2013, 08-16 Permit: SW-13001447 Sewer SPOKANE COUNTY UTILITIES
PERMIT
Application Number: SW-13001447 Permit Issued Date: 08/16/2013
Expiration Date: 08/16/2014
Project Description: SEWER CONNECTION
Project Name: SOUTH GREENACRES
Primary Contact: PRO-EXC Applicant: PRO-EXC
Phone: 509-413-9529 Address: PO BOX 700
NINE MILE FALLS,WA 99026
Phone: 509-413-9529
Email:
SITE INFORMATION:
Site Address: 18026 E RIVERWAY AVE Owner: MARTIN, PATTY C
Parcel Number: 55071.0150 Address: 18026 E RIVERWAY AVE
SPOKANE VALLEY,WA 99016
Phone:
Assessor's Description: GREENACRES IRR DIST PL A PTN OF TR 1 DAF; Email:
BEG AT SW COR 0 F SD TR 1 TH N3ODEG 10MIN
E240.60FT TH E287.70FT TH N55FT TO TRUE
POB TH CONT N55FT TH N5ODEG 32MIN
E247.81 FT TH S19DEG 50MIN E142.30FT TH S71
Inspection Area: : (509)-477-3675
Water District: Consolidated Irrigation Fire District: Spokane Valley Fire
District#19
Zoning: Land Area: 24036.3 Square Feet
CONTRACTOR INFORMATION:
PROEX**876KT, Exp.05/30/2015
PRO-EXC
PO BOX 700 NINE MILE FALLS,WA 99026
509-413-9529
DETAILS:
Class Type Quantity Unit Charge Value
SEWER SEWER CONNECTION 1 $125.00 $125.00
$125.00
FEE DETAIL:
Processing-Utilities $26.32
Utilities Permit $125.00
Total Fee: $151.32
CONDITIONS:
Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire.
Inside Public Transit Benefit Area
CALL 1-800-424-5555 BEFORE YOU DIG--AT LEAST 2 WORKING DAYS IN ADVANCE.SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR& INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
SEWER PERMITS ARE VALID FOR ONE(1)YEAR FROM THE DATE OF ISSUANCE. FOR SEWER INSPECTIONS CALL THE UTILITIES
DEPT AT(509)477-3604 FROM 8:30-5:00 MONDAY-FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT
ALLOWS FOR A 30-MINUTE INSPECTION.ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES.
Date Printed:08/16/2013 10:30:51 Project Coordinator:Kathy Cummings
SPOKANE COUNTY UTILITIES
PERMIT
Application Number: SW-13001447 Permit Issued Date: 08/16/2013
Expiration Date: 08/16/2014
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED.SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed:08/16/2013 10:30:51 Project Coordinator:Kathy Cummings