2014, 08-08 Permit: SW-14001168 Sewer SPOKANE COUNTY UTILITIES
PERMIT
Application Number: SW-14001168 Permit Issued Date: 08/08/2014
Expiration Date: 08/08/2015
Project Description: SEWER CONNECTION
Project Name: S PONDEROSA
Primary Contact: ACME EXCVT&SEWER BORING CO Applicant: ACME EXCVT&SEWER BORING CO
Phone: (509)228-0691 Address: 6808 S.LINKE RD.
GREENACRES,WA 99016
Phone: (509)228-0691
Email:
SITE INFORMATION:
Site Address: 11622 E SANDS RD Owner: CURTIS,J D&L
Parcel Number: 45334.9152 Address: 11622 E SANDS RD
SPOKANE,WA 99206-9402
Phone:
Assessor's Description: 33-25-44 A PARCEL OF LAND IN THE SW1/4 OF Email:
THE SE1/4 OF SEC 33 DAF; BEG AT A PNT
WHICH BEARS S 89DEG 47MIN E 330',&N 04MIN
W 460'DISTANT FROM FROM THE S 1/4 COR OF
SD SEC THENCE S 89DEG 47MIN E 318'
Inspection Area: : (509)-477-3675
Water District:Spokane County Water Fire District:Spokane Valley Fire
District#3
Zoning: Land Area:2.34 Acre(s)
CONTRACTOR INFORMATION:
ACMEEES963LD, Exp.06/04/2016
ACME EXCVT&SEWER BORING CO
6808 S. LINKE RD.GREENACRES,WA 99016
(509)228-0691
DETAILS:
Class Type Quantity Unit Charge Value
SEWER SEWER CONNECTION 1 $125.00 $125.00
$125.00
FEE DETAIL:
Processing-Utilities $26.64
Utilities Permit $125.00
Total Fee: $151.64
CONDITIONS:
Possible FEMA Flood Zone
Inside Public Transit Benefit Area
Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire.
Possible Wetland On Site
CALL 1-800-424-5555 BEFORE YOU DIG--AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR&INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
Date Printed:08/08/2014 09:18:30 Project Coordinator:Kathy Cummings
SPOKANE COUNTY UTILITIES
PERMIT
Application Number: SW-14001168 Permit Issued Date: 08/08/2014
Expiration Date: 08/08/2015
SEWER PERMITS ARE VALID FOR ONE(1)YEAR FROM THE DATE OF ISSUANCE. FOR SEWER INSPECTIONS CALL THE UTILITIES
DEPT AT(509)477-3604 FROM 8:30-5:00 MONDAY-FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED.PERMIT
ALLOWS FOR A 30-MINUTE INSPECTION.ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES.
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed:08/08/2014 09:18:30 Project Coordinator:Kathy Cummings