2013, 03-18 Permit: SW-13000230 Sewer SPOKANE COUNTY UTILITIES PERMIT Application Number: SW-13000230 Permit Issued Date: 03/18/2013 Project Description: SEWER CONNECTION Project Name: SO GREENACRES PH 3 Primary Contact: KALIN EXCAVATION Applicant: KALIN EXCAVATION Phone: 509-954-9101 Address: 9229 E WOOLARD RD COLBERT,WA 99005 Phone: 509-954-9101 Email: SITE INFORMATION: Site Address: 18017 E RIVERWAY AVE Owner: SIMMONS, NORMAN L Parcel Number: 55071.0182 Address: 18017 E RIVERWAY AVE SPOKANE VALLEY,WA 99016 Phone: Assessor's Description: GREENACRES IRR DIST. PLAT"A"TR"B"OF Email: SP93-890 AUD#9406210217 BK 11 PG 10 BNG A PTN OF TR"0"OF GREENACRES IRR DIST PLAT Inspection Area: : (509)-477-3675 Water District:Consolidated Irrigation Fire District: Spokane Valley Fire District#19 Zoning: Land Area: 1.31 Acre(s) CONTRACTOR INFORMATION: KALINE*0431B, Exp.03/31/2013 KALIN EXCAVATION 9229 E WOOLARD RD COLBERT,WA 99005 509-954-9101 DETAILS: Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION 1 $125.00 $125.00 $125.00 FEE DETAIL: Processing-Utilities $26.32 Utilities Permit $125.00 Total Fee: $151.32 CONDITIONS: CALL 1-800-424-5555 BEFORE YOU DIG--AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR&INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT(509)477-3604 FROM 8:30-5:00 MONDAY-FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30-MINUTE INSPECTION.ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. Date Printed:03/18/2013 08:22:16 Project Coordinator:Kathy Cummings SPOKANE COUNTY UTILITIES PERMIT Application Number: SW-13000230 Permit Issued Date: 03/18/2013 SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED.SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed:03/18/2013 08:22:16 Project Coordinator:Kathy Cummings