2012, 05-09 Permit: SW-12001283 Sewer SPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Permit Issued Date:
Application Number: SW-12001283 05/09/2012
Expiration Date:
Project Description: SEWER CONNECTION Primary Contact: GOBERS LLC
Project Name: SOUTH GREENACRES PHASE 3 Applicant: GOBERS LLC
Permit Type: SEWER Address: 11215 E TRENT AVE
SPOKANE,WA 99206
Phone: (509)924-5372
Email:
SITE INFORMATION:
Site Address: 17919 E RIVERWAY AVE Owner: HARDING,JAMES D
Parcel Number: 55071.0121 Address: 17919 E RIVERWAY AVE
GREENACRES,WA 99016-9571
Subdivision: PLAT A Phone:
Assessor's Description: GRNACRS IRR DIST A PT OF B Q BEG AT MOST Email:
SLYCOR TH NEL Y 83 1/3FT TH NWLY PAR WITH
SWLY LN TO INT WITH LN DRN 250FT NWLY OF
MOST SLYCOR&300FT NWLY OF MOST ELY
COR TH SWLY TO PT 250FT NWLY FROM POB
Inspection Area:
Water District: Fire District: Fire District 1
Consolidated Irrigation
District#19
Zoning: Land Area: 0.479 acres
CONTRACTOR INFORMATION:
General Contractor
GOBERL*899L7
*GOBER'S LLC
11215 E TRENT AVE
SPOKANE,WA 99206
509-924-5372
DETAILS:
Class Type Quantity Unit Charge Value
SEWER SEWER CONNECTION 1 $125.00 $125.00
$125.00
FEE DETAIL:
Processing-Utilities $25.94
Utilities Permit $125.00
Total Fee: $150.94
CONDITIONS:
Possible Shoreline On Site
Date Printed:05/09/2012 07:41:40 Printed by:IIS APPPOOL\ASP.NET v4.0
SPOKANE COUNTY BUILDING AND PLANNING
PERMIT
•
Permit Issued Date:
Application Number: SW-12001283 05/09/2012
Expiration Date:
CALL 1-800-424-5555 BEFORE YOU DIG--AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR& INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY. _
FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT(509)477-3604 FROM 8:30-5:00 MONDAY-FRIDAY PRIOR TO COVER.
ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30-MINUTE INSPECTION.ADDITIONAL INSPECTION FEES
APPLY AFTER 30 MINUTES. _
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION. _
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED.SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. _
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed:05/09/2012 07:41:40 Printed by: MS APPPOOL\ASP.NET v4.0