFic ~ FNC3INFFRIAI0 GRA S ZE D ST'R BUT ON ~ . SIZE OF OPENING IN INCHEIS U.S. STANOARO SIEVE SIZE I HYDROMETER 30 40 5p6pgp 1 pp 2pp ~ 1 5 3/4' 3/g' Y gl1 0 16 201 I 1 1 1-( I i ~ t 1 I ~I I 1 100 -100 90...'_~_:_ '90 gp...~_~,_~ --gG IF 0 70.-._-__-, w -70 ~ ~ . m Gp...__---- -60 w 5p•,------- -50 Z 1 F- -40 W ~ ~ 30...__~,__ ,30 W ~ 20.._------ -20 ~o--------- - - 1o 0 0 I o00 100 10 i.o 0.1 0.61 o.oo1 GR NIN SIZE IN MILLIMETERS g~rro 4- F 3 r-!A16s COBBLES GRAVEL %'OARSEl MEDIUM + FINE FINES (SILT, CLAY) SAND , EXPLORATION SAMPLE DEPTH 7, MOISTURE 7o PASSING 200 ~ ~ _5 -2- I I v I 17 I I ~ usc.s ~ G~ l I I t_ - - PROJECT N PROJECT NAML U6-4 w~`L~- oATE: g 97 ~G~~r~6N~ L~a•lf~ 5~~. 3~.~f 2~, l~'GT. ~~Z - 2' . ~ . ~ . . INLAND . ~ PACIFIC FNn~N~cQiun e i ~ ~ GRAN_ SZE DISTR BUT-ON SIZE OF OPENING IN INCHE% U.S. STANDARD SIEVE SIZE I HYDROMETER ~5 3 14 34 g' 4 q 10 1620 30 4a 5060 B~0 I00 270 100 -100 90--------- -90 ~ gp...~__~__ --86 _ • _ ~ 70...____~_ w -70 ~ r 1 60---=----- -60 m w so--------- •------------C---- -50 LL F- 40 Z W U(if 30..____ -ao W LL 20------_-- -20 io--------- ...y_,_- - 1o 0 0 - 1000 ioo io _ 1.0 0 .1 0.01 o.oo1 6~~~~ GRtiIN SIZE IN MILLIMETERS c 13 <AN 0 23 m COARSd MEDIUM I FINE ~ ~j ~y(S ZV COBBLES GRAVEL SAND • FlNES (SILT, CLAY) . , EXPLORATION SAMPLE OEPTH ~ MOISTURE % PASSING 200 - us~s _ 6~t PROJECT N,o.: PROJECT NAME: frr8xW~-y C f L onrE: ~ Aa~t~ Sr~' I 3 3 4-. l~3' z r ~ ' ~ • , , INLAND PACIFIC ~ ENGINEERINCi ~ . ~ EASEMENT EASEMENT LIMITS LIMITS 20' EASEMENT N o-4 I C/L I I ~ 10' ~ 10' I ~ I . I I ~ 2' 8' PAVED WIDTH ~ 8' PAVED WIDTH 2'' ~ ~ . . . I . I ~ ~ VARIES VARIES ~ . I L , , . r . . . . . , , . . . , . • ' •i•' 'Y1' •''`'"v.,• . . + SPOKANE COUNTY TYPE "R" CURB (1YP.) 2" COMPACTED CLASS "B" ASPHALT CONCRETE CONTAINING 5 3/4% TO 6 1/4% ASPHALT ON 6" COMPACTED CRUSHED SURFACING BASE COURSE IN ACCORDANCE WITH W.S.D.O.T. SPECIFICATIONS. ~NOT TO SCALE , I / ~ INLAND r R IVERWALK 9TH AD D ITIO N ~ PACiFIc TEMPORARY TURNAROUND SECTION ENGINEERING 707 West 7th . Suite zoo (509) 458-sa40 S HAN N 0 N LAN E DATE: 9 Spokane, WA 99204 FAX: (509) 458-6844 ' 1...~ /22/97 ~ ..,W .w . _ . . , . . . , •~I'i'~ . ~ . 4~'~" ~3~f~~ SIlliS~fj . . - , - - _ - - - + ~ ~d ' ~ ~ ,.ir , l~ t ` r7~ Y ~ry . ` ` , = 1.,~. - • 1 . , + ~ ' 'Y~~~~':~; y " . _ . . . . ~1~ J - ~~.R~ 1 4! i 71„ ` 1~, ~M e s~i :I, . ~ . ~ . . i . , ! ~ ~ ; ~?R r + ~ - k, ~ , . . ~l ~ . ~ , o , _ r'~ ~5 p~ 1,I~~+~ ~ a- ~ • ~ r, . ~ , ~ ,i,. _ ~ ~ _ - , ~ ~ r ~ i, y p~) { a ,^Il, .d ' ~ ~W.7~ ~ q~ ,•i~~ ~ , - 9^ . i; ' G .{'j'_ +I~ 4 F ~ ~ l. 'F. ~ s _ ' ~ • ~i 4 G+r~^~~~ ' •i ~ ! ~ ' ~ f. Fl ~ ~ `r ~ 1., y~`" ' , ~ ''~i . r~ . a i~~~ I ~ ~ ~i ~ k'- M ~..hA• . k ia~ rYl Iw . , ~ i = ,3 F. ;4~~~. ~ j~;~; ~ ' ~ . . . 1p~~?"~a cy'~ ~ ~ ' ~ ~ c. " . . . . _ '6~'" ~(4d - ~ II `~~V , e~, 9, ~ r ~~1Sr'"~',t * : Yt.t . ' . , i . . . , , . . ~~r° ~ ~'y s•.. ~ ~ ~5 l ~ . ~ ~~j . - ~..tr' ~ . .1~ ~ ' ~Rt F ~ ~~J~+ il ~Y~ i _ ; ~ , . J.. '-0 . r r ~ - 5~ ~',,I~X~~ ~ ~I H r~,-_ . :I' + ~,k !"~.tl~ '9 + ' ~ .r~# 1 _ , ~ ~ _ ~.,r ~ . - t~~, ~ ~C~ 'li-,~'~ ~ 1~' .~r , d~ '~s ~ ~ ~ _ . „ , , t ~ - ' ~ ~ . ~ ~1 ~ . €-i~ 1-+_ - , - ~ ~ ~ j~~ y ~ ~ ~ ~ ..~F i". • ~ ti , . µ . .,a ~'~r ~ s ~ 9,• ~ ■ ~ . . b! ' n f- ~ ` . ~ ss. ~ , : R .:-~sr..A ' i` E ~ . •t'_.'~;1 r•` , ~ti+:~~ .r' ~i._~. _ • r... . " p , _ . , ~ . ~ _ ~~lt~~ 1~ .iy ~ I ~ •~i~''~ - T i R+,'~~,~. . . .i. 11 ; •r°y.~ ~~t~r- ~f ~rt,.J ~ . , ~~t_ "`:r a ~ ; ~ t A, k~,p~,~ r . ' pw q i .~i - 4 : ' . ~ ~ . =ti , r~~ t., ' " ~ , ~ ' I R~` '.i E . _ # w k' '•4 ~ 4"_ . ~ .7~~ .t~..:~,~ . J ~ ~ 4 : a'F ,s ryT,~.:` ~~e~ y * ~ Y d '^~"la~r~' Sy,"': . . ~~f~ ,iY.hSd,: e.~ t . . . ° ~ . ~ , ~ . . kR+' ~ r 1 # Il . ~ ~ f~, ~ : ~.a ~ . t r:. cy .r~ ~ "'a' . ~1~~ v ~ - q, '1' ~~e'~',. ~4?, i ar~~ ~ ; "t~ i'` ~ s~,~' w~y1 ~+s'.~:} y. . ~ ~ r~" 4 , n'T ~ rl ~ ~ _ . -,titi. . "ui i ~'~l. .d . h, _ ' a a ~ e. ~ • e ` ' . ~~n' F-..sa ~ . ~I~., 1~ o I~• ~Y ~'3- - ~ r ~ r ~y . ~r F~.- - W . _E.-r_-_' ~ 1L , _ ~.ra.+~ ~ ~ _ ~fl . ~ -e`'.1 ~ ..4 . I~ . ,±:.~~~yy~,'d~w . l~ ~._.~~m..a.___ , Il~.. a'~ . I 'd~. 1y~ "1 f'•r~G,fI~ "!f l~ ,ti~'r~ , ' , . : ~ } . - ~ q~ - ~ A . `f~'N1~"~ ~ -~a~f;~~i ~ h, •;;~5 ~"~I+~r ~ y ~t `M-~ . 'i,° ,rt: ' ~ { eJa• ° e . - ` • . ~M~ ~ . . ~I . . . f ~ ' ~ . q . , _ ~ i, a~~ , 5 •,~rF, ~ f:-'1i •r I' _ . ~ , ,t~ •7,jy ~~.~4'~ ~~.M pr ~ - .y~ ~ ` i7 R :•~,/`.~'t~ _ d '+;j - '1 .'~t ,-~.~Cd~, r~:~ ~ w~~,~c ti;~"~'.~~~ . ~ ~Y 'f. T~y~~i~~y.~. yy„ tia~ A~. ~ . to: a ~ '~.4i~r-~ 11 . ~ .i~ "i ~ ~ xr. . L i. ' . . ~ 1~' . , . . t~ . . . . r _ . . ~ a- . . . - c Tc ~ i ~ - - ~ Y * ..t-.~-• ~-.s,..-..~Fi~y~:~'~-- ~ ',k•,eV _t't' ~ ~ .,u. ~I~ I,~ J~i ~ . _ - i i3 r- . . ~r ~-~-T-,-- . _ _ , , . Y ~ ~-h ' "~r' ~`~y, ~ ~ ' ! ~"*~p7~ . - ~-+r- - - ~ ~ - - ~ i ' , -.--_'~''-t` ~1 . y:- ~ `'V, :F; t.~ J ~ ~Y4. ;~M Gi ~ , ~ ~I r 16 S as: ~ ~r~ I~~~ ~ ...r.~ . ~ _l~~ rty~ ~ 1^ 31 u r + ~ f+,y7 : ~u~ s~}~ru~'.l.}, ~ ~,r~~~{'. . { , , . - ~ ii 1- . . l~ ,~r i~ ~ , . . `R 1 . 3 `a~ ~ 2. . . . ir~ a . . ~ . ..i0 e ~i al ~ ~ _ , , - : , . 5++~ ~x 'd • _ r l.._ - ~ - ~ tll~^b ,r u ~ . . ~ ` ~ r, _ .y . . 1 - - i~ ,7i, ~ a R . ~ r . . _ - _ - v . - v - _o --6 ~ u I~ , ~ , ~ . - ~ . ~ ~ . . - i x - . . ! fi..,.;, ' ~T.i +i . ~ ~-~~-~'`5, a~ P~`~'`: 11 'IE;~ , ~ f.: . ~a ~t- . , .T'- ._.r '~i. . _ -~_~~w.4 ~ . - ~ ~ di'; ~.~i. . y' ~i r ~ - i ~j. , _ . a~, "41 _r . g ~i~ ~t~. :a~ t i.,{. 1.' ',1 t _ . ~ ~II ~ ~ .I ~ . , ~ y . „ ~.i,. , - ~ f i , ~~~v~•~a q• ,'~-S"~ ~ ~K I ~ _ ~ ~ . ' 11 t~'~ j!i? '.~~µt t ~I ~ [ Q. U~ . - t . . . t"~.r ~ .,.~I~ r,.. rhr~~ i - - . ~ s_. I . :~f'~ ~ : r","4.. - °.r ~ " t ~ _ j = . , e - ;,i.' r~~ i ,r,:}t'_-, ~r y.^a~~ ~ -r~ . ~.~f . ,i' ~ : pt'~~,. I rV~'~4, ~ E !h ~~•~''~Ia'~ ~ ~ ll ~ ~ lp.,~ ~ . . . .~(,~ti . . , ~ ,~..v~ ~ ~ .i` a g.r i y~ ? s~~Y•. ~ ~ a.l .4': _ _ - ` , ~ -11r'. 'M,I ~ ia a;`s ~-z , . ~1•,~ .,,t,~~, ~ _'i °i W!'~:,AIM ~~~..o'-i + t;i~. . r . r ~ , . .ilt ~4+ ~ ~ _ ~ OCd~. ~ '~'a iIP, , Tf ~ ~s~f ~ .~Y'~ h~' ~;t•. -i _ . ,,j~ ~ i ' 5, . ~ t .s~ ~+r . . ~ _ ~ Cj'~~9i . . - - . 1 '~.r ` ~ . !i.a`AN~`"Y, -,fi:. 1 ~ . , , , . 1+'~e .1 4 rl. . I. ii. . . . ~ - ~ - ~~c'~=~°~ . ~;~li.~ ' ~ ..a~~~.~ i ~ .w . , • . ~.i , 3W1'~ ~ ~ w ~ p , ,t ~ ~ ~ . ,fq,'td ~ ~ ~k.• ~ .~~`l+. [,~~f ~ ~i 1 ~ .w~ ,1:+~,~^~,~ ~ , . ` ' .1"~ .1. ~```1 _ ~ ~ ~ 11^i~`,"~ ~1 ~ ~ a ! i ~ , ~ ` ~ ~•a II .y~~ ~ li _ .a~i~.i r c~. r ~ ~ • ~ . llt}- - i'~:._ ~ 9ra\`3 ~ .~a . ~ "i1 ~ ~ y;. r ~ , ' , ~ . JR. . ~"~n . . . ~ e r+~5 li ~ ~ ~Kh ~ s . . . }t~ ~ - ~ti - 9 ~ ~ ~ y t , R .~1'~ ~ • `i.4 3 k~ P~" ; V , ~ q . ` ' ~ i'Y~ ` ~ ',1 '.~:~I 8 y~ [ ~ . , l;.Y .~i . i ...n~ f . . ''4~'~ . - . 8 ',i~. .~ne , . 4~+F, . r'~'~ t~~"1! . , . t's.-.. i .7 . ~k.~,. .{Y . , . ~ • . r~ -lL~~'+~ a ~ g ~ . _ 1 `t. _ ~ , , r,~ N ta' . „ ' t~~_ ~t~~. ` , • -~•;-Ea ~ `~,.,5~ ~ , y+ Rr li n?' ~ ~ ~'.a,,.t° ~ t-~ , ~ , Tr, 'IY.~~ 3 ~ •p. , ~ - P, ~i . . . . s , ~Ly~~~ . .k. . ~ . :f7: ~ , ~ -,~a. •ri ~ I: ~rl, 3 ~Jr74~'" ~ . 4w ~s . y.~ - . }I~.:: I: . _ ~ . ~ f r . ~ • . { .s'~L1 , G~ ~ u. ~ ~ ; ' a , ' t~;t~' _ _ ' ~t _ ~ f - ' II _ - ~ . J . - ~ ~ - ~ . - • ~ *I,Tn- ~1~!'~ y, :l~E ,~q'1MS ' ~ f ~i!T • ~ y. f I~ "IV-4:..- . .~.~~~k ' 3,~}i~ ~i. _ j + . . . t r' ' . . _k.~ r~ . + a- t, .Ir1t,d . . 1_'.~ 1," ~ ~ 'll ! • . ' , i ~ . ~r~.~._ ~ z~~ . . . ~ s ,h - t r. ' w ~ i r;, ~ i ~ i. ~ . F- a 1 w ~ 1 ~ ~ ~ r+~ f ~ . . ~ f ~ , . ~ ~ _ . , . ~ '.i.~.t~` 1j7d , , ~ . ~_'o-, 1 , . c~, ~ p~? ~ . ..Y. U~ . _ . _ - ~ 4;` : , , , ~ ....'i~' _ '"'~s'"i~, , -i _ . n ~ 'T ~ ~ , , • ~ ~ _ ~w. , . : v ~ ~ a ~ - , , . . , ~ , r _ ~ ` - ~ ~ + _ , ~~~5 ~I~ .t. ~.i f~."~\t~ .i ~il!`~r+y~ . a. ~'M+ . ~''i.. `~"!1 ~yf''Yr~, ~ ~ r r~ ~a ; . ~3• ;f ~ - v . . ~i ~ ~ : _~S 5 ~ a r ~ , -j~ ~'i.~ i! t ~ ) t ~i° . . , ~ ~ -.'-b~~,.__'-` s'~ ~ ~ ' ` ~ , ' • ~ ~ . , ~ . . . . , , . ~ . . . , ~ . . , . . . • . . . . - ' r ~ - j,~ , ; ' ~ ~ . .+1~'~ , ~1~.[ ~ ~ q,~ ~ ~ 1 jr . II ~ f • I_ ' #`,,d . . ff ~ ~ 7 '.a.,.. . . '7~,'.' u ~ . ` , . r' ~ . : ~ ' . ! ~ ` .d t . ° ~ ~ ~ i , •.vi .m~ , 1. ' --y. ' : ~ i ' ~ r~ 'f . , ~ - , ; k • ~i e w;~. ~ ' ~ , ~ ~ . M ~ , . . . . , ~ a u ' . 1I ` ~ ~'~G r ,y . ! y~,sBtA,. ~ y f~~ Ly ' e ~ ~`--v ~ ,~F , r ~ ~ a ~.i;. y~ _ .x _ -b ~n i r i II Ct! •~C. ~ '~4;` m W „ . . ~ . . . i~ ~ * : . , r~&g o ~ + . a . 4 r }.i y Y +1~J ~ 9'e~j,. ~ ; ~ li r z'k ~'i~ ` ~r ' , y, • 'a,:'' y w .m 7~~ . , , . ; L . . . . , j ~ ' i , r Ji~ ~ry.. ' i+$ y~' 1 ~ ~i. . ' +h- ~ . r .:4 Y.~ . ~ ' ; ~~R. ~k~~F{~ -YI ~ ~ 11 I :5.~°,i ~ . in., ~ 1 ~ V.~f.~ ~i 1y ..6~i~ ~~~$Y,'-~ f_,'7~ P! • . . ' ~„~h . ~ ~F~ • . # ~ -Y ~'3: + - ~ ,.i .l ~ ~ . ~*.ti~ .i~. , ta * ~~.F . , t- '•y :~'~yti-.'~ ~_;f.. . . as i . .r ' d ~ I ~ r. ~ - -4 . . ~V~. ~t ~ ~ 't«.~1~,`~ ~1..,, ~ ~ C. f,'. 1~ ~ , ~ ~ +d. a ~ ~ o~ S - ~i ` ~1~ , y yp~. ~ 4~~y - ~!1 ~ ~i~ p J r~~ ' . 9di.,til _'y~~~~ ~.-~a5 ,r-~ . s~.. ~ a'. ~ ,~7 . ~ ~ 4 1;' ~ I~~ IL,~ey - `1~.. .r~/,A\ ,.~`~~~.~~!4 ~f' , ' ~ ~ ~ ~71~ 'f' c~ ' 7 ~ 14~ r~~. S r u ~ - ° + ,c• 'Js~, ` ~ .C ~ J'~'[~ ~'t~ ~1 .+~N~~ , ~ f ,=Y. ~ M, r+r. ,3ti . ~I :S w~, ef1 ~ ' A ~ "kI . , ' Y - . 4 i".J~' [ ~ , ' ~ . 1q ,.;t"~' ' y'..;~ l*#t' . ~ . r +Y ~ II ~i` 1,an~ +k,,~` 4 C~h ' , f., . +~u. , , ' , ~,Y. . ~ ~ ~ ` . k`~~ , r 'li, ' ~ .»~S+ `.i.~~.f ~ ~ , . . a t.,~. . . , . ..1 , ~ •1•~ , 'k C ~r~.~ 9~ i y~~. ' , ~ y ~ . i - ; ~4r...~ n .II ~ y~ .~~i . . ,~r F"~W~,, v~ ~i . .<p', ~r4 .3 ~ , `'I . ~ • ~ ~ , . ° . . a +r:a,~~w.. . .4,;'~ . -F ~ . ~ ~ . . ' ~ I ~ . ' . - ' . ~ . ~ f', e ' i, c;rf, I . ' ~+...~...s, ~.,r ~ w ~ . f A+, t~~~~ t ~'{yh,~~f . . 1 r~ ,~a ~Yf r~ . ~ ` w,~ . - . , . , ~ ! tr . i yI . ~ ~ .I ~ L ..f .t~ ~ t . . . r ~ ~ ...I ~ , ~W ~ ~ ;:F. ' ~ ~'7 r ' ~ . . I ~k r" ~ ~~,1..: (i`~A~'y * "f ' .5'S.' ~ . t,:, . . t y ~p 4 y,,~. ~ • . ' ~ , , _ ~ l f y n. ~ 7. ;.~e~. ~ b , \ `TM'~Yf•Y..~~ I .yj~~. 4 J" . ~ . -d . , _ ~ . . ~F .:.tll ' . .,~~~;r{ ~.'r ~ . . I I .4 r ~ C . _ 4F ~ U.. ~ ~ ~ r. ~ ~ , , . . . ~ . , . . * o ~;n~ . , , ~ , ~ ~ ~,;d -~i-{~ ~ ' iv..7.~,~ . . ~.r. i~ ~ . !Y t~ . ~']c~r' ~4 . r;~ . - ~ ar S '"t4. . ;:71e, ~r~~ ~ „ ~ ' ~ rr~.,. ~u1~w^ , \~6 t g ~ " b i 61 ll _ ' ~ , ~ . ~ ~ . . ~ _6 ~ . ' ' ~ I , „y. . . . , - . . . . . ~ . . ~ ~ , . ~ . . , yT r^ ~ ~t1Y' ~ ,I . ~ ~ ~ ti A!: ~e ~~~~-4 4` .{ay' ~ ~r,' i i ~"y , _ _ '~"e ~Jr~ ~ . y • ~~I~-- ~ -•.(y 5' J ' . . _ _ . . . , J i: ~ Cr 1~ .~I~. ~,r` . 'v ''.`s' . 1. . ~ I f3 `J ~ , ~'"w( . f~. , _ , ~ . . ~ i.. . i r.~~ ,M :~r r r~ 1... .~~tia. . . ~ ~ .~r ~ . , r , n . ~ :x . ~.'~F . ~ , ~ .~I; , . ~ M:~l„~~r.. . . ~ r . . ~ . G ~ ~ \ ..~r•... !,O_ / a . L-. ~ ~~].r! ~h'~ i4.7R~.,~., 1.,.,W ~,1, . • , , 5.1... ~ ~ f a r " '1~ ~ t y~++.~~.}y, -fi : . . ~ yT,: ~a ~ ~ _ Y~ y° , ~ , _1: rt . , ~„JS~. . ~r -'Y~ ~A~. _ , ~ s ^ ~ ° ~Y ~ . .~~„+li , ~p..] .,v ~ d ..F~ .?I~ t ~ ~ i. i , 1,. d' QS . ,~i - ~ ' : i rp ~.y1' ,''S~~ ~ ~ - . ~ bt'-.. `s y.r1'~~ si ~ tJ !~f , . . ary i~i~ r 7 ~ U ~ _ .~r .,,e ~ ~ , : `~`4 4i~ i ~ ',ti ' ~~'v ;t r ' °wrA~ ~ ~ , , ' . " . ,,r~ . .:{rr. , . : ~ ~ s . a I ~i If . - C _ . k.j~ ~ "f:r . `F . . - . ~ . i! . . _ . _ ` .j r ~i ~ }~h~~ 1 ~ ,~Fi: ~ ~ r'.~ "M~. . e.` .:,s~y `.-~1~ a r+v '~R . '1. ~ ~t ' ~ 4^ J . t ~ ~ ~ ~ ..t. ~ .~~~N~ { I.4 " ~ , `1 w , 1{c f , a 0 I~ . . ~4 . ~ ~ ~ r .'1' _ ~ , Y . . . + - - . ~ { ~ t y l -4: . rl ' ~ ~ ~ 'h-' ~ . ~ ' . ' ~ ~ f. il.r . ..4 l 't~+~, ~ r f` , L ~.~L,~ '"~ti - `;.Y'$a`r ~~~;..k, . ji; •d ' - ~°w. ~ ~ ~ . , ,f . ' ❑ . ~ . ~ . ~•~y ` ~ ,y , . ~ , L y.. ~ • .y ~ l ~.y ft~r.~6 ~ { ~}14~ l'~ i ~,{'SI J p :~!E3~'. ~ ,p~,',,~ . y.`., e f .~.-,!i : ~ w ~ ~ . . y . ~ ~ . . . . er , ~ . . . } , • _ i . ~ l^; t~:~.'. , r•~~~' nqr~-,'.;.~~'F' . , ~ ,y w. ~i~ p ~ f± 1 il II ~ . ~ ~ ~ - ^ 1 .!Pi.~ i . i, ; f ~~~iF,~ . 1 v r~ P~}' s ~.~wy . . , k.1F . - . ~4 , , _ I M ~ S ~ ~ ~ ' ~ . . . . r" /1• . ; , ie , o. , . v. . , ~ I ~ a . , ~ y ; ~ ~ I I~ ~ , ~,1 ~i . .r :'7.. s ~.1 e i , . . : . y °r . . r' .~`='C=--', _ - . ! . _ J"_ _ 7l • ~.i+. e p ~~C . ~.r•~y .~:.!"L~ . ~ . 1 . . ~ ~ ~ . ' . _ . -r ] l~ " , , -1 ' ~ . .a7 . . ; . . _ _ . _s , p 1~ d ~ f ; . ~ ~ , - , ~ ~ , ~ . ~ 9 J ~ ~ ci .,,r. .a h - ~ ~ ~ ~ ~ a "4r +.i . ~A ~i r; , " d~ L~' ~ 4;vJ 4 4 - - ° ' ' '~cr ,,tYi+' I ~.s~.~~ ~Y1 r~~~h ' N~. Y: i~r ~~;~}"-H7 ~ {r :-Y~ w r' r r ► - . , , ~+v ' II f~* . . . ~ C ' ~+e'.. +t .r ~ .4 ~ ~ ~ . ~ `1 *7"~ ~'3' ~;+v°', ~'i~' V F . I, . . ~ . . ,.rs.. 11 ~~y"F. ~ i.s. ~ y ,Y ~1 ~ ~ ~.~y F . `-`-pil~rg~ , k; ~ I ~ ~~iF~:~ ~ - ' . . . ~ . I . . : a c r ~ . ~ ~y 4~ ~ ~ 'r:1 '~T'~ ' ~ 4 4 ~ ~U~ t'A~',~ . i~ . - , ~ - k,~r ~ ~ ~1~,~ r.~. ~ p ~g I~ a 'Y ~1~~~ - ',~n, tIl., f{k.r~~^~,, w ~,~~y , _ ,i ~ - ~ ~ , ti± . .n 'r' - +r. ~`~'Y ~ ~ , ~ '4._ . ' ~~=..7 :a ~.d- ~ ~ : - " ~t , . ,Y',~l'Sr.,~.!; v ,..3 y. ~ I '7 ^r, : ,'r ~'.e~ ..~rr'. , ~ ~ ~ IH ~ 4l,.~ ~~J".: 1` ~~I t' . '.t'.." ~ ; . d . ' eFy~~:. ` 'k ~ . Y .ii ° ~1' = ~ ^ CE ':J~ f~.=~ y. I . ~~IyA1'~~"T,'~ ~ ' ifJ Y ~ i "f`d 51 } . ~ y s""45 . ~ . .'~"k~.r ' ~ w r,g ~ ,I. , . .y, . ~Lil.~} . a y .I ~~~.a ~ ' ~ C,~' . +°_r'}r ;'a~iM~r r ~ ~ ~~~5. y.. ~i' , ' a.. ~ I I~ tb.~' . Yb, d ' Y ~ s, ~ gy~ .p /~?i -~t ~~'~e ~ 9 ~aP'1 k. 7~~ 4 1 ~ _ , .:i"'. ~ . a w , ~ .u.. :.I~' I~ ~•f7rLa.x..A.s,--. '~..~ra!~°~ ~r - {~ttY~~.~v;3.:. ~,11'~ :•l:k .i~~- ,..+:~=r~+,~~ . ' , . ..~.~."~`~._l. . ~ s~• ~rn.r ' . : ~r , ~ ~ ~ ~.4~ - ~ ;a '6~..~.. . ~ _ ~ . ~ , , . ~l ~ Y I , _ _ : . _ ' . , - ~`.,k~f ~ .r ' ~ . ,~aa,,, Z ~.~~i.F, ,F ~ ~J~:: ~y~_.. ~ ~ ~ ~ . . , ' ' ,F ~.:~.,r . ~ ~ . ~ ~ ~ ~ , ~ ~ ~ . r~, . - . . ~ . , . , . , ~ . i i . ' ~ P ~ . . • ~ ~~'.~f'` T .~t ' . ie'. ~~r ~ `16~'r'~+~ < .OiA' . . ~ ~ ~ I - .A 1,T.. •=+r. C, a •V'. ~`~J . ~ . . ~ ~ . . 44 . ~y ~ ~b~ i , i: j i . ~ ~ ~ . ! _ , ~ ~ ~ , , ~;A k~~ ~'r~ . ~ wc ~ i: e~ ~ ~'";fy; .~q " I ~ ~ ~ - ~ , r ' ~ ~'i*'~i ~ei3ij fi , # ` U r _ ~ F ~r,R ~ , ap 4 I ~ a ~ " . I . 9 ~j:.' S'+~ ^ f J 1 A,} w ~-°__'~'71 r .r' S~' ' . 0 .n . ! J 1. ~.r ---~.1 .~Y'J . . ~ . . q . .~~F~ ~ r ~ ~ ~ - ' " ; ~~f M r ~ _ 1' ~ ~ p _ _,a. } . ; , ~ t, ~~,i Y., { , • , L:~ ~ , w . . . , ~ } . , s ~~-I ~ ~ ii ~~i~r~~~rj~ „r 4 I!. ~ I~ + I:',~ I v ~11i j{!~~ . W ~ . ~ - , . ,a~-~ . - . -~~i3'~ . ~~Ir;• . _ ~ '~~.:F. i', '!I l ~l ,F~~ . °aw~,-t•rs~. 's. . , - . . . , _ # 4 h . ~ ~ . . . . . • Y'{ : . ~ t q . tf 1 . ~~a:1 "n ~Or l 7~' ~ . ^ n ~79 1} ~ Jr ,Il / ~y ~`ay~. . r. , S I ~ . . _ ' ~ a;'~~ .e~>~{*~.E . ..v~r, ,~''~F ~~'~fi - r ~ ~ ~ ~ ~.kl~~~l~i~ . x~ 4F~a..~h . . 4 i~~~~''a4. - ~i~, ~ - °u~ , s • r' ` ~ , ~ a t~~ } _ A~j S . e • a - r ~ ~ »r- ~"t`°"'~~' . r'16 ~ - - ,3. ~ , ~ ' ~ , ; . . - ~ . . ~ ..r . . l ' - . . , , (y . . Y , a.. ,,s ,r.~ .,,t - . , ~ " . . ~ ~ ~ ~ ~ i~ ~ ; . Y ~ : Y{'"'. i ` ~ . l 5~ ' r ~ . ~ . ~,~..~P. ~ ~ . s ' ~ t + ..eS ~~ye; ~ Yr . . . _ . . . . . . ~_i . ~ . - I r~ l ~{i~'41.~ 6 .s ~ ' . 1 ; ~ d ; ~ . ~ 4.'...+ . f ~ ° i ~ . ~ j~ i . ' ~y :_n.~~~, ~rp ~ « yt~~"1 } ~ w~34i . ! . . 'l~Ifilt ~ . ~4t ~~1~ ra`~. ~„f t , ~ ~.F~~..~. 11g,r 'f t~ _ i . . ;~i . , ~ . ~ . ~ . x• - ~'P, ~C~~ , ~ ; i ; . ~ ~~~:0 . ,M~.' ~.dP~ yy' ~ ~ a ,a~. _~~.m~ r , , , ~"`~a.~r~. ~.,.Y- ~1.. ,.N, ~%~.,~.Y~~ . ~;~,,,.;+,aF&'~.i ~ ~="4» . ~ a.- ~ ~~~,~1i.- ~~'`.-~ra. r~~ gc~,!,~'~''~ ;.~a ;(,t~4s t - „ pt 1 ~J , . . ~.r:_ ~.i~~ ; a~,:s . . ~ ~ , , ~ t .I`' ..+rJ ~:'I_..r- :1.!Ch~... r ~ . ~ ,aL~'~..~C.-..~.~~-.~ ~ ~ ~ ; , . 1 'i , _ . . + ~ . ' , y I,Iz.~ a. ! ~ 4 ~•w~~ r 1 . ;:.t ~1 ~ . . . . ~~F. . ` ,t:.A~ , 'fl d.s~t.4 ~.~~t.. r .;r~. { • , ;r, r '«h._ F il ~Ff'~`.'u'W - j~.ryi:1k"f15`,.~~_ ~1 I~ ,f~~- ~~,p.Z~' ~,~',.;4~~i: . ~ :~7~ , k„~.t7 . , i .,,.ti . ~ ..r ~ a~ . ti-~.n.~-~•~ r.~.k~.,q.. _ ',s,' ~ i ~ F e~.~~. ,~'iy l A"\.~. ,,F. _~s . - ~ , ....t.: ~ SI~ ,4w - y,yF i J 'Rr' j'~ °°'rL. .dr+ i,' ~m~ . w ~ r ` , x . ~ ~~R~ r. , _ , .4 , . . . . . ,j . , .:'P ~ , Y._ ~ , P!e; ~I+ t k,: ~ ,ry .,e#'''~[ r . _ . - ~ ~ . 1 "t ,'l.. -K S~i'J rC~~. } . , ~ ~ ( t .v•,~8 ~ s.~ f - ~ , , ~ . . . . . , ~ } y . ~ . , ~ . .,p 1.. a. ~.,~'.d~ , • .is ?~.3~~4.~ `+-R R , . N7:-,'1 t~~-i.' " j-'s'~' ~lY~'~'~!1} ~ ~~,`s,. ~~~,r . ..r'~t~ i i.,wy'r ~ .1I ; ~ ~i ' ~ I ' . l~~. ~ . s ' . ' . . . - 3,±- . ,i~ses~ 4. e aTh ~ ~;,7 ~ F ~ - ~ ~.v~57- `n~~ `i :h,'~ i, e ~ ~ ~I~ , ~E~`~ ~ , a M h . x.r_. , #=-~i--~~,. 1~ '~,r^ t . . ~ , ~ , { . y.l 1'. .e ~~~V^1.'~.. . .S . • - ~ I~ . . ~ 1 - i~~ ,'~t Fh~ + F ~ . . , , . .f , - i i"~.va 44 . J"~r. :,r ~ .~~YI `~N•~~ ~ t~ i e~~ ~a~..r, al_;~ I~.~ r~,7 M~T ~ l' . . . , , " , 4t: ~~~i~ . , ~ ;t.r.au f .Il~d rd~ ° ° .g~, y. r,~..~{~,~ _ - .],i ~a I , . ~ • ~ . ~ . . ^s ~ `s~1 , , ! . . . ~r, iP ~ r ~ ~ . ~ „ . . - . „"r' _ ` ~ ~ ~ . '.~,i s..' . ~ . .~c.,. , . . ~ _ , , ~ ' . y . . . , . . . ~ . ~C * , ~ , ~ ° ' . , , , ~ , , +b,.., .P~ . ~ R~ l~S: . . ~ : . ~ n.'r ii r/~~ , [ A, , . . . ~ . ~ : ,t~ ~ l . . : ,u ,d h . - L , tw . ~ t _ l . ~ :~1F' . -F,•, ,.y~• ~ / ' . a '~,r ' • .,~R y~~~,. . , . J ~ o .r,7.' A,,urri 'a r.- ~ ~ - i w . ~ ~ . C ^ . . ; ,,,~,i. . . . '.k '~'~:a~i~- t~ ~ i y~ . w..,.. W~, '.1~i,y" -I.~ J, ~1 .i } Fss~. k~. ~ ~~t~~ r~n~ i~ '~4, , . . :tr~'R~.e°~#°~~ ~'r• ~w., , , . , . „ • y~ . iWn : c ~ . . ~ . , , y, ; 4 ` [F ~i . . . " .~e^.`rr''-<.. : ..:,-a.~,"~}I~:..~-= ~4.~..~t,- -..`r~1t~~, t.[. ° l~ ~r ..~"t~ n" ~ y~~ ...W . . .i' c~ ~a~ ~ ~.i I w ~ ' t ~i r=',:- _ f...g:~~ R. ~.F°~P Y v11 h~~ ~ , ~-,1 ~ I . ~ . . . rr " ` ,P a}•. . ;..:~~':.~~r"`- .r ' . ~~,....s', ~q ~ . ,a ,r. ~ - - ~i.. . r~'trdid,~: . '+t*, ^ - r , ~ `S~'i . , „ ~ . - ~ . ~ ~ . ' ~ . l- l~ . t._o- ; . . . y ~ . j- ~ ~ . i ,-ut~c~ :v ~ 4~~ .,~.~^'a:~']~,r "~d~ :i~~.-. . . , . . ~~~_S., ~ •k~ - , ~ " t; . ~ ~ _ . , , . , ~ . , ~ ' j c ~ ~ . ' - -0t ~ i A ~ ' ~ t ( "1 'a" Y~ii+.. ~ ~ ' . I ~ i ~C' i nF!r _ - ~ ; , ~ . ~ ~ ~rw'~ ~ ~ t'.. , •+7 ~ ~ , . ° n ~.t , ~ 3'~,,~~ 'ayt""~' Q.~ . - ~ . : ' ' . a . . : . t4Y . , , , . , r ' ° . s~, ' r , . , i ..+k,,.:K~k}~. : ~r.j~t.i'! :4 r~.Yi. - .V~ ...s . . ~ ' ; • : ~ r ~ . . ~ . '~~i~'P~y . ' ti fa ~~e 5 , ~ . . . ~ . . . ` it:YQ ~ y +k+tia= ,N * : +.~r~ ; ' ~ kk ~l ? j ~ i ` t . ~ e~ ~ h' ;:~..i'~` . 'n i~~,*~,a." asd ? - ~ ~ + ~~',~e , i' - ~i. , J , : . _ . , . , i, ~ ~ ~ . . t,t~ : ;i., s " ~+~',~~5~~'"11q'tdr.,+iF'• ~~:t:~c~ _ - a1~ i .i1~ ,.r ,,~r~~' 1 .y ,t. • ' ' . '~~:,r . '1 + ~...C`.~ ~ Y ~ . 4 , .e( , , IG _ , . . ~,~9r. ~ - ,arr~`p , . ~ r. ~ UJ .+r ,~r ~ _ ..h*~ ,:~r ~'4*R~~~ - . I " , ~,~~'I, . , ~ . . P ~ _ " ` ~ ~ Vr ~-1,.~. ~:..f_._ ~rri'u~: 1 , : .~t?,`~/ i~`~. 'l ~ 1 • - ' , ~ ~ i . . ~ . ,!i. a". o ~ ~'3 t~ ~ .'41y . . . ~ ~ , , ~ . . . ~ ~ ~ , . ._..a~~..~i _ , ~ . ~r ~ . ~Ji~,~.~{ ~ . . t ~ , ~ . . f ~ E~". . .,a..n~ ~ . . iw.. . - ' ~ -f . I ~ ^ev," .~~di ...:.J. •..4' ,..t - ~ ~ . ~ r r~...{! . ' ~ , . . ~ •~,i_, , . ~ . . ~~~.~~F ~ t'.. e„~. ~ xr_i... .:~:.~-=J .o .a-_;'.~ . ..~~;~:.r~'R a ~ ~f~".4a c 's~'`'F '+'.LMj'!~~'~y r kt+..':I;{ ry:~ ~"•h~~ i4., ~ ~ ~y . , . ~ . . : . , ~ _ , ~ i . r wI ~v~ ~ ~ i . vt. • ~ ! ,,.~y .i ' ' - 4 1 n ' r ai ~l e~.. I E 1 rl,..~~~ ,.-r~~"~ . . . . _ _ ' ' I~1} p K. , , ~ ~~1.., ~ rr ~}"S~ i . . - ~ ~,i!.& A+#. ++..i,~', i t{1~'i. : , r~T~,ra ..M,'' 'L ~.Mwdw+ w.. . ~ . . ` . . ~ L~ ,r.Y~'1~ ~ ~..s.._ a,~..~~.d~.:',~ ~ - 'a~ >~.~i..~ . ~~d-r7-~*° ..rJ ~4 .~Ya i~M+~ ~ ~rF~+*Ni , ~~,,,~a~ i; . , . ti „ , ys . ,r,. • , . ,r ~ x r r~ • ~ T :1 a r;.~ ~ ~r M - ~ - i. ..t~. ~ ~t ~ '~4. ~~"'r ~ Y r m` ' ~i ~ i a_ ~ .1 . ~ Y"~ , ~ r ~ ~:T, ,r., , . ~ ~ ~ ~ ~s . . ~p . a . ~ . W + ' . . , . ~ .t. o ~ tJ, r~ ~ y y • , .d. ~ , ~ ,Ry ~t, . ~ , , ~ ~ ' a. r, . ~ ~ ~ , ti , ~ ~a, ° ~ - ~ - ~ w~ ~ ~ 4~~. .U~ , ~ l : 5 r~ • , ~ •,r + -u~ ~ r . . , , * ~ . q y, . . ~ , • . _ . . ~ ~ +~3r: r ~ ~ ; . , ~ :"i,h,Mv~m., , a. . ~ r -r - ; ~i``+ '4'-~ 7bN'N~ ~,i, ~ ~c7~ ~ ,tr3+ .w♦ ~,r^+~.~ u rv ~ -~y,. 7 . t-, ,b ~ J ~ z " " ~ ~i ti. _ • . , . 11 i x $ k1' +J i ~3~ ~4 _ ~ '_i* 1' -d - . s- . . . 4 JFr'~, ~ .iv..'( r~. ~ , . : e. q~~ ,1 ~ .t{~ I .J^ds~ f. .y~F ~ ~ ~i~~. ~ k .Qa'~~ d~a ~ . .3}y'.~~-, eu ~ . . .4 ~Y ,~F .,1 ~ i j ~!S } ~I'' . _ ~ J i . _ . ,~ut~''..~} ~ rT .;'.i~?, , ~'N .Y a... 'i'.. i `~~I ~~4 ~ ~F r+}. ~y'~' k. . 1.~ °i ~ ...uaf"t' _ e ..,i ~.r~ ,r,. +r:C'. . ~,.y. , 4~ ~.Li ~ ~.'i . F'^ -.~y '°j l. ~ ~ a a,~ ' : : ~ '~i a i ...,-?r ~ . , . ~ +-~t"~' r ~ k'i,,a }w L-' ~ .3 , ,a:~ ~ti~ ~ '~kr ~ . . , w, .r,. . , +6... . i M ~ ::r J 1:: ..~i~'~~ ~,F2b~. ~ r. ~ r. _ ,t~';- . 'I T~ ~~s#•" ~ - i~~~ `daY- • . ~ . . , ~y y~~ e ~ 4 4 5 1 ~ rr , .:..f ~ .J.;,., d.~_.,, ~.;~F ~ i" .~,.'S . C,~ •°r,F, . °,~P ~ .l1~. ~ , . , ~ , .`F~ `f~_.. ~ 't' ~ti'. ~ , . ,r, r'Y ~ ~ ~ Y - - -5, ,~1, 4,~.! . -~,f~ ..ili~,~, ra"! . . .i~~r~ ~~.1tY-fr~~~".~a ~ ~~,i'-,~+r' ~ + . . c~ d- , :4 ~ i o i ^ . +r .J 'l,P ; gd ,ti- ~ ~+'3~.~ I ~ 4~~# ~5- ' " ~ • . ~y: ~€i ~ ,ty ! , a,i,.- r!~ . ~ ~ . ti 1 : :ti ~ ~ ~ '~l~~~, . e: s Ir" ~y, S. , r,. , ti . , _~.`71~"N hf~' ~ ,~G r, . . ~ . ~ ` ;r r.% ' l~ . , , : - ~f ' • e ( ~ 'a : F•~''"~._,;~.,} .a~, ~ _ . f~~' ~ _ Y ' . f ~ _~3'~.. .,ffr ~a # 3 . ~ ~ ` ~ . ~ + d ~ .~l: , _ v_ ..'--"`k~^ R~ . !~?a' t.:~ , __s..t . _ ..i l''". ~ _ . ~ . . , ~r L ~ . ~t-, ' ' ; a .r~'. tt . . ~ , - _ ' ~8 5 5~I(? ta~'~ -a...- _ ~ ~9 ~6~~ ~ ~P . f) LL ~ ~ ~ti ~ ~9 ~i3~INf1N .L33HS - N~1~NIHS"d~4 "~1N~ld~ ~N'd`~~dS ~ ~ ~ . LOCAL ACCESS PAVE"MENT STRUCTURES AVERAGE DA1LY TRAFF?C ~ : SC IL ?voc 0- 0 ^.r%~-~uG E ou0 r ~ i ~ G„ ~ l..i r-►`~f 21 V I 1 ~ l.. ~ Zr 2~~1r~~ ~ L+~1r! ~ 1 , , Gi111 2„ 2•►r.,, : , . C~ 1 nil/ SW j G l SP ~ G11 16 t 2# ~'n~~ ~ ~1i1rQ11 f i ! G ~ ~ f S~ ~ L"~. 21018" 3901611 ~ ~ SC ` Pavefnert JesiSn ~ , . , ML 3"J6' ~"18" d",'6" ~ a i n ~ ~ ! ; C;. , , avement ~,esi5n ; ~ OL 4„7 v„f„ ~ ~ MH Pavement (Design ~ QH Pavement Design PT Pavement Design 1) Soii type is classified by th Unif ed Soil CSassification System. 2) Required thickness is give as in&es of asphait cancrete pavement vver inches of crushed surfacin . SP4KANE CaUNTY A TERNATE PAVEMENT DESiCN iiNTERIM) . ' J o~S~~6ENEl~cOy9 ~ H NORTHWEST ~ofA R1~P~ - ME SOILS, TESTING & INSPECTION WORK AUTHORIZATION AMENDMENT TO ATTACHMENT "A" DETAILED DESCRIPTION OF WORK Riverwalk 9' Addition (38 Residential lots with Private Road Frontage) Construction Inspection STI Northwest W.O. # 97192 STI Northwest will perform Construction Inspection services as outlined below and charge for said services on the basis of time and expense. A. ROAD CONSTRUCTION INSPECTION OF: 1. Earthwork and Subgrade Preparation. 2. Placement and compaction of all base material. 3. Placement and compaction of pavement. 4. Curb and sidewalk installation. 5. Drywells, inlets, and general facilities. 6. Temporary drainage facilities. 7. Erosion control. 8. Coordination with Spokane CountY. I 9. Preparation and submittal of "Record Drawings". 10. Soil testing for compaction and backfill for items 1 thru 5, and sewer installation. B. Direct Expense 1. Mileage at $0.30 per mile. 707 W. 7th Avenue, Suite 200 • Spokane, WA 99204 • Phone (509) 458-6840 • Fax (509) 458-6844 Inspection page 2 2. DESCRtPTION O'F V'UfORK Inspection by STI hlorthwest persvnne1 or other agency personnel shall not relieve #he contractor vf his respvnsibility #o construct the facilities covered by this agreement to the Iine and grade shown on the approved plans or as staked by the engoneer. ~ 1. The scope af these construction engineering services includes: A} Periodic observation, reporting, and soil testing of speci#ic construction activities on this prnject whi+ch include; Sewer BackfEll, Bases, Subgrade, P'avem+ent, Concrete Curb and Gutter, Sidewalks, and Storm Drainage; B} Maintenance of aik construction records related #o construction activities outlined in paragraph "Au above, which may include; daily inspection repvrts, rnanufacturers' certiflcations, nnateriaM test reports, and correspondence; C) Assurance that the construction of the rvads is according to the approued pIans accep#ed by ths Spokane Cvunty Engineer, Spokane County General Provisions, #he Standard Specifications, and applic.able portions of the VIISDOT Construction Manua1; D} Development of 'P'ost Constructian Record Drawings for Street and Sfiorm Drainage Facilities; it is understood the facilities inspected byr firms other than ST1 Nar#hwest will be certified by thvse firms in a forrn accep#able to Spokane County; E} Coordinativn of the testing of construction materials for compliance to the plans accepted by the Spokar~e Caunty Engineer, 5,~okane Coun#y+ Genera6 prvvisions, the Standard Specifications, and applicable portions of the WSDOT Construction Manual. Sorne materials testing will be performed by others and billed separately from STI Northwest bi41ing. 2. Prior to accep#ance of the raads and drainage facilities by Spvkane County, #he Engineer shall submit all construction records and the Record Drawing to the Spvkane County Engineer. _ _ ~I Inspec#ion page 3 ST1 EVorthwest will provide as much soil and rrinaterials testing in house as possible, but will not hesitate to use autside cansultants where fheir specNalty is required. We feel we can provide better service in quali#y c.on#rol, and streamline #he inspection process as required 'bY ~ Spokane Caunty. We have a nuclear densometer for compaction testing that ren#s out vn an hourly basis. The I soils and material #es#ing is billed on a time an~ expense basis. A mvnthly inv►oice will be prepared and sen# fiv y►ou for the soil and materials #es#ing. The amount of testing is impossible to anticipate, and will require your contractor and constructinn manager to caordinate with our in~pectivn department. As you knaw, there are soils and material testing guidelines required by Spokane County, but the requirements are only the minimum and additional testing may be required. Th~ services described herein wi11 be performed as needed and billed on the basis of time and expense as outlined in the maximum hvurly billing rates by joh classification included in the Work Authvrization. You should budget $14,630.00 for the inspection servires autlined aborre on a vne time basis, and you should budge# $2,400.00 for soils and material tes#ing. K.C. Construction agrees to provide to STI or arrange for appropriate certifcations from other firrr~~ ~nd tv include pravisions in their cons#ruction contracts to back charge #heir contractor for the ca►st of STI services which may be required for re-inspection vr re-testing of facilities which failed to meet the required standards. Billings for said re-inspections wfill be carefully identified on STI's billing to K.C. Constructivn. K.C. Constructian will be respansible to back charge their can#ractor. It NS aISo k.JnderStood that E'lo iNof ~ sh~~~ com[71+E?f1ce WNIthICI any p(?rtIOfI t3f the pr(3pOSed Spokan+E' County Right af Way without first obtaining awritten permit and apprav$d plans from the County Engineer. It is a1so understovd that any praject facilities constructed without adequate inspection and documentation by STI will be rernoved and r~cons#ructed in accordance with appraved prvject plans and Spokane Cvunty Spe+cifications, ar STI will not be resp+ansible for proj~~t cerkificatian or submission of recvrd drawings to the Cvunty Engineer. r Acrepted: STI orthw Acc.epteci: KC. Consfruct' by. by: date. ~ - ~ ~ date: ~ 17 SEP-17-1gg'? 11'27 01158415 0213041402150514 P.02 . , • . , . . . . ~ 7~ 17 ~~UM Fox DEs1GN nEVUUoN ~ $3o.ao • . ~ DATE FESRU 19, 1997 , ROAD NAME B VERyT~LK I.ANE / S~LAi~TNOT1 i.4~NE CRp/RID N NAM OF PLAT R,VE,RMK 9TH ADDITZOtQ phu # ADDRESS OF BLDG NAME oF BLDG PROJIECT sLDG# B9 s r R FEDERAiISTAn PRUJBCT M ~ PR03EC'I' LIMITS , MISTjNG CONDi110NS: PROPOSED IIViPR4VF.NtENTS: ROAD WIDTH - -31 t WIDE PAVFD ROAD ROAD Sj]RFACE ,ACP OVER CSTC AVG. DAII.Y '1`R-AFFIC ~wr ~ V O Cmtnat Ts=ffic Coaat Design Yr.v 7aft Count P1tOiELT DESCRIP'I'ION- -~,,~tWALR• 9~ IS ~0.8$ &C~tE t DIYI SUBDZYI~:A I~ITO 38 _BUI D NF~T UN X T S AN~ 1 T. R~ACT . . PRQPOSED DESIGN DEVIATipN PAIVATE ROADWAY SECTION OF lj t ! VIM WITq ROLLED CURB. ~ SIDEWALK ON ONE SIDEt ADJACENT TO CURB. _ L- . . . . - !US'tMGATTflN: • 1~ 1'HE ROARS WIUIN THE RjWWAL&.,,9T9 PjA1T AZZLiALL PRIY T,fi RO ,ADS ~l UpHIEW L&4E WILL $E =ENDED INTO RIVERWALK 9TH ADDIT 0 FROM FIVEKWALK 5TH ADDITION # M T HIN THE AP,EROVED r, FISTING CRQSS-SE~'FIQN P~DESL COl~~NUITY . 3) RIVE$W&It & U&NNON ES NILL CH IXL CROS5--SE ION 0t T QT}tER PRIvAT,rE ROADS uTJ" THE_KQRnLgALF y TKE,~RIV~ALK Pj~y,AQVII?I~TG_ C•4NUNtJx,T,Y,..W_EN THE C,,"NECTLAM BETWEEN RIVERWaDK 9TH AD LITIOV b RIVpWAj.x sTH ADDI2ION IS CqZkW-A._ , i , . ~ , , , SU9MMrr- nv §uaAt►1 MUUHy/IgLpND pA IFIC lNGI E~tNG DATE FE MARY 19 1927 1 M'nwr~ ~ . , so~e p; ~ o _(s4.2) 45 - - A . _ AD TiVE YARItNCE FEE OF .00,.00 PAID TO SFOKANE COUNTY ' 1026 w sROwnWwY. SPOKANE WA 49Z60-O170 PHONE (SC?"- 56-36M FAX t509)324-3478 •REQUfST'Wfl,L NOT 8E REVMWED Wi't'HO : 'Al Lti ~ ~ CASH! HECK Q DA''E ~ C ~.L~° _iLECEYED SY ~ tr~+r.t„►~ v+~ September 25, 1997 W.O. 96238 K.C. Construction P.O. Box 1455 Hayden Lake, Idaho 83835 Attn: Mike Klika By your signature below, we have your permission to sign the bond street and storm drainage plan set for you for submittal on September 26, 1997. I will be signing for you. Sincerely, INLAND PACIFIC ENGINEERING COMPANY Susan Murphy / ZS Developer's Approval Date sm cc: file OCT-07-1997 10:22 INLAND PACIFIC ENG P.01 ~ DATE: ~ To: - ~ ~ tNLANO PACIFIC ENGINEERING CO. COMPANY: 707 West 7th Ave., Suge 200 Spo E~~-~ Sp01Caf1@, WA 99204* ' ~IFFAX NUMBER: Telephone - (509) 45{T6V'TV ES FAX - (509) 458-6844 i ~ROM: S. rY1,urpkAj ib NU 8 O A(3ES: fd6 NUMSER INCL. COVER PAGE ~ NOTES: >AO " QAEi?z- AF-E . A rxw,tPc.E crF ~Ww,- A -ft.c.W &0 k J _ LA1JE. ~ ts"' T WtTA1 0 'C~ -PLAr 13D*L4, matm~5 'c-457 T~ Tu~ll~ D ~ ~ ~ uj,t) -t c.?~ pF -M-s 1 LsT;rRe-"t"tel~ lun;v'&~ -T.o uu n-tA-c ~ ~ op -ru~ tQrF.,ser,-neoL). r-s tT TinSs,F~E -ic~ -DF-eP -rWc- Tu40 Q ~ --Flzo xvn i ,Wj) aqpQF7j ej_) &V -rJ40 Pc.Ar nPNZ, • G tar NAe Kl.IJL1 bkA;T _ -[~kjIJ~.• . . - t FAX TRANSMISSION ~ . . , . . . . , •e.s~~`-, 1 ; ' ' : ~•i~•• ~ ~'ti ~ ~ ~ ~\y ~ ~i. .a . T ~~I~.~ ~ ` ~ . ~ . • '~,•1~~~~/►,ii~`!+~ • ' • .''4.,,~~'• • ~ • ' ' , • • . ~ v ' • • r, . . , • ' ~ - ~ ` \ . • . . , ~ . , . ~ ~ ~`.w . . ; 3 : , - ' 1 ::r,~,ul ~ ~ ~ . , t. • ~ Y•: . ~ • , . ~ . , t. . .`::';k: : fi;~ • ~ . . • . ,~..~,•s' : • . ~ . . , . . . 1 • ! . . . .:''d:.:~ ~ . :r.. • i~' r. , , . ' • ~ ;L,, ` ' ~ ~ • , ~ i'•;:f • _ , - . 1~'~ 'i • • . , . . . r' ' .e:'.•- ' : -Y.' • . ' _ , ~ . . ~ a` •t . . . V • . ; ~,i~' . . ~ . . • ' , . ` - `(.~'K ` ' • ' , . . 1 " . ' . ; • L~ ~I • . ~ . j, ~ . ' ~ • • ' . . ' . ` ~ . • _ .V" , . f~. • • • • ' . ~ 1. ' • • . ' •e~i~F. , . : ` . ' ~ ,y`• ` i,-' ,r ti~C{~. . t r ~ Z ) { • , o. 7d++~~~ ~ ~ ' • tt ~~r ~i - r .1 ~ R , ' . ~ . ' " ' . ~ ~l ~ r • ` ' . ; • ~ , . 'yf~,'k ? ~ ' -•f ~y/ . . .i- . „tst'.~'~:~i,~ ~.;.~tr~ +.~"f ~ , ; ~;att,.• ~:.;~:~'~ir~ ~:1. • ; ~ I 1 . ~j~ ~ xti, • j f~.~~ ~ ~ ` . . ' .r ~ ~ ~ # I / ~ . . ~ , 1'• / . • . • . ~ . ~ . ~ f ~ r fy . ' , . . • ~ : . . , ~ . /f • . ' ~~j,~. ~ ~ ' :r ~ ` , ~ • ; j , .4~ , . . . ' 1. ~ ~ ~ ~ ~~f,•:'•;~ ' . . . . . , , ~ . ~ . . ~ . ~ 1 , ' ( ~ r' ~;SJ. ; ~a ~ • . . ' ` . ' , ~ ~ ~ ~ ~ . ` ~ ~ . . ► ; ' . . VL~~ ~ ~ ~ ~ Y~~,~ h.• • • t. . ~ f ~ ~ ~ , , . / . ' 't: ' ' .,k ' • " " ~ ; 1 ! ~ . , . . ~;+~,,:%.h~ ~i'' ~ ~ ~ t ' • ' • :`:~''t'~'= - .f' ~ ~ ~ ' - t t . r ' , . 1~ • ~e 1 t ~ . ,j• ~ • • . ~ 4.ljlir~ Y' . i 1 ~ ~ . : t ~ ~ . • ~ , , , ~ 1 , . ~•r:;;:`•~ . . , ~ + . . • ~ . , ; ~ . . ' • • ' . c' 1t+l10~ w_ ~""'f~. • . . ..~.~r . . . _ 1~ . . ~ ~ ~ . r ' . . . . : ~ 0000 . ' . • . ~ . • ~ ~ ` . ~ • ~ ' t'* ~r ~ ~ ` t . . • f . . ` : ~ ~ j ' ' ~d. : W►~E ~ ~ ~ ~ ~ j t .~~E 1~ . . • 1 , ~ . r~ ~?E~ . ' ' . '`Y' - • , . 1 . ` . !j~.'. -V~~;`. . ,:r: , • ' ~ ' . ~ . . ' ~ ~ • ' ~ , i. ; 1 . . : . . . . . . , . ♦ . . ,~+f. ' . •:1.%1. y~~•~.',~,..• • • • ♦ ~ ~ . f'` • ' ' .r • • , ~ . • t. t. • '~i1{~~~~`. ' ~ ' ^ • ~ . . , ~ f~ • . " ,i 'tiJ., ~~;y ~I~~f,• • ',..~,:`.t,:~r,-.7~2. . , ' . I t . , , '~•~.i•-' •'I. r.., ~y' ~.i'y~.~~r: ' • ' • ;h ~ ~ ~ . t ' ' . ~ ' , , . ~ ;'S..'• L^ i,:•,. . ~ f! , • .s: r : . • . ,{r ~ • ~ .i ' • . ' • 1~ ~\1 ' ~ ` .f,•ti•Y'•:, ir.:' '~,:S~j:`Z~ ~,j:~'. : ~ '~r.~- • ' ~ t... , . S,' i'•''~.':~" ~:;ryyy~l •:,~w . • . ~ . . r . ' ' • • - •t• ~ . • ~ ~ ' ~ r `~fi`'~::r~..~ •i It ~ r ~ ` . . . ~ :e.•!yx :;S•1 r . • . r,r:~ ~~:r.• ~r f . . ~ : . , . ' ~ %w • , • . r' . _ • ; . . ~ : .r` . . ~hr ' ' t C. : . . •~~t r, ~r. :i: ,1-,; . ; • , , , . ~ ~~r:~ ~,t: +~i i • G,•.~ r ~~J~ f . S fy. , . . , . , ' . , . . ~~rt Y" ' _ trJ .~~t, ~ . . , ' ~ ~ ~ • ;l~ ~F'f ~t ` 1j S♦ f~' ~ . ` • . •a ~ ~ A~•''r Y ~V7J fV ~ ~ i ' , w Y~ ~,,~~t , ~ `r•ti,w,J ~e'~r~t~ y3-`,!~ ~ . • ~ '.i ~ r 4 Y - 'i ~ ' ~ r .i F ';~1~"~` j.`,r~~ ~ ti , 1~~.:~~.~ ~a. ~ ~c -L r " . ~~iR • 1 • . ~4 l ~i i~.~;: ~ .~.~..'1:;. 1` ~~Y, u~c ; ~ ~ . ; . • . • • . ~,~r~~'+,~ , :r~-~~ TS ~ ~ . ~ t ' ~ • .1~' ~ , 1 ;',r. : . • . ♦ 1 r nr ' : ~ ~a:Tc :~.r:y`;•. ~ :~r,.•L' ~~-r~:'+;•.~.• • ~ ■ ~ , 1 • t,7+i!ti.r r, , Y . . G ~ . ~ ~,.i i ~~fy1~-; e'"'~.;'~;y ~ f'•'~• ~ ; . i_ ~ ' ~ - 1: 1 ~ ..Z . 1. ; . , r • r. 'tv',',~~j~~~n 'i . . • . , , • ~ ~ ' . 1~ • : . . ! ~"a` . . ~ ~ , : / . . , . l. ' , , • • ! • / ~ . • ~ ~ ,t-- f - . . ~ ~ ' , . . . . . . , ~ ~ . . 00 l ~ 'J ~ ' ' . ~ 1 . • • , t ~ r . l~Y;~;~:' . . . . . t~,' ' • ' • . ( , ~ I4, ~ ~ : i ' ` . . ~l: , 1. . • ' • i ` J ;w~,~ ,4 . . , ' ''1~~,• ' •'I. • ~ ' ~f'~,•.~~.•' • ' ~ r~ 1• ~ • - ' • • ••t•;~• ~,i ~ ~ . ; ' • 'i - , ~~r:;:- ; . i 1 " ~ ' ' ~ r ~ ~ . . • ~1.~~'~ " , ~ • ~ ~ • . : - ~ . . . . • ~ •~i: •a ' f.~. ~ 1 • • ~ • ~ • . ~ • • . . ~ I I ' . ~ • ~ ; i; ~ : i'",:`. . ~ . , , • , . 1 ! ~ . , . ~ `_`"1 ' ; • r : i : . : '•:'s•;::.:;:,: 1 ` . . , . : ~ • • •±I ' ' ~ .#!.,"i ~I,.. ~ . ~ ~ ' . . ' .S ~ ~ti~-~.r'~, . . ,.1 ~ ~t . ~ ~ . ' . ; . . . ' . • . , ~ ' Z . ~ . • ' ' . • . . ~ ~.1 1 ~ ' . ~ ' • . . ' ' ti,~'.• ~ . . . ~ ~ . , . } : : , ~ • • . J, ' _ . i • . . • ~ . • - •.l r'~ . . / ~ Ih'S~ ~ ~1 _ . ' ' . . r •:~:1'~ f j J. \ - , . .y..~ -t .i•: l ~t'~. . ~ •h.~ ~V .1'~~~~i• . ~f.).! ~1..' . ~ , ~ • , • •,1 • _ : 1' ~ ~ ~ ~ • . I ' ~ S'Y t • S . ~ \ . ' . . ~ ' - s~w~.i~~~i.~ •F'.~.'~i: 'i~!^.~Y'•.Y;~!t'.. i1 ~ t , . . ::~'i.;;~:;.;.cs'r~~~..-, .~;:.f• - ~ ,•:,w:.- • , , . • •i . . . . . : . ''r % r. ' . ` ~ _ ~ ' . ~I ~ - . , :.T+':.y:~ti ::r~- ..:i. ~ ~ ~~:r.~'t~?:• r~~~ ' • ' ~i . ' - . ' op ..~~''n; - ' . ; ~ . / , ~ ~~ifii~{'='• ~-`•y \ . . • . ~ i ~ • , . , . ,~',:'ti,,::H; ~ - . • f. . ~/t. ~ J'' ~t• : .i~ . a... • 1 1 C ~r• ~r • /_~r • , • 'iM1'r':;-, ~ ~ ° • ~ . . •}i t' z, . ~ • ; . ' ~ ~ - ~ • , ' . ,'i. - ~ j ~ ~ . ' I•~ _ ' • . . 72 . ; :•;`'t~.~ ~ !f , ' " , . . . i r ,i` • , ~ . , . I~ '.h ~ . ' ' • • r ~ , t. . . 4~ - ~ • • : ' y!„~'~ ~ • ' ' ~ ' • ' . • - . t ~ ~ • • j • - ' - ' ' . : ' Q~ , a. • , ~ ' . , t - ' :~4~i?I ~ • ~ ' .i"~ ' • . . ~ -t'•_t :ix. ~ j~ • .r- 0J • r ~ - f ~ • . . . • . _ • • ' • • ~ .~~ti~~~ t - . . . f•l~r, ~ ~ ir.:~ ' ' . . . ~ ~ ~~~~~.C`1,h ~d• , ~,.C:. ~~:'iy ~ ' l . - " . ` . ~~1~'ti .`'i,[' ' • , ~ • l / ~ ~ , - .~'~r?w'r.`:.Yi~+; rt~~ ~.'f:;<.' E'►j., ~"~~w• . ~ r,,,, + ~l~ . . , `j.~; : ^.i.•'.~~.~ ~ ~:t ~ ~ ~(,~Gl~;~ - , v , ` r . ~ ~ ~ . . ~ ~1, . . ~ ~ . . - _ . j~:t~'~~I~'G ~ . :\t~ t_'t yJ!At, • •1~ ~~i'4~w^,~a... . ~~if~.~ .i t.tr~,~♦'r. . • . •r•;,r.: .y . .r% ~NK. . . • . ~ •~~j~".•~~`7r'Z1`..~•„~ ' :t lt~:~•'.r..:i~;. Y`.,."d.. ~t - ~ r' .s ' ~ ' ~ ' . - ''J• ~j.~IC,~~'".,, :~.J,~„fy~ i` \ ~ «i~. ::r~a4^ ~ i . ' ,r.%~. ~ ~ . . ~;~.~r~• ~k.. 2 .1t r~,_. t_}~ f'-~1.. ..r+ • . . - 'LArbi•"i~' .i .,t% .1.:.1: _ . N~..~. " ~ -a.... _t •..~-~~'F~~;•~:. ~ ~ ~ . ' =i,)'• K~~ , '~r':~''`~~~4~;~~4L i-.4:.~ ~-r'.f: _y ~i:'.• 'l.1~.~ ~1~~"1'. • + • J:Y-- ~~~~•~'•.J~:~ . :~`1 'r~'~ft;'F~ rr~:~\4 t~'~~ ~"~_Y~ ~ti -t., rjtll~~.i~~I .i ~♦Yr~~ •~I`~ ' . ' ~r~~i ~a7:~ ~1N~ ~..*i~ ~r`~` .t... I,.~•:.:~;j.'~~•"'•.1~~..•.' •i' s , ` , t. ~'t'"~t,.i~=~F7~'~~~r;~ ~ , L~.:~l~~ ~•.ti ~ . • . . , r , : ':.e~.. , ~ : y::: ' ~ f x• 'i - ~ ~ j !~r , ` . ` , -'!('~s~y.t~i{ oer~.,j'~ir ;:f. • " j'~,c•N/~ts u ' ~ :~~,:'•,~~yf 'c~i •''`4i.. j' Jyi• .1*'! . • . _ . , it: ' ".CJ 4 ,SJ.'1.r .*^1 `~'+~'^41.M~~r.~• rt : ;~n"•:• .t '`y1. . , , • . ~ t.,:.yy~~~4 ..~t_~.l~ic 3,~f 'i- .,~.,~~~.t~i.. wk~ ,ya ~"C ri ~t.~1F t~'a~ ~ ~y~{+~i,~1r!•y;: . '+r. ~ :t:: i..~ ^.!.i~r' ~t fCt. j'~` ~ %_r~' e - f~••:.~1 _ Y.. . - - , ~ ' + ~f' ~ a~aT ~7-,~ ~ * T ab h~'~-,~'~ L r:'fr. 7`i . .~'~r .ti`~ ~ , -r♦ t ~ r. r,~~~ . . • r` ~'Y~'~+.C . ♦.t*. 4~j.~1v . - . :~1!.•i I' -•"r• ~ ~t ~ ' T.~" yL. ~ 7r .iuT ~ ~ ~t ~ ~~hi~ •y~~~: . ' ~~G . .~~'~V"Y' ~t ` . ..~r ri ~ .•T~~` ~ j,: 71 : L ^:`i:^~~ ~~1~'«7'" • •rA~~ yxs,~ ~ ~Yr~ _ • . ~.lwT,iy~ . 1., i;. _ iVtk: ~ - w Yi : " " ~ ~ ` ~ ' •S~, Y~ `~1} ~rir~ a ~A v.'(' w~, 'Ir , ~ ,,y 1 i~~~., ~ Y. , , ' . . i'I . ~^7, y ~ ~~jA► tri. ` j rt.*~.. C~. r+ ~~.4.~~,'Z~ i ~ . ~ TM.i•. i_ ~1''` 7~~~t'.;•' j . n _ :«~{t'µ'f; :ti,.; ; . ~ : . . : t . . - . . . ' ~?}u~i'~ ' ':4! } Y ~ ~1''y`. .::r 4,, , '7~•~~ £ ~~'K"' 4 j ~ ~ r1A~iM : ' . . . ' y'~• ''~/b`:~ ' 'r'.:~•~-~-. . ♦ . x~' _ 4'1~ , :j,,. • • ,1 r )n::Y:~'~:.n~T~ ' ~ a,,. ~t:f~ • ;t , ,~•~J~~' ~r'; ` ~ :Y:; t` .i ~i.~'.3,si'} -ai.. ~'4~' ! ,v 'l • . . . ,p.• . r ~•'~`~..'v r~.~.• _ . ~;^;:rf ~ ~ . ~ ~ t'~-~ 1 ~ + ` . • _ ~y~ t .k` _f . r. ~ ~ ( ~ ' 1ti . i ; . ~ , S 1 A ~~.ay~~••i ~ 1 ~:i . . . . . . t -y • : y'^ r.`-~~~,~ . t ; ~ rr.'f~~,`+' Y . -j.'•'rt:. 1 :1T: ``i-~~ ~•~4 ~~,~i ~,~wZ c {~.~.i ~ f ~-j 'i;•'~1'+w w~~~i. a„ ti` j! " ~ 1.-:'C"; ; • , . t ~L~x ~4~.y :s -1, ; ~''f ~ yt ♦ +'~ri~ .I ~l 1? _ . ~.r.. ~'e• k! 7. , ~i 'N." S .t. ~C +i..~~ Jh.~"` ~ ~Yi_ 'J ..:~r} :J.'::' `'::•1: ~ . ` ti ' ' 4 ;ti..'=).. . ...•.i'• t .t,=,,. ~t,r ri' `~.1`;; ^yz..1•~`Jti"t~ ti>"~'~j,~' . • ; . . •Y :H. ..p.~.%X.,._ '~4.-;s~ ~.^Qi,;. t. t''r_•-r •`~ry t` ^ ' 3 ` ~7', _ ~ . r. ~ , ~ ±t i ~ r4'. ~ ~r- J.rL~'~.F ~ ~n, ~ ti j.~~,~'::,,,~,~~ . , , y. . Y ~ 3 l.J t+4 -w 1• , ~ ~ • ` ti ~ ~ j. r , ~ ~1 •~74 15f•y~l,~.~~1 { . • 1 ~ T ~1 . F~~Y. . . ~ \\1I • . .4: /~1.. ~ V. ~ 1 J I z l~~l;R~ ` ~I~ ~ ~ Z'~~ ~;*z.v~,~;;ir '~`w7 ~..rt ~ .4 ~ - ~ ' 4ti~~+n.i lk ~ ' - 1.►~ • ;,1"4.1~~{` ~ " ~ ;~t 'a` h:~ , i~'~+'~ ~ ' L, , ,i ' ~ ~ • • , ' ~ _ . •X` ♦ , : ~ v ~ ~ ~ : ~ii: ~i ' 1. , t: 1 • ~ r ' ~ ' • ~ • t~~" ~ 4 • ~ ` , t •Ir • ~ ~ ~ . ~ v'~ t' ~ .w;'•.. ; 400 ~ : ~r ` • ' ~ ~ , • • r r . ..r C.~ 1 • ~ ~ , ~ . ~ t ► ~ 1 ~ 1 .•r , ~ ► . ~.,,~,..r• -'~r~ ti t ' • "1 t ' ~ ♦ , ~ ~1 • . . ~ • 1 . , R i~ ` 3 ^ ~ ~ ~ ~;r MAOE ' ~t►U-N ~ , ~ . . . ~•~'t`~ . ~ ~ ~,~t... , • ~ . .fiQ ta~•`+~f: "1 . '71y' , ' ~ . . , . •17"..i. ~~J~~ ~c i~.; Y~ ir ~'!C`i'f ~ F'~ =~f'y~v 1 ~ . , ~ . ~ f ' ~ ' ' . r . r-* , / . . . ~ . '-,p;~ M:t: f:~'n ~ ~ i~~~t'~f~."~ - i . ' _ ~4 ~ •ti _ _y^ ~ .~~L.~ R : . ` , y~ ~f1 ~ , i~~ ' ' 1 • . ~ . ~ . l :z.~.;f, :;r _ , . y,e vsr,.' ~~{'tir•' • ~ • . . .•y r. *y~:y _ ~,'.~"~i~~1•.1,. , , ~ ~ . - . ' rr'+~ . .C"1' :r ~ ~~~-~''K i:^.~ f ~ • . , . . ~ ' . ~ r j' ~ ~ ~d~Y`+'!j`y~. • ~ ~ ' • . . „~'.}~'ul, r~s~t~lf~._'~.~::1~~{ ' . ~'t . : . ' . . ' 'jtitu, i•~'a . t~`r ~ t' ~ ~ 44A.: ~ . . ~ . . . . . .wr ;•3j1^,; ~ r~ ~ ~ 7 i Y - ~ ~ . ' ~ . . . , .~i •;t • 'r F T r r Il~~ h r ~ '•i ~ : ~ ' . t :r i: . . . . i ~ , . , i ~ w r ~ ~G~,~ • . 'y.~y~ '.L . . . • , .w " . ti.~,,. M~':.'., . ~s' N'~'t~ .V:,. ~ . . ;t~~ • ':h.:•~ ' :~;,ti.ri' T1, r _ T'"~.i ~)e►~ ~~1.:;~: ; y;~4, ' . , • ',,e a • ~ 7 ^ r~.r~ Y~::.'~ l~''~:ll.~'~y~r'`~( ~'Y .f. ! i ' ,v •7 ~ '~r ' ~ ~ . , t •f~,.~r; ~'~~`y~ ~ ~•"r' ~1,~. i ' § -f 1~.. ` , ~'~:.x: 1 •,+i. . riF r` 'l ts 3... ..~i~ ~ , ~ r R ~ ~r i~ • , . . ; ~ ' r.r '?~1. ; ~ -tiM~ ~~,r~ .'T ~ a -!l'.,`V'„i••'-' i : • ~ ~t, {u '-x.~'.~~1 : ,y , ► s' : ~ ~ , 7~'t~ ~ .h~` ';~~~rr~~;~''};j~ '.,~~=~~,t~•, •,.~i ~ ~ ~ •t 4r (,~1• ~4~~~~ ~ , , ..Ap'•- - ~.C r~-~'!7:' ' •.u.i"."'~ - i r- . ~ ' v~i~~ ~q .~.'.^'f~j•~6 f~.~`'~~'~'~+r3, • ~r4'X•tN~.',`„'~i~~v ~ : • ~ ~ - : 7.t cr J~J~ ~ ~ri~ .N. .i"►. ~ . ~ . ~ ; ' ~ ~ _ ,a ~>.'.J, . : • " * . • ro p , ~ ' tt•~c.`• rr~~~~. r . y . . . f • ~V,~ t J ~t ~1' '''.~>t - ' . .i%w?~~ ts , , . ~ I t .•M., Y{„rG ~s Y J."'. ~ ~ . • ~ - ~ ~ r 1 C:. ~ ~ . ~ i ~ a '~t'~,Jca`~~~~s- "~»l~:~^~=~ ..::5~~ ~ ~ ~ e • . ` + :.~i~ } ~i a: r~ ' ~":'j' -,f1 / ~ + 1. ` • v~ ~~t' :r :~'i^~'J4~ti~ '~-~'I rt` ' ~ ~ ?t~ t~• ~~}'~•~`y7•~f'~, I ~,=~i ~ ~ ~ ~ . ` t ~""'('~`wY~, . . + : 1 ~ t . ?;j~ti;~; , 1 ~~l ,,e.~~.~'r. . r ~ ~ i ~'l~I~'j ~ •J•' ..y • , . ' ~ J~' , ~ ` . ~ `:;rj~ _ : ~ ~ . , . ° \ i t .I , ~ - ` • ' • 1 • ~ ~ ' ' \ .i''~1 . ~ . ~ •i~ , ~ ~ ' \ Jt ~ . . , . :•j•',:;:;.'. . , ~ 1 ~ . ; ~ /Q ?'.'•~.1. , . ,i' . , , ~ •,`1~ . ~ ~??T'r t • • • . • . . . ^ ~ , ' tr~. . ~ •:.~a~L'~ .j . r ~ ; • / . ~ ~J 1~~,y7,i~T'.4• ' . ~ ';~'~:'r'i; . . ~ . • ' t . , ~ ~ . ~ ~.•7~"Y~~' ~ ~ ii . h Y.;' ' ' ~ ~t l~~ ~V , ~ . ' . . ~ ~'"l( ' ` . ~ •j ~y~,~; i- .~.rs..` ~~~,~;y 1 t~'~.i, • • • . ' + ~t t "f► ~ ~'~~i{P ' ~i. u ~ . : • . , ' . . , r • ; : : ' / ~ ' .'t~..,y . r ~ ~1';: ~ ~tti~Yi- r « .i;iT.tyj='~•~~ ~F. ii,`Z~•~r! ~ , ~ I • ~ r~~'~~ 'C:~ Y • ~ ~~..~.t+.rl..';•,' ~ji ~j}~~~. - • ! ~ } I~ ~ • . . . . -r . ~ ) f ~ ytir~~ . ~ ~ . i ~ ~ . • , t - ' . .i ' ! e '•i ~~•l ' • ~ r ,~y~~ t "~;{a~h^~ ~ ~t ~ ~ r i ~~~1'45~: : . A i r / ,ti ~ foY~f+~~ r , ;'S ~Si ~v: t';a ti;~~'~ t.i.~;•' . ' . ~ ~ ~'ti'~~~_i'`~,~Q~ ~ , ~ +;.f~~'.. t'.~L~,~'7.'~ ~ . ~ r- • •r 1~f~; . ~ t ~t"~'~~S y ';'r r ~ n.r ~ . 1 ♦ „ 'l/' i •;:~t j,f;r'° c :~C.•'y;,;.'<<i. i1~:t , ~ ~ : ~ .~`J,'~;5~}~;.•~''~.. t ~,a. ~,;e~ri~.:. ~ .r~;~„it ` • ' I ` ~L~•'l'••,:,'•iJi'~~.;,"~t '~i~ '~'~.:1.~: .7`•~~~~i•t~r, . • `+.~+'iI!; j f ! ~,Z~(•j~ L~~~r.~:;l, ..~,.~~j.~. - . ;,.'-'s ,,..,:.q,,', _ . ° : . .•r~' , . . ~ ,y ~.n . . , 'r►'~„ ~ ,i;~~-~'' •,;.,.t ! ~ ~ t, i~. f .4 y' =f '1~~ , ~ ~tl,, . r. ~ i i t ~ ` ~ ~ ; • ~ : ' : ' . . ' ' . ' t ~ ~ ' r z,~~; . • , • t 1''=,~ ' • . c;•'' i • • / 1 i 7~vr; . .',~~."a.~``.; . . ' , ' • • . . , a,~ ~y~~' : . ~ a . . ~ 1 ~ VV, ~~`^.~b~••,.', ' R°• ~ ~~.{;~•~t ~ ~ ` ~ :aa~:f, ..i~i;.. : , -,1w.; ' • .~rr'~"'`,~~:: r . SD~ r`I : j: ~ z ~ , . . ` ' , s'►► ~ J `1"~ ~ ~ L• ~ .:x~ i ~i Ey~~-' ~ , : _ , ~ : ~ . , 1 . ~ Ri;• / T ~ • \ POND B BOTTOM ELEV. = 2024.60 BOTTOM AREA = 422 S.F. ~ VOLUME PROVIDED = 211 C.F. MIN. BERM ELEV. = 2026.03 r ~ 25462 75.41' W I ~ DXPtES 9/24/ ~ o Wj z v) 2 ~ . , o Q OD ~ Q ~ N. STA. 30+07, 20.54' RT. 3i TYPE `A' DRYWELL W/ TYPE 4 METAL FRAME I g' ~ ~ m5 AND SOLID LID. I o; ~ o; RIM ELEV. = 2025.78 :31 N: W STA. 29+98.51, RT. ~ TYPE 2 CURB INLET I T.C. ELEV. = 2025.83 361 I : . ; - Ot 20' ~ 5' (TYP.) ~ l+J 30 L.F. OF 12" CMP- • STA. 29+88, 45.5, RT. ~ ~ r- CONCRETE INLET TYPE 1 W/ TYPE 2 METAL PROPOSED DRAINAGE FRAME & GRATE L, EASEMENT GRATE ELEV. = 2025.10 37.40' ~ T ~ TYPE `R' CURB \ PRIV ATE ROAD ~ 60UNOARY OF LEVEL EASEMENT ~ FLAT EOTTOM AREA MlCbtt~LLl LANE sTA. 10+47.49, LT. - TYPE 2 CURB INLET T. C. ELEV. = 2026.43 i ` SCALE: 1 "=20' i 1 ~ I NLAND PACiFic LO T 5, B LO CK 4 ENGINEERINQ RIVERWALK 9th ADDITION 707 West 7th • Suite 200 (509) 458-6840 DATE: 9/19/97 \Spokane, WA 99204 FAX: (509) 458-68440,f \ J ~ ~ ' 7 ! 5.5' WIDE TYPE t CURB INLET PER SPOKANE COUNTY TYPE `R' CURB STANDARD PLAN B-S STA 15+43,- RT PRIVATE ROAD TC=•2027.46 PN~ EASEMENT 7 - IP ,9 i•~ \ 0 2~ " 4` \ •~O. , . • ~9~ ' . 4 9 60UNDARY OF LEVEL FLAT BOTTOM AREA _ , ~ ~ o~ - •m(~ - Vy l ~ PROPOSED DRAINAGE EASEMENT J r- ~ 6~ 0$ ~ 2 ExPtREs 9na ~ P ON D K POND BOTTOM EL=2021.78 '208' AREA REQUIRED=266 SF ` '208' AREA PROVIDED=272 SF SCALE: 1"-20' ` MINIMUM BERM EL=2022.61 ~ I NLAND ~ / ~ PACIFIc L4T 9, BL4CK 4 - ENQINEERING R I VE R WA LK 9 TH A D D I TI 0 N 707 we9t 7tn • suite 200 (gos) 458-6840 ` DATE: 09/17/9~ `Spokane. WA 99204 FAX: (509) 458-6844~ ` POND D BOTTOM ELEV. = 2019.19 BOTTOM AREA = 524 S.F. VOLUME PROVIDED = 262 C.F. • MIN. BERM ELEV. = 2020.62 ~ 25462 STA. 14+26.92, RT. SPOKANE COUNTY STANDARD LEXPJREI.9~P4/ ~ NPE 2 CURB INLET TYPE `R' CURB T.C. ELEV. = 2020.42 RIVERWAY LANE ~ PRIVATE ROAD BOUNDARY OF LEVEL EASEMENT FLAT BOTTOM AREA HARMONY STA. 35+18, LT. ~ = I PROPOSED DRAINAGE TYPE T.C. 1 ELEV. = CURB INLET 2021.74 EASEMENT ` - ' - ~ 6' SIDEWALK _ 83'19~ ~ 13. 74' _ 6'.U11LITY 0 SIDEWALK EASEMENT _ , _ I_ ~ _ • • `2 ~ ~ . : . . . . . . . . .2a'. . . . . . . . . . . . . . . . . 1N ~o ~ • Q 3.84'~ . . . . 18.89' • s~• ~ ~ ~ N \ o ~ ~ ~5.. ~r ~ • ~d\ ~ ° . 2~ 2~~ G 2 . 1~9•2~ HARMONY LANE STA. 35+10, 25' LT. SPOKANE COUNTY STANDARD TYPE `8' DRYWELL WITH TYPE 4 METAL FRAME & GRATE. RIM EL. = 2019.69 ~ ` SCALE: 1 "=20' , ~ T" NLAND PACiFic LD T 1, B LO CK 2 ENOINEERINCi R I VE R WA L K 9 t h A D D I TI 0 N 707 West 7th • suite zoo (509) 458-6aao DATE: 9/19/97 \Spokane, WA 99204 FAX: (509) 458-6844J \ J ~ ~ ~ 70' ~ ~ ~ EXPIREs sa ~ ~ PROPOSED DRAINAGE ~ EASEMENT BOUNDARY QF LEVEL ~ FLAT BOTTOM AREA ~ ~ - ~ tiy ± a a t. e e•• f a a • 10.00' 10.00' C(3NCRETE INLET ~ ~ . . . . , . . ~ ~ ; TY'PE 1 W TH TYPE 2 ~i 11' h~IET►4L FRAME 8G GF2ATE ~ STA 1 fi+49 LT 31 GRATE EL=2~},~1.~52 ~ . ~ -i- ~ ~ - - - 16' U11LITY EASEMENT ~ ~ - TYPE 2 CURB II~ELET ~ ; ~ ~ ~ . STA 16+5$,78 LT { I TG= 2~}21.35 ~ f ~ fi` ~la£Y~IALK 70.00 ' i ~ fr ~ TU1 1NF •ROUNV EASEMENT ZSHAN~NON L~I. T~rPE "B " aR~rwFLL 1+~ITH TYPE 4 ~1ETAL FRAME & SOLID +~(7VER . STA 16+45, LT 24.5' - Gl~1~TE EL-2021,30 11' 0F 12" PIIC T ~ 5=0.~}1 0~} FT/FT I~ ~=2017.41 45° OF 12`+ P'VC IE ~~JS _2017.30 5=0,01 Q0 FTf FT IE =2017_30 IE ~1~S =2017.75 POND I POhID BOTTOM EL-2020.12 '208' AREA REQIJIREa= 190 SF '20$' AREA PRQVI[7ED=1 90 SF ~ Iu11NlMUh+t BERM EL=2021_55 SCALE: 1"=20' ~ INLAND ~.C~T 1, _ BLOCK 5 - P~~c~~i~c ENGINEERINC1 RI 11E RWALK 9TH ADDITi ON 707 west 7th • Suite 200 (W9) 458-6W - DATE: 09/17/97 ~ spokane, +wA 99204 FnX. (509) 458-sea~~ ~ _ , ! \ INSTALL 5.5' WIDE TYPE 1 CURB INLET PER SPOKANE COUNTY ~ STANDARD PLAN B-8 ~ STA 15+43, RT TC= 2027.46 ~ ~ / ~3" •~O GsE~'~"N~ ` , ~ ~ v~ / (,f\ • 9 ,Q 6•5 O v,~L~"C~ / O• \ , ~ O 1 1. / ~ / .~PG~. • . •~g0 20. ~~pG . BOUNDARY OF LEVEL FLAT BOTTOM AREA PROPOSED DRAINAGE ~ EASEMENT oo 4 8 ~ • f ~ - ._~1~ ......._,f" •r ! ! 0 , f Z 6y ~5 2 EXPIRES 9/24/ ~ P ON D K POND BOTTOM EL=2021.78 ~ '208' AREA REQUIRED=266 SF SCALE: 1"--20' '208' AREA PROVIDED=272 SF ~ MINIMUM BERM EL=2022.61 ~ I NLAND - OT 8, BLOCK 4 PACIFic RIVERWALK 9TH ADDITION ENGINEERINGi 707 west 7tr, • suite 200 (509) 458-6840 DATE: 09/17/97 `Spokane, WA 99204 FAX: (509) 458-6844~ \ J ~ 40.10' . ' --2.5' ~ 254b2 ~ . ~ EXPERES 9/24 ~ ~oM ~o~' ' - 5 3 CD LO 0 ~ - PROPOSED DRAINAGE EASEMENT c.., , . ~ BOUNDARY OF LEVEL . • 26.50' ~ FLAT BOTTOM AREA ~ 16.54' . . • ~ ~ ~ SE7BACK ; S ~ K ~ n' EASEA,IEN ~r . . . . . . . . f N . ~ : ' -T - 5' (TYP.) ` I = ~ . ~ c~ss,s4• 6' sIDEwALK 32.1 ~ . ` ~ - TYPE 2 CURB INLET - SH AN N ON LAN E STA 15+25 LT - - TC= 2022.66 POND H POND BOTTOM EL=2021.78 '208' AREA REQUIRED=266 SF '208' AREA PR4VIDED=272 SF SCALE: 1"=20' ` MINIMUM BERM EL=2022.61 J T INLAND PACiFic LO T 5, B LO C K 3 ENGINEERINQ R I VE R WALK 9 TH A D D I TI ON . 707 West 7th • Suite 200 (509) 458-6840 DATE: 09/17/97 ` Spokane. WA 99204 FAX: (509) 458-6844of ~ .i i i ~ ~ 45 L.F. OF 12 PVC ; PNE TYPE 1 CURB -INLET STA 16+59.07, RT TC=2021.35 ~ ~ 50 ~996 °o. o CONCRETE INLET ; EP_ ~ o. ~0 5 TYP E 1 WI TH TYPE 2 ! ~ 50 • • METAL FRAME & GRATE STA 16+49 RT 25' ~ . r-,.~J _.-._.-r SE. • GRATE EL=20 ~'c.~F 20.62 zo. i M BOUNDARY OF LEVEL ' FLAT BOTTOM AREA PROPOSED DRAINAGE ~ EASEMENT ~ - 4 10 > >o~ ; ; i ~ - O~ p~ 59 95 , 25461 ~ I ~ ~ONqL~ POND J EXPIRES 9/24/ ~ PON D BOTTOM EL= 2020.12 '208' AREA REQUIRED=174 SF '208' AREA PROVIDED=178.5 SF ~ MINIMUM BERM EL=2020.82 SCALE: 1"=20' 10, INLAND LOT 10, BLOCK 4 PACiFic ENC3INEERINQ RIVERWALK 9TH ADDITION 707 West 7th • Suite 200 (509) 458-6840 DATE: 09/17/97 ` Spokone, WA 99204 FAX: (509) 458-6844J \ J ~ i ~ I BDl'7QM ELEV. = 2q1 ~.12 ~aT~~o~ ~a~~~ = - s~. ~ ~ VOL~iME PROIfIaED ~ 2~~ C.F, ~ MIN. B~RM E~EV. = 202~.55 ~ 165.s0' . , ~ , ~ ' ~ ~ . . r ~ ' ! ; , r~E R cuR~-~ I : t I • r ~ : ~ ~ ~ ' ~ PRIVATE R~AQ . ? EA~EM~NT I : ~ E~ • ~ l.t1 w ~ r ~ • ~ , I ~ ~ ~ r I a J ,,i ~ W : ~ c~ ~ ~ f ~ ~ ~ ~ ~ . • ~ ~ ~ : c~ ~ ~ r' ~ ❑ ~ ~ f •m , ~ ` • . ~ ~ I ~ _ , ~ ~ I ~ ; , ; , , ~ ~ . . M : ~ - ~ ~ ~ ~ g # ~ ~ ~ . ~ . ,~.1.~ : w I E S~`A~ 14+~6.9~, LT, ~ W. , : ~ . ~YP~ 1 ~URB I~fL~T ' ~ ~ : ~ ~ r.co E~~v. = 2azo.a~~ , ~ . : ~ t~ ~ ~r'~ ~ ' nr I ' # 1 ~ 2$ , ~~U~IDA~Y OF' L~VEL I • < FLAT BQ~TOM AREA a . ~ I ~ h , ~ C~ - ~ ~ . . '~,I ~ r P . ~ . . ~ B~'` • g ~ ~ r ~ r ~ . , j ~ ! ~ ~ , - ~ ~ 1 ~ PR~~QSEQ DRAII~AGE , ~ ~ ~ ~ ~ . . ~ EASEMEI~T ~ C~ ~ - ~ , ~ ~ . ~ ~ . ~ r _v ~ . i ; ~ , ~ . ~ 5462 STA, 36+0~, ~4.50 LT, ~ _ TYPE `A' DRYWE~L W ~ ~ ~ ~ TY~E 4 METAL FRAME ~ , , AND ~RRT~, GRATE ~ . _ 4 ~ EXP~R€S 9 4 . ~LEV. - 201 ~.6~ ~ 1 ~ ~TA. 36+12.33, LT. . _ . i . ~ ~YPE 1 ~URB INL~T ~ T.~. ~L~~', = 2~2Q.44 SCAL~: 1 ~20 ~ 203 _ I , ~ ~ ~ I , r ~ . . , ~ ~ NLrA~VQ ~ ~ . A~IFIC ' . ~1GII~EE~I~VC~ ' . . . ~07 w~~t ~tn • s„rc~ 200 ~a-ea~a ~ . Spokone, wA ~20~ FA~: ~5~9) 458-6844 { ~ATE: ~ 1~ 9' ~ ~ ~ ~ ~ , • . E; 9 f 19/97 4 , f