Loading...
2012, 05-09 Permit: SW-12001283 Sewer SPOKANE COUNTY BUILDING AND PLANNING PERMIT Permit Issued Date: Application Number: SW-12001283 05/09/2012 Expiration Date: Project Description: SEWER CONNECTION Primary Contact: GOBERS LLC Project Name: SOUTH GREENACRES PHASE 3 Applicant: GOBERS LLC Permit Type: SEWER Address: 11215 E TRENT AVE SPOKANE,WA 99206 Phone: (509)924-5372 Email: SITE INFORMATION: Site Address: 17919 E RIVERWAY AVE Owner: HARDING,JAMES D Parcel Number: 55071.0121 Address: 17919 E RIVERWAY AVE GREENACRES,WA 99016-9571 Subdivision: PLAT A Phone: Assessor's Description: GRNACRS IRR DIST A PT OF B Q BEG AT MOST Email: SLYCOR TH NEL Y 83 1/3FT TH NWLY PAR WITH SWLY LN TO INT WITH LN DRN 250FT NWLY OF MOST SLYCOR&300FT NWLY OF MOST ELY COR TH SWLY TO PT 250FT NWLY FROM POB Inspection Area: Water District: Fire District: Fire District 1 Consolidated Irrigation District#19 Zoning: Land Area: 0.479 acres CONTRACTOR INFORMATION: General Contractor GOBERL*899L7 *GOBER'S LLC 11215 E TRENT AVE SPOKANE,WA 99206 509-924-5372 DETAILS: Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION 1 $125.00 $125.00 $125.00 FEE DETAIL: Processing-Utilities $25.94 Utilities Permit $125.00 Total Fee: $150.94 CONDITIONS: Possible Shoreline On Site Date Printed:05/09/2012 07:41:40 Printed by:IIS APPPOOL\ASP.NET v4.0 SPOKANE COUNTY BUILDING AND PLANNING PERMIT • Permit Issued Date: Application Number: SW-12001283 05/09/2012 Expiration Date: CALL 1-800-424-5555 BEFORE YOU DIG--AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR& INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. _ FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT(509)477-3604 FROM 8:30-5:00 MONDAY-FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30-MINUTE INSPECTION.ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. _ INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. _ SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED.SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. _ THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed:05/09/2012 07:41:40 Printed by: MS APPPOOL\ASP.NET v4.0