Loading...
2014, 10-07 Permit App: APR-2014-0104 ApproachSpokane �,,. Valleyk PROJECT ADDRESS: '1Z1 START DATE: Community Development Department Permit Center 11703 East Sprague Avenue, Suite B-3 Spokane Valley, WA 99206 Tel: (509) 720-5240 Fax: (509) 688-0037 permitcenter aspokanevallev.om (Staff Use Only) PERMIT NUMBER: PERMIT FEE: Project -A1190 I /0 APPROACH PERMIT APPLICATION RECEIVED 5/( lr i ,2 QC kC ANTICIPATED COMPLETION DATE: BUILDING OWNER NAME: MAILING ADDRESS: 1 Z iv ill=griger i GC�ecT CITY: Spo &F - V1,41€1-4V1,41€1-4STATE: " "" "- CONTACT PERSON NAME: t T'71,E PHONE: SS - 6Lb- 1190S- FAX: N tt CONTRACTOR NAME: ,� E Li 1 C, " C=.1(1('bh E c - UW -47i ep14 PEPMIT CENTER j U B *� I REV. — CELL: S744`' MAILING ADDRESS: CITY: STATE: ZIP: PHONE: FAX: CELL: CONTRACTOR LICENSE #: CAA kA 4 YJt 16,C, EXPIRES: If-ia CITY BUSINESS LICENSE #: i Residential Driveway O Existing Curb & Gutter Culvert Installation O Other Conditions: PROJECT DESCRIPTION (Please Provide Site Sketch) 0 Commercial/Industrial Driveway O Rural Road Section O Sidewalk Repair/Construction Bond/Insurance certification must be on file with the City. DISCLAIMER The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of Spokane Valley permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted and subsequently approved before this application can be processed. Signature DE -001: V-1 Date: 7 1 Page 1 of 2 APPROACH PERMIT APPLICATION REQUIRED SKETCH INFORMATION Provide required measurements (in sketch boxes), and include street name. Check all existing conditions that apply: Sidewalk ft wide ft from back of curb oStreetside Swale (Drainage Ditch ElDrywell (show location on sketch) ['Other (please describe below) w z DISTANCE FROM NEAREST PROPERTY LINE MAYBE LEFT OR RIGHT SIDE) FT (SEE TABLE) CONCRETE APPROACH CURB RETURN CURB J WI z oI --4'4—THROAT WIDTH 1=1FT 4' WING (SEE TABLE) WING STREET NAM E Oi 12Gl ai (-jKa•^, 12-0cic STREET WITH CURB DISTANCE FROM NEAREST PROPERTY LINE MAY BE LEFT OR RIGHT SIDE) FT (SEE TABLE) ASPHALT APPROACH \IF CORNER LOT, DISTANCE FROM CURB RETURN I-1 FT (SEE TABLE) RADIUS RETURN EDGE OF' ASPHALT I ----THROAT WIDTH I—I FT —I (SEE TABLE) STREET NAME STREET WITH ASPHALT EDGE SIF CORNER LOT, DISTANCE FROM RADIUS RETURN Q FT (SEE TABLE) Approach Requirements: • Maximum 2 approaches per property frontage; one on arterials. • • lUliil WIWI' U.I. tapplual:llc. uVL W cnvcvu .+v ito vi uv++..•p,.. •••••.••. Residential Approaches Commercial Approaches Distance from Curb/Radius Retum 15' minimum 75' minimum Separation between Approaches (measured from centerline to centerline of each approach) None specified See Page 7-27 in City Street Standards Throat Width (flat portion) 16' min., 30' max. 30' min., 40' max. Wing Width (at curb line) 4 feet typical 4 feet typical Minimum Distance from Side Property Line (p r/w) 5.0' 5.0' Minimum Distance from Crosswalk 5' 5' DE -001: V-1 Page 2 of 2