Loading...
HomeMy WebLinkAbout2007, 12-21 Permit App: 07004936 Pole Bldgrro *ect Number: 07004936 Inv: I Application Date: 12/21/2007 Page 1 ar 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Proiect Information:. Permit Use: 40 X 50 POLE BLDG Contact: SPOKANE POST FRAME Address: 7001 E 2ND C - S - Z: SPOKANE, WA 99212 Setbacks: Front Left: Right: Rear: Phone: (509) 926-0865 Group Name: Project Name: Site Information:_ _ Plat Key: 000000 Name: ROTCHFORD ACRE TRACTS District: East Parcel Number: 45244.0802 Block: Lot: SiteAddress: 1217 S SHAMROCK ST Owner: Name: FARWELL, E M & K Address: 1217 S SHAMROCK ST Location:: CSV VERADALE, WA 99037-9208 Zoning: R-1 SF Res Estate District Water District: 010 VERA Hold: ❑ Area: ;,301.00 Acres Width: 0 Depth: 0 Right Of Way (ft): 0 Nbr of Bldgs: 0 Nbr of Dwellings: 0 Review Information:w .: �• _.� .� .Q... .,o r _ ,..E ..r. . _. ;. ... rf.... Review Building Plan Review _ Released By: :1 Originally Released: 12/21/2007 By: tmelbourn Septic Sys Review Released By: Originally Released: Landuse/Zoning/HE Conditions 12/21/2007 By: LHALSEY Released By: Originally Released: 12/21/2007 By: cjjanssen Permits: Operator: JD Printed By: jmm Print Date: 12/21/2007 Project Number: 07004936 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 12/21/2007 Contractor: SPOKANE POST FRAME Address: 7001 E 2ND AVE SPOKANE, WA 99212 Building Height 22 Description Grp POLE BDLG U-1 Building Permit Page 2 of 2 Firm: SPOKANE POST FRAME Phone: (509) 926-0865 Building Characteristics Type Notes VB Item Description RESIDENTIAL PERMIT FEE ACCESSORY PLANS REVIEW WSBC SURCHARGE Notes: Payment Summary: Permit Type Building Permit Totals: Units 1 1 1 This Application: Sq Ft Valuation 2,000 $38,000.00 2,000 Unit Desc SELECT SELECT SELECT $38,000.00 Permit Total Fees: Fee Amount Invoice Amount $657.69 $657.69 $657.69 $657.69 Total Project: Sp Ft Valuation 2,000 $38,000.00 2,000 $38,000.00 Fee Amount $522.55 $130.64 $4.50 Amount Paid $0.00 $0.00 $657.69 Amount Owing $657.69 $657.69 Disclaimer: Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: JD Printed By: jmm Print Date: 12/21/2007 Permit Center s `PERMIT NUMBER 40 11707 E Sprague Ave, Suite 106 Spokane Valley, WA 99206 PERMIT FEE: 4;ii;00%ft e (509)688-0036 FAX: (509)688-0037 A www.spokanevalley.org t. Community Development Residential Construction New Construction ❑ Accessory Bldg Permit Application ❑ Addition/Remodel ❑ Deck ❑ Other: SITE ADDRESS: 12 1-1 5 ASSESSORS PARCEL NO: qg'. Llu ©(d Z- LEGAL DESCRIPTION: Building Owner: Name: Address: City: State: A. 4*031 Phone: / Fax: Contact Person Name: e VIAM Phone: j Contractor: Name: S ©S. Address: 100 2 "d , City: 504)k. State: • rt, Zip4.121Z Phone: .©�' Fax: Contractor Lie No: Exp Date: City Business Lic. No: d Describe the scope of work in detail: Cost of Project: $ 'OV I Proposed Use: **************The following MUST be complete: (write N/A if not applicable)********************** HEIGHT TO PEAK: DIMENSIONS: # OF STORIES: TOTAL HABITABLE SPACE: MAIN FLOOR TO SQ. 2 FLOOR SQ. FTG: UNFIN BASEMENT SQ. FTG: IMPERVIOUS SURFACE FTG: AREA: FINISHED BASEMENT GARAGE SQ. FT :DECKICOV. t PATIO SQ. FTG: 30% SLOPES ON SQ. FTG: 2 0 PROPERTY: # OF BEDROO S: CONSTRUCTION TYPE: HEAT SOURCE: SEWER OR SEPTIC? dV The permitee verifies, acknowledges and agrees by their sighature that: 1) If this permit is for construction of or on a dwelling, the dwelling Wwill be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Pians or additional information may be required to be submitted, and subsequently approved before this application car ba rocesseo!") _`-- SIGNATUR DATE: /2- 'd Method of Payment: ❑ Cash ❑ Check Bankcard #: Authorized Signature: REVISED 9/15/07 ❑ Mastercard ❑ VISA Expires: VIN#: Spokan�� jUalley For City Use Only PLUS Project Number ' i' i - Project Address 11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206 509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. Your application review TARGET DATE is The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review ➢ Submit complete, accurate plans and documents. Extra time may be required for re -submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. ➢ Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. ➢ Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure, you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re - submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE -APPLICANT PINK - BUILDING FILE REV 9/07 S1>0KA.NE POST FRAME,, INC. i Pole Buildings , ROUE WILL shops garaga`.s Sales Manager - Owner storage buildin.gs 509.924-0865 • F&X 509-924-5161 cab;ns kits -cyst ptt�s ^.r 1-866.926-0865 ?001 E. 2rd rive Visit as at Spot, ane, WA 9')-17. wwwspekanepostf-ame.com i Stow sIreet.s/aIIey Show septiclsew`er/dFalnfield Sl'.ow existing bulidinq �•h�ti proposed 0"Jildirlg Show setbacks - front, rear, side:. Show lot Sze iONING CRITIERIA -- SPOKANE if closer Lhnn 5' to property !'ne - need flrewalt and paraoet JOS NAI-11Etai d��%-""""` - PHONE s — =--. ADDRESS C LEG;ryt t:ESCRIPTION _ 40 23 Q SSD D -A of rear 30' and closer Ih,n - nred waiver from neiohbor —,"m n t cover mere than 50`� :) rear 25' Lnr'19r ICI. - b'altdln; mi-ist bf, 20' from -, operty line in:nirrium sett,acl: from front property )Inc than 3' from resid2n,e - need f irew•all I'AIMum s7uare footage - l:,°a of lot area ("lust be less than 3,000 sa. ft.) i *3v not sul;r.Slvlde Ict so that bciidtr o Is more than. 10% of residual tot area 'r closer than 5' to property fine -need Iflrev;all IQ' from septic/drairJield I-ess than b' from residence - need firevaali r ° SETBACKS ARE SFtOvdN BELOW. WILL MEED TO CHECK CODE BOOK ?Ncl > NOY WHAT ZONING YOU RE IN TO BE SURE. MVfIIUt1 BUILDING SIZE AIM CHANGES WITH DIF EpENT ZONING. 5' minimum side yard setbac, -minimum rear yard SetbacK Hin4mum `rant and side street setback -- 25' from property line or 55' from r,ereter of read - whichever is greater ,4- V d Ni ikoif W 9 VSiD 5 1- a PLANNING DEPT. APPROVED BYLIIL � DATE. ''D 1 a 11 U L 2 VK-1`3� Site Address: 1217 S SHAMROCK ST Parcel Number. 45244.0802 Project Transmittal City of Spokane Valley Community Development Department 11703 E. Sprague Ave, Suite B3 Spokane Valley, WA 99206 Phone: 509.688.0036 New project Previous pre -app meeting El Plan revisions EI Transmittal Date: Thursday, December 20, 2007 Project Number: 07004936 Zoning: R-1 Water District: VERA Fire District: FD 01 Applicant: SPOKANE POST FRAME Owner: FARWELL, E M & K 7001 E 2ND 1217 S SHAMROCK ST SPOKANE, WA 99212 VERADALE, WA 99037-9208 (509) 926-0865 e-mail: Contact: SPOKANE POST FRAME 7001 E 2ND SPOKANE, WA 99212 (509) 926-0865 e-mail: Contractor: SPOKANE POST FRAME 7001 E 2ND AVE SPOKANE, WA 99212 (509) 926-0865 Project 40 X 50 POLE BLDG Description: e-mail: Occupant: e-mail: Arch / Engineer. e-mail: Please send all plan review and project comments via e-mail to the highlighted individuals. CITY OF - p SOKane lle Vay 4;00 For City Use Only PLUS Project Number -77 Project Address 11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206 509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. Your application review TARGET DATE is The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Proiect Application Review ➢ Submit complete, accurate plans and documents. Extra time may be required for re -submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised Information. ➢ Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. ➢ Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure, you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email, or snail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re - submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE —APPLICANT PINK — BUILDING FILE REV 9/07 Permit Center Wan 11707 E Sprague Ave, Suite 106 PERMIT NUMBER: Spokane Valley, WA 99206 PERMIT FEE: ,;;O`afler (509)688-0036 FAX: (509)688-0037 ��``''JJ www.spokanevallev.ore Community Development Residential Construction New Construction ❑ Accessory Bldg Permit Application ❑ Addition/Remodel ❑ Deck ❑ Other: SITE ADDRESS: 1 1 5 ASSESSORS PARCEL NO: gQLru F 9?6 Z, LEGAL DESCRIPTION: Building Owner: Name: Address: 5>'14) ilt'l cLi-5� - City: State: NL Zip:C 6 Phone: f -- Fax: Contact Person Name: t, Ifh.Li Phone:') Describe the scope of work in detail: Proposed Use: Contractor: DIMENSIONS: Name: TOTAL HABITABLE SPACE: Address.� f City: 00k. L state: • rte zipcj411/z Phone: q'©,S— Fax: 2 FLOOR SQ. FTG: Contractor Lie No: eExp Date: IMPERVIOUS SURFACE City Business Lie. No: S o Cost of Project: $ *0 7�ao **************The following MUST be complete: (write N/A if not applicable)********************** HEIGHT TO PEAK: DIMENSIONS: # OF STORIES: TOTAL HABITABLE SPACE: ZZ' MAIN FLOOR TO SQ. 2 FLOOR SQ. FTG: UNFIN BASEMENT SQ. FTG: IMPERVIOUS SURFACE FTG: AREA: FINISHED BASEMENT GARAGE SQ. FTS: DECK/COV. PATIO SQ. FTG: 30% SLOPES ON SQ. FTG: 6M 2—&V PROPERTY: # OF BEDROOMS: CONSTRUWIQN TYPE: HEAT SOURCE: SEWER OR SEPTIC? The permitee verifies, acknowledges and agrees by their sioature that: 1) If this permit is for construction of or on a dwelling, the dwelling istwill be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before this application ca rocesse . SIGNATUR : DATE: %2--,---70 •Ct Method of Payment: ❑ Cash ❑ Check Bankcard #: Authorized Signature: REVISED 7115107 ❑ Mastercard ❑ VISA Expires: VIN#: S.POKANE, POSE' FRAME, INC. Engineered !Vole Buildings shops ROLFE N'4ILL garages Sales Manager - Owner smrage buildings cabins 509-926-0865 • Fax 509-924-5161 kits -cost plus or 1-856-926-0865 7001 E. 2rd Ave Visit us at Spokane, WA 99212 wwv+spokanepostf ame.cont Site Plan 0NIN6 CRIIER{A — Si'OKANE: Z3' r1a•; !r closer than 5' to trrcpert.i'+ne - need flre�sali and paraget `-it of rear 30' ::+n�a closer than 5' - oeeO waiver from neiohbor t.V) t cover m,;re than Sn% arear 2`-' Comer lot - billding must I)e 20' from property line `; ;n;ntrrrurn etGaCV: trorn f, ont proRerty 11ne Us; Than 2' from rosidenr� need f irewal l l,x1murn square footage - I) o of lot area (`lust be less than 3.000 sa. fL) t i;v not s.rbrllvldF Ict. so that building Is more than 107. of residual lot area 'r closer than 5' to property line - need firevwail 10 from sept`cfdralori?Id Less than 6' from residence need fir'ewali HIIER,A SETEACK5 ARE SHOWN BELOW. WILL MEED TO CHECK CODE BOOK ,t,'lC Y;NOW WHAT ZONING YOU RE iN TO BE SURE. MAXir1UM BUILDING SIZE AIM CHANGES WiTH DIFFERENT ZONING. minin uir,, side yard setbaC. 5' rr.irlrnum rear yard setbacr i1!n;m{irn front and side street setback - 25' from property line or SS' from center of r^ad - whichever Is greater jce, twiE Pf (ONE r ADDRESS ✓h yzoC _ LEGAL E5CRIPTIOtJ` q_.Z 40 �0 j�50 ,4- 9NI i 1 tl'� a S� M SI'ow streets/alley Show septic/sewer/dr,�inYield Stow exl5ting buliding� St crr proposed wilding Show setO2cks - front, rear, sides. Show lot size 0NIN6 CRIIER{A — Si'OKANE: Z3' r1a•; !r closer than 5' to trrcpert.i'+ne - need flre�sali and paraget `-it of rear 30' ::+n�a closer than 5' - oeeO waiver from neiohbor t.V) t cover m,;re than Sn% arear 2`-' Comer lot - billding must I)e 20' from property line `; ;n;ntrrrurn etGaCV: trorn f, ont proRerty 11ne Us; Than 2' from rosidenr� need f irewal l l,x1murn square footage - I) o of lot area (`lust be less than 3.000 sa. fL) t i;v not s.rbrllvldF Ict. so that building Is more than 107. of residual lot area 'r closer than 5' to property line - need firevwail 10 from sept`cfdralori?Id Less than 6' from residence need fir'ewali HIIER,A SETEACK5 ARE SHOWN BELOW. WILL MEED TO CHECK CODE BOOK ,t,'lC Y;NOW WHAT ZONING YOU RE iN TO BE SURE. MAXir1UM BUILDING SIZE AIM CHANGES WiTH DIFFERENT ZONING. minin uir,, side yard setbaC. 5' rr.irlrnum rear yard setbacr i1!n;m{irn front and side street setback - 25' from property line or SS' from center of r^ad - whichever Is greater jce, twiE Pf (ONE r ADDRESS ✓h yzoC _ LEGAL E5CRIPTIOtJ` q_.Z 40 �0 j�50 ,4- 9NI i 1 tl'� a S�