2012, 04-27 Permit: SW-12001235 Sewer SPOKANE COUNTY BUILDING AND PLANNING
PERMIT,
Permit Issued Date:
Application Number: SW-12001235 04/27/2012
Expiration Date:
Project Description: SEWER CONNECTION Primary Contact: C H CONSTRUCTION
Applicant: C H CONSTRUCTION
Permit Type: SEWER Address: 10716 E 46TH AVE
SPOKANE,WA 99206
Phone: 509-710-6794
Email:
SITE INFORMATION:
Site Address: 18111 E RIVERWAY AVE Owner: PYE, MARY ANN
Parcel Number: 55071.0173 Address: 18301 E RIVERWAY AVE
GREENACRES,WA 99016
Subdivision: PLAT A Phone:
Assessor's Description: GREENACRES IRRIGATION DISTRICT PLAT A Email:
PTN TRACT L DAF; BEG AT SW COR SD TRACT
L; TH S 19DEG 54MIN 49SDS W, 125FT;TH N
70DEG 05MIN 12 SDS E, 397FT;TH N 18DEG
32MIN 20SDS W, 125.04FT TH SWLY ALG NWLY
Inspection Area:
Water District: Fire District: Fire District 1
Consolidated Irrigation
District#19
Zoning: Land Area: 1.1435 acres/49812 sgft
CONTRACTOR INFORMATION:
General Contractor
CHCONHC893DQ
C H CONSTRUCTION
10716 E 46TH AVE
SPOKANE,WA 99206
509-710-6794
DETAILS:
Class Type Quantity Unit Charge Value
SEWER SEWER CONNECTION 1 $125.00 $125.00
$125.00
FEE DETAIL:
Processing-Utilities $25.94
Utilities Permit $125.00
Total Fee: $150.94
CONDITIONS:
CALL 1-800-424-5555 BEFORE YOU DIG--AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR& INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
Date Printed:04/27/2012 11:01:43 Printed by: IIS APPPOOL\ASP.NET v4.0
SPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Permit Issued Date:
Application Number: SW-12001235 04/27/2012
Expiration Date:
FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT(509)477-3604 FROM 8:30-5:00 MONDAY-FRIDAY PRIOR TO COVER.
ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30-MINUTE INSPECTION.ADDITIONAL INSPECTION FEES
APPLY AFTER 30 MINUTES. _
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION. _
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. _
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed:04/27/2012 11:01:43 Printed by: IIS APPPOOL\ASP.NET v4.0