Loading...
2014, 10-30 Energy Compliance Certificatev ?% ••-, •�--w r ti =rfi • ti Property Conditioned Builder or -{fungi Address: C-1‘.2 1 43 r SA. /2-zL_Jc JaG Floor Area / Date GG' /31- /2c,) y registered design professional : / [ -04 1-744. - �" itS ih- i-1 DIA) Signature: Ceiling: Walls: Above Below, Below, NFRC rating Default rating System ,1�-1-eJ' 14 Vaulted R -_Floors Over unconditioned space Attic R- q G7 Slab on grade floor R- R - grade R- Z / Doors R- int. R- R- ext. R- R- (or) Windows U- SHGC- (chapter 2009)SkylightSHC44 T a _ Type Efficiency Heating 1. v U Coolin DHW `•-t nii All ducts Test Method: Test Target Building air System type: `?T.a & HVAC in conditioned space ( yes / no) Insulation Total leakage Leakage to exterior Air handler CFM@25Pa Test Result R - present CFM@25Pa / : 9 tP leakage target: SL A<0.00030 - Tested leakage: SLA= Rated annual generation Kwh Duct Testing Calculator (New Construction) House address or lot #:Z Conditioned Floor Area: Duct tester location: Pressure tap location: Ring (if applicable): 12 //tv 5J1,..).0.-7 fjocK (Ed / 3 ,, ` h2,);2 dc's. Standard ❑ Open i 1 ❑ 2 0 At Rough -In or Post Construction Test Method Standards Calculated Target Testi- CFM25 "sir Hander Present (Leakage to Exterior or Total Leakage) < 4 CFM25 per 100 sf of CFA Air Handler not Present <_ 3 CFM25 per 100 sf of CFA ;Leakage to Exterior or Total Leakage) 1. Test CFM25 must be equal to or less than the calculated target. Air Leakage testing Calculator (Blower Door Test) Conditioned Floor Area: Ceiling Hieght (ft) / 3 ( Z Calculated Volume (cubic feet) ` 0 Standard Tested CFM so Calculated Test Result (ACH50) __5.0 ACH50 (cFMsox 4 -conditioned Volume) 5; 460 Glossary Rough-tn: After installation of the complete air distribution system but before installation of insulation and sheet rock. Allows for access to all duct seams and connections for re-evaluation of seal integrity if standard is not met in intitial test. Post Construction: At or near final inspection. The home must be complete enough to pressurize the home to 25 pa. Total Leakage: Aggregation of the entire systems duct leakage in a duct test. Leakage to Exterior: Aggregation of all duct system leaks to the exterior of the CFA in a duct test. Pascal (pa): Unit of pressure CFA: Conditioned floor area in square feet CFM25: Cubic feet per minute of air leakage at 25 pascals of pressure CFM50: Cubic feet per minute of air leakage at 50 pascals of prt Conditioned Volume: Volume of conditioned space (CFA X ceil ACH50: Air changes per hour at 50 pascals of pressure fps : ERMOUt A N WEST FNSULAf N 16019 E. Lacrosse Lane, Spokane Valley, WA 99216 Cell (509) 294-1112 E-mail - chriss@iwinsulation.com #IWIINI*111 MU -WA • #RCE-19317-IDAHO.62240-OREGON Office (509) 926-3136 • Fax (509) 474-0320 Chris Schuh, Production Manager 4:;r• i 'The Energy & Sound Professionals"