2014, 10-30 Energy Compliance Certificatev
?%
••-,
•�--w
r
ti
=rfi
• ti
Property
Conditioned
Builder or
-{fungi
Address: C-1‘.2 1 43 r SA. /2-zL_Jc JaG
Floor Area / Date GG' /31- /2c,) y
registered design professional : /
[ -04 1-744. - �" itS ih- i-1 DIA)
Signature:
Ceiling:
Walls: Above
Below,
Below,
NFRC rating
Default rating
System
,1�-1-eJ'
14
Vaulted R -_Floors Over unconditioned space
Attic R- q G7 Slab on grade floor
R-
R -
grade R- Z / Doors R-
int. R- R-
ext. R- R-
(or) Windows U- SHGC-
(chapter
2009)SkylightSHC44
T
a _
Type
Efficiency
Heating
1.
v
U
Coolin
DHW
`•-t
nii
All ducts
Test Method:
Test Target
Building air
System type:
`?T.a
& HVAC in conditioned space ( yes / no) Insulation
Total leakage Leakage to exterior Air handler
CFM@25Pa Test Result
R -
present
CFM@25Pa
/ : 9 tP
leakage target: SL A<0.00030 - Tested leakage: SLA=
Rated annual generation
Kwh
Duct Testing Calculator (New Construction)
House address or lot #:Z
Conditioned Floor Area:
Duct tester location:
Pressure tap location:
Ring (if applicable):
12 //tv 5J1,..).0.-7 fjocK (Ed
/ 3 ,,
`
h2,);2 dc's.
Standard
❑
Open i 1 ❑ 2 0
At Rough -In or Post Construction
Test Method
Standards
Calculated
Target
Testi-
CFM25
"sir Hander Present (Leakage
to Exterior or Total Leakage)
< 4 CFM25 per 100 sf of CFA
Air Handler not Present
<_ 3 CFM25 per 100 sf of CFA
;Leakage to Exterior or Total Leakage)
1. Test CFM25 must be equal to or less than the calculated target.
Air Leakage testing Calculator (Blower Door Test)
Conditioned Floor Area:
Ceiling Hieght (ft)
/ 3 ( Z
Calculated Volume (cubic feet)
`
0
Standard
Tested CFM so
Calculated Test
Result (ACH50)
__5.0 ACH50 (cFMsox
4 -conditioned Volume)
5;
460
Glossary
Rough-tn: After installation of the complete air distribution system but before installation of insulation and
sheet rock. Allows for access to all duct seams and connections for re-evaluation of seal integrity if standard
is not met in intitial test.
Post Construction: At or near final inspection. The home must be complete enough to pressurize the home
to 25 pa.
Total Leakage: Aggregation of the entire systems duct leakage in a duct test.
Leakage to Exterior: Aggregation of all duct system leaks to the exterior of the CFA in a duct test.
Pascal (pa): Unit of pressure
CFA: Conditioned floor area in square feet
CFM25: Cubic feet per minute of air leakage at 25 pascals of pressure
CFM50: Cubic feet per minute of air leakage at 50 pascals of prt
Conditioned Volume: Volume of conditioned space (CFA X ceil
ACH50: Air changes per hour at 50 pascals of pressure
fps : ERMOUt A N WEST FNSULAf N
16019 E. Lacrosse Lane, Spokane Valley, WA 99216
Cell (509) 294-1112
E-mail - chriss@iwinsulation.com
#IWIINI*111 MU -WA • #RCE-19317-IDAHO.62240-OREGON
Office (509) 926-3136 • Fax (509) 474-0320
Chris Schuh, Production Manager
4:;r•
i
'The Energy & Sound Professionals"