Loading...
2014, 07-22 Permit App: BLD-2014-1725 ResidenceCommunity Development Department Permit Center 11703 East Sprague Avenue, Suite B-3 Spokane Valley, WA 99206 Tel: (509) 688-0036 Fax: (509) 688-0037 permitcenter@sookanevallev.orq RESIDENTIAL CONSTRUCTION PERMIT APPLICATION Is ACCESSORY BUILDING Arr NEW CONSTRUCTION M ADDITION/REMODEL Ef DECK �/ IM OTHER / SITE ADDRESS: 5-01 ..p , Slhtl. yrt ►�t�C ASSESSORS PARCEL NO.: LS/ `") LEGAL DESCRIPTION:LOT:7 PJM: BUILDING OWNER NAME: Jiec4ot C-4'27 6 -4 -APS NAME: (1,'IVt S Ltietf -0111 ADDRESS: / !j�L, 1 [E • /e62 CITv:�vy.{ STATE: ZIP: qei20 s FAX: CELL: CONTACT NAME: PHONE: i,,e p�} �jp� : FAX: CELL: CONTRACTOR NAME: 141,43r1-4 cry . ,1/1 S T iri 1 t)vv % dvt MAILING ADDRESS: CITY: vil •e AS 44106 e_ STATE: ZIP: PHONE: FAX: CELL: CONTRACTOR LICENSE No.: Y V`AIKoe ;4.101 I EXP ES: CITY BUSINESS LICENSE NO.: TIP/1/ l(0 64) 5 DESCRIBE THE SCOPE OF WORK IN DETAIL AND INDICATE USE & PROPOSED USE: ****YOU MUST COMPLETE THE FOLLOWING**** PPLICABLE Height #P Peek: Diplon ns; / 6 �I `7 No. of Stories: 4 ..L Total Habitable / ��O Space: Mai FI or SQ FT: S C) Upper Floor SQ FT: " Unfinished Basement SQ FT: Finished Basement SQ FT: ----- 1Garage GarageSQ FT: 9r4/D Deck/Covered Patio SQ FT: 4u4�p 1 Impervious Surface Area:5 30% Slopes on Property: X 0 No. of Bedrooms: Construction Typez_7j( (t Heat Source: A -A. A Sewer or Septic: /J TOTAL COST OF PROJECT: $ DISCLAIMER The permitted verifies, acknowledges and agrees by their signature that: 1) If this permit Is for construction or on a dwelling, the dwelling Is/will be served by potable water. 2) Ownership of this City of Spokane Valley permit Inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done In full compliance with the City of Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of Spokane Valley permit Is A a permit or a•proval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be re, .ire to be submi- e and subsequently approved before this application can be processed. Date: 7//$ /i Signature Updated 1-11-11 Page 1 of 1 http : //www. spokaneva lley.org/fi lestorage/ 124/938/210/948/ 1496/Building_Perm it_-_Resid a ntia l_11-11-11.doc RESIDENTIAL CHECK LIST DIRECTIONS: Place a check mark in box next to each document required for complete submittal. ❑ SITE PLAN o Property lines and dimensions o Direction arrow pointing North and orientation to streets ❑ Proposed/existing buildings (footprint and dimensions) ❑ Utilities, septic tank/drain field locations and distances o Setbacks to property lines o Distance between buildings ❑ Right of way/easement location & sizes o Driveway approach size and location BUILDING PLANS (3 SETS) (minimum 1/8 inch scale or completely dimensioned) O Elevations (Front/Rear/Sides) with roof peak and wall height including basement: ❑ Foundation Plan (crawlspace, basement or slab on grade): o Footing sizes and locations o Perimeter concrete foundation wall sizes o Crawlspace ventilation o Supporting wood cripple walls or beams o Thickened concrete pads supporting beams or girder trusses O Floor Plan of each level (finished or unfinished) with dimensions: o Floor Joist direction, size and spacing o Header, beam or concrete lintel sizes o Brace wall panel locations o Water heater and furnace locations o Exhaust fan locations o Deck or concrete patio sizes and locations ❑ Roof Plan: ❑ Engineered truss direction and spacing o Rafter and over frame direction, size and spacing ❑ Wall Section Detail including: Roof o Slope/ roofing material/ underlayment/ ice dam protection o Sheathing size and type Ceiling ❑ Joist size and spacing Wall o Height/ top plate/ stud size and spacing/ sole plate ❑ Exterior sheathing size and type Floor o Joist size and spacing Foundation Wall o Concrete or Masonry unit width o Earth to wood separation distance Footing o Size Radon o Passive system with 6mil vapor barrier Miscellaneous Construction Details ❑ Deck: o Floor plan/ side view/ dimensions ❑ Floor Joist/ decking direction, size and spacing D Stairway tread rise & run and nosing o Window and door location and sizes o Window well locations if applicable o Room usage labels o Smoke detector locations o Attic and crawl space access locations o Fire Wall construction o Ridge, eave and valley lines o Beam and girder size and location o Truss or rafter size, spacing & connection ❑ Attic insulation/ air space baffle/ ventilation o Size of ceiling gypsum wall board o Siding/ exterior house wrap/ anchor bolts o Insulation, vapor barrier, gypsum wall board o Sheathing or concrete floor size/ insulation o Footing bottom to finished ground level depth o Horizontal & vertical reinforcement if any o Reinforcement if any o Active system with 6 mil vapor barrier o Footings/ post/ and beam size and locations O Handrail / Guard height & spacing Target Date sheet For City Use Only PLUS Project , .4 , .,;'A' t- - j , ok.S Project Address 11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206 509.720-5240 ♦ Fax: 509.688.0037 ♦ permitcenter®spokanevaltey.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. Your application review TARGET DATE is The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review ➢ Submit complete, accurate plans and documents. Extra time may be required for re -submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. ➢ Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. ➢ Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date, please feel free to contact us if you haven't heardfrom us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure, you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re - submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at that time. CD -003 V-7/ 06-21-11 Page 1 of 1 Application Number: SW -14001127 SPOKANE COUNTY UTILITIE1 ProjECt == Permit Issj41 DYtq: 21#11/20 Expiration Date: 07/31/2015 PERMIT RrCEIVFD�____ Project Description: Project Name: Primary Contact: Phone: SEWER CONNECTION MEADOWCREST ESTATES WATSON, CHRIS 509-499-9213 vv . �.nrv�f! C.CIV1Ci-i 11 Applicant: WATSON, CHRIS Address: Phone: Email: 1321 E 18TH AVE SPOKANE, WA 99203 509-499-9213 SITE INFORMATION: Site Address: Parcel Number: Assessor's Description: Inspection Area: Zoning: 509 N SHAMROCK RD 45134.2907 MEADOW CREST ESTATES LT 7 BLK 1 (AUDITORS #5763050 BK 35 PG 58 & 59) : (509)-477-3675 Owner: Address: Phone: Email: WATSON, CHRIS 1321 E 18TH AVE SPOKANE, WA 99203 509-499-9213 Water District: Vera Irrigation District #15 Fire District: Spokane Valley Fire Land Area: 7565 Square Feet CONTRACTOR INFORMATION: HSCONCL879L5, Exp. 06/25/2015 H & S CONSTRUCTION 11817 E VALLEYWAY SPOKANE VALLEY, WA 99206 509-926-8964 DETAILS: Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION FEE DETAIL: Processing - Utilities Utilities Permit Total Fee: $26.64 $125.00 $151.64 1 $125.00 $125.00 $125.00 CONDITIONS: Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire. Inside Public Transit Benefit Area CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. SEWER PERMITS ARE VALID FOR ONE (1) YEAR FROM THE DATE OF ISSUANCE. FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. Date Printed: 07/31/2014 11:14:24 Project Coordinator: Kathy Cummings SPOKANE COUNTY UTILITIES PERMIT Application Number: SW -14001127 Permit Issued Date: 07/31/2014 Expiration Date: 07/31/2015 SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed: 07/31/2014 11:14:24 Project Coordinator: Kathy Cummings