2013, 08-28 Permit: SW-13001506 SewerSPOKANE COUNTY UTILITIES
PERMIT
Application Number: SW -13001506 Permit Issued Date: 08/28/2013
Expiration Date: 08/28/2014
Project Description:
Primary Contact:
Phone:
SEWER CONNECTION
RIPLEYS PLUMBING INC
Applicant: RIPLEYS PLUMBING INC
Address: 922 S HATCH
SPOKANE, WA 99202
Phone:
Email:
SITE INFORMATION:
Site Address:
Parcel Number:
1309 S SHAMROCK ST
45244.0803
Assessor's Description: ROTCHFORD ACRE TRACTS LT 3 BLK 8
Inspection Area: : (509)-477-3675
Owner: SHERMAN, CRYSTAL L & RICHARD M
Address: PO BOX 609
SPOKANE VALLEY, WA 99037
Phone:
Email:
Water District: Vera Irrigation District #15 Fire District: Spokane Valley Fire
Zoning: Land Area: 45284 Square Feet
CONTRACTOR INFORMATION:
RIPLEP1107B6, Exp. 02/02/2015
RIPLEYS PLUMBING INC
922 S HATCH SPOKANE, WA 99202
DETAILS:
Class
Type
Quantity Unit Charge Value
SEWER SEWER CONNECTION 1 $125.00 $125.00
FEE DETAIL:
Processing - Utilities
Utilities Permit
Total Fee:
$26.32
$125.00
$151.32
$125.00
CONDITIONS:
Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire.
Inside Public Transit Benefit Area
Erodible Soils within Parcel
CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
SEWER PERMITS ARE VALID FOR ONE (1) YEAR FROM THE DATE OF ISSUANCE. FOR SEWER INSPECTIONS CALL THE UTILITIES
DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT
ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES.
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
Date Printed: 08/28/2013 11:22:15 Project Coordinator: Kathy Cummings
SPOKANE COUNTY UTILITIES
PERMIT
Application Number: SW -13001506 Permit Issued Date: 08/28/2013
Expiration Date: 08/28/2014
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed: 08/28/2013 11:22:15 Project Coordinator: Kathy Cummings