2010, 04-27 Permit App: 10001160 ResidenceProject Number: 10001160 Inv: I Application Date: 4/27/2010 Page 1 of 3
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Parcel Number: 45134.3007 Block:
SiteAddress: 510 N SHAMROCK RD
Location:: CSV
Zoning: R-3 SF Res District
Water District: 010 VERA
Area: 9,561 Sq Ft Width: 0
Nbr of Bldgs: 0 Nbr of Dwellings: 0
Lot:
Owner: Name: LEWARD DEVELOPMENT, LLC
Address: 12402 N DIVISION ST PMB 244
SPOKANE, WA 99218
Hold: ❑
Depth: 0 Right Of Way (ft): 0
eviewn ormation .,. :- x ...,.. z ,h:,.. .., = ,. .ate.
Review
Building Plan Review Released By:
Originally Released: 4/26/2010 By: tmelbourn
Driveway/Approach Released By:
Originally Released: 4/26/2010 By: RPEGRAM
Landuse/Zoning/HE Conditions Released By:
Originally Released: 4/26/2010 By: CJJANSSE
Sewer Review Released By:
Permits•
.,
Operator: JD Printed By: JD Print Date: 4/27/2010
Project Number: 10001160 Inv: 1 Application Date: 4/27/2010 Page 2 of 3
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Contractor: LEWIS CONST & DEV INC
Address: 12402 N DIVISION #197
SPOKANE WA 99218
Item Description
APPROACH -CONST IN ROW
Contractor: LEWIS CONST & DEV INC
Address: 12402 N DIVISION #197
SPOKANE WA 99218
Approach
Firm: LEWIS CONST & DEV INC
Phone: (509)951-6959
Units Unit Desc Fee Amount
1 NUMBER OF $52.00
Permit Total Fees: $52.00
Building Permit
Firm: LEWIS CONST & DEV INC
Phone: (509)951-6959
Contractor: LEWIS CONST & DEV INC
Address: 12402 N DIVISION #197
SPOKANE WA 99218
Item Description
GAS WATER HEATER
GAS APPLIANCE<=100,000BTU
GAS PIPING
VENTILATING FANS 1 DUCT
Permit Total Fees: $1,991.59
Mechanical Permit
Firm: LEWIS CONST & DEV INC
Phone: (509)951-6959
Units
Unit Desc
Fee Amount
This Application:
Total Project:
Description Grp
Type
Notes
So Ft
Valuation
Sq Ft
Valuation
1&2 FAMILY R-3
VB
$44.00
803
$79,456.85
803
$79,456.85
2ND FLOOR R-3
VB
1,008
$74,803.68
1,008
$74,803.68
BASEMENT U R-3
VB
803
$12,045.00
803
$12,045.00
DECK OPEN R-3
VB
108
$1,620.00
108
$1,620.00
GAR WOOD U-1
VB
405
$7,695.00
405
$7,695.00
Totals:
3,127
$175,620.53
3,127 $175,620.53
Item Description
Units
Unit Desc
Fee Amount
RESIDENTIAL PERMIT FEE
1
SELECT
$1,419.35
WSBCC SURCHARGE
1
SELECT
$4.50
SF PLNS RVW < 7999 SQ FT
1
SELECT
$567.74
Contractor: LEWIS CONST & DEV INC
Address: 12402 N DIVISION #197
SPOKANE WA 99218
Item Description
GAS WATER HEATER
GAS APPLIANCE<=100,000BTU
GAS PIPING
VENTILATING FANS 1 DUCT
Permit Total Fees: $1,991.59
Mechanical Permit
Firm: LEWIS CONST & DEV INC
Phone: (509)951-6959
Units
Unit Desc
Fee Amount
1
NUMBER OF
$11.00
1
NUMBER OF
$13.00
2
# OF UNITS
$2.00
4
NUMBER OF
$44.00
Permit Total Fees:
$70.00
Operator: JD Printed By: JD Print Date: 4/27/2010
Project Number: 10001160 Inv: I Application Date: 4/27/2010 Page 3 of 3
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Contractor: LEWIS CONST & DEV INC
Address: 12402 N DIVISION #197
SPOKANE WA 99218
Item Description
TOILETS/BIDETS
SINKS
TUBS
DISH WASHERS
GARBAGE DISPOSAL
CLOTHES WASHER
MISCELLANEOUS FIXTURES
Plumbing Permit
Firm: LEWIS CONST & DEV INC
Phone: (509) 951-6959
Units
Unit Desc
Fee Amount
3
NUMBER OF
$18.00
4
NUMBER OF
$24.00
2
NUMBER OF
$12.00
1
NUMBER OF
$6.00
1
NUMBER OF
$6.00
1
NUMBER OF
$6.00
3
NUMBER OF
$18.00
$90.00
Permit Total Fees:
$90.00
Notes
THIS SUBDIVISION HAS EXISTING 16' WIDE CURB CUTS FOR THE DRIVEWAY. ANY
OTHER WIDTH WILL REQUIRE A LETTER FROM THE ENGINEER STATING THAT THE
SWALE TREATMENT DESIGN VOLUME WILL NOT BE AFFECTED
SAW CUTTING OF THE EXISTING CURB IS NOT ALLOWED WITHIN THE CITY'S
JURISDICTION. DRIVEWAY IS TO BE INSPECTED BY THE CITY'S ROW INSPECTOR PRIOR
TO CONCRETE PLACEMENT.
Payment Summary .......
..... ._.; u._. �... r...A�E�,,
, d,...h-_..
Permit Type
Fee Amount
Invoice Amount
Amount Paid
Amount Owin-g
Approach
$52.00
$52.00
$0.00
$52.00
Building Permit
$1,991.59
$1,991.59
$569.98
$1,421.61
Mechanical Permit
$70.00
$70.00
$0.00
$70.00
Plumbing Permit
$90.00
$90.00
$0.00
$90.00
$2,203.59
$2,203.59
$569.98
$1,633.61
Disclaimer:
Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information
contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: JD Printed By: JD Print Date: 4/27/2010
04/26/2010 09:37 5094831007 mut oi�ui
SPOKANE COUNTY
DEPARTMENT OF BUILDING & PL.ANNING
1026 WEST BROADWAY AVENUE - SPOKANE, WA 99260-0050
SPO&W COQ Rly
Site Information
Site Address: 508 N SHAMROCK RD
Parcel Nurnber. 45134,3007
Subdivision: CITY OF SPOKANE VALLEY
Block. Lot:
Zoning:
Owner: LEWARD DEVELOPMENT, i.J.f'
Address: 12402 N DIVISION ST PMB 244
SPOKANE, WA 99218
Building Inspector:
Water Dist:
Sewer Comsectiort Permet
Project Information
Project Number: 1 0001853 Inv- I Issue Aatc: 4/26/2010
Permit Use: SEWER CONNECTION
Applicant: CONNER EXCAVATING
1809 E HOUSTON
SPOKANE, WA 99217
Contact: CONNER EXCAVATING
I suy 1:: HUUSTUN
SPOKANE, WA 99217
Setbacks - Front, Left: Right:
Permits
Contractor: CONNER EXCAVATING
PROCESSING FEE
Group Name:
Project Name:
License 4: WCCONE*277JR
$15.00 51 SEWER CONNECTION
phone: (509) 483-1123
Phone: (509) 483-1123
Rear:
Total Permit Fee:
I $125.00
5140.00
**FOP- SEWER IWSPP.rTION.S. CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO
COVER ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION, ADDITIONAL
INSPECTION FEES APPLY AFTER 30 MINUTES.
**CALL 1-800-4245555 BEFORE YOU DIG --AT LEAST 2 WORKING nAY9. IN ADVANCE. SPOKANE COUNTY CODE
REQUIRES THE INSTALLER COMPLY W M.J ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES,
INCLUDING THOSE RELATED TO TRENCH SAFETY.
"INSfALLJ;K IS Kt;SPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY
BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE
ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY. OTHER EXCAVATION.
**SEWER STUBS ARE TO BE CNECKED PRIOR TO CONNECTION TO EN5U14Z THAT THEY HAY E ACCEPTABLE ORADE
AND ARE CLEAR AND UNOBSTRUCTED TO THE MAIN. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
**THF. INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SC14EDULED INSPECTION TIME.
BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO
OWNERS OF UNDERGROUND FACILITIES.
Total Fess AmountQaid AmountOwina
$140.00 $ I40.00 $0.00
Payment Summary
Iran Date Receipt Payment Amt
4/26/2010 1529 $140.00
Processed By: DOMPIER, DAWN PERMIT
Printed illy: Forcc, Faith rage : 1 or t
SenCITY OF
po
'�,,,;00*Ve
alle
y
For City U e ply ,
PLUS Project Number
Project Address
11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206
509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org
As part of our on-going commitment to customer service during the review process of your project
application, we are providing you with a TARGET DATE for the initial technical application review. If for
any reason we cannot meet this date, we will contact you with a revisrd target date.
Your application review TARGET DATE is z
The TARGET DATE is the date we estimate your project application will have had its initial technical
review. It is not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
➢ Submit complete, accurate plans and documents.
Extra time may be required for re -submittals as project application reviewers work on multiple applications and it
may be several days before they can look at your new or revised information.
➢ Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one individual with the
expertise for dealing with reviewer comments would be the best choice for the entire review process.
➢ Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us
by your target date. Staff may contact you before the target date if the initial review is complete. By following this
procedure, you will save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required
documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred
submittal. This does not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free
from substantive flaws that would prevent technical staff from completing the technical review once it is started. When
this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it
comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance
review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by
phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re -
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections
of the application are received, a Permit Specialist will process the application and contact the person specified on your
application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by
the Permit Specialist at that time. `
WHITE -APPLICANT PINK - BUILDING FILE REV 9/07
CITY OF
Me
..;0OWley",
CITY OF SPOKANE VALLEY
Community Development Department
Permit Center
11703 East Sprague Avenue, Suite B-3
Spokane Valley, WA 99206
Tel: (509) 688-0036
Fax: (509) 688-0037
perm itcenter@spokanevaIley.org
(Staff Use Only)
PERMIT NUMBER:
PERMIT FEE:
RESIDENTIAL CONSTRUCTION PERMIT APPLICATION
NEW CONSTRUCTION ❑ ADDITION/REMODEL ❑ ACCESSORY BUILDING
❑ DECK ❑ OTHER
SITE ADDRESS: 51 ON SHAMROCK ROAD, SPOKANE VALLEY, WA 99206
ASSESSORS PARCEL NO.:45134.3007 LEGAL DESCRIPTION: LOT 7, BLOCK 2,
MEADOW CREST ESTATES, AS PER PLAT THEREOF RECORDED IN BOOK 35 OF PLATS, PAGES 58-59;
SITUATE IN THE NORTHWEST QUARTER OF THE SOUTHEAST QUARTER OF SECTION 13, TOWNSHIP 25
NORTH, RANGE 44 EAST, WILLAMETTE MERIDIAN, CITY OF SPOKANE VALLEY, COUNTY OF SPOKANE,
STATE OF WASHINGTON..
BUILDING OWNER NAME: LEWIS CONSTRUCTION & DEVELOPMENT, INC
NAME:LEWIS CONSTRUCTION & DEVELOPMENT, INC.
ADDRESS: 12402 N. DIVISION #197
CITY:SPOKANE STATE:WA ZIP:99218
PHONE: 509-951-6959 FAx:509-279-0967 CELL: 509-951-6959
CONTACT NAME:TIM LEWIS
PHONE: 509-951-6959 FAx:509-279-0967 CELL: 509-951-6959
CONTRACTOR NAME:SAME AS ABOVE
MAILING ADDRESS:
CITY: STATE: ZIP:
PHONE: FAX: CELL:
CONTRACTOR LICENSE NO.:LEWISCD917BN EXPIRES:01/15/2011 CITY BUSINESS
LICENSE NO.:602-728-595
DESCRIBE THE SCOPE OF WORK IN DETAIL AND INDICATE USE:
NEW, SINGLE FAMILY RESIDENCE - 5 BED, 2.5 BATH, 2 CAR GARAGE, 2 STORY, 2624 SF, UNFINISHED BASEMENT,
ON LOT 7, BLOCK 2 OF MEADOW CREST ESTATES (SUB -04-07)
Effective October 28, 2007 Page 1 of 3
(-•\I1carc\Tim\DP,,ktnn\1 1 awic Cnnctrnrtinn and r)PVPInnmPnt Tnr\111Prniartc Artiva\tn-nl S - Chad R Sarah Rnvar - Acnan at
PROPOSED USE:
NEW SINGLE FAMILY HOME
Effective October 28, 2007 Page 2 of 3
C•\Ilcarc\Tim\I)acktnn\1 I awic Cnncfmrfinn and Davalnnmant Tnr\I I IPrniprtc Arfiva\1 (T -(N S - Chad R carah Rnvar - Acnan nt
/10 — //(. D
****YOU MUST COMPLETE THE FOLLOWING****
MARK N /A TF NAT APPLICABLE
Height to Peak:22'-0"
Dimensions:52' X 41'
No. of Stories•2
Total Habitable
FROM FINISH GRADE
Space:2624
Main Floor SQ FT:$09'
Upper Floor SQ
FT:1008 fl_ -_- --�
Unfinished -Basement
SQ FT.:AW 'o 3
Finished Basement
SQ FT:N/A
Garage SQ FT:41.0' '_
1/0S
Deck/ overed P io-
SQ FT:107.5 1!:�--
Impervious Surface
Area:537
30% Slopes on
Property:NO
No. of Bedrooms:5
Construction
Heat Source:GAS,
Sewer or
Type:STICK FRAME
FORCED AIR
Septic:SEWER
TOTAL COST OF PROJECT: $180,000 = LAND @ $55,000 & CONSTRUCTION @ $125,000
DISCLAIMER
The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling, the dwelling is/will
be served by potable water. 2) Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property
owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of
Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of
Spokane Valley permit is not a permit or approval fgpany vio1jiton of federal, state or local laws, codes or ordinances. 6) Plans or additional
information may be required to be submitted an ue pproved before this application can be processed.
re
Method of payment: ❑ Cash ® Check
Date: 04/26/10
❑ Visa ❑ Mastercard
Bankcard #: EXP: VIN#:
Authorized Signature:
Effective October 28, 2007 Page 3 of 3
C\1lcnrc\Tim\r)Pd[tnn\1 I awic rnnctriirtinn And r)avPlnnmant Inr\IIIPrniartc ArtivP\10-n1 S - rharl P. Sarah Rnvar - Acnan at
PERMIT NUMBER:
PERMIT FEE:
❑ Commercial On Residential
Name: Phone: Fax:
Address: City: State: Zip:
Contractor
Name: LEWIS CONSTRUCTION & DEVELOPMENT, INC Phone: 509-951-6959 Fax: 509-279-0967
Address: 12402 N. DIVISION # 197 City: SPOKANE State: WA Zip: 99218
License No: LEWISCD917BN City Business Lic: 602-728-595
Contaet/Project Manager:
Name: Tim Lewis Phone: 509-951-6959
Permit Center
#UNITS
E Sprague Ave, Suite B-3
#6kd11703
`_
'S Vdia
Spokane Valley, WA 99206
(509)688-0036 FAX: (509)688-0037
Community Development
PermitcenterLspokanevalley.ori
Mechanical Permit Application
SITE ADDRESS:
L/
577 A1 . -j �/
HEAT PUMP/AIR CONDITIONER
Building Owner
PERMIT NUMBER:
PERMIT FEE:
❑ Commercial On Residential
Name: Phone: Fax:
Address: City: State: Zip:
Contractor
Name: LEWIS CONSTRUCTION & DEVELOPMENT, INC Phone: 509-951-6959 Fax: 509-279-0967
Address: 12402 N. DIVISION # 197 City: SPOKANE State: WA Zip: 99218
License No: LEWISCD917BN City Business Lic: 602-728-595
Contaet/Project Manager:
Name: Tim Lewis Phone: 509-951-6959
EXPIRES: VIN:
❑CASH ® CHECK ❑ VISA ❑ MC
CARD #: SIGNATURE
7
C:\Users\Tim\Desktop\! Lewis Construction and Development Inc\!!!Projects Active\10-015 - Chad & Sarah Boyer - Aspen at MCE\06 Permitting\10-015 20 10.04.26
Mechanical Permit Application.doc
#UNITS
FURNACES & SUSPENDED HEATERS -INSTALLATION OR RELOCATION
Up to & including 100,000 BTU
1
FURNACES & SUSPENDED HEATERS -INSTALLATION OR RELOCATION
Over 100,000 BTU
DUCT WORK SYSTEM
HEAT PUMP/AIR CONDITIONER
0-3 TON
AIR CONDITIONER
Over 3-15 TON
AIR CONDITIONER
Over 15-30 TON
AIR CONDITIONER
Over 30-50 TON
AIR CONDITIONER
Over 50 TON
GAS WATER HEATER
1
GAS PIPING SYSTEM each outlet
2
GAS LOG, FIREPLACE, & GAS INSERT
APPLIANCE VENTS INSTALLATION, RELOCATION, REPLACEMENT
REPAIRS OR ADDITIONS
BOILER, COMPRESSORS, ABSORPTIONS SYSTEM
0 to 3 h 100,000 BTU or less
BOILER, COMPRESSORS ABSORPTIONS SYSTEM
Over 3 - 15 h —100,001 to 500,000 BTU
BOILER, COMPRESSORS, ABSORPTIONS SYSTEM
Over 15 — 30 h - 500,001 to 1,000,000 BTU
BOILER COMPRESSORS, ABSORPTIONS SYSTEM
Over 30 h — 1,000 001 to 1,750,000 BTU
BOILER COMPRESSORS ABSORPTIONS SYSTEM
Over 50 h — over 1,750 000 BTU
AIR HANDLER DOES NOT include ducting)
Each unit up to 10,000 cfm, including ducts
AIR HANDLER DOES NOT include ducting)
Each unit over 10,000 cfm
EVAPORATIVE COOLERS other thanportables)
VENTILATION AND EXHAUST
Each fan connected to a singe duct
4
VENTILATION AND EXHAUST
Each ventilations stem
VENTILATION AND EXHAUST
Each hood served by mechanical exhaust
INCINERATORS
Installation or relocation of residential
INCINERATORS
Installation or relocation of commercial
APPLIANCES
Range, Clothes Washer
elec
UNLISTED APPLIANCES
Under 400,000 BTU
UNLISTED APPLIANCES
Over 400,000 BTU
HOOD
Type I
HOOD
Type II
L P STORAGE TANK
WOOD OR PELLET STOVE INSERT
WOOD STOVE SYSTEM — FREE STANDING
EXPIRES: VIN:
❑CASH ® CHECK ❑ VISA ❑ MC
CARD #: SIGNATURE
7
C:\Users\Tim\Desktop\! Lewis Construction and Development Inc\!!!Projects Active\10-015 - Chad & Sarah Boyer - Aspen at MCE\06 Permitting\10-015 20 10.04.26
Mechanical Permit Application.doc
00 Permit Center
�'TM0F7>�..,�m 11703 E Sprague Ave, Suite B-3 PERMIT NUMBER:
laSpokane Valley, WA 99206
(509)688-0036 FAX: (509)688-0037 PERMIT FEE:
JMI
perm itcenter(t�spokanevalley.org
Community Development
Plumbing Permit
SITE ADDRESS:
❑ Commercial ® Residential
Building Owner
Name:
Phone: Fax:
Address:
City: State:
Zip:
Contractor
Name: LEWIS CONSTRUCTION & DEVELOPMENT, INC Phone: 509-951-6959 Fax: 509-279-0967
Address: 12402 N. DIVISION #197
City: SPOKANE State: WA
Zip: 99218
License No: LEWISCD917BN
City Business Lic: 602-728-595
Contact/Project Manager:
Name: Tim Lewis
Phone: 509-951-6959
# OF UNITS
PLUMBING FIXTURE ON A TRAP
TOILETS
3
URINALS
TUBS
2
SHOWERS r trap)
SINKS
Lav/Basins, Bar, Floor, Kitchen, Laundry, Utility, Janitor, Photo, X-ray, Food,
Prep/Culinary Prep/CulinaryMeat
4
DISHWASHER
1
CLOTHES WASHER
t
GARBAGE DISPOSAL
1
WATER SOFTNER
FLOOR DRAIN
Area, Case Coil Trench Condensate
ROOF DRAIN/OVERFLOW DRAINS
FOUNTAIN, DRINKING
WATER PIPING/DRAIN-IN WASTE
Installation Alterations Repair, Reversals
WATER USING DEVICE
Ice and/or Coffee maker, hose bib, steamer proofer, carbonator, swamp cooler
3
PRIVATE SEWAGE DISPOSAL SYSTEM
WATER HEATER
If Gas See Mechanical
gas
INDUSTRIAL WASTE PRETREATEMENT
INCEPTORS
Including traps, vents except kitchen type grease interceptors functioning as fixture traps
REPAIR OR ALTERATION
Water piping, drainage or vent piping
ATMOSPHERIC TYPE VACUUM BREAKER
BACK FLOW PROTECTIVE DEVICE
Other than atmos hent type vacuum breakers
MEDICAL GAS
INCEPTORS
❑CASH ® CHECK ❑ VISA ❑ C EXPIRES:
Card# VIN:
SIGNATURE: -1
CURRENT FEES AVAILABLE AT: http://www.spokanevalley.org/ under the quick links for Forms, Master Fee Schedule.
C:\Users\Tim\Desktop\! Lewis Construction and Development Inc\!!!Projects Active\I 0-015 - Chad & Sarah Boyer - Aspen at MCE\06 Permitting\10-015 2010.04.26
83.88' East Property Line
/V , v
l 57'-4" Rear Setback l
l (20'-0" Required) l
( l
MINK
I l
l l
l
l :ZT
29'-f0"North Setback(20'-0"Flanking Required)
Alki
Avenue
�N
I:yrjfi:ffVjrA1f i
Meadow Crest Estates
Lot 7, Block 2
510 N Shamrock
Spokane Valley, WA 99206
Sewer
Fire Hydrant Stun
�a Depth = 12'-0"
116.34'
South
Property line
12'-0" South Setback
(5'-0" Required)
Lot Size = 9,561 SF x1
4 ___ -----------
R-3 Zoning `
$3'-0" Front Setback
(20'-0" Required)
Shamrock Road
-o ' [-['T. APPROVE
Scale 1/4" = 1a
Pmm 1-90 go Sam a Sullivan - then P.ul a Valleywap
DONOT SCALE! th.Nn°haSnaan-k
Reproduction may distort scale. {{��
DATE: 11' �(d � �
2Tie
Aspen 1816
gk�s4Q� S�
$ 8ta9v�,
`
a
PH121T 1
Z
fijiiiq; -1
0
J .
L[wl■
CCN9TRU CTICN
& DCV
INCPMCNT.
INC
12402 0.......
# N.
W
9 —
9921e WA ,
99118
W
Address:
510 N. Shamrock Rd.
Q
Spokane Valley, WA
99206
Location:
Meadow Crest Estates
Z
(SUR -04-07)
Lot 7 - Block 2
0
Job #: 10-015
P
V
Square Footage:
(Aper—nnae)
Basemen( 808
I st Floor: 808
ry
2nd Floor: 1,008
LL
Bonus Room: N/A
L
(;.am 410
i1n
hJ
Total SF: 2,624
Finished SF. 1.916
ZI
FloorPlates:
lAppox. Flmr-Floor Hi)
U
B—mmi 8'
10 Floor 8'
2nd Floor: 8'
rn
Bonus Room: N/A
Y+
Garage: 8'
Permit Drawing Date:
April 2010
1.1
J i
Scale As Noted
Site
Plan
A01
Community Development Department (Staff Use Only)
Permit Center
CITYOF 11703 East Sprague Avenue, Suite B-3 PERMIT NUMBER: v1v
il&ne Spokane Valley, WA 99206
Tel: (509) 688-0036 PERMIT FEE:
Fax: (509) 688-0037
permitcenter@spokaneva I ley. org
APPROACH PERMIT APPLICATION
PROJECT ADDRESS:510 N SHAMROCK ROAD, SPOKANE VALLEY, WA 99206
START DATE:04/26/10 ANTICIPATED COMPLETION DATE:06/30/10
BUILDING OWNER NAME:
MAILING ADDRESS:SAME AS BELOW
CITY: STATE: ZIP:
CONTACT PERSON NAME:TIM LEWIS
PHONE: FAX: CELL:
CONTRACTOR NAME:LEWIS CONSTRUCTION & DEVELOPMENT, INC
MAILING ADDRESS: 12402 N. DIVISION #197
CITY:SPOKANE STATE:WA ZIP:99218
PHONE: 509-951-6959 FAx:509-279-0967 CELL:509-
951-6959
CONTRACTOR LICENSE No.:LEWISCD917BN EXPIRES:01/15/2011 CITY BUSINESS
LICENSE NO.:602-728-595
PROJECT DESCRIPTION (Please Provide Site Sketch) 41r4ZZ
Residential Driveway ❑ Commercial/Industrial Driveway
Existing Curb & Gutter ❑ Rural Road Section
[] Culvert Installation ❑ Sidewalk Repair/Construction
Other Conditions:
Bond/Insurance certification must be on file with the City.
DISCLAIMER
The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling, the dwelling is/will
be served by potable water. 2) Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property
owner or has permission to represent the property owner in this transaction. 4) All construction Is to be done in full compliance with the City of
Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of
Spokane Valley permit Is not a permit or approval four angio n of federal, state or local laws, codes or ordinances. 6) Plans or additional
information may be required to be submitted an moque y approved before this application can be processed.
--t
Signature v Date:04/26/10
Method of payment: ❑ Cash ® Check ❑ Visa ❑ Mastercard
Bankcard #: EXP: VIN#
Authorized Signature:
Effective October 28, 2007 Page 1 of 1
r-\iki-rr\TIm\r)PCktnn\I I PWIC CnnrtrUrtlnn And riPVPlnnmpnt Tnf\IIIPmiprtC ArtivP\1n-M S - rhart 1L Sarah Rnvar - Acnan at
The
83.88' East Property Line Aspen 1816
'v
57'-4" Rear Setback
1 (20'-0" Required) 8 3
4g!` 6� Z
po I I $�W!" 5 Z
y �g W
29'40" North Setback
(20'-0" Flanking Required)
a
I �w 3ab� Isar
i I
CON 9TRUCTIDN
IL
DEVELD—ENT, O
e I INC
- - I 124D2 N. D—SION J
#197 W
Alki1 ® R 99218 WA
1
Avenue I - 4 I W
1 I 116.34' Address:
1 1 South 510 N. Shamrock Rd. Q
Property Line Spokane VelleY, WA
99206
Location:
NI I Meadow Crest Estates
/SUB -04-071 L
1 Lot 7 - Block 2 O
12'-0" South Setback _
1
(5'-0" Required) Job #: 10-015 L
I r
Squazc Footage: U
Nater (Apprnximete)
Stub Basement: BOS 7
i A z1 • I Ist Floor: 808 ry
-------------����-------------i�T��� --- --� ------ �Bwus
Fluor: 1.008 LL
Sewer Room: A L
Stub ee 410NFire Hydrant SF: 2,624
Is Depth = 12'-0" w <w
Finished SF'. 116
,8
SITE PLAN Floor Plates:
Lot Size= 9,561 SF --- __-- —_1� — (AFRa• Flaar-Floor Bq
4 U . . Basement: 8'
R-3 Zoning IstFloor: 9'
Meadow Crest Estates 3'-0" Front setback 2nd Fluor: 8' ff1
s»nne...�,4 Bonus Room: N/A W
Lot 7, Block 2 (20'-0" Required)
Garage: R'
510 N Shamrock Permit Drawing Date:
Spokane Valley, WA 99206 April 26, 2010 W
Scale As Noted J
Shamrock Road Site
Plan
Scale 1/4" = V-0" Fo, 1.90go1—hon
honSa�w �
From N. go n Sh on Sulliean -then Easton Valleyway AO 1
DONOT SCALE! hea Nonh onS amm k.
Reproduction may distort scale.` O<
DATE: Z41DL(' I tc,
S
Development Engineering
11707 E Sprague Ave Suite 106 ♦ Spokane Valley WA 99206
509.921.1000 ♦ Fax: 509.921.1008 1 cityhatt@spokanevalley.org
Approach Permit Application Review
TO: Building Department
Site Address: 508 N. Shamrock Rd.
Project No: SUB -04-07
Reviewed By: Date:.���;.D/6
Accepted
Not Accepted
Approach
Building Location
Paved Access
Notes: Saw cutting of existing curb is not allowed within the City's
jurisdiction. Driveway is to be inspected by the City's ROW Inspector prior
to concrete placement.
This Subdivision has existing 16' wide curb cuts for the driveway. Any other
width will require a letter from the Design Engineer stating that the swale
treatment design volume will not be affected.
Reviewed By: Date:.���;.D/6