Loading...
2010, 04-27 Permit App: 10001160 ResidenceProject Number: 10001160 Inv: I Application Date: 4/27/2010 Page 1 of 3 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Parcel Number: 45134.3007 Block: SiteAddress: 510 N SHAMROCK RD Location:: CSV Zoning: R-3 SF Res District Water District: 010 VERA Area: 9,561 Sq Ft Width: 0 Nbr of Bldgs: 0 Nbr of Dwellings: 0 Lot: Owner: Name: LEWARD DEVELOPMENT, LLC Address: 12402 N DIVISION ST PMB 244 SPOKANE, WA 99218 Hold: ❑ Depth: 0 Right Of Way (ft): 0 eviewn ormation .,. :- x ...,.. z ,h:,.. .., = ,. .ate. Review Building Plan Review Released By: Originally Released: 4/26/2010 By: tmelbourn Driveway/Approach Released By: Originally Released: 4/26/2010 By: RPEGRAM Landuse/Zoning/HE Conditions Released By: Originally Released: 4/26/2010 By: CJJANSSE Sewer Review Released By: Permits• ., Operator: JD Printed By: JD Print Date: 4/27/2010 Project Number: 10001160 Inv: 1 Application Date: 4/27/2010 Page 2 of 3 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Contractor: LEWIS CONST & DEV INC Address: 12402 N DIVISION #197 SPOKANE WA 99218 Item Description APPROACH -CONST IN ROW Contractor: LEWIS CONST & DEV INC Address: 12402 N DIVISION #197 SPOKANE WA 99218 Approach Firm: LEWIS CONST & DEV INC Phone: (509)951-6959 Units Unit Desc Fee Amount 1 NUMBER OF $52.00 Permit Total Fees: $52.00 Building Permit Firm: LEWIS CONST & DEV INC Phone: (509)951-6959 Contractor: LEWIS CONST & DEV INC Address: 12402 N DIVISION #197 SPOKANE WA 99218 Item Description GAS WATER HEATER GAS APPLIANCE<=100,000BTU GAS PIPING VENTILATING FANS 1 DUCT Permit Total Fees: $1,991.59 Mechanical Permit Firm: LEWIS CONST & DEV INC Phone: (509)951-6959 Units Unit Desc Fee Amount This Application: Total Project: Description Grp Type Notes So Ft Valuation Sq Ft Valuation 1&2 FAMILY R-3 VB $44.00 803 $79,456.85 803 $79,456.85 2ND FLOOR R-3 VB 1,008 $74,803.68 1,008 $74,803.68 BASEMENT U R-3 VB 803 $12,045.00 803 $12,045.00 DECK OPEN R-3 VB 108 $1,620.00 108 $1,620.00 GAR WOOD U-1 VB 405 $7,695.00 405 $7,695.00 Totals: 3,127 $175,620.53 3,127 $175,620.53 Item Description Units Unit Desc Fee Amount RESIDENTIAL PERMIT FEE 1 SELECT $1,419.35 WSBCC SURCHARGE 1 SELECT $4.50 SF PLNS RVW < 7999 SQ FT 1 SELECT $567.74 Contractor: LEWIS CONST & DEV INC Address: 12402 N DIVISION #197 SPOKANE WA 99218 Item Description GAS WATER HEATER GAS APPLIANCE<=100,000BTU GAS PIPING VENTILATING FANS 1 DUCT Permit Total Fees: $1,991.59 Mechanical Permit Firm: LEWIS CONST & DEV INC Phone: (509)951-6959 Units Unit Desc Fee Amount 1 NUMBER OF $11.00 1 NUMBER OF $13.00 2 # OF UNITS $2.00 4 NUMBER OF $44.00 Permit Total Fees: $70.00 Operator: JD Printed By: JD Print Date: 4/27/2010 Project Number: 10001160 Inv: I Application Date: 4/27/2010 Page 3 of 3 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Contractor: LEWIS CONST & DEV INC Address: 12402 N DIVISION #197 SPOKANE WA 99218 Item Description TOILETS/BIDETS SINKS TUBS DISH WASHERS GARBAGE DISPOSAL CLOTHES WASHER MISCELLANEOUS FIXTURES Plumbing Permit Firm: LEWIS CONST & DEV INC Phone: (509) 951-6959 Units Unit Desc Fee Amount 3 NUMBER OF $18.00 4 NUMBER OF $24.00 2 NUMBER OF $12.00 1 NUMBER OF $6.00 1 NUMBER OF $6.00 1 NUMBER OF $6.00 3 NUMBER OF $18.00 $90.00 Permit Total Fees: $90.00 Notes THIS SUBDIVISION HAS EXISTING 16' WIDE CURB CUTS FOR THE DRIVEWAY. ANY OTHER WIDTH WILL REQUIRE A LETTER FROM THE ENGINEER STATING THAT THE SWALE TREATMENT DESIGN VOLUME WILL NOT BE AFFECTED SAW CUTTING OF THE EXISTING CURB IS NOT ALLOWED WITHIN THE CITY'S JURISDICTION. DRIVEWAY IS TO BE INSPECTED BY THE CITY'S ROW INSPECTOR PRIOR TO CONCRETE PLACEMENT. Payment Summary ....... ..... ._.; u._. �... r...A�E�,, , d,...h-_.. Permit Type Fee Amount Invoice Amount Amount Paid Amount Owin-g Approach $52.00 $52.00 $0.00 $52.00 Building Permit $1,991.59 $1,991.59 $569.98 $1,421.61 Mechanical Permit $70.00 $70.00 $0.00 $70.00 Plumbing Permit $90.00 $90.00 $0.00 $90.00 $2,203.59 $2,203.59 $569.98 $1,633.61 Disclaimer: Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: JD Printed By: JD Print Date: 4/27/2010 04/26/2010 09:37 5094831007 mut oi�ui SPOKANE COUNTY DEPARTMENT OF BUILDING & PL.ANNING 1026 WEST BROADWAY AVENUE - SPOKANE, WA 99260-0050 SPO&W COQ Rly Site Information Site Address: 508 N SHAMROCK RD Parcel Nurnber. 45134,3007 Subdivision: CITY OF SPOKANE VALLEY Block. Lot: Zoning: Owner: LEWARD DEVELOPMENT, i.J.f' Address: 12402 N DIVISION ST PMB 244 SPOKANE, WA 99218 Building Inspector: Water Dist: Sewer Comsectiort Permet Project Information Project Number: 1 0001853 Inv- I Issue Aatc: 4/26/2010 Permit Use: SEWER CONNECTION Applicant: CONNER EXCAVATING 1809 E HOUSTON SPOKANE, WA 99217 Contact: CONNER EXCAVATING I suy 1:: HUUSTUN SPOKANE, WA 99217 Setbacks - Front, Left: Right: Permits Contractor: CONNER EXCAVATING PROCESSING FEE Group Name: Project Name: License 4: WCCONE*277JR $15.00 51 SEWER CONNECTION phone: (509) 483-1123 Phone: (509) 483-1123 Rear: Total Permit Fee: I $125.00 5140.00 **FOP- SEWER IWSPP.rTION.S. CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION, ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. **CALL 1-800-4245555 BEFORE YOU DIG --AT LEAST 2 WORKING nAY9. IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY W M.J ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. "INSfALLJ;K IS Kt;SPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY. OTHER EXCAVATION. **SEWER STUBS ARE TO BE CNECKED PRIOR TO CONNECTION TO EN5U14Z THAT THEY HAY E ACCEPTABLE ORADE AND ARE CLEAR AND UNOBSTRUCTED TO THE MAIN. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. **THF. INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SC14EDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Total Fess AmountQaid AmountOwina $140.00 $ I40.00 $0.00 Payment Summary Iran Date Receipt Payment Amt 4/26/2010 1529 $140.00 Processed By: DOMPIER, DAWN PERMIT Printed illy: Forcc, Faith rage : 1 or t SenCITY OF po '�,,,;00*Ve alle y For City U e ply , PLUS Project Number Project Address 11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206 509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revisrd target date. Your application review TARGET DATE is z The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review ➢ Submit complete, accurate plans and documents. Extra time may be required for re -submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. ➢ Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. ➢ Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure, you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re - submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at that time. ` WHITE -APPLICANT PINK - BUILDING FILE REV 9/07 CITY OF Me ..;0OWley", CITY OF SPOKANE VALLEY Community Development Department Permit Center 11703 East Sprague Avenue, Suite B-3 Spokane Valley, WA 99206 Tel: (509) 688-0036 Fax: (509) 688-0037 perm itcenter@spokanevaIley.org (Staff Use Only) PERMIT NUMBER: PERMIT FEE: RESIDENTIAL CONSTRUCTION PERMIT APPLICATION NEW CONSTRUCTION ❑ ADDITION/REMODEL ❑ ACCESSORY BUILDING ❑ DECK ❑ OTHER SITE ADDRESS: 51 ON SHAMROCK ROAD, SPOKANE VALLEY, WA 99206 ASSESSORS PARCEL NO.:45134.3007 LEGAL DESCRIPTION: LOT 7, BLOCK 2, MEADOW CREST ESTATES, AS PER PLAT THEREOF RECORDED IN BOOK 35 OF PLATS, PAGES 58-59; SITUATE IN THE NORTHWEST QUARTER OF THE SOUTHEAST QUARTER OF SECTION 13, TOWNSHIP 25 NORTH, RANGE 44 EAST, WILLAMETTE MERIDIAN, CITY OF SPOKANE VALLEY, COUNTY OF SPOKANE, STATE OF WASHINGTON.. BUILDING OWNER NAME: LEWIS CONSTRUCTION & DEVELOPMENT, INC NAME:LEWIS CONSTRUCTION & DEVELOPMENT, INC. ADDRESS: 12402 N. DIVISION #197 CITY:SPOKANE STATE:WA ZIP:99218 PHONE: 509-951-6959 FAx:509-279-0967 CELL: 509-951-6959 CONTACT NAME:TIM LEWIS PHONE: 509-951-6959 FAx:509-279-0967 CELL: 509-951-6959 CONTRACTOR NAME:SAME AS ABOVE MAILING ADDRESS: CITY: STATE: ZIP: PHONE: FAX: CELL: CONTRACTOR LICENSE NO.:LEWISCD917BN EXPIRES:01/15/2011 CITY BUSINESS LICENSE NO.:602-728-595 DESCRIBE THE SCOPE OF WORK IN DETAIL AND INDICATE USE: NEW, SINGLE FAMILY RESIDENCE - 5 BED, 2.5 BATH, 2 CAR GARAGE, 2 STORY, 2624 SF, UNFINISHED BASEMENT, ON LOT 7, BLOCK 2 OF MEADOW CREST ESTATES (SUB -04-07) Effective October 28, 2007 Page 1 of 3 (-•\I1carc\Tim\DP,,ktnn\1 1 awic Cnnctrnrtinn and r)PVPInnmPnt Tnr\111Prniartc Artiva\tn-nl S - Chad R Sarah Rnvar - Acnan at PROPOSED USE: NEW SINGLE FAMILY HOME Effective October 28, 2007 Page 2 of 3 C•\Ilcarc\Tim\I)acktnn\1 I awic Cnncfmrfinn and Davalnnmant Tnr\I I IPrniprtc Arfiva\1 (T -(N S - Chad R carah Rnvar - Acnan nt /10 — //(. D ****YOU MUST COMPLETE THE FOLLOWING**** MARK N /A TF NAT APPLICABLE Height to Peak:22'-0" Dimensions:52' X 41' No. of Stories•2 Total Habitable FROM FINISH GRADE Space:2624 Main Floor SQ FT:$09' Upper Floor SQ FT:1008 fl_ -_- --� Unfinished -Basement SQ FT.:AW 'o 3 Finished Basement SQ FT:N/A Garage SQ FT:41.0' '_ 1/0S Deck/ overed P io- SQ FT:107.5 1!:�-- Impervious Surface Area:537 30% Slopes on Property:NO No. of Bedrooms:5 Construction Heat Source:GAS, Sewer or Type:STICK FRAME FORCED AIR Septic:SEWER TOTAL COST OF PROJECT: $180,000 = LAND @ $55,000 & CONSTRUCTION @ $125,000 DISCLAIMER The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of Spokane Valley permit is not a permit or approval fgpany vio1jiton of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted an ue pproved before this application can be processed. re Method of payment: ❑ Cash ® Check Date: 04/26/10 ❑ Visa ❑ Mastercard Bankcard #: EXP: VIN#: Authorized Signature: Effective October 28, 2007 Page 3 of 3 C\1lcnrc\Tim\r)Pd[tnn\1 I awic rnnctriirtinn And r)avPlnnmant Inr\IIIPrniartc ArtivP\10-n1 S - rharl P. Sarah Rnvar - Acnan at PERMIT NUMBER: PERMIT FEE: ❑ Commercial On Residential Name: Phone: Fax: Address: City: State: Zip: Contractor Name: LEWIS CONSTRUCTION & DEVELOPMENT, INC Phone: 509-951-6959 Fax: 509-279-0967 Address: 12402 N. DIVISION # 197 City: SPOKANE State: WA Zip: 99218 License No: LEWISCD917BN City Business Lic: 602-728-595 Contaet/Project Manager: Name: Tim Lewis Phone: 509-951-6959 Permit Center #UNITS E Sprague Ave, Suite B-3 #6kd11703 `_ 'S Vdia Spokane Valley, WA 99206 (509)688-0036 FAX: (509)688-0037 Community Development PermitcenterLspokanevalley.ori Mechanical Permit Application SITE ADDRESS: L/ 577 A1 . -j �/ HEAT PUMP/AIR CONDITIONER Building Owner PERMIT NUMBER: PERMIT FEE: ❑ Commercial On Residential Name: Phone: Fax: Address: City: State: Zip: Contractor Name: LEWIS CONSTRUCTION & DEVELOPMENT, INC Phone: 509-951-6959 Fax: 509-279-0967 Address: 12402 N. DIVISION # 197 City: SPOKANE State: WA Zip: 99218 License No: LEWISCD917BN City Business Lic: 602-728-595 Contaet/Project Manager: Name: Tim Lewis Phone: 509-951-6959 EXPIRES: VIN: ❑CASH ® CHECK ❑ VISA ❑ MC CARD #: SIGNATURE 7 C:\Users\Tim\Desktop\! Lewis Construction and Development Inc\!!!Projects Active\10-015 - Chad & Sarah Boyer - Aspen at MCE\06 Permitting\10-015 20 10.04.26 Mechanical Permit Application.doc #UNITS FURNACES & SUSPENDED HEATERS -INSTALLATION OR RELOCATION Up to & including 100,000 BTU 1 FURNACES & SUSPENDED HEATERS -INSTALLATION OR RELOCATION Over 100,000 BTU DUCT WORK SYSTEM HEAT PUMP/AIR CONDITIONER 0-3 TON AIR CONDITIONER Over 3-15 TON AIR CONDITIONER Over 15-30 TON AIR CONDITIONER Over 30-50 TON AIR CONDITIONER Over 50 TON GAS WATER HEATER 1 GAS PIPING SYSTEM each outlet 2 GAS LOG, FIREPLACE, & GAS INSERT APPLIANCE VENTS INSTALLATION, RELOCATION, REPLACEMENT REPAIRS OR ADDITIONS BOILER, COMPRESSORS, ABSORPTIONS SYSTEM 0 to 3 h 100,000 BTU or less BOILER, COMPRESSORS ABSORPTIONS SYSTEM Over 3 - 15 h —100,001 to 500,000 BTU BOILER, COMPRESSORS, ABSORPTIONS SYSTEM Over 15 — 30 h - 500,001 to 1,000,000 BTU BOILER COMPRESSORS, ABSORPTIONS SYSTEM Over 30 h — 1,000 001 to 1,750,000 BTU BOILER COMPRESSORS ABSORPTIONS SYSTEM Over 50 h — over 1,750 000 BTU AIR HANDLER DOES NOT include ducting) Each unit up to 10,000 cfm, including ducts AIR HANDLER DOES NOT include ducting) Each unit over 10,000 cfm EVAPORATIVE COOLERS other thanportables) VENTILATION AND EXHAUST Each fan connected to a singe duct 4 VENTILATION AND EXHAUST Each ventilations stem VENTILATION AND EXHAUST Each hood served by mechanical exhaust INCINERATORS Installation or relocation of residential INCINERATORS Installation or relocation of commercial APPLIANCES Range, Clothes Washer elec UNLISTED APPLIANCES Under 400,000 BTU UNLISTED APPLIANCES Over 400,000 BTU HOOD Type I HOOD Type II L P STORAGE TANK WOOD OR PELLET STOVE INSERT WOOD STOVE SYSTEM — FREE STANDING EXPIRES: VIN: ❑CASH ® CHECK ❑ VISA ❑ MC CARD #: SIGNATURE 7 C:\Users\Tim\Desktop\! Lewis Construction and Development Inc\!!!Projects Active\10-015 - Chad & Sarah Boyer - Aspen at MCE\06 Permitting\10-015 20 10.04.26 Mechanical Permit Application.doc 00 Permit Center �'TM0F7>�..,�m 11703 E Sprague Ave, Suite B-3 PERMIT NUMBER: laSpokane Valley, WA 99206 (509)688-0036 FAX: (509)688-0037 PERMIT FEE: JMI perm itcenter(t�spokanevalley.org Community Development Plumbing Permit SITE ADDRESS: ❑ Commercial ® Residential Building Owner Name: Phone: Fax: Address: City: State: Zip: Contractor Name: LEWIS CONSTRUCTION & DEVELOPMENT, INC Phone: 509-951-6959 Fax: 509-279-0967 Address: 12402 N. DIVISION #197 City: SPOKANE State: WA Zip: 99218 License No: LEWISCD917BN City Business Lic: 602-728-595 Contact/Project Manager: Name: Tim Lewis Phone: 509-951-6959 # OF UNITS PLUMBING FIXTURE ON A TRAP TOILETS 3 URINALS TUBS 2 SHOWERS r trap) SINKS Lav/Basins, Bar, Floor, Kitchen, Laundry, Utility, Janitor, Photo, X-ray, Food, Prep/Culinary Prep/CulinaryMeat 4 DISHWASHER 1 CLOTHES WASHER t GARBAGE DISPOSAL 1 WATER SOFTNER FLOOR DRAIN Area, Case Coil Trench Condensate ROOF DRAIN/OVERFLOW DRAINS FOUNTAIN, DRINKING WATER PIPING/DRAIN-IN WASTE Installation Alterations Repair, Reversals WATER USING DEVICE Ice and/or Coffee maker, hose bib, steamer proofer, carbonator, swamp cooler 3 PRIVATE SEWAGE DISPOSAL SYSTEM WATER HEATER If Gas See Mechanical gas INDUSTRIAL WASTE PRETREATEMENT INCEPTORS Including traps, vents except kitchen type grease interceptors functioning as fixture traps REPAIR OR ALTERATION Water piping, drainage or vent piping ATMOSPHERIC TYPE VACUUM BREAKER BACK FLOW PROTECTIVE DEVICE Other than atmos hent type vacuum breakers MEDICAL GAS INCEPTORS ❑CASH ® CHECK ❑ VISA ❑ C EXPIRES: Card# VIN: SIGNATURE: -1 CURRENT FEES AVAILABLE AT: http://www.spokanevalley.org/ under the quick links for Forms, Master Fee Schedule. C:\Users\Tim\Desktop\! Lewis Construction and Development Inc\!!!Projects Active\I 0-015 - Chad & Sarah Boyer - Aspen at MCE\06 Permitting\10-015 2010.04.26 83.88' East Property Line /V , v l 57'-4" Rear Setback l l (20'-0" Required) l ( l MINK I l l l l l :ZT 29'-f0"North Setback(20'-0"Flanking Required) Alki Avenue �N I:yrjfi:ffVjrA1f i Meadow Crest Estates Lot 7, Block 2 510 N Shamrock Spokane Valley, WA 99206 Sewer Fire Hydrant Stun �a Depth = 12'-0" 116.34' South Property line 12'-0" South Setback (5'-0" Required) Lot Size = 9,561 SF x1 4 ___ ----------- R-3 Zoning ` $3'-0" Front Setback (20'-0" Required) Shamrock Road -o ' [-['T. APPROVE Scale 1/4" = 1a Pmm 1-90 go Sam a Sullivan - then P.ul a Valleywap DONOT SCALE! th.Nn°haSnaan-k Reproduction may distort scale. {{�� DATE: 11' �(d � � 2Tie Aspen 1816 gk�s4Q� S� $ 8ta9v�, ` a PH121T 1 Z fijiiiq; -1 0 J . L[wl■ CCN9TRU CTICN & DCV INCPMCNT. INC 12402 0....... # N. W 9 — 9921e WA , 99118 W Address: 510 N. Shamrock Rd. Q Spokane Valley, WA 99206 Location: Meadow Crest Estates Z (SUR -04-07) Lot 7 - Block 2 0 Job #: 10-015 P V Square Footage: (Aper—nnae) Basemen( 808 I st Floor: 808 ry 2nd Floor: 1,008 LL Bonus Room: N/A L (;.am 410 i1n hJ Total SF: 2,624 Finished SF. 1.916 ZI FloorPlates: lAppox. Flmr-Floor Hi) U B—mmi 8' 10 Floor 8' 2nd Floor: 8' rn Bonus Room: N/A Y+ Garage: 8' Permit Drawing Date: April 2010 1.1 J i Scale As Noted Site Plan A01 Community Development Department (Staff Use Only) Permit Center CITYOF 11703 East Sprague Avenue, Suite B-3 PERMIT NUMBER: v1v il&ne Spokane Valley, WA 99206 Tel: (509) 688-0036 PERMIT FEE: Fax: (509) 688-0037 permitcenter@spokaneva I ley. org APPROACH PERMIT APPLICATION PROJECT ADDRESS:510 N SHAMROCK ROAD, SPOKANE VALLEY, WA 99206 START DATE:04/26/10 ANTICIPATED COMPLETION DATE:06/30/10 BUILDING OWNER NAME: MAILING ADDRESS:SAME AS BELOW CITY: STATE: ZIP: CONTACT PERSON NAME:TIM LEWIS PHONE: FAX: CELL: CONTRACTOR NAME:LEWIS CONSTRUCTION & DEVELOPMENT, INC MAILING ADDRESS: 12402 N. DIVISION #197 CITY:SPOKANE STATE:WA ZIP:99218 PHONE: 509-951-6959 FAx:509-279-0967 CELL:509- 951-6959 CONTRACTOR LICENSE No.:LEWISCD917BN EXPIRES:01/15/2011 CITY BUSINESS LICENSE NO.:602-728-595 PROJECT DESCRIPTION (Please Provide Site Sketch) 41r4ZZ Residential Driveway ❑ Commercial/Industrial Driveway Existing Curb & Gutter ❑ Rural Road Section [] Culvert Installation ❑ Sidewalk Repair/Construction Other Conditions: Bond/Insurance certification must be on file with the City. DISCLAIMER The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction Is to be done in full compliance with the City of Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of Spokane Valley permit Is not a permit or approval four angio n of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted an moque y approved before this application can be processed. --t Signature v Date:04/26/10 Method of payment: ❑ Cash ® Check ❑ Visa ❑ Mastercard Bankcard #: EXP: VIN# Authorized Signature: Effective October 28, 2007 Page 1 of 1 r-\iki-rr\TIm\r)PCktnn\I I PWIC CnnrtrUrtlnn And riPVPlnnmpnt Tnf\IIIPmiprtC ArtivP\1n-M S - rhart 1L Sarah Rnvar - Acnan at The 83.88' East Property Line Aspen 1816 'v 57'-4" Rear Setback 1 (20'-0" Required) 8 3 4g!` 6� Z po I I $�W!" 5 Z y �g W 29'40" North Setback (20'-0" Flanking Required) a I �w 3ab� Isar i I CON 9TRUCTIDN IL DEVELD—ENT, O e I INC - - I 124D2 N. D—SION J #197 W Alki1 ® R 99218 WA 1 Avenue I - 4 I W 1 I 116.34' Address: 1 1 South 510 N. Shamrock Rd. Q Property Line Spokane VelleY, WA 99206 Location: NI I Meadow Crest Estates /SUB -04-071 L 1 Lot 7 - Block 2 O 12'-0" South Setback _ 1 (5'-0" Required) Job #: 10-015 L I r Squazc Footage: U Nater (Apprnximete) Stub Basement: BOS 7 i A z1 • I Ist Floor: 808 ry -------------����-------------i�T��� --- --� ------ �Bwus Fluor: 1.008 LL Sewer Room: A L Stub ee 410NFire Hydrant SF: 2,624 Is Depth = 12'-0" w <w Finished SF'. 116 ,8 SITE PLAN Floor Plates: Lot Size= 9,561 SF --- __-- —_1� — (AFRa• Flaar-Floor Bq 4 U . . Basement: 8' R-3 Zoning IstFloor: 9' Meadow Crest Estates 3'-0" Front setback 2nd Fluor: 8' ff1 s»nne...�,4 Bonus Room: N/A W Lot 7, Block 2 (20'-0" Required) Garage: R' 510 N Shamrock Permit Drawing Date: Spokane Valley, WA 99206 April 26, 2010 W Scale As Noted J Shamrock Road Site Plan Scale 1/4" = V-0" Fo, 1.90go1—hon honSa�w � From N. go n Sh on Sulliean -then Easton Valleyway AO 1 DONOT SCALE! hea Nonh onS amm k. Reproduction may distort scale.` O< DATE: Z41DL(' I tc, S Development Engineering 11707 E Sprague Ave Suite 106 ♦ Spokane Valley WA 99206 509.921.1000 ♦ Fax: 509.921.1008 1 cityhatt@spokanevalley.org Approach Permit Application Review TO: Building Department Site Address: 508 N. Shamrock Rd. Project No: SUB -04-07 Reviewed By: Date:.���;.D/6 Accepted Not Accepted Approach Building Location Paved Access Notes: Saw cutting of existing curb is not allowed within the City's jurisdiction. Driveway is to be inspected by the City's ROW Inspector prior to concrete placement. This Subdivision has existing 16' wide curb cuts for the driveway. Any other width will require a letter from the Design Engineer stating that the swale treatment design volume will not be affected. Reviewed By: Date:.���;.D/6