2013, 08-16 Permit: SW-13001447 Sewer SPOKANE COUNTY UTILITIES PERMIT Application Number: SW-13001447 Permit Issued Date: 08/16/2013 Expiration Date: 08/16/2014 Project Description: SEWER CONNECTION Project Name: SOUTH GREENACRES Primary Contact: PRO-EXC Applicant: PRO-EXC Phone: 509-413-9529 Address: PO BOX 700 NINE MILE FALLS,WA 99026 Phone: 509-413-9529 Email: SITE INFORMATION: Site Address: 18026 E RIVERWAY AVE Owner: MARTIN, PATTY C Parcel Number: 55071.0150 Address: 18026 E RIVERWAY AVE SPOKANE VALLEY,WA 99016 Phone: Assessor's Description: GREENACRES IRR DIST PL A PTN OF TR 1 DAF; Email: BEG AT SW COR 0 F SD TR 1 TH N3ODEG 10MIN E240.60FT TH E287.70FT TH N55FT TO TRUE POB TH CONT N55FT TH N5ODEG 32MIN E247.81 FT TH S19DEG 50MIN E142.30FT TH S71 Inspection Area: : (509)-477-3675 Water District: Consolidated Irrigation Fire District: Spokane Valley Fire District#19 Zoning: Land Area: 24036.3 Square Feet CONTRACTOR INFORMATION: PROEX**876KT, Exp.05/30/2015 PRO-EXC PO BOX 700 NINE MILE FALLS,WA 99026 509-413-9529 DETAILS: Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION 1 $125.00 $125.00 $125.00 FEE DETAIL: Processing-Utilities $26.32 Utilities Permit $125.00 Total Fee: $151.32 CONDITIONS: Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire. Inside Public Transit Benefit Area CALL 1-800-424-5555 BEFORE YOU DIG--AT LEAST 2 WORKING DAYS IN ADVANCE.SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR& INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. SEWER PERMITS ARE VALID FOR ONE(1)YEAR FROM THE DATE OF ISSUANCE. FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT(509)477-3604 FROM 8:30-5:00 MONDAY-FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30-MINUTE INSPECTION.ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. Date Printed:08/16/2013 10:30:51 Project Coordinator:Kathy Cummings SPOKANE COUNTY UTILITIES PERMIT Application Number: SW-13001447 Permit Issued Date: 08/16/2013 Expiration Date: 08/16/2014 INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED.SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed:08/16/2013 10:30:51 Project Coordinator:Kathy Cummings