2012, 12-06 Permit: SW-12002599 Sewer SPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Permit Issued Date:
Application Number: SW-12002599 12/06/2012
Expiration Date:
Project Description: SEWER CONNECTION Primary Contact: GOBER'S LLC
Project Name: WEST FARMS Applicant: GOBER'S LLC
Permit Type: SEWER Address: 11215 E TRENT AVE
SPOKANE,WA 99206
Phone: 509-924-5372
Email:
SITE INFORMATION:
Site Address: 13414 E SANSON AVE Owner: PHELAN,JOHN R&PATRICIA J
Parcel Number: 46344.0205 Address: 13414 E SANSON AVE
SPOKANE,WA 99216
Subdivision: SHP-23-06 Phone:
Assessor's Description: SP 2006-23: LOT 1 (AFN 5461839-AKA SHP-23- Email:
06)
Inspection Area:
Water District:Trentwood Fire District: Spokane Valley Fire
Irrigation District#3
Zoning: Land Area:58506 Square Feet
CONTRACTOR INFORMATION:
General Contractor
GOBERL*899L7
GOBER'S LLC
11215 E TRENT AVE
SPOKANE,WA 99206
509-924-5372
DETAILS:
Class Type Quantity Unit Charge Value
SEWER SEWER CONNECTION 1 $125.00 $125.00
$125.00
FEE DETAIL:
Processing-Utilities $25.94
Utilities Permit $125.00
Total Fee: $150.94
CONDITIONS:
Inside Public Transit Benefit Area
Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire.
CALL 1-800-424-5555 BEFORE YOU DIG--AT LEAST 2 WORKING DAYS IN ADVANCE.SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR&INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
Date Printed:12/06/2012 06:53:57 Printed by:IIS APPPOOL\SmartGovProdApp
SPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Permit Issued Date:
Application Number: SW-12002599 12/06/2012
Expiration Date:
FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT(509)477-3604 FROM 8:30-5:00 MONDAY-FRIDAY PRIOR TO COVER.
ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30-MINUTE INSPECTION.ADDITIONAL INSPECTION FEES
APPLY AFTER 30 MINUTES.
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED.SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed:12/06/2012 06:53:57 Printed by:IIS APPPOOL\SmartGovProdApp