2012. 08-27 Permit: SW-12002077 Sewer SPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Permit Issued Date:
Application Number: SW-12002077 08/27/2012
Expiration Date:
Project Description: SEWER CONNECTION Primary Contact: *H&S CONSTRUCTION
Project Name: SO GREEN ACRES PH III Applicant: *H&S CONSTRUCTION
Permit Type: SEWER Address: 11817 E VALLEYWAY
SPOKANE,WA 99206
Phone: (509)926-8964
Email:
SITE INFORMATION:
Site Address: 18004 E RIVERWAY AVE Owner: COLEMAN,RICHARD G
Parcel Number: 55071.0145 Address: 18004 E RIVERWAY
SPOKANE VALLEY,WA 99016
Subdivision: PLAT A Phone:
Assessor's Description: GREENACRES IRR DIST PL A PTN TR 1 DAF; Email:
BEG AT SW COR OFT R 1 TH NLY ALG WLY LN
516.69'TO TRUE POB TH S49DEG 08MIN E197.19
'TH N5ODEG 32MIN E72.04'TH N49DEG 08MIN
W218.33'TO SD WLY LN TH SLY ALG S
Inspection Area:
Water District: Fire District:Spokane Valley Fire
Consolidated Irrigation
District#19
Zoning: Land Area: 14832.6 Square Feet
CONTRACTOR INFORMATION:
General Contractor
HSCON**123KF
H&S CONSTRUCTION
11817 E VALLEYWAY AVE
SPOKANE,WA 99206
509-926-8964
DETAILS:
Class Type Quantity Unit Charge Value
SEWER SEWER CONNECTION 1 $125.00 $125.00
$125.00
FEE DETAIL:
Processing-Utilities $25.94
Utilities Permit $125.00
Total Fee: $150.94
CONDITIONS:
Inside Public Transit Benefit Area
Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire.
Date Printed:08/27/2012 14:59:22 Printed by:IIS APPPOOLWSP.NET v4.0
SPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Permit Issued Date:
Application Number:SW-12002077 08/27/2012
Expiration Date:
CALL 1-800-424-5555 BEFORE YOU DIG--AT LEAST 2 WORKING DAYS IN ADVANCE.SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR&INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT(509)477-3604 FROM 8:30-5:00 MONDAY-FRIDAY PRIOR TO COVER.
ONE WORKING DAY NOTICE REQUIRED.PERMIT ALLOWS FOR A 30-MINUTE INSPECTION.ADDITIONAL INSPECTION FEES
APPLY AFTER 30 MINUTES.
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION.INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED.SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME.BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed:08/27/2012 14:59:22 Printed by:IIS APPPOOLWSP.NET v4.0